Charging station participation power market bidding method and system considering response uncertainty

By building the responsive capacity and total discharge power boundary model of the charging station, a robust optimization double-layer bid optimization model is established, which solves the difficulty of optimizing bidding strategies caused by uncertainty in the discharge behavior of electric vehicles and improves the stability of market participation of charging stations. Sexual and economical.

CN119067763APending Publication Date: 2024-12-03STATE GRID SICHUAN ELECTRIC POWER CORP ELECTRIC POWER RES INST
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411105736.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

When charging stations participate in the electricity market bidding, it is difficult to accurately predict the responsive capacity due to the uncertainty of electric vehicle discharge behavior, which makes it difficult to optimize the bidding strategy.

Method used

By obtaining the driving data of electric vehicles, a responsive capacity model and a total discharge power boundary model of the charging station are built, a robustly optimized double-layer bid optimization model is established, constraints are configured, and the model is solved to determine the bidding strategy.

Benefits of technology

Effectively respond to the uncertainty of electric vehicle discharge behavior, improve the reliability and economicality of charging station bidding strategies, ensure power balance, reduce losses caused by prediction errors, and improve the stability and economic benefits of market participation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067763A_ABST
    Figure CN119067763A_ABST
Patent Text Reader

Abstract

The invention discloses a charging station participation electricity market bidding method and system considering response uncertainty. According to the scheme, a double-layer bidding optimization model for participation of the charging station in the power market based on robust optimization is established on the basis of the responsible capacity of the charging station, a charging station responsible discharge total power boundary model and a charging station default penalty model; the constraint condition of the double-layer bidding optimization model is configured to effectively deal with the uncertainty problem caused by the random discharge behavior of the electric vehicle, and the reliability and economy of the bidding strategy of the charging station are improved; according to the method, the bidding strategy of the charging station is optimized in the day-ahead market, the charging and discharging plan of the charging station can be adjusted in the real-time market, the electric energy balance of the charging station is ensured, economic losses caused by prediction errors are reduced, and therefore the stability and economic benefits of the charging station participating in the electric power market are remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric energy planning, and in particular to a method and system for charging stations to participate in bidding in an electricity market taking into account response uncertainty. Background Art

[0002] In recent years, the rapid development of electric vehicles and their large-scale access to the power grid have had a significant impact on the safety and economic operation of the power system. Electric vehicles not only play the role of charging equipment that consumes electricity, but also provide peak load auxiliary services for the power system through flexible and adjustable energy storage capacity, so as to promote the consumption of intermittent new energy generation and improve the stability and economic benefits of the power system operation.

[0003] As a medium for electric vehicles to participate in the power grid, charging stations can directly manage and dispatch electric vehicles. Charging stations participating in the peak load auxiliary service market need to complete the declaration of information such as price and load curve in the day before, and these declared information will be used for centralized market clearing. In order for charging stations to better participate in the electricity market, how to accurately predict the responsive capacity of charging stations based on electric vehicle data and optimize the bidding strategy considering the uncertainty of electric vehicles are issues that need to be studied urgently. Summary of the invention

[0004] In view of the above-mentioned deficiencies in the prior art, the present invention aims to provide a method and system for charging stations to participate in electricity market bidding taking into account response uncertainty, thereby solving the uncertainty problem caused by the random discharge behavior of electric vehicles when charging stations participate in electricity market bidding.

[0005] The present invention is achieved through the following technical solutions:

[0006] This scheme provides a method for charging stations to participate in the electricity market bidding considering the response uncertainty, including:

[0007] Acquire driving data of electric vehicles related to the charging station, and aggregate the responsive capacity of the charging station based on the driving data;

[0008] Construct a total power boundary model of the charging station that can respond to discharge caused by the uncertainty of electric vehicle discharge behavior, and construct a box-type uncertainty set of uncertain variables;

[0009] In the worst scenario, a charging station default penalty model is established with the fluctuation range of uncertain variables as a constraint;

[0010] Based on the responsive capacity of the charging station, the responsive total discharge power boundary model of the charging station and the default penalty model of the charging station, a two-layer bidding optimization model for the charging station to participate in the power market based on robust optimization is established, and the constraint conditions of the two-layer bidding optimization model are configured;

[0011] The two-layer bidding optimization model is solved to obtain the bidding strategy.

[0012] A further optimization scheme is that the driving data of electric vehicles related to the charging station is obtained, and the responsive capacity of the charging station is aggregated based on the driving data; including:

[0013] Acquire driving data of each electric vehicle; the driving data includes: station entry time, station departure time, battery capacity, initial power, maximum charge and discharge power, charge and discharge efficiency, and discharge compensation coefficient;

[0014] The grid-connected status of each electric vehicle at different times is represented in the form of state variables, and the overall charging and discharging power of the charging station and the total capacity of the charging station are used as variables of the charging station's responsive capacity model;

[0015] The driving data, the grid connection status of each electric vehicle at different times, and the variables of the charging station responsive capacity model are input into the charging station responsive capacity model to calculate the responsive capacity of the charging station.

