Intelligent maintenance operation system suitable for urban rail vehicle
Through the intelligent maintenance operation system, combined with mathematical analysis and automated dispatch, the problems of low maintenance efficiency and difficult quality of urban rail transit vehicles have been solved, and an efficient and safe maintenance process has been achieved, reducing operation and maintenance costs.
Patent Information
- Application Number
- CN202410990913.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-12-03
AI Technical Summary
The maintenance efficiency of existing urban rail transit vehicles is low and the inability to carry out targeted special repairs, which makes it difficult to ensure the quality of maintenance, and rely on manual skills and literacy to effectively ensure the normal operation of the vehicle.
An intelligent maintenance operation system was designed, including a business subsystem, an analysis subsystem and a safety management and control support subsystem. Through mathematical analysis, automated dispatch and video monitoring, intelligent maintenance and resource scheduling of vehicles are realized, and data is provided. maintenance records and safety monitoring.
It improves maintenance efficiency and quality, reduces operation and maintenance costs, realizes the transition from traditional planned repair to state repair, reduces over-repair and under-repair problems, and enhances the dataization and security of the maintenance process.
Smart Images

Figure CN119067634A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of urban rail transit, and in particular to an intelligent maintenance operation system suitable for urban rail vehicles. Background Art
[0002] In recent years, with the country's strong support for rail transit, major cities across the country have been vigorously developing rail transit. Vehicle maintenance of urban rail transit is an important part of ensuring the safe operation of urban rail transit systems. Maintenance of urban rail vehicles is an important means to ensure the safe operation of urban rail transit.
[0003] With the continuous expansion of urban rail transit networks and the increase in passenger flow, vehicle maintenance work is particularly important. Urban rail transit vehicle maintenance refers to the regular inspection, repair and maintenance of urban rail transit trains, which is the premise for ensuring the safe, reliable and comfortable operation of urban rail transit trains. The current maintenance status is to use manual maintenance operations on urban rail vehicles according to a predetermined plan, but this method often has low maintenance efficiency and a wide range of maintenance operations. It is impossible to carry out special repairs on faults in a targeted manner, resulting in the inability to digitize maintenance results, and it is difficult to extract and analyze. The quality of maintenance operations is difficult to guarantee, and the quality of maintenance is also heavily dependent on the skills and literacy of maintenance personnel, and the normal operation of urban rail vehicles cannot be guaranteed. Summary of the invention
[0004] The purpose of the present invention is to provide an intelligent maintenance operation system suitable for urban rail vehicles in view of the deficiencies in the prior art; it can perform intelligent maintenance on rail transit vehicles, reduce the problems of over-repair and under-repair in traditional maintenance methods, and use the information management system to connect various professional operation systems, improve maintenance efficiency and maintenance quality, and reduce operation and maintenance costs; it solves the maintenance problems such as low maintenance efficiency, high maintenance difficulty, and inability to implement special maintenance operations caused by traditional maintenance relying heavily on manual maintenance according to a predetermined plan. To achieve the above purpose, the present invention is implemented through the following technical solutions:
[0005] An intelligent maintenance operation system suitable for urban rail vehicles, comprising a business subsystem, an analysis subsystem and a safety control support subsystem, characterized in that the business subsystem comprises a display unit, a maintenance business unit, a resource management business unit and a supervision business unit; the analysis subsystem comprises a data center, a data management service unit, a fault diagnosis and prediction unit and a business management support unit; the safety control support subsystem comprises a key area protection unit, a production safety protection unit and a GIS electronic map unit; the business subsystem is used to generate a specific business event, and send the demand for the business event to the analysis subsystem, and require the analysis subsystem to feedback the analysis result for use by the business subsystem; the safety control support subsystem provides auxiliary support information for the business subsystem;
