Site selection analysis method and system for comprehensive land improvement
By constructing a comprehensive analysis of geospatial models and transportation network maps, the problems of low efficiency and insufficient accuracy in the comprehensive land remediation site selection analysis are solved, and more efficient and accurate site selection results are achieved, which meets the considerations of multidimensional factors and improves the improvement of the requirements. The implementation effect of the rectification project.
Patent Information
- Application Number
- CN202411124673.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology has low efficiency and insufficient accuracy in the analysis of comprehensive land remediation site selection, and cannot effectively consider multi-dimensional factors such as terrain, soil and transportation, resulting in the site selection results deviating from actual needs and affecting the implementation effect of the remediation project.
Through interactive acquisition of land project information and regional land information, a geospatial model is constructed, alternative remediation areas are screened and analyzed, the remediation costs are calculated based on land physical conditions, and traffic accessibility analysis is carried out in combination with the transportation network map, and the target is finally determined through comprehensive evaluation Remediate the area.
The efficiency and accuracy of comprehensive land remediation site selection are improved, multi-dimensional factors can be considered more comprehensively, ensuring that site selection results are closer to actual needs, and improving the implementation effect of the rectification project.
Smart Images

Figure CN119067716A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data processing, and in particular to a site selection analysis method and system for comprehensive land improvement. Background Art
[0002] With the continuous acceleration of urbanization and economic development, the shortage of land resources has become increasingly prominent. Comprehensive land remediation has become a key means to optimize land resource allocation, improve the ecological environment and improve land use efficiency. However, with the expansion of the scale of remediation projects and the diversification of remediation objects, the site selection analysis process of comprehensive land remediation is also facing increasing challenges. Traditional site selection analysis methods often rely on manual data processing and empirical judgment, which leads to a long analysis process with low accuracy and difficulty in fully considering multidimensional factors such as terrain, soil and transportation. At the same time, it is impossible to effectively cope with complex and changing environmental conditions, resulting in site selection results often deviating from actual needs, affecting the implementation effect of remediation projects. Summary of the invention
[0003] The present application provides a site selection analysis method and system for comprehensive land improvement, which is used to solve the technical problems of low efficiency and insufficient accuracy in the prior art when performing site selection analysis for comprehensive land improvement.
[0004] In view of the above problems, the present application provides a site selection analysis method and system for comprehensive land improvement.
[0005] In a first aspect of the present application, a site selection analysis method for comprehensive land management is provided, the method comprising: Interactively obtain land project information, wherein the land project information includes land spatial condition constraints and land physical condition constraints; interactively obtain regional land information of the area available for site selection, and construct a generated geographic space model based on the regional land information; use the land spatial condition constraints as screening conditions, traverse the geographic space model to perform site selection analysis, and obtain multiple candidate remediation areas, wherein the land spatial condition constraints include land shape constraints and land area constraints; obtain multiple land physical condition information of the multiple candidate remediation areas by calling from the geographic space model; perform land deviation analysis based on the land physical condition constraints and multiple land physical condition information, and obtain multiple land remediation costs; interactively obtain a comprehensive transportation network diagram of the area available for site selection, and fit the multiple candidate remediation areas to the comprehensive transportation network diagram to perform transportation accessibility analysis, and obtain multiple transportation connection costs; conduct a comprehensive site selection evaluation on the multiple candidate remediation areas based on the multiple land remediation costs and multiple transportation connection costs, and locate the target remediation area.
[0006] The second aspect of the present application provides a site selection analysis system for comprehensive land management, the system comprising: A land project information acquisition module, wherein the land project information acquisition module interactively obtains land project information, wherein the land project information includes land spatial condition constraints and land physical condition constraints; a regional land information acquisition module, wherein the regional land information acquisition module interactively obtains regional land information of the area available for site selection, and generates a geographic space model based on the regional land information; a site selection analysis module, wherein the site selection analysis module uses the land spatial condition constraints as screening conditions, traverses the geographic space model for site selection analysis, and obtains multiple candidate remediation areas, wherein the land spatial condition constraints include land shape constraints and land area constraints; a land physical condition information acquisition module, wherein the land physical condition information acquisition module obtains the land from the area The land physical condition information of the multiple candidate remediation areas is obtained by calling the physical space model; the land deviation analysis module is used to perform land deviation analysis according to the land physical condition constraints and the multiple land physical condition information to obtain multiple land remediation costs; the traffic accessibility analysis module is used to interactively obtain the comprehensive traffic network diagram of the available site selection areas, and fit the multiple candidate remediation areas to the comprehensive traffic network diagram to perform traffic accessibility analysis to obtain multiple traffic connection costs; the comprehensive site selection evaluation module is used to perform comprehensive site selection evaluation on the multiple candidate remediation areas according to the multiple land remediation costs and the multiple traffic connection costs to locate the target remediation area.
[0007] One or more technical solutions provided in this application have at least the following technical effects or advantages: The present application interactively obtains land project information, wherein the land project information includes land spatial condition constraints and land physical condition constraints; interactively obtains regional land information of areas available for site selection, and constructs a generated geographic spatial model based on the regional land information; uses land spatial condition constraints as screening conditions, traverses the geographic spatial model to perform site selection analysis, and obtains multiple candidate remediation areas, wherein the land spatial condition constraints include land shape constraints and land area constraints; obtains multiple land physical condition information of multiple candidate remediation areas from the geographic spatial model; performs land deviation analysis based on the land physical condition constraints and multiple land physical condition information, and obtains multiple land remediation costs; interactively obtains a comprehensive transportation network diagram of the area available for site selection, and fits multiple candidate remediation areas to the comprehensive transportation network diagram for transportation accessibility analysis, and obtains multiple transportation connection costs; conducts a comprehensive site selection evaluation on multiple candidate remediation areas based on multiple land remediation costs and multiple transportation connection costs, and locates the target remediation area. The present invention solves the technical problems of low efficiency and insufficient accuracy in the existing technology when conducting site selection analysis for comprehensive land improvement. It interactively obtains land project information and regional land information, constructs a geographic space model, screens and analyzes alternative improvement areas, calculates the improvement cost based on the physical conditions of the land, conducts traffic accessibility analysis in combination with a traffic network diagram, calculates the traffic connection cost, and finally determines the target improvement area through comprehensive evaluation, thereby achieving the technical effect of improving the efficiency and accuracy of site selection for comprehensive land improvement. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0009] Figure 1 A schematic flow chart of a site selection analysis method for comprehensive land management provided in an embodiment of the present application; Figure 2 A schematic diagram of the structure of a site selection analysis system for comprehensive land improvement provided in an embodiment of the present application.
