Method and system for monitoring geological disasters of power transmission line and monitoring wake-up mechanism
By setting up a device trigger mechanism in the geological disaster monitoring of transmission lines, using LSTM prediction model and low-power equipment to collect data, and awaken high-power equipment step by step, the problem of high power consumption in the existing technology is solved and a lower overall Power consumption and higher monitoring efficiency.
Patent Information
- Application Number
- CN202411210195.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-12-03
AI Technical Summary
In the prior art, the geological disaster monitoring method of transmission line requires the coordinated working of multiple sensors, resulting in high operating power consumption and reducing overall power consumption.
By setting up a trigger mechanism for monitoring equipment, data collection is only carried out when there is disaster risk, low-power meteorological and geological disaster monitoring equipment collects basic data, build a long-term and short-term memory neural network LSTM prediction model, predict the probability of geological disasters, and wake up Or sleep related devices, trigger high-power consumption devices step by step to reduce overall power consumption.
It effectively reduces the overall power consumption of geological disaster monitoring in transmission lines, improves monitoring efficiency and accuracy, and avoids unnecessary high-power consumption equipment.
Smart Images

Figure CN119068633A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power transmission line monitoring, and in particular to a method and system for monitoring geological disasters of power transmission lines, and a monitoring wake-up mechanism. Background Art
[0002] Geological disasters such as landslides, mudslides, ground collapse, ground subsidence, earthquakes, etc. will endanger the safety of power transmission lines. At the very least, they will damage the transmission facilities and shorten the service life of the facilities. At worst, they may cause multiple transmission lines to trip, resulting in power outages.
[0003] At present, the commonly used monitoring of mudslides on power transmission lines is to conduct precise monitoring simultaneously through multi-parameter technical means such as meteorological sensors, vibration sensors, and pressure sensors. When abnormal dynamics such as vibration and displacement of the mountain are detected, the video device (camera) is awakened to collect images of the surrounding geological conditions. The development trend of geological disasters is identified through intelligent image processing, timely warnings are issued, preventive measures are taken, and secondary disasters are prevented from occurring.
[0004] In order to improve the accuracy of debris flow warning, the above method adopts a multi-parameter comprehensive judgment method, which requires multiple types of sensors to work together and has problems such as high operating power consumption.
[0005] In order to solve the problem of high power consumption in the existing technology, it is urgent to provide a new method for monitoring geological disasters on transmission lines to reduce the overall power consumption of geological disaster monitoring on transmission lines. Summary of the invention
[0006] The technical problem to be solved by the present invention is that the traditional monitoring technology for debris flows on transmission lines adopts a multi-parameter comprehensive judgment method, which requires multiple types of sensors to work together and has problems such as high operating power consumption. The purpose of the present invention is to provide a monitoring method, system and monitoring wake-up mechanism for geological disasters on transmission lines. On the basis of traditional monitoring technology, method improvements are made. By setting a trigger mechanism for starting normal monitoring work of the monitoring equipment, monitoring data is collected only when there is a disaster risk, thereby reducing the overall power consumption of geological disaster monitoring on transmission lines.
[0007] The present invention is achieved through the following technical solutions:
[0008] This scheme provides a method for monitoring geological disasters of power transmission lines, including:
[0009] Collect basic data of the target area;
[0010] Construct a long short-term memory neural network LSTM prediction model, and predict the probability of geological disasters based on basic data and the long short-term memory neural network LSTM prediction model;
[0011] Wake up the vibration monitoring equipment to work or sleep mode according to the probability of geological disasters;
[0012] When the vibration monitoring device enters the working state, first data collected by the vibration monitoring device is acquired; based on the first data, the image monitoring device is awakened to enter the working state or the sleeping state;
[0013] When the environmental image monitoring device enters the working state, environmental image data is acquired; image determination is performed based on the environmental image data to obtain geological disaster monitoring results.