[0006] The display unit can realize information data integration function, information comprehensive display function, daily production plan display function and custom data display function; the maintenance business unit realizes auxiliary maintenance process optimization function, auxiliary process optimization function, automatic dispatching function and auxiliary material preparation function by combining mathematical analysis with physical object analysis system; the resource management business unit is used to realize comprehensive resource scheduling management required for vehicle maintenance operations; the supervision business unit is used to realize real-time and all-round control and supervision of the production site situation;
[0007] The data center is used to realize the functions of data access, data processing, data storage, data analysis, and data display; the data management service unit is used to realize the diversity and timeliness of the collected data and the multi-dimensionality and scalability of the business display of the analysis system, and regularly synchronize the incremental data of the local data platform to the remote backup data platform to realize data distribution, data publishing or subscription services across network nodes; the fault diagnosis and prediction unit can use the trackside and on-board detection data, combined with mathematical and probability statistics, and reliability analysis technology to conduct a full life cycle health assessment of the components, and output component inspection and maintenance strategies; the business management support unit is used to realize statistical analysis, automatic planning analysis, automatic job dispatch analysis, and material demand analysis functions;
[0008] The key area protection unit is used to perform positioning and video monitoring functions on the staff in the key area. The production safety protection unit is used to monitor the staff walking along a fixed path. If it is found that the staff does not walk along the prescribed path, an alarm or prompt will be issued; the GIS electronic map unit is used to display the location of outdoor equipment, the working status of outdoor equipment and provide interactive operation functions.
[0009] Preferably, the maintenance business process of the maintenance business unit includes the following steps:
[0010] Step S11, inspecting the vehicle configuration, maintenance BOM, component life cycle and operating mileage;
[0011] Step S12, sequentially executing the maintenance operation strategy and the planning and scheduling model;
[0012] Step S13: formulate a task pool and implement an automated dispatching model;
[0013] Step S14: Use manual and automated equipment to execute the work order of the automated dispatching model to obtain the maintenance results and related data;
[0014] Step S15, the maintenance results and related data are fed back to the maintenance operation strategy in a cyclic optimization operation strategy, so that the maintenance results and related data can better fit the maintenance operation of the subway train in the current scenario.
[0015] Preferably, the planning and scheduling model in step S12 can automatically associate the required bill of materials, turnover parts replacement list, site process equipment, tools and tooling equipment, and personnel public demand information based on the content output by the maintenance work strategy to form a complete task package and identify the urgency and importance of the task package; multiple task packages are used to form a task pool.
[0016] Preferably, the implementation method of the automated dispatching model in step S13 includes the following:
[0017] S131: Automatically decompose and label the task content according to preset conditions;
[0018] S132: Loading the information of all operators on shift for the day and the basic information of preset operators, wherein the basic information includes the type of work, skill level, and working experience;
[0019] S133: comprehensively sorting the task packages in the task pool according to urgency and importance, setting the ratio of the task packages with urgency to 70% and setting the priority of their task tags to 1, setting the ratio of the task packages with importance to 30% and setting the priority of their task tags to 2;
[0020] S134: Load the task tag with priority 1, use the text similarity algorithm to match the skills with the on-duty workers, and screen out all the workers who are suitable for this task; and so on, continue to load the task tag with priority 2, and screen out all the workers who are suitable for this task, until all the tasks in the task pool for the day are loaded;
[0021] S135: The overall operation time does not exceed the preset operation time, the labor time of a single operator does not exceed the preset time, and the completion of all tasks in the task pool are set as boundary conditions, and the traversal algorithm is used to solve the above boundary conditions to match the specific personnel list and operation time period required to execute each task;
[0022] S136: If there is no solution under the above boundary conditions, the task with the lowest priority is abandoned and solved again until a solution is found; if there are multiple solutions under the above boundary conditions, the first three solutions are sorted according to the earliest completion time, and the first three solutions are presented;
[0023] S137: After the solution is completed, it is presented on the data display page, and the administrator selects and confirms the execution plan.
[0024] Preferably, the data management service unit consists of a Hadoop distributed file system and an RDBMS.