[0016] A further optimization scheme is that the charging station responsive capacity model includes:

[0017]

[0018] In the formula, Indicates the maximum charging and discharging power of electric vehicle n; P t ch,max With P t dis,max They represent the maximum charging and discharging power that a charging station can participate in market bidding at time t; It represents the maximum battery capacity that the charging station can respond to at time t; It represents the maximum amount of electricity that electric vehicle n can respond to at time t; represents the minimum battery capacity that the charging station can respond to at time t; represents the maximum amount of electricity that electric vehicle n can respond to at time t; X n,t represents the grid-connected status of electric vehicle n at time t; X n,t-1 represents the grid-connected status of electric vehicle n at time t-1; △S t S represents the change in power consumption at the charging station caused by the connection of electric vehicles to the grid at time t; n,arr represents the initial charge of electric vehicle n; S n,lea N represents the off-grid power of electric vehicle n; EV represents the set of all electric vehicles in the charging station; T represents the response time interval.

[0019] A further optimization scheme is that the charging station can respond to the total discharge power boundary model including:

[0020]

[0021] In the formula, represents the actual power sales boundary that can participate in the auxiliary market at time t, represents the offset of the discharge power boundary at time t, δ t It represents the offset coefficient of the discharge power boundary at time t and is also an uncertain variable.

[0022] A further optimization scheme is that the box uncertainty set of the uncertain variables includes:

[0023]

[0024] In the formula, ||δ t ||1, ||δ t || ∞ Denotes δ t The one-norm and infinite-norm of , τ dis Represents the robustness index.

[0025] A further optimization scheme is that the charging station default penalty model includes:

[0026]

[0027] Where W X represents the penalty function, Δt represents the bidding time interval, P dis,t represents the planned bidding discharge power of the charging station at time t, ρ t Represents the price of peak load penalty at time t.

[0028] A further optimization scheme is that the two-tier bidding optimization model includes:

[0029] Upper-level bidding strategy optimization model:

[0030] Lower market clearing optimization model:

[0031] Where P t ch With P t dis They represent the responsive charging and discharging power of the charging station at time t; f DA represents the day-ahead cost function of charging station i; represents the decision variables of the upper bidding strategy optimization model; represents the day-ahead clearing electricity price at the charging station during period t; represents the bid of the mth segment of the generator; P t G Represents the reported power of the generator at time t; MG represents the segmented set of power generator quotations; argmin represents the independent variable when the function takes the minimum value The value of It represents the capacity of the mth bidding segment of the generator in period t.

[0032] A further optimization scheme is that the constraints include:

[0033] Charging station capacity change balance constraints, bidding price boundary constraints, capacity range constraints of each power generator's bid, charging station bidding charging and discharging power range constraints, node power balance and transmission power constraints, system power balance constraints and branch transmission power boundary constraints.

[0034] A further optimization scheme is that solving the two-layer bidding optimization model to obtain a bidding strategy includes:

[0035] By establishing the KKT conditions of the lower-level market clearing optimization model, the lower-level market clearing optimization model is transformed into constraints and added to the upper-level bidding strategy optimization model; the KKT (Karush–Kuhn–Tucker conditions) conditions refer to the necessary and sufficient conditions for nonlinear programming problems to have optimal solutions under certain regular conditions, which is an important achievement of the generalized Lagrange multiplier.

[0036] According to the linearization deduction of the nonlinear part in the upper bidding strategy optimization model, an equivalent mixed integer linear programming model is obtained.

[0037] The present solution also provides a system for charging stations to participate in the power market bidding considering response uncertainty, which is used to implement the above-mentioned method for charging stations to participate in the power market bidding considering response uncertainty. The system includes:

[0038] A collection module, used to obtain driving data of electric vehicles related to the charging station, and aggregate the responsive capacity of the charging station based on the driving data;

[0039] The first model building module is used to build a charging station's responsive total discharge power boundary model caused by the uncertainty of electric vehicle discharge behavior, and to build a box uncertainty set of uncertain variables;

[0040] The second model building module is used to establish a charging station default penalty model under the worst scenario with the fluctuation range of uncertain variables as a constraint;

[0041] The third model building module is used to establish a two-layer bidding optimization model for charging stations to participate in the power market based on robust optimization based on the responsive capacity of the charging station, the responsive total discharge power boundary model of the charging station and the default penalty model of the charging station, and configure the constraint conditions of the two-layer bidding optimization model;

[0042] The solution module is used to solve the double-layer bidding optimization model to obtain the bidding strategy.

