Method, device and equipment for determining reasonable productivity of oil reservoir and storage medium

By combining well test data and dynamic production data, the yield curve is drawn and correlation analysis is carried out, a reasonable capacity calculation method for the whole life cycle of fracture reservoirs was established, and the problem that the existing technology is difficult to apply to the solution-breaking reservoirs is solved. , realizes efficient production capacity calculations throughout the entire life cycle of the oil well.

CN119067333APending Publication Date: 2024-12-03CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310648485.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-02
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The existing method of determining reasonable capacity of oil reservoirs is difficult to apply to solution-free reservoirs, especially to effectively calculate production capacity throughout the life cycle of the well, and there is a lack of methods suitable for fault control and multi-stage separating reservoirs.

Method used

By combining well test data and dynamic production data, the output curve is drawn to determine the initial reasonable production capacity, and using correlation analysis and curve fitting, a reasonable capacity calculation method for the entire life cycle of the oil well is established, which is suitable for each period of faulty reservoirs.

Benefits of technology

It realizes reasonable capacity calculations for the entire life cycle of the oil well. It can be used whether it is old, new, water-seeking or unseen wells. It is suitable for various periods of solution-cutting reservoirs, and improves the accuracy and speed of capacity calculations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067333A_ABST
    Figure CN119067333A_ABST
Patent Text Reader

Abstract

The invention provides a method, device and equipment for determining the reasonable productivity of an oil reservoir and a storage medium, and belongs to the technical field of oil reservoir development. The method comprises the steps that under the condition that the oil well production duration is smaller than a duration threshold value, a first yield curve is drawn based on well testing data, and initial reasonable productivity is determined based on an inflection point of the first yield curve; under the condition that the oil well production duration is larger than a duration threshold value, correlation degree analysis is conducted on the basis of the basic information data and the dynamic production data data, and the correlation degree of all the influence factors to the productivity in all the production periods is obtained; and calculating the reasonable productivity of each production period based on the correlation degree, and fitting the reasonable productivity with the corresponding production period to obtain a second yield curve. Through combination of mine field data, reasonable productivity determination modes of an initial stage and a middle and later stage of a commissioning well are respectively established, and reasonable productivity calculation of a full life cycle of the oil well is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of oil reservoir development, and in particular to a method, device, equipment and storage medium for determining a reasonable oil reservoir production capacity. Background Art

[0002] Compared with other fracture-cave reservoirs, fault-karst reservoirs are more special. The geological characteristics and reservoir formation rules of fault-karst reservoirs are all controlled by faults, and are also affected by the upper freshwater and lower hydrothermal karst. Therefore, the formation of fault-karst reservoirs is multi-stage and the spatial distribution of reservoirs is diverse. The unique reservoir characteristics of fault-karst reservoirs increase the difficulty of production capacity allocation of fault-karst reservoirs.

[0003] At present, the methods used to determine reasonable production capacity mainly include production statistics, well test analysis, statistical methods, reservoir engineering methods, system well test analysis and reservoir numerical simulation. However, fault-karst reservoirs have the characteristics of "one well, one reservoir". The above methods are applicable to a small range and are mostly used in the early stage of oil well production. For example, the production statistics method requires a large amount of oil well production data support and is suitable for the early stage of oil well production. It is mainly used in Tahe Oilfield, Xinjiang Oilfield, etc.; the well test analysis method is mainly used in the early stage of gas well production, such as Changqing Oilfield, Puguang Gas Field, etc. Therefore, it is urgent to establish a new production capacity evaluation method. Summary of the invention

[0004] This application provides a method, device, equipment and storage medium for determining the reasonable production capacity of an oil reservoir, which can realize the calculation of the reasonable production capacity of an oil well throughout its life cycle. The technical solution is as follows:

[0005] On the one hand, an embodiment of the present application provides a method for determining a reasonable production capacity of an oil reservoir, the method comprising:

[0006] When the production time of the oil well is less than or equal to the time threshold, a first production curve is drawn based on the well test data, and an initial reasonable production capacity is determined based on the inflection point of the first production curve, wherein the first production curve is used to characterize the relationship between oil production and bottom hole flowing pressure, and / or the relationship between oil production and nozzle size;

[0007] When the production time of the oil well is greater than the time threshold, a correlation analysis is performed based on the basic information and the dynamic production data to obtain the correlation of each influencing factor to the production capacity in each production period;

[0008] The reasonable production capacity of each production period is calculated based on the correlation, and a second production curve is obtained based on the fitting of the reasonable production capacity and the corresponding production period. The second production curve is a curve showing that the reasonable production capacity changes with production time.

[0009] On the other hand, an embodiment of the present application provides a device for determining a reasonable production capacity of an oil reservoir, the device comprising:

[0010] The acquisition module is used to obtain the well test data, basic information and dynamic production data of the oil well to be evaluated;

[0011] A drawing module, used for drawing a first production curve based on the well test data when the production time of the oil well is less than or equal to the time threshold, and determining the initial reasonable production capacity based on the inflection point of the first production curve, wherein the first production curve is used to characterize the relationship between the oil production and the bottom hole flowing pressure, and / or the relationship between the oil production and the nozzle size;

[0012] An analysis module, configured to, when the production time of the oil well is greater than the time threshold, perform a correlation analysis based on the basic information and the dynamic production data to obtain the correlation of each factor with the production capacity in each production period;

[0013] A calculation module is used to calculate the reasonable production capacity of each production period based on the correlation, and to obtain a second production curve based on the fitting of the reasonable production capacity and the corresponding production period, wherein the second production curve is a curve showing that the reasonable production capacity changes with the production time.