[0025] Preferably, the fault diagnosis prediction method of the fault diagnosis prediction unit comprises the following steps:
[0026] Step S101, constructing a train inspection state set, a train maintenance operation set and a train state observation set according to a maintenance knowledge base;
[0027] Step S102: construct a train state transition function T(s * ,a * ,s * ′); This function is a transfer function constructed based on the historical data of train maintenance;
[0028] Step S103, using a multi-dimensional matrix method to fuse the train data to determine the train observation variables;
[0029] Step S104, establish an observation function for each observation variable to represent the state s * In the operation being performed * The state after is s * The probability of being observed when ′ is P;
[0030] Step S105, evaluate the train status and output the maintenance strategy with the best time, the best cost or the best overall performance.
[0031] Preferably, the train state conversion function T(s) in step S102 * ,a * ,s * ′) is a transfer function constructed based on the historical data of train maintenance.
[0032] Preferably, the method of locating the staff in the key areas is to use GIS technology to build a GIS map in the key areas, and combine it with the head-mounted GPS tags worn by the staff to confirm the position of the staff in the key areas.
[0033] Preferably, the monitoring method of the production safety protection unit is: by installing gas sensors, temperature and humidity sensors, and smoke sensors in specific areas, and monitoring the safety parameter indicators in the specific areas in real time, when the safety parameter indicators are close to or exceed the threshold, an alarm is issued, and the specific areas include welding areas, hazardous chemicals rooms, and battery charging and discharging areas.
[0034] Preferably, the outdoor equipment includes a camera, an electronic fence and a gate machine; the working status of the outdoor equipment includes a device alarm display, a device fault display and an open or closed status of the gate machine.
[0035] Beneficial effects of the present invention:
[0036] 1. The intelligent maintenance operation system of the present invention can perform intelligent maintenance on rail transit vehicles, realize the transition from traditional planned maintenance to condition-based maintenance, reduce the problems of over-maintenance and under-maintenance in traditional maintenance methods, and use the information management system to integrate the business units related to maintenance operations, and connect various professional operation systems through electronic work order flow information to improve the maintenance efficiency of rail transit vehicles;
[0037] 2. The intelligent maintenance operation system of the present invention adopts fully digital maintenance operation records and uses a comprehensive knowledge base to guide the maintenance operation process. It can provide detailed guidance and traceability for all maintenance operations, which is conducive to improving the quality of maintenance. It also uses security monitoring methods such as video, sensors, and personnel positioning to reduce the probability of safety accidents in the entire process, effectively improve overall operating efficiency, and significantly reduce the operation and maintenance costs of rail transit vehicles. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a structural logic diagram of the intelligent maintenance operation system of the present invention;
[0039] Figure 2 A maintenance business flow chart of the maintenance business unit of the present invention;
[0040] Figure 3 This is a flow chart of the fault diagnosis prediction method of the fault diagnosis prediction unit of the present invention. DETAILED DESCRIPTION
[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "set" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal connection of two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. The following is an explanation of an embodiment of the present invention based on the overall structure of the present invention.
[0043] Below, the present invention is further described in conjunction with the accompanying drawings and specific embodiments:
[0044] In order to make the purpose, technical solutions and advantages of the present invention more clear and explicit, the present invention is further described below with reference to the accompanying drawings and embodiments.
[0045] Embodiment 1:
[0046] like Figures 1 to 3As shown in the figure, an intelligent maintenance operation system suitable for urban rail vehicles is composed of 3 subsystems, and each subsystem contains 3-4 business units; specifically, the intelligent maintenance operation system includes a business subsystem, an analysis subsystem and a safety control support subsystem; wherein, the business subsystem includes a display unit, a maintenance business unit, a resource management business unit and a supervision business unit; the analysis subsystem includes a data center, a data management service unit, a fault diagnosis and prediction unit and a business management support unit; and the safety control support subsystem includes a key area protection unit, a production safety protection unit and a GIS electronic map unit. This intelligent maintenance operation system is mainly based on the business subsystem, and the service objects of the analysis subsystem and the safety control support subsystem are also the business subsystem. Specifically, it can be understood that after the business subsystem generates a specific business event, it will send the event demand to the analysis subsystem and require the analysis subsystem to feedback the analysis results for the business subsystem to use; the safety control support subsystem is an auxiliary facility that provides necessary auxiliary support information for the business subsystem. Even without the information of this subsystem, the business system can still operate well. The display unit within the business subsystem can display all the data generated within the business subsystem, but it needs to selectively display some key content based on necessity and user acceptability; the maintenance business unit in the business subsystem is an important component, and the resource management business unit and the supervision business unit are also two auxiliary but necessary parts serving the maintenance business unit.