[0043] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0044] The present invention provides a method and system for bidding for charging stations in the electricity market taking into account response uncertainty. The scheme establishes a two-layer bidding optimization model for charging stations to participate in the electricity market based on robust optimization based on the responsive capacity of the charging station, the boundary model of the total responsive discharge power of the charging station and the default penalty model of the charging station, and configures the constraint conditions of the two-layer bidding optimization model to effectively deal with the uncertainty problem caused by the random discharge behavior of electric vehicles and improve the reliability and economy of the bidding strategy of the charging station. The method not only optimizes the bidding strategy of the charging station in the day-ahead market, but also adjusts the charging and discharging plan of the charging station in the real-time market to ensure the power balance of the charging station and reduce the economic losses caused by prediction errors, thereby significantly improving the stability and economic benefits of the charging station participating in the electricity market. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:

[0046] Figure 1 A flow chart of the bidding method for charging stations to participate in the electricity market considering response uncertainty;

[0047] Figure 2 It is a schematic diagram of the responsive capacity envelope;

[0048] Figure 3 It is a schematic diagram of the dischargeable power fluctuation range;

[0049] Figure 4 A schematic diagram for comparing day-ahead market bidding strategies for charging stations under different modes in the determination scenario;

[0050] Figure 5 Schematic diagram of comparison of day-ahead market bidding strategies of charging stations at different τ under the price acceptance mode in uncertain scenarios;

[0051] Figure 6 Schematic diagram of comparison of day-ahead market bidding strategies of charging stations at different τ under the price impact model in uncertain scenarios;

[0052] Figure 7A schematic diagram showing the comparison of real-time market bidding strategies for charging stations in the price acceptance mode;

[0053] Figure 8 Schematic diagram of the comparison of real-time market bidding strategies for charging stations under the price impact model. DETAILED DESCRIPTION

[0054] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.

[0055] Example 1

[0056] This embodiment provides a method for charging stations to participate in the electricity market bidding considering the response uncertainty, such as Figure 1 As shown, including:

[0057] Step 1: Acquire driving data of electric vehicles related to the charging station, and aggregate the responsive capacity of the charging station based on the driving data; specifically, the following steps are included:

[0058] S11, obtaining the driving data of each electric vehicle; the driving data includes: the time of entering the station Departure time Battery capacity S, initial charge Maximum charge and discharge power Charge and discharge efficiency η ch , η dis and discharge compensation coefficient η ref ;

[0059] S12, characterizing the grid connection status of each electric vehicle at different times in the form of state variables, and using the overall charging and discharging power of the charging station and the total capacity of the charging station as variables of the responsive capacity model of the charging station;

[0060] Since the grid-connected states of electric vehicles in charging stations are different in different time periods, integrating all electric vehicles is not a simple superposition based on individual models; therefore, the actual solution defines a state variable X n,t It is used to represent the grid-connected state of electric vehicle n at time t, so that the definition domain of each electric vehicle can be Extended to the same responsive interval T, where T is defined as 24 hours:

[0061]

[0062] S13, inputting the driving data, the grid connection status of each electric vehicle at different times, and the variables of the charging station responsive capacity model into the charging station responsive capacity model to calculate the responsive capacity of the charging station.

[0063] The overall charging and discharging power of the charging station and the total capacity of the charging station are used to replace the electric vehicle aggregate as the variable of the charging station's responsive capacity.

[0064]

[0065]

[0066] Where P t ch With P t dis They represent the responsive charging and discharging power of the charging station at time t; S t It represents the total amount of electricity that the charging station can respond to at time t.

[0067] Defining parameters in the charging station responsive capacity model This set is the responsive capacity of the charging station for bidding in the day-ahead market. Bring the driving data into the responsive capacity model of the charging station:

[0068]

[0069] In the formula, Indicates the maximum charging and discharging power of electric vehicle n; P t ch,max With P t dis,max They represent the maximum charging and discharging power that a charging station can participate in market bidding at time t; It represents the maximum battery capacity that the charging station can respond to at time t; It represents the maximum amount of electricity that electric vehicle n can respond to at time t; represents the minimum battery capacity that the charging station can respond to at time t; represents the maximum amount of electricity that electric vehicle n can respond to at time t; X n,t represents the grid-connected status of electric vehicle n at time t; X n,t-1 represents the grid-connected status of electric vehicle n at time t-1; △S t S represents the change in power consumption at the charging station caused by the connection of electric vehicles to the grid at time t; n,arr represents the initial charge of electric vehicle n; S n,lea N represents the off-grid power of electric vehicle n; EV Represents the set of all electric vehicles in the charging station; T represents the response time interval, which is 24 hours in total.