[0014] Working principle of this scheme: Traditional monitoring technology for debris flow on transmission lines adopts a multi-parameter comprehensive judgment method, which requires multiple types of sensors to work together and has problems such as high operating power consumption; the purpose of the present invention is to provide a monitoring method, system and medium for geological disasters on transmission lines. On the basis of traditional monitoring technology, method improvements are made. By setting a trigger mechanism for starting normal monitoring work for different monitoring devices, monitoring devices with higher power consumption are triggered to start normal working state when there is a disaster risk, and monitoring data is collected to reduce the overall power consumption of geological disaster monitoring on transmission lines.
[0015] Basic data is collected through low-power meteorological monitoring equipment, geological disaster monitoring equipment and other equipment, and whether to wake up the vibration monitoring equipment with higher power consumption is determined based on the basic data. After the vibration monitoring equipment is awakened, whether to wake up the camera is determined based on the first data collected by the monitoring equipment. In this application, the monitoring equipment with overall low power consumption triggers the monitoring equipment with high power consumption step by step, thereby reducing the working time of the monitoring equipment with high power consumption, thereby reducing the overall power consumption of mudslide monitoring of transmission lines.
[0016] A further optimization scheme is that the basic data includes: temperature, humidity, wind speed, air pressure, horizontal position inclination angle of the ground and soil moisture of the target area.
[0017] A further optimization scheme is to construct a long short-term memory neural network LSTM prediction model, and predict the probability of geological disasters based on basic data and the long short-term memory neural network LSTM prediction model; including methods:
[0018] Based on grey correlation analysis, the basic data is used as the feature quantity Xi, and the probability of debris flow is used as the prediction target output quantity Yi to build an LSTM prediction model;
[0019] Obtain historical basic data and build a time series based on the historical basic data; train the LSTM prediction model based on the historical basic data and the time series to obtain the long short-term memory neural network LSTM prediction model;
[0020] The basic data is input into the long short-term memory neural network (LSTM) prediction model to obtain the probability of debris flow occurrence.
[0021] A further optimization scheme is that the vibration monitoring device is awakened to enter a working state or a dormant state according to the probability of geological disasters, including the following method:
[0022] Set a threshold for the probability of disaster occurrence and put vibration monitoring equipment into a dormant state;
[0023] Determine whether the probability of geological disasters is greater than the threshold value of the probability of disasters. If so, the vibration monitoring device is turned on; otherwise, the vibration monitoring device remains in a dormant state.
[0024] A further optimization scheme is that the first data includes vibration data of the transmission tower body, and the vibration data includes vibration frequency and amplitude.
[0025] A further optimization scheme is that the method of waking up the image monitoring device according to the first data to enter a working state or a dormant state includes:
[0026] A threshold condition is set, and when the first data exceeds the threshold condition, the image monitoring device enters a working state; otherwise, the image monitoring device remains in a dormant state.
[0027] A further optimization scheme is that the geological disaster monitoring results are obtained by performing image determination based on the environmental image data, including the following method:
[0028] Acquire environmental image data;
[0029] The environmental image data is input into the constructed YOLOv8 diagnostic model to obtain the geological disaster monitoring results.
[0030] The present invention also provides a transmission line geological disaster monitoring system, which is used to implement the above-mentioned transmission line geological disaster monitoring method, and the system includes:
[0031] The first acquisition module is used to acquire basic data of the target area;
[0032] The probability prediction module is used to build a long short-term memory neural network LSTM prediction model and predict the probability of geological disasters based on basic data and the long short-term memory neural network LSTM prediction model;
[0033] The first wake-up module is used to wake up the vibration monitoring device to enter a working state or a dormant state according to the probability of geological disasters;
[0034] A second wake-up module is used to obtain first data collected by the vibration monitoring device when the vibration monitoring device enters a working state; based on the first data, wake up the image monitoring device to enter a working state or a dormant state;
[0035] The determination module is used to obtain environmental image data when the environmental image monitoring device enters the working state; and perform image determination based on the environmental image data to obtain geological disaster monitoring results.
[0036] A further optimization solution is that the vibration monitoring equipment is arranged on the transmission tower body.