[0047] Specifically, the display unit set in the business subsystem can realize the functions of information data integration, information comprehensive display, daily production plan display and custom data display; the maintenance business unit combines mathematical analysis with the physical object analysis system to realize auxiliary maintenance process optimization, auxiliary process optimization, automatic dispatching and auxiliary material preparation, so as to implement the maintenance operation process, standardize the maintenance process requirements, ensure the quality of maintenance operations, and master the health status of the vehicle. The resource management business unit is used to realize the comprehensive scheduling management of resources required for vehicle maintenance operations, including basic information management such as resource types and ledgers, tracking and registration management of high-priced interchangeable parts, tracking management of mobile material inventory, track and tool scheduling management, human resources management, etc. Users can also use this unit to fully understand the resource holdings, the occupancy of various resources and the requirements of resources, manage and control the coordination process of resources, and ensure efficient production execution. The supervision business unit is used to realize real-time and blind-angle control and supervision of the production site situation, including maintenance operation safety supervision, maintenance operation progress supervision, maintenance operation personnel trajectory supervision and maintenance operation quality supervision.
[0048] Among them, the maintenance business unit can execute the following maintenance business processes. The specific operation steps are as follows:
[0049] Step S11, inspecting the vehicle configuration, maintenance BOM, component life cycle and operating mileage;
[0050] Step S12, sequentially executing the maintenance operation strategy and the planning and scheduling model;
[0051] Step S13: formulate a task pool and implement an automated dispatching model;
[0052] Step S14: Use manual and automated equipment to execute the work order of the automated dispatching model to obtain the maintenance results and related data;
[0053] Step S15: The maintenance results and related data are fed back to the maintenance operation strategy in a continuous cycle of optimization operation strategies, so that the maintenance results and related data can better fit the maintenance operation of subway trains in the current scenario. And the final maintenance results will be fed back to the maintenance operation strategy link as part of the big data, so as to continuously optimize the operation strategy in a continuous cycle, so that it can better fit the maintenance operation of subway trains in the current scenario.
[0054] The planning and scheduling model in step S12 can automatically associate the required material list, turnover parts replacement list, site process equipment, tools and tooling equipment, personnel public demand information, etc. according to the content output by the maintenance work strategy to form a complete task package and mark the urgency and importance of the task package; multiple task packages are used to form a task pool.
[0055] And because the automated dispatching model will give priority to urgent tasks, then important tasks, and then automatically generate a work order containing task content and resource list according to the resources required to perform the task, the implementation method of the automated dispatching model in step S13 includes the following:
[0056] S131: Automatically decompose and label the task content according to preset conditions;
[0057] S132: Loading the information of all operators on the day's shift and the basic information of the preset operators, the basic information including the type of work, skill level, working experience, etc.;
[0058] S133: comprehensively sorting the task packages in the task pool according to urgency and importance, setting the ratio of the task packages with urgency to 70% and setting the priority of their task tags to 1, setting the ratio of the task packages with importance to 30% and setting the priority of their task tags to 2;
[0059] S134: Load the task tag with priority 1, use the text similarity algorithm to match the skills with the on-duty workers, and screen out all the workers who are suitable for this task; and so on, continue to load the task tag with priority 2, and screen out all the workers who are suitable for this task, until all the tasks in the task pool for the day are loaded;
[0060] S135: The overall operation time does not exceed the preset operation time, the labor time of a single operator does not exceed the preset time, and the completion of all tasks in the task pool are set as boundary conditions, and the traversal algorithm is used to solve the above boundary conditions to match the specific personnel list and operation time period required to execute each task;
[0061] S136: If there is no solution under the above boundary conditions, the task with the lowest priority is abandoned and solved again until a solution is found; if there are multiple solutions under the above boundary conditions, the first three solutions are sorted according to the earliest completion time, and the first three solutions are presented;
[0062] S137: After the solution is completed, it is presented on the data display page, and the administrator selects and confirms the execution plan.