[0070] Step 2: construct a boundary model of the total power of the charging station that can respond to discharge caused by the uncertainty of the electric vehicle discharge behavior, and construct a box uncertainty set of uncertain variables;

[0071] Due to the uncertainty of electric vehicle travel patterns, the predicted responsive capacity of charging stations will fluctuate. In order to study the impact of fluctuations caused by inaccurate predicted capacity on bidding strategies, this scheme designs the dischargeable power in the predicted responsive capacity of charging stations, that is, the sold power participating in the auxiliary market, to fluctuate to a certain extent. The corresponding charging station responsive total discharge power boundary model is:

[0072]

[0073] In the formula, represents the actual power sales boundary that can participate in the auxiliary market at time t, represents the offset of the discharge power boundary at time t, δ t It represents the offset coefficient of the discharge power boundary at time t and is also an uncertain variable.

[0074] The boxed uncertainty set of the uncertain variables includes:

[0075]

[0076] In the formula, ||δ t ||1, ||δ t || ∞ Denotes δ t The one-norm and infinite-norm of , τ dis represents the robustness index, i.e. The intensity of fluctuations; generally τ dis The larger it is, the more violent the fluctuation is, and the result after robust optimization is more conservative.

[0077] Step 3: In the worst scenario, a charging station default penalty model is established with the fluctuation range of uncertain variables as a constraint. In the charging station bidding problem under robust optimization, this scheme sets the worst scenario as the predicted power participating in the auxiliary market is all greater than the power that the actual charging station can provide. The specific charging station default penalty model is:

[0078]

[0079] Where W X represents the penalty function, Δt represents the bidding time interval, ρ t represents the price of the peak load penalty at time t, which is set to 80% of the electricity price at time t in this embodiment; the penalty function represents the penalty fee that will be paid when the power that the charging station can actually participate in the auxiliary market does not reach the day-ahead forecast value.

[0080] Step 4: Based on the responsive capacity of the charging station, the responsive total discharge power boundary model of the charging station and the default penalty model of the charging station, a two-layer bidding optimization model for the charging station to participate in the power market based on robust optimization is established, and the constraint conditions of the two-layer bidding optimization model are configured;

[0081] During the specific implementation process, this plan established a two-layer bidding optimization model for charging stations to participate in the electricity day-ahead market; the two-layer bidding optimization model includes two layers of structures: the charging station optimizes the bidding strategy with the minimum electricity cost as the goal, and the market clearing strategy with the goal of maximizing social welfare; specifically, it includes:

[0082] Upper-level bidding strategy optimization model:

[0083] Lower market clearing optimization model: In the formula, Indicates the maximum charging and discharging power of electric vehicle n; P t ch,max With P t dis,max They represent the maximum charging and discharging power that a charging station can participate in market bidding at time t; It represents the maximum battery capacity that the charging station can respond to at time t; It represents the maximum amount of electricity that electric vehicle n can respond to at time t; represents the minimum battery capacity that the charging station can respond to at time t; represents the maximum amount of electricity that electric vehicle n can respond to at time t; X n,t represents the grid-connected status of electric vehicle n at time t; X n,t-1 represents the grid-connected status of electric vehicle n at time t-1; △S t S represents the change in power consumption at the charging station caused by the connection of electric vehicles to the grid at time t; n,arr represents the initial charge of electric vehicle n; S n,lea N represents the off-grid power of electric vehicle n; EV represents the set of all electric vehicles in the charging station; T represents the response time interval.

[0084] The configuration constraints include:

[0085] Charging station capacity change balance constraint: Among them, S t-1 represents the total amount of electricity that can be responded to by the charging station at time t-1;

[0086] Charging station capacity boundary constraints: in, represents the minimum battery capacity that the charging station can respond to at time t, The maximum battery capacity that the charging station can respond to at time t;

[0087] Bid price boundary constraints: in, represents the minimum bid price in the day-ahead market at time t; represents the maximum bid price in the day-ahead market at time t;

[0088] The capacity range constraints of each bid of the power generator are: in, represents the capacity upper limit of the mth bidding segment of the generator;

[0089] Charging station bidding charging and discharging power range constraints:

[0090]

[0091] It represents the maximum charging and discharging power that a charging station can participate in the market bidding at time t;

[0092] Since this solution considers the charging station as a grid node, the charging and discharging power of the charging station should also meet the power balance and transmission power constraints of the node; the power balance and transmission power constraints of the node are:

[0093]

[0094] Among them, P ij,t represents the power flowing from node i to node j at time t, and node j is the child node of node i; K represents the set of child nodes of node j, N L is the set of all nodes in the distribution network; represents the basic load of node j at time t.

[0095] System power balance constraints:

[0096]

[0097] Where P 0z,t represents the sum of the transmission power from the balancing node to all child nodes at time t; K0 represents the set of child nodes of the balancing node, and z represents the child nodes of the balancing node.

