The invention relates to the field of
agricultural land improvement, in particular to a rolling and crushing construction method and device for a
dry land-to-
paddy field impermeable layer, and aims at solving the problems that in the prior art, a
dry land-to-
paddy field impermeable layer construction method is complex in procedure and large in work amount, the following scheme is provided and comprises the following steps that 1,
a site is prepared, after the construction area is determined to be a full-body
loam area, preliminary leveling is carried out, sundries are removed, and mechanical operation is ensured; secondly, an impermeable layer is constructed, specifically, a three-edge wheel
impact road roller is used for conducting
impact rolling on the field surface original soil for multiple times, or a vibratory roller is used for conducting vibratory rolling on the field surface original soil for multiple times; 3, surface soil crushing: crushing 30-40cm soil on the
surface layer by using a hydraulic rotary cultivator, and loosening the
surface layer soil. According to the method, construction steps are simplified, in-situ
soil resources are utilized to the maximum extent, dependence on external materials is reduced, meanwhile, under the condition that a large amount of original soil is prevented from being stripped, the depth of a
plough layer is effectively increased, and disturbance to the
soil structure is reduced.