[0014] On the other hand, an embodiment of the present application provides a computer device, which includes a processor and a memory; the memory stores at least one instruction, at least one program, a code set or an instruction set, and the at least one instruction, the at least one program, the code set or the instruction set are loaded and executed by the processor to implement a method for determining the reasonable production capacity of an oil reservoir as described in any of the above aspects.

[0015] On the other hand, an embodiment of the present application provides a computer-readable storage medium, in which at least one instruction, at least one program, code set or instruction set is stored, and the at least one instruction, at least one program, code set or instruction set is loaded and executed by a processor to implement a method for determining the reasonable production capacity of an oil reservoir as described in the above aspects.

[0016] The technical solution provided by this application includes at least the following beneficial effects:

[0017] The present application provides a method, device, equipment and storage medium for determining the reasonable production capacity of an oil reservoir. By combining mine data, reasonable production capacity determination methods for the early and mid-to-late stages of a well in production are established respectively, thereby realizing the calculation of reasonable production capacity over the entire life cycle of an oil well. The method can be used for all stages of the development of a fault-karst oil reservoir and can also calculate the reasonable production capacity of a single well or a combination of multiple wells. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following briefly introduces the drawings required for describing the embodiments.

[0019] Figure 1 is a schematic diagram of a fault-karst reservoir model and characteristics provided by an exemplary embodiment of the present application;

[0020] Figure 2 It is a diagram of oil production per unit pressure drop and energy retention degree of a single well in the same belt provided by an exemplary embodiment of the present application;

[0021] Figure 3 This is a single well daily production data diagram under different oil nozzles provided by an exemplary embodiment of the present application;

[0022] Figure 4 It is a single well production mode diagram of a fault-karst reservoir provided by an exemplary embodiment of the present application;

[0023] Figure 5 is a flow chart of a method for determining a reasonable production capacity of an oil reservoir provided by an exemplary embodiment of the present application;

[0024] Figure 6 is a reasonable capacity determination flow chart provided by an exemplary embodiment of the present application;

[0025] Figure 7 is a flow chart of a method for determining a reasonable production capacity of an oil reservoir provided by another exemplary embodiment of the present application;

[0026] Figure 8 is a schematic diagram of an IPR curve provided by an exemplary embodiment of the present application;

[0027] Fig. 9 is an IPR curve diagram of the M1 well provided by an exemplary embodiment of the present application;

[0028] Fig.10 is a nozzle productivity curve diagram of the M1 well provided by an exemplary embodiment of the present application;

[0029] Fig.11 is a schematic diagram of a grey relational analysis step provided by an exemplary embodiment of the present application;

[0030] Fig.12 is a schematic diagram of the grey correlation analysis results of Well M1 provided by an exemplary embodiment of the present application;

[0031] Fig.13 is a graph showing the relationship between the reasonable production capacity of the M1 well and time provided by an exemplary embodiment of the present application;

[0032] Fig.14It is a structural block diagram of a device for determining a reasonable production capacity of an oil reservoir provided by an exemplary embodiment of the present application;

[0033] Fig.15 It is a structural block diagram of a computer device provided by an exemplary embodiment of the present application. DETAILED DESCRIPTION

[0034] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below with reference to the accompanying drawings.

[0035] During the exploration and development of the western Tahe oil reservoir, it was discovered that faults control the reservoir. The basic connotation of the fault-karst theory is: fault-karst control of reservoir, plate-like fractures and caves, source below the reservoir, vertical drainage, compound accumulation, and segmented accumulation. Fault-karst reservoirs have large production and reserves, and are the main position for increasing oil and gas reserves and production.

[0036] Compared with other fracture-cavity reservoirs, fault-karst reservoirs are more special. The geological characteristics and reservoir-forming laws of fault-karst reservoirs are all controlled by faults, and are also affected by the upper freshwater and lower hydrothermal karstification. Therefore, the formation of fault-karst reservoirs is multi-stage and the spatial distribution of reservoirs is diverse. Figure 1 After nearly five years of exploration and development, we have come to realize that the main characteristics of fault-karst reservoirs are as follows:

[0037] ① A large number of unexposed karst fracture-cave reservoirs are developed along the fault zone;

[0038] ② The fracture-cavity reservoir has strong lateral heterogeneity and good vertical connectivity, and the matrix has basically no storage and permeability;

[0039] ③ Ultra-deep (7000-8500m), ultra-high pressure (70-87MPa), and ultra-high temperature (140-162℃).