[0098] Branch transmission power boundary constraints: In the formula represents the maximum value of the branch transmission power at time t (i, j), P ij,t represents the branch transmission power (i, j) at time t.

[0099] Step five, solving the two-layer bidding optimization model to obtain the bidding strategy.

[0100] The step of solving the two-layer bidding optimization model to obtain a bidding strategy includes:

[0101] By establishing the KKT conditions of the lower-level market clearing optimization model, the lower-level market clearing optimization model is transformed into a constraint condition and added into the upper-level bidding strategy optimization model; the double-layer problem is transformed into a single-layer problem, and the original problem is transformed into a mathematical programming problem with equilibrium constraints.

[0102] According to the linearization deduction of the nonlinear part in the upper bidding strategy optimization model, an equivalent mixed integer linear programming model is obtained.

[0103] In addition, this embodiment also establishes a charging station bidding model based on real-time rolling updates in a real-time electricity market to verify the optimization effect of the proposed robust optimization on the double-layer bidding optimization model;

[0104] Since the day-ahead market is based on the predicted responsive capacity, the actual charging and discharging power of the charging station on that day may differ from the predicted value. Therefore, relying solely on the power purchased in the day-ahead market may not be able to fully support the charging plan of the charging station for the whole day. In order to ensure the power balance of the charging station, the charging station can participate in the real-time electricity market through the actual power deviation. This scheme constructs a two-stage real-time market bidding model based on real-time rolling updates.

[0105] For the upper bidding strategy optimization model, this scheme is designed to minimize the cost of the charging station participating in the real-time market during the rolling window x as the objective function. The formula is as follows:

[0106]

[0107] in is the dual variable corresponding to the unified market clearing electricity price in the real-time market; ΔP t ch , ΔP t dis are the changes in charging and discharging power of the charging station in period t relative to the day-ahead contract;

[0108] The constraints include:

[0109]

[0110]

[0111] In the formula, represents the charging power bid by the charging station at time t; represents the day-ahead bid discharge power of the charging station at time t;

[0112] For the lower-level market clearing optimization model, this scheme designs the spot electricity cost and the balancing cost of contract deviation (i.e. penalty cost). The clearing cost represents the loss of the market caused by the deviation of the line and the power of the generator due to clearing, minus the cost earned by the charging station for purchasing electricity. The formula is as follows:

[0113]

[0114] In the formula represents the clearing function of the charging station in the rolling window x; is the dual variable corresponding to the system marginal electricity price of the day-ahead market clearing; ΔP t G is the power deviation of the generator; π G,bal To balance the unit price of expenses; The dual variable corresponding to the system marginal electricity price that represents the real-time market clearing.

[0115] Line power constraints and generator power constraints include:

[0116]

[0117] Among them, ΔP 0j,x is the power deviation of the branch whose parent node is a balancing node; is the power of branch (i, j) in the day-ahead market; and are the lower and upper limits of the power regulation of the generator, corresponding to the peak regulation capacity of the system; K0 represents the sub-node set of the balancing node, and z represents the sub-node of the balancing node; Represents the power change of the generator in the time window x.

[0118] Based on the above model, the charging and discharging power data in the previous time window x is used to update the charging and discharging decisions of the charging station that have been completed, and the bidding strategy for the next time window x+1 is updated in real time. Finally, the bidding plan implemented by the charging station in the real-time electricity market for a whole day is obtained.

[0119] This scheme effectively addresses the uncertainty problem caused by the random discharge behavior of electric vehicles by considering the uncertainty of electric vehicle discharge behavior, and improves the reliability and economy of the bidding strategy of charging stations; through a two-layer optimization model and a real-time rolling update mechanism, this method not only optimizes the bidding strategy of charging stations in the day-ahead market, but also adjusts the charging and discharging plans of charging stations in real time to ensure the power balance of charging stations and reduce losses caused by prediction errors, thereby significantly improving the stability of charging stations participating in the electricity market.

[0120] Example 2

[0121] This embodiment provides a system for charging stations to participate in power market bidding considering response uncertainty, which is used to implement the method for charging stations to participate in power market bidding considering response uncertainty of embodiment 1. The system includes:

[0122] A collection module, used to obtain driving data of electric vehicles related to the charging station, and aggregate the responsive capacity of the charging station based on the driving data;

[0123] The first model building module is used to build a charging station's responsive total discharge power boundary model caused by the uncertainty of electric vehicle discharge behavior, and to build a box uncertainty set of uncertain variables;

[0124] The second model building module is used to establish a charging station default penalty model under the worst scenario with the fluctuation range of uncertain variables as a constraint;

[0125] The third model building module is used to establish a two-layer bidding optimization model for charging stations to participate in the power market based on robust optimization based on the responsive capacity of the charging station, the responsive total discharge power boundary model of the charging station and the default penalty model of the charging station, and configure the constraint conditions of the two-layer bidding optimization model;

[0126] The solution module is used to solve the double-layer bidding optimization model to obtain the bidding strategy.