[0037] This solution also provides a monitoring wake-up mechanism for implementing the above-mentioned method for monitoring geological disasters of power transmission lines; including:
[0038] Collect basic data of the target area;
[0039] Waking up the first power consumption monitoring device based on the basic data to enter a working state or a sleeping state;
[0040] Based on the first data collected by the first power consumption monitoring device in the working state, waking up the second power consumption monitoring device to enter the working state or the sleeping state;
[0041] The power consumption of the first power consumption monitoring device is less than that of the second power consumption monitoring device.
[0042] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0043] 1. The present invention provides a method, system and monitoring wake-up mechanism for geological disasters on transmission lines. Based on the traditional monitoring technology, the method is improved by setting a trigger mechanism for different monitoring devices to start normal monitoring work. Monitoring devices with higher power consumption are triggered to start normal working state when there is a disaster risk, and monitoring data is collected to reduce the overall power consumption of geological disaster monitoring on transmission lines.
[0044] 2. The present invention provides a method, system and monitoring wake-up mechanism for geological disasters on transmission lines; basic data is collected by low-power meteorological monitoring equipment, geological disaster monitoring equipment and other equipment, and whether to wake up a vibration monitoring equipment with higher power consumption is determined based on the basic data; after the vibration monitoring equipment is awakened, whether to wake up the camera is determined based on the first data collected by the monitoring equipment; in this application, the monitoring equipment with overall low power consumption triggers the monitoring equipment with high power consumption step by step, thereby reducing the working time of the monitoring equipment with high power consumption, thereby reducing the overall power consumption of debris flow monitoring of transmission lines. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:
[0046] Figure 1 This is a schematic diagram of the monitoring method of geological hazards of power transmission lines;
[0047] Figure 2 This is a schematic diagram of the monitoring process of geological hazards of transmission lines;
[0048] Figure 3 This is a schematic diagram of the structure of the monitoring system for geological hazards of transmission lines;
[0049] Figure 4 A schematic diagram of the application environment of the monitoring method for geological hazards of power transmission lines;
[0050] Figure 5 This is a schematic diagram of the computer device structure of Example 6. DETAILED DESCRIPTION
[0051] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0052] The traditional monitoring technology for debris flow on power transmission lines adopts a multi-parameter comprehensive judgment method, which requires multiple types of sensors to work together and has problems such as high operating power consumption. In view of this, the present invention provides the following embodiments to solve the above technical problems:
[0053] Example 1
[0054] This embodiment provides a method for monitoring geological disasters of power transmission lines. Figure 1 and Figure 2 As shown, the steps include:
[0055] Step 1: Collect basic data of the target area; the basic data includes: temperature, humidity, wind speed, air pressure, horizontal position inclination angle of the ground and soil moisture of the target area.
[0056] Step 2: Build a long short-term memory neural network LSTM prediction model, and predict the probability of geological disasters based on basic data and the long short-term memory neural network LSTM prediction model; the specific methods of this step during implementation include:
[0057] Based on grey correlation analysis, the basic data is used as the feature quantity Xi, and the probability of debris flow is used as the prediction target output quantity Yi to build an LSTM prediction model;
[0058] Obtain historical basic data and build a time series based on the historical basic data; train the LSTM prediction model based on the historical basic data and the time series to obtain the long short-term memory neural network LSTM prediction model;
[0059] The basic data is input into the long short-term memory neural network (LSTM) prediction model to obtain the probability of debris flow occurrence.
[0060] Step three: wake up the vibration monitoring equipment to enter working state or dormant state according to the probability of geological disasters. During the implementation process, this step specifically includes the following methods:
[0061] Set a disaster probability threshold and put the vibration monitoring equipment in a dormant state; the disaster probability threshold during the specific implementation process is 50%;
[0062] It is determined whether the probability of geological disasters is greater than the threshold of the probability of disasters. If so, the vibration monitoring device is turned on, otherwise, the vibration monitoring device is kept in a dormant state. In the specific implementation process, the vibration monitoring device is a vibration sensor with a sensitivity of 10000mV / g.