[0040] It is the unique reservoir characteristics of fault-karst reservoirs that increase the difficulty of capacity allocation for fault-karst reservoirs. At present, there are two problems in determining the reasonable capacity of fault-karst reservoirs:

[0041] ① There are differences in oil and gas filling and enrichment in fault-karst oil and gas fields. The scale and production capacity of reservoirs in different zones and sections vary greatly. How to reasonably control production capacity and improve efficiency is the key issue facing development. The unit pressure drop oil production in the same fault-karst zone varies greatly, such as Figure 2 How to determine the reasonable production capacity is the key to efficient development.

[0042] ② Most of the production wells in the fault-karst reservoir were self-flowing in the early stage. At present, the surface pipeline network has not been built. The single well production capacity is mainly controlled by adjusting the nozzle, such as Figure 3How to reasonably adjust the nozzle and propose effective development technology policies needs further research.

[0043] At the same time, different nozzle selections will also result in different production trends in fault-karst reservoirs. On-site statistical analysis shows that based on the production dynamics of a single well, the production dynamics of fault-karst reservoirs can be divided into the following three categories according to the production decline rate and decline method: stable production type, declining type, and step type. The schematic diagram of typical wells and production status is shown in Figure 2. Figure 4 As shown. Different production dynamic modes reflect different geological types and production systems. Among them, geological factors are internal factors that determine the upper limit of well production and stable production time. The production system can be artificially adjusted to control the stable production time of the well, production allocation and other issues. Therefore, the size of the reasonable nozzle is also a key factor restricting the production capacity model. The nozzle needs to be optimized to improve the recovery rate of a single well.

[0044] At present, the determination of reasonable production capacity is the key to restricting the development effect of fault-karst oil reservoirs. This patent is based on production dynamic data, well test data and single well history data, and integrates reservoir engineering and mathematical algorithms to establish a technical method and calculation process for quickly determining the reasonable production capacity of fault-karst oil reservoirs.

[0045] The problem discussed and solved in this application is reasonable capacity. From the definition, reasonable capacity has two meanings: one is the reasonable capacity with the best economy, and the other is the reasonable capacity with the highest recovery rate. This application aims to solve the reasonable capacity with the highest recovery rate, so the definition of reasonable capacity in this application is as follows:

[0046] The production capacity of an oil well when the formation fluid supply capacity reaches the optimum within a period of time. The so-called optimum means that the formation can continuously and adequately supply fluid, and the fluid flow remains stable. If the bottom hole production pressure difference continues to increase or decrease, the optimum state will be broken. Reasonable production capacity requires that the oil well must ensure a certain oil production rate and control the pressure drop rate to avoid degassing and water cone in the side and bottom caused by rapid pressure drop.

[0047] Literature research found that the methods currently used to determine reasonable production capacity mainly include production statistics, well test analysis, statistical methods, reservoir engineering methods, system well test analysis methods and reservoir numerical simulation methods, as shown in Table 1.

[0048] Table 1

[0049]

[0050]

[0051]

[0052] Literature research found that the six reasonable production capacity determination methods listed in Table 1 have the following defects in their application to fault-karst reservoirs:

[0053] ① Fault-karst reservoirs have the characteristic of "one well, one reservoir", and there is currently no better productivity model to evaluate the productivity of fault-karst reservoirs, so reservoir engineering methods and statistical methods are difficult to apply;

[0054] ② The current modeling method for fault-karst reservoirs is mainly phase-controlled modeling, and there is no mature method based on reservoir body (carved body) modeling. Therefore, the traditional numerical simulation method still has large errors when simulating the production of fault-karst reservoirs. In addition, the traditional modeling methods are all based on continuous media. The reservoir space types of fault-karst reservoirs are diverse, including pores, holes and fractures. Therefore, in terms of medium type, they may be more inclined to non-continuous media. Therefore, further exploration may be needed in numerical simulation methods.

[0055] ③ Since the discovery of fault-karst reservoirs, the current production scale is relatively small, and the oil wells have a long self-flowing period. In the early stage of oil well production, the oil wells are almost water-free. Therefore, for fault-karst reservoirs, the production statistics method has certain limitations;

[0056] ④ Although there is abundant systematic well testing data for fault-karst reservoirs, the structural pattern of fault-karst reservoirs is still not very clear during well testing interpretation, and the well testing model and the actual fracture-cavity geological structure need to be studied. In addition, for the entire life cycle, systematic well testing analysis is more suitable for the early stage of oil well production.

[0057] Therefore, it is urgent to establish a new method to determine the reasonable production capacity of fault-karst reservoirs.

[0058] Please refer to Figure 5 , which shows a flow chart of a method for determining a reasonable production capacity of an oil reservoir provided by an exemplary embodiment of the present application. The method comprises the following steps:

[0059] Step 501, obtaining well testing data, basic information and dynamic production data of the oil well to be evaluated.

[0060] Among them, well testing data refers to the oil well data collected under stable conditions (constant pressure drop rate and constant oil well production) during the production capacity testing stage, such as data on oil well production under different bottom hole flow pressures; basic information data refers to data reflecting the geological characteristics of the oil well, such as the porosity, saturation and permeability of a single well; dynamic production data refers to data reflecting the production dynamics of the oil well collected during the actual production stage, such as daily oil production, oil pressure, nozzle size, etc.