[0063] Specifically, the data center set up in the analysis subsystem is used to realize the functions of data access, data processing, data storage, data analysis, and data display; the functions of the data management service unit are mainly reflected in three aspects. First, the data management service unit is a system architecture composed of Hadoop distributed file system and RDBMS, which is used to realize the diversity and timeliness of collected data and the multi-dimensional and scalable display of analysis system business; second, because it adopts dual-machine hot standby and fault-tolerant solution to ensure the system, it can smoothly switch services when the main server fails, supporting uninterrupted access to normal business, and at the same time, through the deployment of local data storage and remote data storage centers, it can realize the local The incremental data of the data platform is regularly synchronized to the remote backup data platform, so that the remote backup data platform can temporarily support the analysis system when the local data platform fails and cannot be accessed; thirdly, by providing integrated functions such as metadata directory, heterogeneous database replication, real-time synchronization, exchange integration, ETL and cross-network remote channel transmission services, it realizes data replication, data synchronization, data backup / recovery, data migration, system data offloading (off-loading), data aggregation and integration, read-write separation, data distribution, data service, big data integration (kafka) and other application scenarios, and realizes data distribution, data publishing or subscription services across network nodes. The fault diagnosis and prediction unit can use trackside and on-board detection data, combined with data analysis methods such as mathematics and probability statistics, and reliability analysis technology to conduct a full life cycle health assessment of components, and output component maintenance strategies, providing effective data support for relevant personnel to more reasonably prepare maintenance plans. The business management support unit is used to realize statistical analysis, automatic plan scheduling analysis, automatic job dispatch analysis, and material demand analysis functions.
[0064] The fault diagnosis prediction method of the fault diagnosis prediction unit comprises the following steps:
[0065] Step S101, constructing a train detection state set, a train maintenance operation set and a train state observation set according to the maintenance knowledge base; wherein the train detection state set can be set to "normal", "general fault", "major fault", "fatal fault", etc.; the train maintenance operation set can be set to "no maintenance required", "tracking observation", "flexible maintenance", "immediate maintenance", etc.; the train state observation set can be set to "normal state confidence 80%", "fatal fault confidence 30%", etc.
[0066] Step S102: construct a train state transition function T(s * ,a * ,s * ′); This function is a transfer function constructed based on the historical data of train maintenance;
[0067] Step S103, using a multi-dimensional matrix method to fuse the train data to determine the train observation variables; the train data here include "train wheel diameter", "motor temperature", "gearbox oil level", "air cylinder noise", "component deformation", etc.;
[0068] Step S104, establish an observation function for each observation variable to represent the state s * In the operation being performed * The state after is s * The probability of being observed when ′ is P;
[0069] Step S105, evaluate the train status and output the maintenance strategy with the best time, the best cost or the best overall performance.