[0127] In this embodiment, a charging station is connected to a regional distribution network, and a total of 1,500 electric vehicles are charged there. The individual differences in battery specifications are ignored, and the same electric vehicle parameters are selected. Among them, the maximum basic load is 40MW, assuming that there is a charging station connected to the area, the selected time period is 24 hours, and the bidding time interval Δt is 15 minutes.

[0128] The information related to the distribution network system and EV related parameters are as follows:

[0129] Table 1 EV simulation parameters

[0130]

[0131] Table 2 Probability distribution of EV driving mode

[0132]

[0133] For the base load distribution in the region and the price range of power generators, see Table 3 and Table 4 below:

[0134] Table 3 System basic load table

[0135] Time Period 1 Period 2 Period 3 Period 4 Load(MW) 24.46 23.32 22.90 22.99 Time Period 5 Period 6 Period 7 Period 8 Load(MW) 23.49 25.77 30.22 35.39 Time Period 9 Period 10 Period 11 Period 12 Load(MW) 38.22 39.13 40.00 39.80 Time Period 13 Period 14 Period 15 Period 16 Load(MW) 38.92 38.81 37.22 35.62 Time Period 17 Period 18 Period 19 Period 20 Load(MW) 36.11 37.68 36.44 34.48 Time Period 21 Period 22 Period 23 Period 24 Load(MW) 33.61 33.24 30.26 26.87

[0136] Table 4 Power generation company quotation parameters

[0137]

[0138] In this embodiment, the responsive capacity envelope curve obtained by all electric vehicles in the aggregated charging station within one day is as follows: Figure 2 As shown; a box-type uncertainty set of uncertain variables is established, and the dischargeable power fluctuation range obtained according to the charging station's responsive total discharge power boundary model is as follows Figure 3 At the same time, this embodiment selects the charging station in a certain scenario, that is, the discharge power boundary is determined, and compares the bidding strategy in an uncertain scenario to illustrate the advantages of the robust optimization method proposed in the present invention. The bidding strategy of the charging station in the day-ahead market under the certain scenario is optimized, and the bidding strategy obtained is as follows Figure 4 As shown. At the same time, the following three bidding strategies are set for comparison:

[0139] Bidding strategy 1: It is assumed that electric vehicles are charged immediately after stopping at the charging station and do not participate in the discharge behavior of the charging station;

[0140] Bidding strategy 2: It is assumed that charging stations participate in the electricity market bidding as price takers, and the electricity price is not affected by the bidders. Electric vehicles participate in the discharge behavior of charging stations;

[0141] Bidding strategy 3: It is believed that charging stations participate in the electricity market bidding as price influencers, the electricity price will be affected by the bidders, and electric vehicles participate in the discharge behavior of charging stations;

[0142] from Figure 4 It can be seen that in the stop-and-charge mode, the charging station does not have the right to allocate electric vehicles and there is no discharge behavior. Charging is chosen during peak hours, which has the highest cost. In the price acceptance and price influence modes, the charging station optimizes the charging sequence in both modes, choosing to sell electricity to the auxiliary market during peak hours and purchase electricity from the power grid to charge electric vehicles during off-peak hours. Both strategies can significantly reduce the cost of the charging station. However, in the price influence mode, the increase in electricity prices will be considered to reduce the purchase of electricity in the early morning.

[0143] Table 5 Determine the cost of purchasing and selling electricity for charging stations under the scenario

[0144]

[0145] As shown in Table 5, the electricity purchase and sales costs of charging stations under the price acceptor and price influencer modes are significantly lower than those of disorderly charging, and the economic benefits are very significant. By comparing the electricity purchase and sales costs of charging stations under the two modes, it can be found that the electricity purchase and sales costs under the price acceptor mode are 4308.9 yuan lower than those under the price influencer mode. This is because the price acceptor model assumes that the capacity of market participants and quotation segments are infinite, so the bidding strategy of the charging station plans more electricity in the early morning when the price is low; while the charging station under the price influencer mode believes that too much bidding in the early morning will lead to price increases. However, the electricity purchase and sales costs under the two optimized bidding strategies are much lower than those under disorderly charging.