[0061] Step 502, when the production time of the oil well is less than or equal to the time threshold, draw a first production curve based on the well test data, and determine the initial reasonable production capacity based on the inflection point of the first production curve, the first production curve is used to characterize the relationship between oil production and bottom hole pressure, and / or the relationship between oil production and nozzle size.

[0062] In the early stage of oil well production, that is, when the production time of the oil well is less than the time threshold (for example, 6 months), technicians usually conduct well testing. Based on the well testing test results, the computer equipment reads the data in the well testing data to draw the first production curve. Among them, the well testing data includes the daily oil production and the bottom hole flow pressure and nozzle size corresponding to the daily oil production. The computer equipment can draw a curve to characterize the relationship between oil production and bottom hole flow pressure, or draw a curve to characterize the relationship between oil production and nozzle size, or draw the above two curves to determine the reasonable production.

[0063] After the computer equipment draws the curve, it determines the inflection point of the first production curve. Since the inflection point is the point where the slope of the curve changes suddenly, that is, the growth rate of oil production at the inflection point will change significantly (the growth rate decreases), the production at the inflection point can be determined as the initial reasonable production capacity.

[0064] Step 503, when the production time of the oil well is greater than the time threshold, a correlation analysis is performed based on the basic information and dynamic production data to obtain the correlation of each influencing factor to the production capacity in each production period.

[0065] When the production time of an oil well is longer than the time threshold (e.g. 6 months), the initial well test data cannot meet the production test requirements. The computer equipment can perform correlation analysis based on the basic information and dynamic production data to obtain the correlation of each influencing factor to the production capacity in each production period. Among them, the influencing factor refers to the factor related to the oil production. The influencing factor can be pre-specified by the technician, or the computer can use all the factors contained in the data as influencing factors, such as oil well depth, permeability, well type, dynamic reserves, etc.

[0066] In one possible implementation, since the degree of influence of most influencing factors on oil production will change with the increase of production time, in order to accurately calculate, the computer equipment can calculate the correlation of each influencing factor in multiple production time periods respectively, for example, calculating the correlation of each influencing factor every 3 months from the initial production of the oil well to the current production period.

[0067] Step 504, calculate the reasonable capacity of each production period based on the correlation, and obtain a second production curve based on fitting the reasonable capacity and the corresponding production period. The second production curve is a curve showing the change of reasonable capacity with production time.

[0068] After the computer equipment determines the reasonable production capacity corresponding to multiple groups of production time, it can perform curve fitting based on the obtained data to obtain the second production curve, so that the reasonable production capacity of different subsequent production periods can be directly read based on the second production curve. The second production curve is a discrete curve. For example, the computer equipment obtains basic information and dynamic production data to perform correlation analysis, and obtains the correlation of each influencing factor when the production time is 3 months, 6 months, 9 months and 12 months, respectively, and then obtains the reasonable production capacity of the four production periods based on linear regression calculation, and then performs curve fitting based on the above four groups of data to obtain the second production curve, which contains the reasonable production capacity of the subsequent 50 months.

[0069] In summary, by combining the mine data, reasonable production capacity determination methods for the early and middle and late stages of production wells are established, and reasonable production capacity calculation for the entire life cycle of the oil well is realized. This method can be used for all stages of the development of fault-karst reservoirs, and can also be used to calculate the reasonable production capacity of single wells and multi-well combinations.

[0070] In another possible implementation, if the oil well is not tested in the early stage, that is, the computer equipment cannot obtain the well test data, the correlation analysis and curve fitting method in step 503 to step 504 can be used to determine the reasonable production capacity. The first production curve is the IPR curve and / or the nozzle and production relationship curve, and the correlation is obtained by gray correlation analysis. Figure 6 As shown, the computer equipment first reads the well test data of the oil well to be evaluated, and further determines the production time if it exists; if the production time is less than or equal to the time threshold of 6 months, the IPR method and / or the mouth flow analysis method are used to determine the initial reasonable production capacity; if the production time is greater than 6 months or there is no well test data, the grey correlation method is used to determine the reasonable production capacity.

[0071] Please refer to Figure 7 , which shows a flow chart of a method for determining a reasonable production capacity of an oil reservoir provided by another exemplary embodiment of the present application. The method comprises the following steps:

[0072] Step 701, obtaining well testing data, basic information and dynamic production data of the oil well to be evaluated.

[0073] The specific implementation of step 701 can refer to the above step 501, and the embodiment of the present application will not be repeated here.

[0074] Step 702, when the production time of the oil well is less than or equal to the time threshold, an IPR curve is drawn based on the corresponding relationship between the oil pressure, bottom hole pressure and production in the well test data. The IPR curve is used to characterize the relationship between oil production and bottom hole pressure.

[0075] The IPR curve refers to the inflow dynamic curve, which shows the relationship between production and flow pressure. Its theoretical diagram is as follows: Figure 8 As shown in the figure. wf ,p r ,p b are bottom hole pressure, formation pressure and saturation pressure respectively; q c ,q b ,q omax ,q o They are daily oil production under unidirectional flow, daily oil production under saturation pressure, maximum daily oil production and daily oil production; J o It is the oil production index. Technicians can test the oil well production under different bottom hole flow pressures in a stable state (constant pressure drop rate and constant oil well production) and record it in the well test data. Computer equipment performs curve fitting based on the oil well production under different bottom hole flow pressures and draws the IPR curve.