[0070] Specifically, the key area protection unit set up in the safety control support subsystem is used to locate and monitor the staff in the key area through video; and the way to locate the staff in the key area is to use GIS technology to build a GIS map in the key area, and combine it with the head-mounted GPS tags worn by the staff to confirm the position of the staff in the key area. The production safety protection unit mainly implements certain specific work tasks, and is used to monitor the staff to move along a fixed path. If it is found that the staff does not follow the prescribed path, an alarm or prompt will be issued. This function is achieved through personnel positioning means, that is, by installing gas sensors, temperature and humidity sensors, and smoke sensors in designated areas, real-time monitoring of safety parameter indicators in specific work areas (such as welding areas, hazardous chemicals rooms, battery charging and discharging areas, etc.), and when the relevant parameters are close to or exceed the threshold, an alarm prompt will be issued. The GIS electronic map unit is used to display the location of outdoor equipment, the working status of outdoor equipment, and provide interactive operation functions. Outdoor equipment includes cameras, electronic fences, and gates, etc. The working status of outdoor equipment includes equipment alarm display, equipment fault display, and the open or closed status of the gate, etc.; for interactive operations, staff can click on the equipment icon on the electronic map to call out the corresponding equipment configuration window and conveniently configure the hardware equipment parameters, such as setting fence arming / disarming, camera parameter settings, etc.
[0071] It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, from any point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the appended claims rather than the above description, and therefore it is intended that all changes within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any figure marks in the claims should not be regarded as limiting the claims involved.
Claims
1. An intelligent maintenance operation system suitable for urban rail vehicles, comprising a business subsystem, an analysis subsystem and a safety control support subsystem, characterized in that: The business subsystem includes a display unit, a maintenance business unit, a resource management business unit, and a supervision business unit; the analysis subsystem includes a data center, a data management service unit, a fault diagnosis and prediction unit, and a business management support unit; the safety management and control support subsystem includes a key area protection unit, a production safety protection unit, and a GIS electronic map unit; the business subsystem is used to generate specific business events, and send the needs of the business event to the analysis subsystem, and require the analysis subsystem to feedback the analysis results for use by the business subsystem; the safety management and control support subsystem provides auxiliary support information for the business subsystem; The display unit can realize information data integration function, information comprehensive display function, daily production plan display function and custom data display function; the maintenance business unit realizes auxiliary maintenance process optimization function, auxiliary process optimization function, automatic dispatching function and auxiliary material preparation function by combining mathematical analysis with physical object analysis system; the resource management business unit is used to realize comprehensive resource scheduling management required for vehicle maintenance operations; the supervision business unit is used to realize real-time and all-round control and supervision of the production site situation; The data center is used to realize the functions of data access, data processing, data storage, data analysis, and data display; the data management service unit is used to realize the diversity and timeliness of collected data and the multi-dimensionality and scalability of the business display of the analysis system, and regularly synchronize the incremental data of the local data platform to the remote backup data platform to realize data distribution, data publishing or subscription services across network nodes; The fault diagnosis and prediction unit can use trackside and on-board detection data, combined with mathematical and probability statistics and reliability analysis technology to conduct a full life cycle health assessment of components, and output component inspection and maintenance strategies; the business management support unit is used to implement statistical analysis, automatic planning analysis, automatic operation dispatch analysis, and material demand analysis functions; The key area protection unit is used to perform positioning and video monitoring functions on the staff in the key area. The production safety protection unit is used to monitor the staff walking along a fixed path. If it is found that the staff does not walk along the prescribed path, an alarm or prompt will be issued; the GIS electronic map unit is used to display the location of outdoor equipment, the working status of outdoor equipment and provide interactive operation functions.
2. The intelligent maintenance operation system suitable for urban rail vehicles according to claim 1 is characterized in that: The maintenance business process of the maintenance business unit includes the following steps: Step S11, inspecting the vehicle configuration, maintenance BOM, component life cycle and operating mileage; Step S12, sequentially executing the maintenance operation strategy and the planning and scheduling model; Step S13: formulate a task pool and implement an automated dispatching model; Step S14: Use manual and automated equipment to execute the work order of the automated dispatching model to obtain the maintenance results and related data; Step S15, the maintenance results and related data are fed back to the maintenance operation strategy in a cyclic optimization operation strategy, so that the maintenance results and related data can better fit the maintenance operation of the subway train in the current scenario.
3. The intelligent maintenance operation system suitable for urban rail vehicles according to claim 2 is characterized in that: The planning and scheduling model in step S12 can automatically associate the required material list, turnover parts replacement list, site process equipment, tools and tooling equipment, and personnel public demand information based on the content output by the maintenance work strategy to form a complete task package and mark the urgency and importance of the task package; multiple task packages are used to form a task pool.