[0146] In uncertain scenarios, the bidding strategy of charging stations will appear more conservative due to the uncertainty of the discharge power boundary, such as Figure 5 and Figure 6 As shown in the figure. By changing the robustness index, the decision to buy and sell electricity will change. When the robustness index increases, the uncertainty range of the discharge power boundary increases, which makes the charging station choose a more conservative strategy to deal with it. This is reflected in the figure that there are some periods of time when the discharge power participating in the auxiliary market no longer reaches the boundary value, and the robustness index increases, and the discharge power will be less. At the same time, τ dis The larger the value, the larger the uncertainty range, the more conservative the strategy will be, the lower the electricity sales revenue will be, and the cost will increase. Compared with the two bidding strategies, the charging station strategy in the price-influenced mode is affected by τ dis This is also because the bidding power selected by the charging station in this strategy does not reach the boundary value, which leads to the insignificant effect of robust optimization. The bidding costs of the two strategies are shown in Tables 6 and 7 below:

[0147] Table 6 Bidding costs of charging stations in price acceptance mode under different τ

[0148] Bidding Model Electricity purchase cost (yuan) <![CDATA[τ dis =0]]> 2426.5 <![CDATA[τ dis =1]]> 2615.6 <![CDATA[τ dis =2]]> 2744.3 <![CDATA[τ dis =3]]> 2823.9

[0149] Table 7. Bidding cost of charging stations under different τ price impact models

[0150] Bidding Model Electricity purchase cost (yuan) <![CDATA[τ dis =0]]> 6735.4 <![CDATA[τ dis =1]]> 6848.5 <![CDATA[τ dis =2]]> 6933.8 <![CDATA[τ dis =3]]> 6956.7

[0151] Due to the predictability of day-ahead decisions, the charging behavior of the charging station on the day will inevitably deviate from the charging plan made a day ago. Based on this, the real-time charging and discharging power deviation of the charging station is simulated, and the real-time charging and discharging power of the deterministic scenario and the uncertain scenario under the price acceptance and price influence modes are compared. Figure 7 and Figure 8 shown.

[0152] The day-ahead bidding power of the charging station represents the expected optimal response obtained by solving the strategic bidding model, and the real-time charging and discharging power is the actual charging and discharging power executed in each time period of the day. Through the clearing of charging and discharging in the real-time scenario, under the price influence strategy, whether in the certain scenario or the uncertain scenario, the real-time charging and discharging plan is basically the same as the day-ahead bidding power strategy, and only at certain time points there is a power deviation that requires real-time regulation. Under the price acceptance strategy, there are a large number of power deviations in both scenarios that need to be adjusted in a timely manner, which shows that the bidding strategy under the price influence mode is more in line with the real-time charging and discharging behavior, and the robust optimization model mentioned above does not affect the accuracy of the strategy.

[0153] In summary, the present invention believes that charging stations as price influencers and price acceptors can reduce the cost of electricity purchases and play a role in peak shaving and valley filling by bidding in the day-ahead market. However, the price acceptor model is more ideal, and the charging and discharging plan touches the boundary value of the responsive power in multiple time periods. At this time, considering the uncertainty of the sold power can improve the reliability of the bidding strategy to a certain extent, making the model calculation results conservative, but the cost of the charging station will increase accordingly. According to the final simulated real-time market bidding, it can be seen that the bidding decision based on the price influence model is more in line with the actual charging and discharging needs of the next day, and it is verified that the robust optimization model does not affect the accuracy of the strategy.

[0154] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A method for charging stations to participate in electricity market bidding considering response uncertainty. It is characterized in that include: Acquire driving data of electric vehicles related to the charging station, and aggregate the responsive capacity of the charging station based on the driving data; Construct a total power boundary model of the charging station that can respond to discharge caused by the uncertainty of electric vehicle discharge behavior, and construct a box-type uncertainty set of uncertain variables; In the worst scenario, a charging station default penalty model is established with the fluctuation range of uncertain variables as a constraint; Based on the responsive capacity of the charging station, the responsive total discharge power boundary model of the charging station and the default penalty model of the charging station, a two-layer bidding optimization model for the charging station to participate in the power market based on robust optimization is established, and the constraint conditions of the two-layer bidding optimization model are configured; The two-layer bidding optimization model is solved to obtain the bidding strategy.

2. The method for charging stations to participate in the electricity market bidding considering response uncertainty according to claim 1, It is characterized in that The step of obtaining driving data of electric vehicles related to the charging station and aggregating the responsive capacity of the charging station based on the driving data; include: Acquire driving data of each electric vehicle; the driving data includes: station entry time, station departure time, battery capacity, initial power, maximum charge and discharge power, charge and discharge efficiency, and discharge compensation coefficient; The grid-connected status of each electric vehicle at different times is represented in the form of state variables, and the overall charging and discharging power of the charging station and the total capacity of the charging station are used as variables of the charging station's responsive capacity model; The driving data, the grid connection status of each electric vehicle at different times, and the variables of the charging station responsive capacity model are input into the charging station responsive capacity model to calculate the responsive capacity of the charging station.