[0076] Schematically, the system well test data of production well M1 is shown in Table 2.

[0077] Table 2

[0078]

[0079] The computer equipment makes the IPR curve of M1 well based on the data in Table 2, such as Fig. 9 shown.

[0080] Step 703, determining the inflection point of the IPR curve based on the change in the slope of the IPR curve, and determining the production capacity at the inflection point of the IPR curve as the initial reasonable production capacity.

[0081] In the early stage of oil well production, as the oil pressure drops, the daily output of the oil well will gradually increase. When it reaches a certain output (i.e., the reasonable output), the daily output growth rate will decrease if the oil pressure continues to decrease. Therefore, the reasonable output can be determined by determining the inflection point of the curve (the point where the slope of the curve suddenly changes).

[0082] Depend on Fig. 9 It can be seen that before the inflection point (nozzle ≤ 4mm), as the nozzle size increases, the bottom hole flow pressure decreases linearly, the production pressure difference is small, the flow near the bottom hole is linear, and the daily oil production increases linearly, the oil production index is constant, and the IPR curve is a straight line; if the nozzle is further increased beyond the inflection point, the flow pressure drops rapidly, the pressure drop range around the well expands, the production increase slows down, the oil production index decreases significantly, and the IPR curve is non-linear. Therefore, the initial reasonable nozzle size of M1 well is 4mm, and the reasonable production capacity is 86m 3 / d.

[0083] Step 704, constructing a nozzle flow equation when the oil well production time is less than or equal to the time threshold, the nozzle flow equation reflects the relationship between daily oil production and nozzle diameter, gas-oil ratio and oil pressure.

[0084] In the early stage of oil well production, the nozzle flow analysis method can also be used to determine the reasonable production capacity, analyze the relationship between production capacity and nozzle size, and determine the reasonable production capacity of the oil well by optimizing the nozzle size. The embodiment of the present application proposes a nozzle flow equation, which reflects the relationship between daily oil production and nozzle diameter, gas-oil ratio and oil pressure. The expression of the nozzle flow equation is as follows:

[0085]

[0086] Among them, q0 is the daily oil production, p t is the oil pressure, R go is the air-oil ratio, d is the nozzle diameter, and a, b, c are statistical constants.

[0087] In one possible implementation, the computer device substitutes multiple groups of daily oil production, oil pressure, gas-oil ratio and nozzle diameter into the nozzle flow equation based on the data in the well test data to calculate the statistical constants.

[0088] Step 705: Substitute the nozzle size ratio and production in the well test data into the nozzle flow equation to obtain a first production curve by fitting. The first production curve is used to characterize the relationship between oil production and nozzle size.

[0089] In a possible implementation, the computer device simplifies the nozzle flow equation to obtain a nozzle flow expression that characterizes the relationship between the output and the nozzle size, and then draws the first output curve based on the expression. Step 705 specifically includes the following steps:

[0090] Step 705a, perform logarithmic processing on the mouth flow equation to obtain the mouth flow expression lnq o =clnd+lnZ.

[0091] Step 705b, substitute the nozzle size and production in the well test data into the nozzle flow equation for curve fitting to obtain the first production curve. The first production curve is lnq o Relationship curve with lnd.

[0092] Where Z is the nozzle productivity index. By taking the logarithm of both sides of the nozzle flow equation, the nozzle flow expression can be obtained. The computer equipment can substitute the nozzle size and production in the well test data into the nozzle flow equation for curve fitting and draw lnq o -lnd curve, determine the statistical constant c and the nozzle capacity index Z. The nozzle flow expression is used to draw the curve, and there is no need to calculate the statistical constants a and b in the nozzle flow equation.

[0093] After the computer equipment draws the first production curve and determines the values ​​of c and Z, the inflection point of the curve is determined to obtain the reasonable production capacity.

[0094] Step 706, determining an initial reasonable production capacity based on the inflection point of the first production curve.

[0095] Schematically, the initial reasonable production capacity of the MI well is determined by applying the mouth flow analysis method. Computer equipment draws lnq o -lnd curve, such as Fig.10 As shown. Fig.10 It can be seen that the reasonable nozzle size appears before the inflection point, that is, the size should be less than 4.5mm. Combined with the well test data, it can be determined that the reasonable nozzle size is 4mm, corresponding to a reasonable production capacity of 86m 3 / d, which is consistent with the analysis results of the IPR method.

[0096] Step 707, when the production time of the oil well is greater than the time threshold, grey correlation analysis is performed according to a preset time step based on the basic information and dynamic production data to obtain the correlation degree.

[0097] Grey correlation analysis is a method to measure the mutual interference and influence between factors based on the similarity or difference of the development trends between factors. Its basic idea is to judge whether the connection between different sequences is close based on the similarity of the geometric shapes of the sequence curves. Fig.11 The computer equipment performs grey correlation analysis on the basic information and dynamic production data obtained, quantifies the key factors of oil well production, that is, analyzes the factors affecting oil well production and determines the correlation between each factor and production.