[0010] Explanation of the reference numerals: land project information acquisition module 11, regional land information acquisition module 12, site selection analysis module 13, land physical condition information acquisition module 14, land deviation analysis module 15, traffic accessibility analysis module 16, comprehensive site selection evaluation module 17. DETAILED DESCRIPTION
[0011] This application provides a site selection analysis method and system for comprehensive land improvement, aiming to solve the technical problems of low efficiency and insufficient accuracy in the existing technology when conducting site selection analysis for comprehensive land improvement. By interactively acquiring land project information and regional land information, a geographic spatial model is constructed, and alternative improvement areas are screened and analyzed. The improvement cost is calculated based on the physical conditions of the land, and traffic accessibility analysis is performed in combination with a traffic network map to calculate the traffic connection cost. Finally, through comprehensive evaluation, the target improvement area is determined, thereby achieving the technical effect of improving the efficiency and accuracy of site selection for comprehensive land improvement.
[0012] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0013] It should be noted that the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or modules that are not explicitly listed or inherent to these processes, methods, products or devices.
[0014] Embodiment 1, as Figure 1 As shown, the present application provides a site selection analysis method for comprehensive land management, the method comprising: Step S100: interactively obtaining land project information, wherein the land project information includes land spatial condition constraints and land physical condition constraints.
[0015] In the embodiment of the present application, in the process of obtaining land project information, the system obtains land spatial condition constraints and physical condition constraints from the user through a series of interactive steps. First, the user enters basic project information through the interface, including geographical location, land use and preliminary requirements. Based on this initial information, the system guides the user to further define the spatial conditions of the land, such as the shape, area and boundary requirements of the land. Then, through the built-in geographic information system (GIS), the land parcel information that meets these conditions is automatically retrieved from the database.
[0016] On this basis, the user is prompted to enter the land physical condition constraints, such as the flatness of the terrain, soil type, geological characteristics and drainage capacity. The system connects to external data sources such as geological exploration data, soil reports and satellite remote sensing, automatically obtains relevant physical condition information, and matches it with the requirements set by the user.
[0017] Through the above process, the land project information is obtained.
[0018] Step S200: interactively obtain regional land information of the area available for site selection, and construct and generate a geographic space model based on the regional land information.
[0019] In the embodiment of the present application, first, the user selects a rough site selection area through the human-computer interaction interface. Specifically, it is achieved by selecting an area on the map, entering geographic coordinates, or selecting a certain area. After determining the area, the system extracts detailed land information related to the area from multiple spatial databases based on the site selection requirements input by the user. This information is called regional land information, including the shape, area, land use type, land coverage, etc. of the plot.
[0020] Next, the extracted regional land information will be integrated and preprocessed to ensure that the information from different data sources can be compatible and converted into a unified format to eliminate duplicate and erroneous data. After the data processing is completed, the geospatial model is constructed based on this information. During the construction, the 3D modeling tools in the Geographic Information System (GIS) are used to integrate information such as terrain, soil, and land parcel boundaries to generate a comprehensive 3D geographic model.
[0021] Step S300: Using the land space condition constraint as a screening condition, traverse the geographic space model to perform site selection analysis to obtain multiple candidate remediation areas, wherein the land space condition constraint includes a land shape constraint and a land area constraint.
[0022] In the embodiment of the present application, the land space condition constraints defined by the user received through the interactive interface include two key parameters: land shape constraint and land area constraint. The land shape constraint refers to the user's requirements for the geometric shape of the plot, such as a regular rectangle or polygon, etc., while the land area constraint refers to the user's expectation that the plot area meets certain minimum or maximum standards.
[0023] Next, call the previously generated geospatial model, which contains the spatial information of all candidate areas. Through GIS technology, traverse the data of each plot in the model. By analyzing the shape information of each plot, the plots that do not meet the shape constraints are removed from the model. For example, if the user requires that the plot must be a regular rectangle, the irregularly shaped plots are automatically excluded. After completing the shape screening, the remaining plots are further screened for area constraints, and the actual area of each plot is calculated and compared with the area range preset by the user. If the plot area is within the range specified by the user, the plot is retained, otherwise it is excluded. At this point, the screened plots meet both the shape requirements and the area requirements.
[0024] Through the above steps, a group of plots that meet the land space constraints are finally obtained. These plots are called alternative remediation areas, that is, multiple alternative remediation areas are obtained through the above steps.
[0025] Furthermore, in the method provided in the embodiment of the application, the land space condition constraint is used as a screening condition, the geographic space model is traversed to perform site selection analysis, and multiple candidate remediation areas are obtained, wherein the land space condition constraint includes a land shape constraint and a land area constraint, and further includes: The land information of the region is used as modeling data, and the three-dimensional modeling tool of the GIS software is used to construct the model to obtain the geographic space model; the land space condition constraints are input into the query analysis tool of the GIS software, and the query analysis tool is used to traverse the geographic space model to select the multiple alternative remediation areas.
[0026] In an embodiment of the present application, the previously acquired regional land information (including the shape, area, terrain data, land use type, etc. of the plot) is first imported into the GIS software. This information is the basic data for building a geographic spatial model, and is used as input data for further spatial modeling. Next, the three-dimensional modeling tool in the GIS software is used to process these regional land information. The three-dimensional modeling tool can convert the input plot data into a visual three-dimensional geographic spatial model, which not only reflects the two-dimensional features of the plot, such as boundaries and area, but also includes the three-dimensional features of the plot such as terrain undulations and slopes. In this way, a global geographic spatial model is generated to intuitively display the spatial characteristics of each area.
[0027] The user then defines the land space constraints through the interactive interface. These constraints include the shape requirements and area range of the plot. These conditions are input into the query analysis tool in the GIS software as screening criteria. The query analysis tool is a core functional module in GIS, which allows users to query and analyze the model according to specific conditions. In this step, the entire three-dimensional geographic spatial model is traversed, and each plot is analyzed to determine whether it meets the preset shape and area constraints. If a plot meets these constraints, it is selected from the model and marked as an alternative remediation area.
[0028] Through the above process, multiple candidate remediation areas are selected.
