Sodium ion battery-based energy storage operation system and method
By using first- and second-level control units in the sodium ion battery energy storage system to cut off the faulty battery module, the problem of fire risk in the lithium battery energy storage system is solved, and the efficient and safe energy storage operation of sodium ion batteries is achieved, which simplifies the The system structures and reduces costs.
Patent Information
- Application Number
- CN202411184206.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-12-03
AI Technical Summary
The fire and explosion risks caused by dendrites in lithium battery energy storage systems are difficult to solve. The existing technology solutions increase product complexity and cost. Sodium ion batteries have low dendrites and spontaneous combustion risks, so it is necessary to find a simplified and safe one. Energy storage operation system solution.
Design an energy storage operation system based on sodium ion batteries, adopting first- and second-level control units, determine abnormal battery modules through signal acquisition and processor, cut off the fault modules, avoid fault diffusion and spontaneous combustion, and only configure cluster-level fire protection Equipment, simplify system structure.
It realizes cutting off the battery module before the faulty battery cell is out of control, reducing fire risk, simplifying the system structure, reducing costs, and improving the reliability and energy density of the energy storage system, avoiding the chance of fire in the lithium battery energy storage system.
Smart Images

Figure CN119069838A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of sodium ion batteries, and in particular to an energy storage operation system and method based on sodium ion batteries. Background Art
[0002] Lithium batteries have the advantages of high energy density and fast charge and discharge speed. Currently, electrochemical energy storage mostly uses lithium batteries to store electrical energy, but the safety issues of lithium batteries have always been difficult to solve. Lithium battery characteristics: The greater the current density, the faster the growth rate of dendrite lithium. The thorny dendrite lithium will eventually pierce the internal structure of the battery, causing the battery to short-circuit and spontaneously combust. This is also the fundamental reason why lithium battery energy storage systems can cause fires and explosions under certain conditions.
[0003] In order to avoid fires in current lithium battery energy storage systems, common technical solutions include adding PACK-level firefighting equipment and adding DC-DC modules to improve system stability. Although the above solutions can reduce the risk of lithium battery spontaneous combustion, they also complicate the product and are not conducive to production and maintenance. The addition of new equipment will bring more potential failure points and increase product costs.
[0004] Compared with lithium-ion batteries, sodium-ion batteries have a lower probability of producing dendrites and a relatively lower probability of spontaneous combustion. The use of sodium-ion battery energy storage systems can effectively avoid the above-mentioned problems of lithium-ion battery energy storage systems; therefore, strengthening research on energy storage operations based on sodium-ion batteries is a key measure to improve the operating quality of energy storage systems. Summary of the invention
[0005] The purpose of the present invention is to provide an energy storage operation system and method based on sodium ion batteries. Without adding additional equipment, sodium ion battery modules are used to cut off the module where the faulty battery cell is located before it gets out of control, thereby avoiding single battery cell failure combustion and battery cell failure spread, reducing the risk of battery spontaneous combustion, and thus ensuring the reliable operation of the energy storage operation system.
[0006] To achieve the above object, the present invention provides the following solutions:
[0007] A sodium-ion battery-based energy storage operation system includes a plurality of battery clusters;
[0008] The battery cluster includes multiple battery packs, a monitoring unit, a power supply and distribution module, and a cluster-level fire protection unit;
[0009] The battery pack includes at least two battery modules;
[0010] The power supply and distribution module is used for AC / DC conversion and cluster-level circuit protection;
[0011] The monitoring unit includes a primary control unit and a secondary control unit;
[0012] The primary control unit is arranged in the battery pack, and includes a signal acquisition circuit, a processor, and a power control circuit. The power control circuit is used to put in or cut out the battery module to control the current direction in the battery pack, and the signal acquisition circuit is used to collect the battery cell data in the battery module; the processor is used to determine whether the battery module is abnormal according to the battery cell data collected by the signal acquisition circuit, so as to control the power control circuit;
[0013] The secondary control unit is arranged in the power supply and distribution module, and is connected to the primary control unit, and is used to receive various data of the primary control unit and calculate the cluster voltage, and control the operation and cutoff of a single battery cluster by judging whether the cluster voltage is lower than a set threshold.
[0014] Furthermore, the power supply and distribution module also includes an inverter and an AC / DC power distribution circuit. The inverter is connected in series in the AC / DC power distribution circuit. The secondary control unit is also used to collect data of the inverter and various devices on the main circuit in the battery cluster.
[0015] Furthermore, the power control loop includes a plurality of switch devices, each battery module is configured with two switch devices, one switch device is connected in series with the battery module, and the other switch device is connected in parallel with the battery module.
[0016] Furthermore, the battery cluster also includes a backup battery pack for use when a battery module in the cluster is removed; the system also includes a backup battery cluster.
[0017] Furthermore, the battery cell data includes internal temperature, air pressure, circuit voltage, and current.
[0018] The present invention also provides a sodium ion battery-based energy storage operation method, which is applied to the sodium ion battery-based energy storage operation system, comprising the following steps:
[0019] S1, the signal acquisition circuit collects the battery cell data in the battery module, and the processor determines whether the battery module is abnormal according to the battery cell data;
[0020] S2. When a battery module is abnormal, the battery module is removed and the energy storage system operates normally;
[0021] S3. When all battery modules in a battery pack are detected to be abnormal, the battery pack is removed. At this time, the cluster voltage detected by the secondary control unit does not meet the input voltage requirement of the converter, so that the battery cluster in which the battery pack is located cannot continue to operate. Then, the battery cluster is removed, and the energy storage operation system still operates normally, but the capacity of the energy storage operation system is reduced.