[0098] Optionally, the computer device sets the time step corresponding to the grey correlation analysis based on the basic parameters of the research block. Since the initial production capacity is usually based on three months of stable production, the embodiment of the present application sets the time step of the grey correlation analysis to three months. The computer device performs analysis based on the cumulative oil production of the corresponding time step as a correlation factor.

[0099] Step 708, substituting the correlation into the linear regression calculation formula to obtain the reasonable production capacity of each production period.

[0100] Based on the results of grey correlation analysis, computer equipment calculates the weight (correlation) of each factor, and then uses linear regression method to comprehensively derive reasonable production capacity.

[0101] Optionally, the linear regression formula is as follows:

[0102]

[0103] Among them, q0 represents reasonable production capacity, q represents actual cumulative production capacity, iIt represents the correlation degree, and the other different letters represent different influencing factors, such as cave volume, effective area, permeability, etc. The subscript 0 corresponds to the reference index of the influencing factor, and the subscripts 1 to n correspond to the actual value of the reference factor.

[0104] Schematically, the computer equipment obtains basic information of the oil well to be evaluated, and the data contained therein are shown in Tables 3 and 4.

[0105] Table 3

[0106]

[0107] Table 4

[0108]

[0109]

[0110] Based on the above basic information and the oil production in each production period in the dynamic production data, a grey correlation analysis was performed to obtain the influencing factors and their correlations for the oil wells accumulated for 3 months, 6 months, 9 months, and 12 months. The analysis results are as follows: Fig.12 The analysis results show that the production capacity is mainly affected by factors such as reserves, fracture level, horizontal section length, permeability, etc. Some of these factors, such as viscosity and skin factor, will gradually increase their impact on production as production progresses.

[0111] Substituting the correlation degree of the above grey correlation analysis results into the linear regression calculation formula, the production capacity equation of the well can be obtained, and the reasonable production capacity of each period can be calculated based on the production capacity equation.

[0112] Step 709, obtaining a second production curve by fitting based on the corresponding relationship between reasonable production capacity and production period.

[0113] The computer equipment performs curve fitting based on the reasonable production capacities corresponding to each stage from the initial production of the oil well to the present, and obtains a discrete second production curve, so that the reasonable production capacity of the subsequent production period can be directly read based on the second production curve.

[0114] Indicatively, curve fitting is performed based on the calculation result of step 708 to obtain a graph showing the relationship between the reasonable production capacity and time of the M1 well, such as Fig.13 As shown in Figure 2, it can be seen that the reasonable production capacity of M1 well is the highest in the early stage, which is 86.02m 3 / d, which is consistent with the reasonable production capacity determined based on the initial well test data, which shows that the method of using grey correlation analysis and curve fitting method to determine the reasonable production capacity is feasible. As the production time goes by, its reasonable production capacity gradually decreases.

[0115] In the embodiment of the present application, the oil well is initially produced by using the IPR method and / or the mouth flow analysis method based on the well test data to determine the production capacity. In the middle and late stages, the dynamic and static data of the oil well are analyzed to determine the main controlling factors affecting the production capacity. The grey correlation method is combined with curve fitting to establish a method for quickly determining the reasonable production capacity of the oil well, which can improve the calculation accuracy and speed of the reasonable production capacity of the reservoir. The method of the embodiment of the present application is suitable for determining the reasonable production capacity of the oil well throughout its life cycle. It can optimize the production capacity of the oil well in real time based on the production situation of the production well, extend the waterless production period of the single well, and improve the recovery rate of the single well.

[0116] Fig.14 This is a structural block diagram of a device for determining a reasonable oil reservoir production capacity provided by an exemplary embodiment of the present application, and the device includes the following structure:

[0117] The acquisition module 1401 is used to acquire the well test data, basic information data and dynamic production data data of the oil well to be evaluated;

[0118] A drawing module 1402 is used to draw a first production curve based on the well test data when the production time of the oil well is less than or equal to the time threshold, and determine the initial reasonable production capacity based on the inflection point of the first production curve, wherein the first production curve is used to characterize the relationship between oil production and bottom hole flowing pressure, and / or the relationship between oil production and nozzle size;

[0119] Analysis module 1403, for performing correlation analysis based on the basic information and the dynamic production data to obtain the correlation of each factor to the production capacity in each production period when the production time of the oil well is greater than the time threshold;

[0120] The calculation module 1404 is used to calculate the reasonable production capacity of each production period based on the correlation, and obtain a second production curve based on the fitting of the reasonable production capacity and the corresponding production period. The second production curve is a curve showing that the reasonable production capacity changes with the production time.

[0121] Optionally, the drawing module 1402 is further used for:

[0122] When the production time of the oil well is less than or equal to the time threshold, an IPR curve is drawn based on the corresponding relationship among the oil pressure, bottom hole pressure and production in the well test data, and the IPR curve is used to characterize the relationship between oil production and bottom hole flowing pressure;

[0123] The inflection point of the IPR curve is determined based on the change in the slope of the IPR curve, and the production capacity at the inflection point of the IPR curve is determined as the initial reasonable production capacity.