[0063] Step 4, when the vibration monitoring device enters the working state, obtain the first data collected by the vibration monitoring device; based on the first data, wake up the image monitoring device to enter the working state or the sleep state; the first data includes the vibration data of the transmission tower body, and the vibration data includes the vibration frequency and amplitude.
[0064] A method for waking up the image monitoring device based on the first data to enter a working state or a dormant state includes:
[0065] A threshold condition is set, and when the first data exceeds the threshold condition, the image monitoring device enters a working state; otherwise, the image monitoring device remains in a dormant state.
[0066] Step 5: When the environmental image monitoring device enters the working state, the environmental image data is obtained; image judgment is performed based on the environmental image data to obtain the geological disaster monitoring result.
[0067] The specific methods of this step during implementation include:
[0068] Obtain environmental image data; preferably, use a camera to obtain an image of the current environment; input the environmental image data into the constructed YOLOv8 diagnostic model to obtain geological disaster monitoring results.
[0069] Example 2
[0070] This embodiment provides a transmission line geological disaster monitoring system, which is used to implement the transmission line geological disaster monitoring method of embodiment 1. Figure 3 As shown, the system comprises:
[0071] The first acquisition module is used to acquire basic data of the target area;
[0072] The probability prediction module is used to build a long short-term memory neural network LSTM prediction model and predict the probability of geological disasters based on basic data and the long short-term memory neural network LSTM prediction model;
[0073] The first wake-up module is used to wake up the vibration monitoring device to enter a working state or a dormant state according to the probability of geological disasters;
[0074] A second wake-up module is used to obtain first data collected by the vibration monitoring device when the vibration monitoring device enters a working state; based on the first data, wake up the image monitoring device to enter a working state or a dormant state;
[0075] The determination module is used to obtain environmental image data when the environmental image monitoring device enters the working state; and to perform image determination based on the environmental image data to obtain geological disaster monitoring results. The vibration monitoring device is arranged on the transmission tower body.
[0076] Example 3
[0077] The method for monitoring geological disasters on power transmission lines provided in Example 1 of the present application can be applied to Figure 4 In the application environment shown. Among them, the terminal 102 communicates with the server 104 through the network. The data storage system can store the data that the server 104 needs to process. The data storage system can be set up separately, integrated on the server 104, or placed on the cloud or other servers. The terminal 102 can send the acquired collected data to the server 104. After receiving the collected data, the server 104 processes the collected data. The server 104 uses the basic data and adopts a recurrent neural network to build a long short-term memory neural network LSTM prediction model; when the probability of debris flow is greater than the set threshold, the working mode of the vibration sensor fixed on the transmission tower is awakened from the dormant state to the starting working state; the vibration sensor is used to monitor the vibration of the transmission tower body to obtain the first data; when the first data reaches the alarm value, the working mode of the camera is awakened from the dormant state to the shooting state; the camera is used to obtain an image of the current environment; and the judgment result is determined based on the acquired image. The server 104 can feedback the obtained judgment result to the terminal 102.
[0078] The terminal 102 may be, but is not limited to, various desktop computers, laptop computers, smart phones, tablet computers, IoT devices, and portable wearable devices. The IoT devices may be smart speakers, smart TVs, smart air conditioners, smart vehicle-mounted devices, etc. The portable wearable devices may be smart watches, smart bracelets, head-mounted devices, etc. The server 104 may be implemented as an independent server or a server cluster consisting of multiple servers, or may be a cloud server.
[0079] Example 4
[0080] This embodiment provides a monitoring wake-up mechanism for implementing the above-mentioned method for monitoring geological disasters of power transmission lines; including:
[0081] Collect basic data of the target area;
[0082] Waking up the first power consumption monitoring device based on the basic data to enter a working state or a sleeping state;
[0083] Based on the first data collected by the first power consumption monitoring device in the working state, waking up the second power consumption monitoring device to enter the working state or the sleeping state;
[0084] The power consumption of the first power consumption monitoring device is less than that of the second power consumption monitoring device. In this embodiment, the first power consumption monitoring device corresponds to a vibration monitoring device, and the second power consumption monitoring device corresponds to an environmental image monitoring device.