[0029] Step S400: obtaining a plurality of land physical condition information of the plurality of candidate remediation areas from the geospatial model.
[0030] In an embodiment of the present application, after the screening of the candidate remediation areas is completed, each candidate area in the geospatial model is called to further extract the land physical condition information of these areas. The land physical condition information includes the terrain data, soil properties, groundwater conditions, climate conditions, etc. of the plot. In order to extract this physical condition information, the system is connected to multiple data sources, including geological exploration reports, meteorological data, soil survey data, remote sensing satellite images, etc. The information in these data sources is automatically called by the system through the integrated tools of the GIS software. For example, the system extracts the soil type, stability and drainage capacity of each candidate area from the geological data set; and obtains the regional precipitation, temperature and other climate information from the meteorological data. When the system calls these data, it corresponds one by one with each candidate area in the geospatial model to obtain multiple land physical condition information of multiple candidate remediation areas.
[0031] Step S500: performing land deviation analysis according to the land physical condition constraints and multiple land physical condition information to obtain multiple land improvement costs.
[0032] Furthermore, in the method provided in the embodiment of the application, land deviation analysis is performed according to the land physical condition constraint and multiple land physical condition information to obtain multiple land improvement costs, and further includes: The land physical condition constraints include land terrain constraints and soil property constraints; the multiple land physical condition information are decomposed to obtain multiple land terrain information and multiple soil property information; multiple terrain adjustment costs are obtained based on the terrain deviations of the multiple land terrain information and land terrain constraints; multiple soil modification costs are obtained based on the property deviations of the multiple soil property information and soil property constraints; the multiple terrain adjustment costs and multiple soil modification costs are mapped and added to form the multiple land improvement costs.
[0033] In the embodiment of the present application, when performing land deviation analysis based on land physical condition constraints and multiple land physical condition information, the land physical condition constraints are first called, and the land physical condition constraints include land terrain constraints and soil property constraints. Then, through the data classification algorithm, the multiple land physical condition information is disassembled into two main parts: land terrain information and soil property information. The land terrain information includes slope, height difference, undulation, etc., and the soil property information includes soil type, soil structure, drainage capacity, etc.
[0034] Next, the acquired land topography information is compared with the preset land topography constraints to identify the terrain deviations for each candidate area. The terrain deviation refers to the difference between the actual terrain characteristics of the plot and the terrain conditions required by the project. For example, if the project requires the slope of the plot to not exceed a certain threshold, and the actual slope of the plot exceeds this range, this part is considered as a terrain deviation. These deviations are then analyzed to assess the cost of terrain adjustment. The adjustment cost includes the cost of engineering operations such as land leveling, slope adjustment, or terrain cut and fill. Through the above analysis, multiple terrain adjustment costs are generated, and each candidate area will receive a terrain adjustment cost estimate.
[0035] Similarly, soil property information is compared with the preset soil property constraints to identify deviations in soil properties. These deviations involve soil bearing capacity, drainage, chemical composition, etc. If there is a large gap between the actual properties of the soil and the needs of the project, soil modification is required, such as adding organic matter, improving drainage, or adjusting pH, etc. By evaluating the need for soil modification, multiple soil modification costs are generated.
[0036] Finally, multiple terrain adjustment costs and multiple soil modification costs are mapped and added. That is, after obtaining the terrain adjustment cost and soil modification cost of each candidate area, the terrain adjustment cost and soil modification cost corresponding to each candidate area are added to obtain multiple land improvement costs.
[0037] Furthermore, in the method provided in the embodiment of the application, according to the terrain deviation of the plurality of land terrain information and the land terrain constraint, a plurality of terrain adjustment costs are analyzed and obtained, and further comprising: A terrain index change threshold set is preset, wherein the terrain index change threshold set includes a slope change threshold, a slope aspect change threshold, a terrain undulation threshold, and a ground roughness threshold; a first grid scale is preset, and a first candidate remediation area is divided based on the first grid scale to obtain a plurality of first terrain units, wherein the first candidate remediation area is any one of the plurality of candidate remediation areas; first land terrain information of the first candidate remediation area is extracted from the plurality of land terrain information, and the first land terrain information is split according to the plurality of first terrain units to obtain a plurality of first unit terrain information; the terrain index change threshold set is used to traverse the plurality of first unit terrain information to compare terrain index change trends; if the plurality of first unit terrain information all meet the terrain index change threshold set, the plurality of first terrain units, the plurality of first unit terrain information, and the land terrain constraints are synchronized to a pre-constructed adjustment cost analysis model to perform terrain adjustment cost analysis to obtain a first terrain adjustment cost; and by analogy, the plurality of terrain adjustment costs are analyzed according to the terrain deviations of the plurality of land terrain information and the land terrain constraints.
[0038] In the embodiment of the present application, a terrain index change threshold set is first preset according to the project requirements, including a slope change threshold, a slope aspect change threshold, a terrain undulation threshold, and a ground roughness threshold. The terrain index change threshold set is preset by the user based on the requirements, and each indicator in these threshold sets has maximum and minimum requirements. For example, the range of slope change cannot exceed a certain set maximum angle, so that the land terrain changes are more consistent and can be processed uniformly.
[0039] Next, the technical experts preset the first grid scale, and divide the first candidate remediation area into multiple grid units according to the preset first grid scale. The purpose of grid division is to divide a larger area into several small units, and obtain multiple first terrain units through this process. Among them, the first candidate remediation area is any one of the multiple candidate remediation areas. Then, the first land terrain information of the first candidate remediation area is extracted from the multiple land terrain information, and the terrain information is divided into multiple first unit terrain information according to grid division, including slope, slope direction, undulation and ground roughness.
[0040] After that, each first unit terrain information is traversed and compared with the preset terrain index change threshold set. For example, check whether the slope, slope direction, terrain undulation, etc. of each unit are within the threshold requirements. After the comparison is completed, if multiple first unit terrain information all meet the requirements of the terrain index change threshold set, multiple first terrain units, multiple first unit terrain information and land terrain constraints are synchronized to the pre-built terrain adjustment cost analysis model. This model calculates the terrain adjustment work required and its corresponding cost based on the input terrain information to obtain the first terrain adjustment cost.