[0124] Optionally, the drawing module 1402 is further used for:

[0125] When the production time of the oil well is less than or equal to the time threshold, a nozzle flow equation is constructed, wherein the nozzle flow equation reflects the relationship between daily oil production and nozzle diameter, gas-oil ratio and oil pressure;

[0126] Substituting the nozzle size ratio and production in the well test data into the nozzle flow equation, and fitting to obtain the first production curve, wherein the first production curve is used to characterize the relationship between oil production and nozzle size;

[0127] The initial reasonable production capacity is determined based on the inflection point of the first production curve.

[0128] Optionally, the mouth flow equation is expressed as:

[0129]

[0130] Among them, q0 is the daily oil production, p t is the oil pressure, R go is the air-oil ratio, d is the nozzle diameter, and a, b, c are statistical constants.

[0131] Optionally, the drawing module 1402 is further used for:

[0132] The mouth flow equation is processed logarithmically to obtain the mouth flow expression lnq o =clnd+lnZ, where Z is the nozzle capacity index;

[0133] Substitute the nozzle size and production in the well test data into the nozzle flow equation for curve fitting to obtain the first production curve. The first production curve is lnq o Relationship curve with lnd.

[0134] Optionally, the analysis module 1403 is further used to:

[0135] When the production time of the oil well is greater than the time threshold, based on the basic information and the dynamic production data, a grey correlation analysis is performed according to a preset time step to obtain the correlation degree;

[0136] The calculation module 1404 is further used for:

[0137] Substituting the correlation into the linear regression calculation formula, the reasonable production capacity of each production period is obtained;

[0138] The second production curve is obtained by fitting based on the corresponding relationship between the reasonable production capacity and the production period.

[0139] Optionally, the linear regression calculation formula is:

[0140]

[0141] Among them, q0 represents reasonable capacity, q represents actual cumulative capacity, r i Indicates the degree of association; other different letters represent different influencing factors. Subscript 0 corresponds to the reference index of the influencing factor, and subscripts 1 to n correspond to the actual value of the reference factor.

[0142] Please refer to Fig.15 , which shows a schematic diagram of the structure of a computer device provided by an embodiment of the present application.

[0143] The computer device 1500 in the present application may include one or more of the following components: a processor 1510 and a memory 1520 .

[0144] The processor 1510 may include one or more processing cores. The processor 1510 uses various interfaces and lines to connect various parts within the entire computer device 1500, and executes various functions and processes data of the computer device 1500 by running or executing instructions, programs, code sets or instruction sets stored in the memory 1520, and calling data stored in the memory 1520. Optionally, the processor 1510 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 1510 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU), and a modem.

[0145] The memory 1520 may include a random access memory (RAM) or a read-only memory (ROM). Optionally, the memory 1520 includes a non-transitory computer-readable storage medium. The memory 1520 may be used to store instructions, programs, codes, code sets, or instruction sets. The memory 1520 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for implementing at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc. The data storage area may also store data created by the computer device 1500 during use, etc.

[0146] In addition, those skilled in the art can understand that the structure of the computer device 1500 shown in the above figures does not constitute a limitation on the computer device 1500, and the computer device may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently. For example, the computer device 1500 also includes components such as a radio frequency circuit, an audio circuit, a Wi-Fi component, a power supply, and a Bluetooth component, which will not be described in detail here.

[0147] An embodiment of the present application also provides a computer-readable storage medium, in which at least one instruction, at least one program, code set or instruction set is stored. The at least one instruction, at least one program, code set or instruction set is loaded and executed by a processor to implement a method for determining the reasonable production capacity of an oil reservoir as described in the above embodiment.

[0148] An embodiment of the present application also provides a computer program product, which runs on a processor of a computer device, so that the computer device executes a method for determining a reasonable production capacity of an oil reservoir as described in the above embodiment.

[0149] Those skilled in the art should be aware that in one or more of the above examples, the functions described in the embodiments of the present application can be implemented with hardware, software, firmware, or any combination thereof. When implemented using software, these functions can be stored in a computer-readable storage medium or transmitted as one or more instructions or codes on a computer-readable storage medium. Computer-readable storage media include computer storage media and communication media, wherein the communication media include any media that facilitates the transmission of a computer program from one place to another. The storage medium can be any available medium that a general or special-purpose computer can access.

[0150] The protection scope of the present disclosure is not limited to the above-mentioned embodiments. Obviously, those skilled in the art can make various changes and modifications to the present disclosure without departing from the scope and spirit of the present disclosure. If these changes and modifications fall within the scope of the claims of the present disclosure and their equivalents, the intention of the present disclosure also includes these changes and modifications.