3. The method for charging stations to participate in the electricity market bidding considering response uncertainty according to claim 2, It is characterized in that The charging station responsive capacity model includes: In the formula, Indicates the maximum charging and discharging power of electric vehicle n; P t ch,max With P t dis,max They represent the maximum charging and discharging power that a charging station can participate in market bidding at time t; It represents the maximum battery capacity that the charging station can respond to at time t; It represents the maximum amount of electricity that electric vehicle n can respond to at time t; represents the minimum battery capacity that the charging station can respond to at time t; represents the maximum amount of electricity that electric vehicle n can respond to at time t; X n,t represents the grid-connected status of electric vehicle n at time t; X n,t-1 represents the grid-connected status of electric vehicle n at time t-1; △S t S represents the change in power consumption at the charging station caused by the connection of electric vehicles to the grid at time t; n,arr represents the initial charge of electric vehicle n; S n,lea N represents the off-grid power of electric vehicle n; EV represents the set of all electric vehicles in the charging station; T represents the response time interval.

4. The method for charging stations to participate in the electricity market bidding considering response uncertainty according to claim 3, It is characterized in that The charging station can respond to the total discharge power boundary model including: In the formula, represents the actual power sales boundary that can participate in the auxiliary market at time t, represents the offset of the discharge power boundary at time t, δ t It represents the offset coefficient of the discharge power boundary at time t and is also an uncertain variable.

5. The method for charging stations to participate in the electricity market bidding considering response uncertainty according to claim 4, It is characterized in that The boxed uncertainty set of the uncertain variables includes: In the formula, ||δ t || 1 、||δ t || ∞ Denotes δ t The one-norm and infinite-norm of , τ dis Represents the robustness index.

6. The method for charging stations to participate in the electricity market bidding considering response uncertainty according to claim 4, It is characterized in that The charging station default penalty model includes: Where W X represents the penalty function, Δt represents the bidding time interval, P dis,t represents the planned bidding discharge power of the charging station at time t, ρ t Represents the price of peak load penalty at time t.

7. The method for charging stations to participate in the electricity market bidding considering response uncertainty according to claim 6, It is characterized in that The two-tier bidding optimization model includes: Upper-level bidding strategy optimization model: Lower market clearing optimization model: Where P t ch With P t dis They represent the responsive charging and discharging power of the charging station at time t; f DA represents the day-ahead cost function of charging station i; represents the decision variables of the upper bidding strategy optimization model; represents the day-ahead clearing electricity price at the charging station during period t; represents the bid of the mth segment of the generator; P t G Represents the reported power of the generator at time t; M G represents the segmented set of power generator quotations; argmin represents the independent variable when the function takes the minimum value The value of It represents the capacity of the mth bidding segment of the generator in period t.

8. The method for charging stations to participate in the electricity market bidding considering response uncertainty according to claim 7, It is characterized in that The constraints include: Charging station capacity change balance constraints, bidding price boundary constraints, capacity range constraints of each power generator's bid, charging station bidding charging and discharging power range constraints, node power balance and transmission power constraints, system power balance constraints and branch transmission power boundary constraints.

9. The method for charging stations to participate in the electricity market bidding considering response uncertainty according to claim 4, It is characterized in that The step of solving the two-layer bidding optimization model to obtain a bidding strategy includes: By establishing the KKT conditions of the lower-level market clearing optimization model, the lower-level market clearing optimization model is transformed into a constraint condition and added into the upper-level bidding strategy optimization model; According to the linearization deduction of the nonlinear part in the upper bidding strategy optimization model, an equivalent mixed integer linear programming model is obtained.

10. Considering the charging station with response uncertainty to participate in the electricity market bidding system, It is characterized in that The method for charging stations to participate in bidding in the electricity market considering response uncertainty as described in any one of claims 1 to 9, the system comprising: A collection module, used to obtain driving data of electric vehicles related to the charging station, and aggregate the responsive capacity of the charging station based on the driving data; The first model building module is used to build a charging station's responsive total discharge power boundary model caused by the uncertainty of electric vehicle discharge behavior, and to build a box uncertainty set of uncertain variables; The second model building module is used to establish a charging station default penalty model under the worst scenario with the fluctuation range of uncertain variables as a constraint; The third model building module is used to establish a two-layer bidding optimization model for charging stations to participate in the power market based on robust optimization based on the responsive capacity of the charging station, the responsive total discharge power boundary model of the charging station and the default penalty model of the charging station, and configure the constraint conditions of the two-layer bidding optimization model; The solution module is used to solve the double-layer bidding optimization model to obtain the bidding strategy.

Citation Information

Cited By

  • Large-scale new energy base scheduling method based on uncertainty of electric power spot market

    CN119651612A