[0041] Similarly, the same process is recursively applied to other candidate remediation areas or plots that have not yet completed the analysis. By splitting, comparing, adjusting and calculating the cost of the terrain information of each area, the terrain adjustment cost of each area is finally analyzed to obtain multiple terrain adjustment costs.
[0042] Furthermore, the method provided in the application embodiment also includes: The plurality of first-unit terrain information are traversed by using the terrain indicator change threshold set, H first-unit terrain information that do not meet the terrain indicator change threshold set are screened, and H first terrain units are obtained from the plurality of first terrain units according to the H first-unit terrain information, where H is a positive integer; 1 / 2 of the first grid scale is used as the second grid scale, and the H first terrain units are divided based on the second grid scale to obtain H groups of second terrain units; the H first-unit terrain information are split according to the H groups of second terrain units to obtain H groups of second-unit terrain information; the H groups of second-unit terrain information are traversed by using the terrain indicator change threshold set, and M third-unit terrain information that do not meet the terrain indicator change threshold set are screened. , and obtain M second terrain units from the H groups of second terrain units according to the M third unit terrain information, where M is a positive integer less than or equal to H; take 1 / 2 of the second grid scale as the third grid scale, and divide the M second terrain units based on the third grid scale to obtain M groups of third terrain units; split the M third unit terrain information according to the M groups of third terrain units to obtain M groups of third unit terrain information; and so on, use the terrain indicator change threshold set to traverse the M groups of third unit terrain information to compare the terrain indicator change trend, and perform multi-level division of terrain units based on the comparison results, until the first candidate remediation area is divided into a number of terrain units whose terrain unit information all meets the terrain indicator change threshold set.
[0043] In an embodiment of the present application, during the site selection analysis process for comprehensive land improvement, in order to more accurately process areas that do not meet the requirements of the terrain indicator change threshold set, a detailed analysis is performed by multi-level division and grid scale reduction.
[0044] First, a preset terrain index change threshold set, including a slope change threshold, a slope aspect change threshold, a terrain relief threshold, and a ground roughness threshold, is used to traverse multiple first unit terrain information, and units that do not meet the threshold are screened out and marked as H first unit terrain information. These units are those areas that exceed the preset requirements in terms of slope, slope aspect, or terrain relief, etc., where H is a positive integer.
[0045] Next, use the rasterization tool to reduce the original first grid scale to 1 / 2 and generate a smaller second grid scale. After reducing the grid scale, the originally larger unqualified unit area is divided again. For example, if the initial grid scale is 50 meters × 50 meters, after reducing it to the second grid scale, the size of each grid becomes 25 meters × 25 meters. In this way, the original unit will be refined into multiple smaller units, thus generating H groups of second terrain units. Each new second terrain unit needs to extract the corresponding terrain data from its original first unit terrain information. Based on the spatial coordinates of each newly divided unit, the information of the original unit is split according to the new grid unit. At this time, the split information includes details such as slope, slope direction, terrain undulation and ground roughness. This information will be extracted according to the spatial boundaries of the new grid unit to obtain H groups of second unit terrain information.
[0046] Then, the terrain index change threshold set is used again to traverse the second unit terrain information of the H groups, and the units that still do not meet the threshold requirements are screened out and marked as M third unit terrain information. Among them, M is a positive integer less than or equal to H. After the M third unit terrain information is identified and marked, the mapping algorithm is used to trace the information of these third units back to their corresponding H groups of second terrain units. This process is achieved through data association technology, which automatically finds the upper-level unit that matches it, that is, the second terrain unit, based on the geographical location of the third unit and the corresponding grid division structure, and obtains M second terrain units.
[0047] Next, for the M second terrain units that do not meet the threshold, the second grid scale is reduced to half of the original scale, which is called the third grid scale. Then, based on this new scale, the M unqualified units are divided into smaller units again to generate M groups of third terrain units. Similar to the above splitting process, the terrain information of M third units is split according to the M groups of third terrain units to obtain M groups of third unit terrain information. Then, the same terrain indicator change threshold set is used to traverse these data, and the terrain features of each unit are compared item by item to determine whether it meets the threshold requirements.
[0048] In a recursive manner, the units that do not meet the requirements are further divided and analyzed at a smaller scale until the terrain characteristics of all terrain units meet the requirements of the preset terrain index change threshold set. At this point, the entire candidate remediation area is divided into several terrain units that meet the requirements.
[0049] Furthermore, in the method provided in the embodiment of the application, the plurality of first terrain units, the plurality of first unit terrain information and the land terrain constraint are synchronized to a pre-built adjustment cost analysis model to perform terrain adjustment cost analysis to obtain the first terrain adjustment cost, and further includes: Interactively obtain multiple sample terrain areas, multiple sample terrain information, multiple sample terrain constraints and multiple sample adjustment costs of associated mapping; construct the adjustment cost analysis model based on a back-propagation neural network; use the multiple sample terrain areas, multiple sample terrain information, multiple sample terrain constraints and multiple sample adjustment costs as training data to adjust the parameters of the adjustment cost analysis model; obtain multiple first terrain areas based on the multiple first terrain units; synchronize the multiple first terrain areas, multiple first unit terrain information and land terrain constraints group by group to the adjustment cost analysis model after parameter adjustment to perform terrain adjustment cost analysis to obtain multiple first unit adjustment costs; add the multiple first unit adjustment costs to obtain the first terrain adjustment cost.
[0050] In the embodiment of the present application, sample terrain data is first obtained from the user through an interactive interface, including sample terrain area, sample terrain information (such as slope, undulation, etc.), sample terrain constraints (such as the allowable slope variation range) and adjustment costs related to these terrains (such as the cost of cutting or filling). These data are associated using a mapping algorithm to form a complete training data set.
[0051] Then, an adjustment cost analysis model is constructed based on the back propagation neural network. In this model, sample terrain information, area and terrain constraints are used as inputs, and adjustment cost is used as output. The model is trained to learn the relationship between these inputs and outputs. During the training process, the sample terrain data is input into the neural network, and the error between the predicted output (adjustment cost) and the actual adjustment cost is calculated by the back propagation algorithm. By using the gradient descent method, the weights and biases in the network are adjusted to minimize the prediction error. This process is iterative, and the model gradually improves the accuracy of the prediction through continuous error feedback until the error convergence of the model is detected, that is, in several consecutive iterations, the error changes are very small and have stabilized. This shows that the model has learned the rules in the data, and the effect of further iterations is limited. At this point, the model training is completed.