Claims

1. A method for determining the reasonable production capacity of an oil reservoir, characterized in that: The method comprises: Obtain well testing data, basic information and dynamic production data of the oil wells to be evaluated; When the production time of the oil well is less than or equal to the time threshold, a first production curve is drawn based on the well test data, and an initial reasonable production capacity is determined based on the inflection point of the first production curve, wherein the first production curve is used to characterize the relationship between oil production and bottom hole flowing pressure, and / or the relationship between oil production and nozzle size; When the production time of the oil well is greater than the time threshold, a correlation analysis is performed based on the basic information and the dynamic production data to obtain the correlation of each influencing factor to the production capacity in each production period; The reasonable production capacity of each production period is calculated based on the correlation, and a second production curve is obtained based on the fitting of the reasonable production capacity and the corresponding production period. The second production curve is a curve showing that the reasonable production capacity changes with production time.

2. The method according to claim 1, characterized in that When the production time of the oil well is less than or equal to the time threshold, drawing a first production curve based on the well test data, and determining the initial reasonable production capacity based on the inflection point of the first production curve, includes: When the production time of the oil well is less than or equal to the time threshold, an IPR curve is drawn based on the corresponding relationship among the oil pressure, bottom hole pressure and production in the well test data, and the IPR curve is used to characterize the relationship between oil production and bottom hole flowing pressure; The inflection point of the IPR curve is determined based on the change in the slope of the IPR curve, and the production capacity at the inflection point of the IPR curve is determined as the initial reasonable production capacity.

3. The method according to claim 1, characterized in that When the production time of the oil well is less than or equal to the time threshold, drawing a first production curve based on the well test data, and determining a reasonable production capacity based on the inflection point of the first production curve, includes: When the production time of the oil well is less than or equal to the time threshold, a nozzle flow equation is constructed, wherein the nozzle flow equation reflects the relationship between daily oil production and nozzle diameter, gas-oil ratio and oil pressure; Substituting the nozzle size ratio and production in the well test data into the nozzle flow equation, and fitting to obtain the first production curve, wherein the first production curve is used to characterize the relationship between oil production and nozzle size; The initial reasonable production capacity is determined based on the inflection point of the first production curve.

4. The method according to claim 3, characterized in that The expression of the mouth flow equation is: Among them, q0 is the daily oil production, p t is the oil pressure, R go is the air-oil ratio, d is the nozzle diameter, and a, b, c are statistical constants.

5. The method according to claim 4, characterized in that Substituting the nozzle size and production in the well test data into the nozzle flow equation to obtain the first production curve by fitting, comprises: The mouth flow equation is processed logarithmically to obtain the mouth flow expression lnq o =clnd+lnZ, where Z is the nozzle capacity index; Substitute the nozzle size and production in the well test data into the nozzle flow equation for curve fitting to obtain the first production curve. The first production curve is lnq o Relationship curve with lnd.

6. The method according to any one of claims 1 to 5, characterized in that: When the production time of the oil well is greater than the time threshold, a correlation analysis is performed based on the basic information and the dynamic production data to obtain the correlation of each influencing factor to the production capacity in each production period, including: In the case where the production time of the oil well is greater than the time threshold, based on the basic information and the dynamic production data, a grey correlation analysis is performed according to a preset time step to obtain the correlation degree; The calculating the reasonable capacity of each production period based on the correlation, and obtaining a second production curve based on fitting the reasonable capacity and the corresponding production period, includes: Substituting the correlation into the linear regression calculation formula, the reasonable production capacity of each production period is obtained; The second production curve is obtained by fitting based on the corresponding relationship between the reasonable production capacity and the production period.

7. The method according to claim 6, characterized in that The linear regression formula is: Among them, q0 represents reasonable capacity, q represents actual cumulative capacity, r i Indicates the degree of association; other different letters represent different influencing factors. Subscript 0 corresponds to the reference index of the influencing factor, and subscripts 1 to n correspond to the actual value of the reference factor.

8. A device for determining the reasonable production capacity of an oil reservoir, characterized in that: The device comprises: The acquisition module is used to obtain the well test data, basic information and dynamic production data of the oil well to be evaluated; A drawing module, used for drawing a first production curve based on the well test data when the production time of the oil well is less than or equal to the time threshold, and determining the initial reasonable production capacity based on the inflection point of the first production curve, wherein the first production curve is used to characterize the relationship between the oil production and the bottom hole flowing pressure, and / or the relationship between the oil production and the nozzle size; An analysis module, configured to, when the production time of the oil well is greater than the time threshold, perform a correlation analysis based on the basic information and the dynamic production data to obtain the correlation of each factor with the production capacity in each production period; A calculation module is used to calculate the reasonable production capacity of each production period based on the correlation, and to obtain a second production curve based on the fitting of the reasonable production capacity and the corresponding production period, wherein the second production curve is a curve showing that the reasonable production capacity changes with the production time.

9. A computer device, characterized in that: The computer device includes a processor and a memory; the memory stores at least one instruction, at least one program, a code set or an instruction set, and the at least one instruction, the at least one program, the code set or the instruction set are loaded and executed by the processor to implement a method for determining the reasonable production capacity of an oil reservoir as described in any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores at least one instruction, at least one program, code set or instruction set, and the at least one instruction, at least one program, code set or instruction set is loaded and executed by a processor to implement a method for determining the reasonable production capacity of an oil reservoir as described in any one of claims 1 to 7.