[0085] Example 5
[0086] This embodiment provides a computer-readable medium on which a computer program is stored. The computer program is executed by a processor to implement a method for monitoring geological disasters of a power transmission line as in Embodiment 1. Specifically, it can be executed by a computer device such as a terminal or a server alone, or by a terminal and a server together. In the embodiment of the present application,
[0087] Step 1: Use meteorological sensors and geological disaster sensors to obtain basic data; the basic data include: temperature and humidity, wind speed, air pressure, ground horizontal position inclination and soil moisture; the geological disaster sensors are installed in the land around the transmission line tower;
[0088] Step 2: Using the basic data and a recurrent neural network, a long short-term memory neural network (LSTM) prediction model is constructed; the long short-term memory neural network (LSTM) prediction model is used to determine the probability of debris flow occurrence based on the basic data;
[0089] Step 3: When the probability of debris flow is greater than a set threshold, the working mode of the vibration sensor fixed on the transmission tower is awakened from the sleep state to the start working state;
[0090] Step 4: Using a vibration sensor to monitor the vibration of the transmission tower body to obtain first data;
[0091] Step 5: When the first data reaches the alarm value, the working mode of the camera is awakened from the sleep state to the shooting state;
[0092] Step six, using the camera to obtain an image of the current environment; and determining a judgment result based on the obtained image, and then sending the judgment result to the terminal.
[0093] In the above steps 1 to 6, the first collected data collected by the low-power meteorological sensor and the geological disaster sensor is used to analyze the probability of debris flow; then, according to the probability of debris flow, it is determined whether to trigger the high-power vibration sensor to collect high-precision vibration frequency, and then according to the second collected data, it is determined whether the alarm value is reached; thereafter, the camera is triggered to perform intelligent image recognition to obtain the judgment result, and the final debris flow warning analysis result is uploaded to the terminal, and the staff makes the final decision.
[0094] In another exemplary embodiment of the present application, Figure 2 As shown, the threshold is set to 50%; when the probability of debris flow is less than or equal to 50%, the vibration sensor continues to be in a dormant state; when the probability of debris flow is greater than 50%, the vibration sensor monitors the vibration of the transmission tower body with a sensitivity of up to 10000mV / g.
[0095] In another exemplary embodiment of the present application, when the vibration sensor does not issue an alarm, the camera continues to be in a dormant state; when the vibration sensor issues an alarm, the camera starts shooting, collects images of disaster sources in the surrounding area and intelligently identifies them, the image recognition algorithm selects YOLOv8, and the mountain "mudslide" is used as an identification defect for training and identification, and the judgment result is sent to the terminal.
[0096] The vibration sensor and camera in this application require a relatively high excitation voltage, and during operation, the power consumption is relatively high. In order to achieve low-power control and avoid problems such as false alarms and missed alarms, this application combines meteorological sensors and geological disaster sensors with lower power consumption to achieve more reasonable low-power operation. The vibration sensor and the IoT proxy device and video device at the edge of the tower are relatively close. Depending on the signal coverage status in the mountainous area, wired communication methods can be used, or wireless methods can be used to improve data transmission efficiency. While achieving low-power monitoring, multi-parameter debris flow comprehensive early warning judgment is retained with high accuracy.
[0097] Example 6
[0098] This embodiment provides a computer device, which may be a server or a terminal. Its internal structure diagram may be as follows: Figure 5As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store collected data. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for monitoring geological disasters of a transmission line is implemented.
[0099] Those skilled in the art will understand that Figure 5 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0100] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for monitoring geological disasters of power transmission lines, characterized in that: include: Collect basic data of the target area; Construct a long short-term memory neural network LSTM prediction model, and predict the probability of geological disasters based on basic data and the long short-term memory neural network LSTM prediction model; Wake up the vibration monitoring equipment to work or sleep mode according to the probability of geological disasters; When the vibration monitoring device enters the working state, first data collected by the vibration monitoring device is acquired; based on the first data, the image monitoring device is awakened to enter the working state or the sleeping state; When the environmental image monitoring device enters the working state, environmental image data is acquired; image determination is performed based on the environmental image data to obtain geological disaster monitoring results.