[0052] After the model training is completed, the actual terrain data is processed. First, the terrain area and terrain information of each unit are extracted from multiple first terrain units. These data include key parameters such as slope and terrain undulation. These extracted data will be used as inputs to the model and further used for adjustment cost analysis. Subsequently, the extracted terrain information, terrain area, and terrain constraints are input into the trained adjustment cost analysis model group by group. Based on these input data, the model calculates the adjustment cost of each terrain unit, that is, the cost required to make the terrain meet the planning requirements. Through the prediction of the model, multiple first unit adjustment costs are obtained.
[0053] Finally, a cost accumulation algorithm is used to add up the multiple first unit adjustment costs to obtain the first terrain adjustment cost.
[0054] In the site selection analysis process of comprehensive land remediation, multiple soil modification costs are gradually calculated by analyzing the property deviations of soil property information and soil property constraints. This process is similar to the analysis of terrain adjustment costs. The specific steps include first, according to the project requirements, presetting the threshold set of soil property indicator changes, which includes key soil characteristic parameters such as pH value, organic matter content, water content, etc. These thresholds are used to assess whether the soil properties exceed the project's allowable range and serve as a benchmark for soil modification needs. Each candidate remediation area is then divided into multiple soil units, and these areas are organized using a grid division method. The data of each unit, such as soil pH, density, and drainage characteristics, are extracted and sorted out to form structured soil property information.
[0055] Then, the traversal algorithm is used to compare the information of each soil unit with the preset threshold set one by one, and the deviation between the soil properties and the standard value is calculated. Soil units that do not meet the threshold requirements are identified. For example, if the pH value of a unit exceeds the allowable range, the unit will be marked as a soil unit that needs to be modified. For these marked units, they are further analyzed with their corresponding soil data through a mapping algorithm. These units are further refined using a smaller grid scale to ensure that each soil area that needs to be modified is analyzed in a refined manner. After completing the soil property analysis, the soil modification cost calculation stage begins, which relies on the constructed soil modification cost analysis model. The model is based on a back propagation neural network (BPNN) and is trained with a large amount of historical data. The nonlinear relationship between soil property deviation and modification cost is learned through historical soil modification data, and a model that can predict modification costs based on input data is established.
[0056] In the cost calculation process, the model first predicts the material and labor requirements for each unit. According to the deviation of soil properties of each unit, the BPNN model is used to infer and predict different modification requirements. For example, for units that need to neutralize pH, the model predicts how much lime or sulfur and other materials are needed based on similar data in historical modification cases. Next, the market price in the material library is called, and the material quantity predicted by the model is multiplied by the unit price to obtain the material cost of each unit. At the same time, according to the construction difficulty and construction period predicted by the model, the number of workers and working hours required are determined through the construction standard database. Combined with the labor cost calculation tool, the labor cost of each unit is calculated based on the worker's daily or hourly wage.
[0057] After calculating the material cost and labor cost separately, use the cost accumulation tool to add the two together to get the total modification cost of each soil unit. For example, if the material cost of a unit is 100 yuan and the labor cost is 600 yuan, then add the two together to get a total modification cost of 700 yuan. Finally, the modification cost of each unit is output as an independent result to generate multiple soil modification costs.
[0058] Step S600: interactively obtain a comprehensive transportation network diagram of the area available for site selection, and fit the multiple candidate remediation areas to the comprehensive transportation network diagram to perform traffic accessibility analysis to obtain multiple transportation connection costs.
[0059] In an embodiment of the present application, GIS technology is first used to obtain a comprehensive transportation network map of the site selection area from a transportation database. The network map contains transportation routes such as roads, railways, and shipping, as well as major transportation nodes, such as highway exits, railway stations, and ports. Geographical location information.
[0060] Next, multiple candidate remediation areas are fitted to the comprehensive transportation network diagram. The fitting process refers to matching the geographical locations of the candidate remediation areas with the transportation nodes and routes in the transportation network diagram through a spatial mapping algorithm. Based on the geographical location of each candidate area, the spatial relationship between the area and the nearest major transportation node, such as highway exits, railway stations, ports, etc., is identified.
[0061] After the fitting is completed, the traffic accessibility analysis is started, and the shortest path algorithm, such as Dijkstra, is used to calculate the shortest path between each alternative remediation area and the nearest traffic node.
[0062] Then calculate multiple traffic connection costs, that is, the cost of building roads connecting alternative remediation areas with existing traffic nodes. First, determine the type of planned road, such as asphalt road, concrete road, and use the material library to calculate the required amount of materials based on the length and type of the road. The type of road is predetermined. The material library includes standard unit prices and usage formulas for common road construction materials such as asphalt, concrete, steel, sand and gravel. Then use cost estimation formulas, such as the number of tons of asphalt and meters of steel bars required per kilometer of road, combined with the unit price in the material library, to calculate the cost of each material. Assuming that one kilometer of asphalt road requires 200 tons of asphalt, multiply 200 tons by the unit price of asphalt in the material library to generate the material cost.
[0063] Next, use the construction standard database to refer to common road construction labor requirements, such as the number of construction workers required per kilometer of road. Estimate the required labor workload based on the length of the road and the construction time. For example, 10 workers are required for each kilometer of road, and the working time is 10 days. Through the labor cost calculation tool, multiply the worker's daily salary, such as 500 yuan per worker per day, by the number of working days to obtain the labor cost. For example, if 10 workers work for 10 days, the total labor cost is 10 people × 10 days × 500 yuan = 50,000 yuan.
[0064] Finally, the cost accumulation algorithm is used to add up the material cost and labor cost to generate the total road construction cost for each candidate remediation area. This process ensures that all material and labor costs are correctly calculated and summarized. For example, if the material cost of an area is 250,000 yuan and the labor cost is 50,000 yuan, the total cost is 250,000 + 50,000 yuan = 300,000 yuan.
[0065] Through the above process, multiple transportation connection costs are obtained.
[0066] Furthermore, in the method provided in the embodiment of the application, a comprehensive transportation network diagram of the area available for site selection is interactively obtained, and the multiple candidate remediation areas are fitted to the comprehensive transportation network diagram for traffic accessibility analysis to obtain multiple transportation connection costs, and further includes: A multi-modal transportation shortest path analysis is performed on the first candidate remediation area in the comprehensive transportation network diagram to obtain multiple first shortest paths, and the multiple first shortest paths are added together to obtain a first transportation connection cost; and similarly, the multiple candidate remediation areas are fitted to the comprehensive transportation network diagram to perform transportation accessibility analysis to obtain the multiple transportation connection costs.
