Power line first-aid repair processing method and device, computer equipment, readable storage medium and program product

The method uses data analysis and optimization algorithms to prioritize and allocate emergency repair resources for power lines, addressing slow response and resource misallocation issues during extreme weather, enhancing power grid recovery efficiency.

CN119067349APending Publication Date: 2024-12-03GUANGDONG POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411001639.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Existing emergency repair methods for power lines during extreme weather conditions suffer from slow response speed and unreasonable resource allocation, particularly during large-scale power grid failures.

Method used

A method utilizing operating status data, a line fault prediction model, and a multi-objective optimization algorithm to determine failure probabilities and repair priorities, optimizing the allocation of emergency repair resources.

Benefits of technology

Enables quick identification of critical power lines and efficient resource allocation, improving the speed and efficiency of power grid recovery and reducing overall operating costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067349A_ABST
    Figure CN119067349A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power line emergency repair, and provides a power line emergency repair processing method and device, computer equipment, a readable storage medium and a program product. The method comprises the following steps: acquiring operation state data of a power network; obtaining the fault probability of each line according to the operation state data and a line fault prediction model; and according to the fault probability of each line, the repair priority of each line and a multi-objective optimization algorithm, obtaining an arrangement result of the line repair task. By adopting the method, the first-aid repair work efficiency and the power grid recovery speed can be improved, and first-aid repair resource allocation is relatively reasonable.