2. A method for monitoring geological disasters of power transmission lines according to claim 1, characterized in that: The basic data include: temperature, humidity, wind speed, air pressure, ground level inclination and soil moisture in the target area.
3. A method for monitoring geological disasters of power transmission lines according to claim 2, characterized in that: The long short-term memory neural network LSTM prediction model is constructed, and the probability of geological disasters is predicted based on the basic data and the long short-term memory neural network LSTM prediction model; Included methods: Based on grey correlation analysis, the basic data is used as the feature quantity Xi, and the probability of debris flow is used as the prediction target output quantity Yi to build an LSTM prediction model; Obtain historical basic data and build a time series based on the historical basic data; train the LSTM prediction model based on the historical basic data and the time series to obtain the long short-term memory neural network LSTM prediction model; The basic data is input into the long short-term memory neural network (LSTM) prediction model to obtain the probability of debris flow occurrence.
4. A method for monitoring geological disasters of power transmission lines according to claim 1, characterized in that: The method of waking up the vibration monitoring device to enter a working state or a dormant state according to the probability of occurrence of geological disasters includes: Set a threshold for the probability of disaster occurrence and put vibration monitoring equipment into a dormant state; Determine whether the probability of geological disasters is greater than the threshold value of the probability of disasters. If so, the vibration monitoring device is turned on; otherwise, the vibration monitoring device remains in a dormant state.
5. The method for monitoring geological disasters of power transmission lines according to claim 1, characterized in that: The first data includes vibration data of the transmission tower body, and the vibration data includes vibration frequency and amplitude.
6. A method for monitoring geological disasters of power transmission lines according to claim 5, characterized in that: The method of waking up the image monitoring device according to the first data to enter a working state or a dormant state includes: A threshold condition is set, and when the first data exceeds the threshold condition, the image monitoring device enters a working state; otherwise, the image monitoring device remains in a dormant state.
7. A method for monitoring geological disasters of power transmission lines according to claim 1, characterized in that: The method of performing image determination based on the environmental image data to obtain geological disaster monitoring results includes: Acquire environmental image data; The environmental image data is input into the constructed YOLOv8 diagnostic model to obtain the geological disaster monitoring results.
8. A transmission line geological disaster monitoring system, characterized in that: A method for monitoring geological disasters of a power transmission line according to any one of claims 1 to 7, the system comprising: The first acquisition module is used to acquire basic data of the target area; The probability prediction module is used to build a long short-term memory neural network LSTM prediction model and predict the probability of geological disasters based on basic data and the long short-term memory neural network LSTM prediction model; The first wake-up module is used to wake up the vibration monitoring device to enter a working state or a dormant state according to the probability of geological disasters; A second wake-up module is used to obtain first data collected by the vibration monitoring device when the vibration monitoring device enters a working state; based on the first data, wake up the image monitoring device to enter a working state or a dormant state; The determination module is used to obtain environmental image data when the environmental image monitoring device enters the working state; and perform image determination based on the environmental image data to obtain geological disaster monitoring results.
9. A transmission line geological disaster monitoring system according to claim 8, characterized in that: The vibration monitoring equipment is arranged on the transmission tower body.
10. A monitoring wake-up mechanism, characterized in that: A method for monitoring geological hazards of a power transmission line according to any one of claims 1 to 7; comprising: Collect basic data of the target area; Waking up the first power consumption monitoring device based on the basic data to enter a working state or a sleeping state; Based on the first data collected by the first power consumption monitoring device in the working state, waking up the second power consumption monitoring device to enter the working state or the sleeping state; The power consumption of the first power consumption monitoring device is less than that of the second power consumption monitoring device.
Citation Information
Cited By
Low-power-consumption device control method, device, storage medium and program product
CN120568195A
Low-power device control method, device, storage medium, and program product
CN120568195B
Wire looseness detection method based on wire fixing device and wire fixing device
CN120610115A
A cord loosening detection method based on a cord holder and the cord holder
CN120610115B