[0067] In an embodiment of the present application, a multi-modal traffic shortest path analysis is first performed on the first alternative remediation area on the comprehensive transportation network diagram. Specifically, a multi-modal traffic shortest path analysis is used to calculate the shortest paths from the alternative remediation area to different transportation nodes according to different transportation modes, such as railways, aviation, roads, etc. In the multi-modal analysis, the directions and positions of various types of transportation nodes are considered. For example, the paths from the first alternative remediation area to the train station and the airport may be different, so the shortest connecting roads in the two directions are calculated separately. Use a shortest path algorithm, such as Dijkstra, to analyze each transportation mode independently to obtain the shortest paths between different transportation nodes.
[0068] After completing the multi-modal traffic shortest path analysis, the lengths of multiple shortest paths are accumulated to calculate the total path length of the first alternative remediation area. Next, the first traffic connection cost is obtained by calculating the traffic connection cost through the aforementioned process.
[0069] Repeat the above analysis steps to conduct traffic accessibility analysis for multiple candidate remediation areas. Through multi-modal traffic analysis, calculate the shortest path connecting different traffic nodes in each area. Then use the material cost estimation tool and labor cost calculation tool, combined with the path length, to calculate the traffic connection cost of each area and obtain multiple traffic connection costs.
[0070] Step S700: Comprehensively evaluate the multiple candidate remediation areas according to the multiple land remediation costs and the multiple traffic connection costs, and locate the target remediation area.
[0071] In the embodiment of the present application, when conducting comprehensive site selection evaluation for multiple candidate remediation areas, the land remediation cost and the traffic connection cost of each candidate remediation area are added together to obtain the comprehensive remediation cost of each candidate remediation area, wherein the land remediation cost includes the terrain adjustment cost and the soil modification cost.
[0072] After the comprehensive remediation costs of all candidate remediation areas are calculated, the comprehensive costs of all areas are compared using the minimum cost algorithm. These areas are sorted according to the size of the comprehensive cost, and the area with the smallest comprehensive cost is selected as the final target remediation area.
[0073] In the embodiments of the present application, in summary, the embodiments of the present application have at least the following technical effects: The present application interactively obtains land project information, wherein the land project information includes land spatial condition constraints and land physical condition constraints; interactively obtains regional land information of areas available for site selection, and constructs a generated geographic spatial model based on the regional land information; uses land spatial condition constraints as screening conditions, traverses the geographic spatial model to perform site selection analysis, and obtains multiple candidate remediation areas, wherein the land spatial condition constraints include land shape constraints and land area constraints; obtains multiple land physical condition information of multiple candidate remediation areas from the geographic spatial model; performs land deviation analysis based on the land physical condition constraints and multiple land physical condition information, and obtains multiple land remediation costs; interactively obtains a comprehensive transportation network diagram of the area available for site selection, and fits multiple candidate remediation areas to the comprehensive transportation network diagram for transportation accessibility analysis, and obtains multiple transportation connection costs; conducts a comprehensive site selection evaluation on multiple candidate remediation areas based on multiple land remediation costs and multiple transportation connection costs, and locates the target remediation area. The present invention solves the technical problems of low efficiency and insufficient accuracy in the existing technology when conducting site selection analysis for comprehensive land improvement. It interactively obtains land project information and regional land information, constructs a geographic space model, screens and analyzes alternative improvement areas, calculates the improvement cost based on the physical conditions of the land, conducts traffic accessibility analysis in combination with a traffic network diagram, calculates the traffic connection cost, and finally determines the target improvement area through comprehensive evaluation, thereby achieving the technical effect of improving the efficiency and accuracy of site selection for comprehensive land improvement.
[0074] Embodiment 2, based on the same inventive concept as the site selection analysis method for comprehensive land management in the previous embodiment, Figure 2 As shown, the present application provides a site selection analysis system for comprehensive land management, and the system and method embodiments in the present application are based on the same inventive concept. The system includes: A land project information acquisition module 11, wherein the land project information acquisition module 11 interactively obtains land project information, wherein the land project information includes land space condition constraints and land physical condition constraints; a regional land information acquisition module 12, wherein the regional land information acquisition module 12 interactively obtains regional land information of the area available for site selection, and generates a geographic space model based on the regional land information; a site selection analysis module 13, wherein the site selection analysis module 13 uses the land space condition constraints as screening conditions, traverses the geographic space model for site selection analysis, and obtains multiple candidate remediation areas, wherein the land space condition constraints include land shape constraints and land area constraints; a land physical condition information acquisition module 14, wherein the land physical condition information acquisition module 14 obtains the land space condition constraints from the selected areas. The geographic spatial model is called to obtain multiple land physical condition information of the multiple candidate remediation areas; a land deviation analysis module 15, the land deviation analysis module 15 performs land deviation analysis according to the land physical condition constraints and multiple land physical condition information, and obtains multiple land remediation costs; a traffic accessibility analysis module 16, the traffic accessibility analysis module 16 interactively obtains a comprehensive transportation network diagram of the available site selection areas, and fits the multiple candidate remediation areas to the comprehensive transportation network diagram to perform transportation accessibility analysis, and obtains multiple transportation connection costs; a comprehensive site selection evaluation module 17, the comprehensive site selection evaluation module 17 performs a comprehensive site selection evaluation on the multiple candidate remediation areas according to the multiple land remediation costs and the multiple transportation connection costs, and locates the target remediation area.
[0075] Furthermore, the system is also used to implement the following functions: The land information of the region is used as modeling data, and the three-dimensional modeling tool of the GIS software is used to construct the model to obtain the geographic space model; the land space condition constraints are input into the query analysis tool of the GIS software, and the query analysis tool is used to traverse the geographic space model to select the multiple alternative remediation areas.
[0076] Furthermore, the system is also used to implement the following functions: The land physical condition constraints include land terrain constraints and soil property constraints; the multiple land physical condition information are decomposed to obtain multiple land terrain information and multiple soil property information; multiple terrain adjustment costs are obtained based on the terrain deviations of the multiple land terrain information and land terrain constraints; multiple soil modification costs are obtained based on the property deviations of the multiple soil property information and soil property constraints; the multiple terrain adjustment costs and multiple soil modification costs are mapped and added to form the multiple land improvement costs.