4. The intelligent maintenance operation system suitable for urban rail vehicles according to claim 2, characterized in that: The method for implementing the automated dispatching model in step S13 includes the following: S131: Automatically decompose and label the task content according to preset conditions; S132: Loading the information of all operators on shift for the day and the basic information of preset operators, wherein the basic information includes the type of work, skill level, and working experience; S133: comprehensively sorting the task packages in the task pool according to urgency and importance, setting the ratio of the task packages with urgency to 70% and setting the priority of their task tags to 1, setting the ratio of the task packages with importance to 30% and setting the priority of their task tags to 2; S134: Load the task tag with priority 1, use the text similarity algorithm to match the skills with the on-duty workers, and screen out all the workers who are suitable for this task; and so on, continue to load the task tag with priority 2, and screen out all the workers who are suitable for this task, until all the tasks in the task pool for the day are loaded; S135: The overall operation time does not exceed the preset operation time, the labor time of a single operator does not exceed the preset time, and the completion of all tasks in the task pool are set as boundary conditions, and the traversal algorithm is used to solve the above boundary conditions to match the specific personnel list and operation time period required to execute each task; S136: If there is no solution under the above boundary conditions, the task with the lowest priority is abandoned and solved again until a solution is found; if there are multiple solutions under the above boundary conditions, the first three solutions are sorted according to the earliest completion time, and the first three solutions are presented; S137: After the solution is completed, it is presented on the data display page, and the administrator selects and confirms the execution plan.
5. The intelligent maintenance operation system applicable to urban rail vehicles according to claim 1, characterized in that: The data management service unit consists of a Hadoop distributed file system and an RDBMS.
6. The intelligent maintenance operation system applicable to urban rail vehicles according to claim 1, characterized in that: The fault diagnosis prediction method of the fault diagnosis prediction unit comprises the following steps: Step S101, constructing a train inspection state set, a train maintenance operation set and a train state observation set according to a maintenance knowledge base; Step S102: construct a train state transition function T(s * ,a * ,s *′ ); This function is a transfer function constructed based on the historical data of train maintenance; Step S103, using a multi-dimensional matrix method to fuse the train data to determine the train observation variables; Step S104, establish an observation function for each observation variable to represent the state s * In the operation being performed * The state after is s *′ The probability of being observed when ; Step S105, evaluate the train status and output the maintenance strategy with the best time, the best cost or the best overall performance.
7. The intelligent maintenance operation system applicable to urban rail vehicles according to claim 6, characterized in that: The train state conversion function T(s) in step S102 * ,a * ,s *′ ) is a transfer function constructed based on historical train maintenance data.
8. The intelligent maintenance operation system applicable to urban rail vehicles according to claim 1, characterized in that: The method of locating the staff in the key areas is to use GIS technology to build a GIS map in the key areas and combine it with the head-mounted GPS tags worn by the staff to confirm the position of the staff in the key areas.
9. The intelligent maintenance operation system applicable to urban rail vehicles according to claim 1, characterized in that: The monitoring method of the production safety protection unit is: by installing gas sensors, temperature and humidity sensors, and smoke sensors in specific areas, and monitoring the safety parameter indicators in the specific areas in real time, when the safety parameter indicators are close to or exceed the threshold, an alarm prompt is issued. The specific areas include welding areas, hazardous chemicals rooms, and battery charging and discharging areas.
10. The intelligent maintenance operation system applicable to urban rail vehicles according to claim 1, characterized in that: The outdoor equipment includes a camera, an electronic fence and a gate machine; the working status of the outdoor equipment includes equipment alarm display, equipment fault display and the open or closed status of the gate machine.
Citation Information
Cited By
Intelligent operation and maintenance method and system for urban rail transit vehicle
CN119887179A
Intelligent operation and maintenance method and system for urban rail transit vehicles
CN119887179B