[0077] Furthermore, the system is also used to implement the following functions: A terrain index change threshold set is preset, wherein the terrain index change threshold set includes a slope change threshold, a slope aspect change threshold, a terrain undulation threshold, and a ground roughness threshold; a first grid scale is preset, and a first candidate remediation area is divided based on the first grid scale to obtain a plurality of first terrain units, wherein the first candidate remediation area is any one of the plurality of candidate remediation areas; first land terrain information of the first candidate remediation area is extracted from the plurality of land terrain information, and the first land terrain information is split according to the plurality of first terrain units to obtain a plurality of first unit terrain information; the terrain index change threshold set is used to traverse the plurality of first unit terrain information to compare terrain index change trends; if the plurality of first unit terrain information all meet the terrain index change threshold set, the plurality of first terrain units, the plurality of first unit terrain information, and the land terrain constraints are synchronized to a pre-constructed adjustment cost analysis model to perform terrain adjustment cost analysis to obtain a first terrain adjustment cost; and by analogy, the plurality of terrain adjustment costs are analyzed according to the terrain deviations of the plurality of land terrain information and the land terrain constraints.
[0078] Furthermore, the system is also used to implement the following functions: The plurality of first-unit terrain information are traversed by using the terrain indicator change threshold set, H first-unit terrain information that do not meet the terrain indicator change threshold set are screened, and H first terrain units are obtained from the plurality of first terrain units according to the H first-unit terrain information, where H is a positive integer; 1 / 2 of the first grid scale is used as the second grid scale, and the H first terrain units are divided based on the second grid scale to obtain H groups of second terrain units; the H first-unit terrain information are split according to the H groups of second terrain units to obtain H groups of second-unit terrain information; the H groups of second-unit terrain information are traversed by using the terrain indicator change threshold set, and M third-unit terrain information that do not meet the terrain indicator change threshold set are screened. , and obtain M second terrain units from the H groups of second terrain units according to the M third unit terrain information, where M is a positive integer less than or equal to H; take 1 / 2 of the second grid scale as the third grid scale, and divide the M second terrain units based on the third grid scale to obtain M groups of third terrain units; split the M third unit terrain information according to the M groups of third terrain units to obtain M groups of third unit terrain information; and so on, use the terrain indicator change threshold set to traverse the M groups of third unit terrain information to compare the terrain indicator change trend, and perform multi-level division of terrain units based on the comparison results, until the first candidate remediation area is divided into a number of terrain units whose terrain unit information all meets the terrain indicator change threshold set.
[0079] Furthermore, the system is also used to implement the following functions: Interactively obtain multiple sample terrain areas, multiple sample terrain information, multiple sample terrain constraints and multiple sample adjustment costs of associated mapping; construct the adjustment cost analysis model based on a back-propagation neural network; use the multiple sample terrain areas, multiple sample terrain information, multiple sample terrain constraints and multiple sample adjustment costs as training data to adjust the parameters of the adjustment cost analysis model; obtain multiple first terrain areas based on the multiple first terrain units; synchronize the multiple first terrain areas, multiple first unit terrain information and land terrain constraints group by group to the adjustment cost analysis model after parameter adjustment to perform terrain adjustment cost analysis to obtain multiple first unit adjustment costs; add the multiple first unit adjustment costs to obtain the first terrain adjustment cost.
[0080] Furthermore, the system is also used to implement the following functions: A multi-modal transportation shortest path analysis is performed on the first candidate remediation area in the comprehensive transportation network diagram to obtain multiple first shortest paths, and the multiple first shortest paths are added together to obtain a first transportation connection cost; and similarly, the multiple candidate remediation areas are fitted to the comprehensive transportation network diagram to perform transportation accessibility analysis to obtain the multiple transportation connection costs.
[0081] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. The processes depicted in the accompanying drawings do not necessarily require the specific order and continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0082] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
[0083] This specification and drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.
Claims
1. A site selection analysis method for comprehensive land improvement, characterized in that: The method comprises: interactively obtaining land project information, wherein the land project information includes land spatial condition constraints and land physical condition constraints; Interactively obtain regional land information of the area available for site selection, and construct and generate a geospatial model based on the regional land information; Taking the land space condition constraint as a screening condition, traversing the geographic space model to perform site selection analysis, and obtaining a plurality of candidate remediation areas, wherein the land space condition constraint includes a land shape constraint and a land area constraint; Obtaining a plurality of land physical condition information of the plurality of candidate remediation areas from the geospatial model; Performing land deviation analysis according to the land physical condition constraints and multiple land physical condition information to obtain multiple land improvement costs; Interactively obtain a comprehensive transportation network diagram of the area available for site selection, and fit the multiple candidate remediation areas to the comprehensive transportation network diagram to perform traffic accessibility analysis to obtain multiple transportation connection costs; A comprehensive site selection evaluation is performed on the multiple candidate remediation areas based on the multiple land remediation costs and the multiple transportation connection costs to locate the target remediation area.
2. The site selection analysis method for comprehensive land improvement according to claim 1, characterized in that: Taking the land space condition constraint as a screening condition, traversing the geographic space model to perform site selection analysis, and obtaining multiple candidate remediation areas, wherein the land space condition constraint includes a land shape constraint and a land area constraint, and the method further includes: Using the regional land information as modeling data, applying the three-dimensional modeling tool of GIS software to construct the model, and obtaining the geographic space model; The land space condition constraints are input into the query analysis tool of the GIS software, and the query analysis tool is used to traverse the geographic space model to select the multiple candidate remediation areas.
3. The site selection analysis method for comprehensive land improvement according to claim 1, characterized in that: Performing land deviation analysis according to the land physical condition constraint and multiple land physical condition information to obtain multiple land improvement costs, the method further includes: The land physical condition constraints include land topography constraints and soil property constraints; Decomposing the plurality of land physical condition information to obtain a plurality of land topography information and a plurality of soil property information; Analyze and obtain multiple terrain adjustment costs according to the multiple land terrain information and terrain deviations of land terrain constraints; Analyze and obtain multiple soil modification costs according to the multiple soil property information and property deviations of soil property constraints; The plurality of terrain adjustment costs and the plurality of soil modification costs are mapped and summed to form the plurality of land improvement costs.
4. The site selection analysis method for comprehensive land improvement according to claim 3, characterized in that: Analyzing and obtaining a plurality of terrain adjustment costs according to the plurality of land terrain information and the terrain deviation of the land terrain constraint, the method further comprises: Preset a terrain index change threshold set, wherein the terrain index change threshold set includes a slope change threshold, a slope aspect change threshold, a terrain undulation threshold, and a ground roughness threshold; Preset a first grid scale, and divide a first candidate remediation area based on the first grid scale to obtain a plurality of first terrain units, wherein the first candidate remediation area is any one of the plurality of candidate remediation areas; Extracting first land topography information of the first candidate remediation area from the plurality of land topography information, and splitting the first land topography information according to the plurality of first topography units to obtain a plurality of first unit topography information; Using the terrain indicator change threshold set to traverse the plurality of first unit terrain information to compare terrain indicator change trends; If the plurality of first unit terrain information all satisfy the terrain index change threshold set, the plurality of first terrain units, the plurality of first unit terrain information and the land terrain constraint are synchronized to a pre-built adjustment cost analysis model to perform terrain adjustment cost analysis to obtain a first terrain adjustment cost; By analogy, the plurality of terrain adjustment costs are obtained by analysis based on the plurality of land terrain information and the terrain deviations of the land terrain constraints.
5. The site selection analysis method for comprehensive land improvement according to claim 4, characterized in that: The method further comprises: Using the terrain indicator change threshold set to traverse the plurality of first unit terrain information, screening to obtain H first unit terrain information that does not meet the terrain indicator change threshold set, and mapping and calling from the plurality of first terrain units to obtain H first terrain units according to the H first unit terrain information, where H is a positive integer; Using 1 / 2 of the first grid scale as a second grid scale, and dividing the H first terrain units based on the second grid scale to obtain H groups of second terrain units; Splitting the H first units of terrain information according to the H groups of second terrain units to obtain H groups of second unit terrain information; Using the terrain index change threshold set to traverse the H groups of second unit terrain information, screen and obtain M third unit terrain information that does not meet the terrain index change threshold set, and obtain M second terrain units from the H groups of second terrain units according to the M third unit terrain information, where M is a positive integer less than or equal to H; Using 1 / 2 of the second grid scale as a third grid scale, and dividing the M second terrain units based on the third grid scale to obtain M groups of third terrain units; Splitting the M third unit terrain information according to the M groups of third terrain units to obtain M groups of third unit terrain information; By analogy, the terrain index change threshold set is used to traverse the M groups of third unit terrain information to compare the terrain index change trends, and the terrain units are divided into multiple levels based on the comparison results, until the first candidate remediation area is divided into several terrain units whose terrain unit information all meets the terrain index change threshold set.
6. The site selection analysis method for comprehensive land improvement according to claim 4, characterized in that: Synchronizing the plurality of first terrain units, the plurality of first unit terrain information and the land terrain constraint to a pre-built adjustment cost analysis model to perform terrain adjustment cost analysis to obtain a first terrain adjustment cost, the method further comprising: Interactively obtain multiple sample terrain areas, multiple sample terrain information, multiple sample terrain constraints and multiple sample adjustment costs of the associated map; Constructing the adjustment cost analysis model based on a back propagation neural network; Using the plurality of sample terrain areas, the plurality of sample terrain information, the plurality of sample terrain constraints and the plurality of sample adjustment costs as training data, and adjusting parameters of the adjustment cost analysis model; Extract and obtain a plurality of first terrain areas based on the plurality of first terrain units; Synchronizing the plurality of first terrain areas, the plurality of first unit terrain information and the land terrain constraints group by group to the adjustment cost analysis model after parameter adjustment processing to perform terrain adjustment cost analysis to obtain a plurality of first unit adjustment costs; The first terrain adjustment cost is obtained by adding the plurality of first unit adjustment costs.
7. The site selection analysis method for comprehensive land improvement according to claim 4, characterized in that: Interactively obtaining a comprehensive transportation network diagram of the area available for site selection, and fitting the multiple candidate remediation areas to the comprehensive transportation network diagram to perform traffic accessibility analysis to obtain multiple transportation connection costs, the method further comprising: Performing a multi-modal traffic shortest path analysis on the first candidate remediation area in the comprehensive traffic network diagram to obtain a plurality of first shortest paths, and adding the plurality of first shortest paths to obtain a first traffic connection cost; By analogy, the multiple candidate remediation areas are fitted to the comprehensive transportation network diagram to perform transportation accessibility analysis to obtain the multiple transportation connection costs.
8. A site selection analysis system for comprehensive land management, characterized in that: The system comprises: A land project information acquisition module, wherein the land project information acquisition module interactively obtains land project information, wherein the land project information includes land spatial condition constraints and land physical condition constraints; A regional land information acquisition module, wherein the regional land information acquisition module interactively obtains regional land information of the area available for site selection, and constructs and generates a geographic space model based on the regional land information; A site selection analysis module, wherein the site selection analysis module uses the land space condition constraint as a screening condition, traverses the geographic space model to perform site selection analysis, and obtains a plurality of candidate remediation areas, wherein the land space condition constraint includes a land shape constraint and a land area constraint; A land physical condition information acquisition module, which obtains a plurality of land physical condition information of the plurality of candidate remediation areas by calling the geographic space model; A land deviation analysis module, wherein the land deviation analysis module performs land deviation analysis according to the land physical condition constraint and a plurality of land physical condition information to obtain a plurality of land improvement costs; A traffic accessibility analysis module, wherein the traffic accessibility analysis module interactively obtains a comprehensive traffic network diagram of the area available for site selection, and fits the multiple candidate remediation areas to the comprehensive traffic network diagram to perform traffic accessibility analysis to obtain multiple traffic connection costs; A comprehensive site selection evaluation module is used to perform a comprehensive site selection evaluation on the multiple candidate remediation areas according to the multiple land remediation costs and the multiple traffic connection costs, and locate the target remediation area.
Citation Information
Patent Citations
Method for site selection of land consolidation project based on ant colony optimization algorithm
CN106651017A
A school location method based on GIS
CN109359162A
Administration land site selection evaluation guiding method
CN117474377A
Hydropower station site selection method, device and equipment and storage medium
CN118071048A
Land comprehensive improvement site selection analysis method and device and computer equipment
CN118228896A