[0022] S4. If any battery module in the same battery pack returns to normal, the battery cluster to which the battery pack belongs restarts;
[0023] S5. If multiple battery modules in different battery packs in a battery cluster are detected as abnormal, these battery modules are removed. At this time, if the cluster voltage detected by the secondary control unit does not meet the input voltage requirement of the converter, the battery cluster is removed due to a fault.
[0024] S6. When two battery clusters are removed in succession, it will be determined that there is a tendency for the fault to spread, and the energy storage operation system will be restricted to automatically shut down. At this time, maintenance will be arranged, and the energy storage operation system will be restarted after the maintenance is completed.
[0025] Furthermore, when a battery pack is cut off, all switch devices of the power control loop are disconnected; when a cluster is cut off, all switch devices of each battery pack are disconnected.
[0026] Furthermore, the battery pack has two battery modules: battery module 1 and battery module 2, the power control loop has four switch devices: switch device 1, switch device 2, switch device 3, switch device 4, and the power control loop of the battery pack has the following working modes:
[0027] Working mode 1 is: switch devices 1 and 4 are closed, and switch devices 2 and 3 are open; when discharging, the negative electrode is input, passes through battery modules 1 and 2, and the positive electrode is output, and the direction is opposite when charging;
[0028] When it is determined that the battery module 1 is abnormal, it is necessary to temporarily cut off the operation of the battery module 1, and the power control circuit enters the working mode 2: the switch devices 2 and 4 are closed, and the switch devices 1 and 3 are disconnected; during discharge, the negative electrode input only passes through the battery module 2, and the positive electrode output is in the opposite direction during charging; when the battery module 1 recovers, the power control circuit switches to the working mode 1;
[0029] When it is determined that the battery module 2 is abnormal, it is necessary to temporarily cut off the operation of the battery module 2, and the power control circuit enters the working mode 3: the switch devices 1 and 3 are closed, and the switch devices 2 and 4 are disconnected; during discharge, the negative electrode input only passes through the battery module 1, and the positive electrode output is in the opposite direction during charging; when the battery module 2 recovers, the power control circuit switches to the working mode 1;
[0030] When it is determined that battery modules 1 and 2 are abnormal, battery modules 1 and 2 are temporarily cut off, and the power control circuit enters working mode 4: switch devices 2 and 3 are closed, and switch devices 1 and 4 are disconnected; during discharge, the negative electrode is input without passing through the module, and the positive electrode is output, and the direction is opposite during charging; when only battery module 2 is restored, the power control circuit switches to working mode 2, and when only battery module 1 is restored, the power control circuit switches to working mode 3. When both battery modules 1 and 2 are restored, the power control circuit switches to working mode 1.
[0031] Furthermore, the method also includes a control scheme for the backup battery pack and the backup battery cluster, including the following steps:
[0032] 1) The backup battery pack is in working mode 4 for a long time and is put into use only when a battery module in the battery cluster is removed;
[0033] 2) When the battery module 1 is removed, the battery module 1 in the backup battery pack is put into use, and the power control circuit enters the working mode 3;
[0034] 3) When both battery modules 1 and 2 in a battery pack are removed, the entire backup battery pack is put into use, and the power control circuit enters working mode 1 without single cluster removal; when any battery module of battery modules 1 and 2 is restored, battery module 2 of the backup battery pack is removed, and the power control circuit enters working mode 3; when both 1 and 2 are restored, the backup battery pack is removed, and the power control circuit of the battery pack enters working mode 4;
[0035] 4) When a major fault occurs in battery cluster A and more than 4 battery modules are removed, battery cluster A is restricted from being removed;
[0036] 5) The backup battery cluster is normally in standby mode. When the faulty battery cluster is removed, the backup battery cluster is immediately put into use to avoid the energy storage system from operating at reduced capacity;
[0037] 6) If a major accident occurs and two battery clusters are removed in succession, the energy storage operation system will automatically shut down regardless of whether the backup battery cluster is put into use.
[0038] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects: the energy storage operation system and method based on sodium ion batteries provided by the present invention only need to add a primary control unit and a secondary control unit to realize the pre-judgment of the module status in advance by collecting the working information of the battery module, and can cut off the battery module where the faulty battery cell is located before it loses control, avoiding the combustion of single battery cell failure and the spread of battery cell failure, ensuring the reliable operation of the system, and effectively suppressing the occurrence of fire. Moreover, since the sodium battery has high thermal stability, the configuration of cluster-level fire-fighting equipment can deal with electrical fires, and the fire-fighting components, fire-fighting host and pipelines in the battery pack are deleted, simplifying the system to facilitate production, debugging and maintenance, improving production and debugging efficiency, and greatly reducing the cost of the energy storage system; after the battery cluster pack-level fire-fighting is deleted, the volume of the battery cluster can be appropriately reduced, the space utilization rate is improved, and the energy density of the system per unit volume can be increased; compared with lithium ions, the probability of sodium ions producing dendrites is low, and the probability of spontaneous combustion is relatively low, which can effectively reduce the probability of fire, thereby ensuring the reliable operation of the system. Since the present invention does not add other components, the battery module control circuit is integrated in the battery management system, and the cost is lower than adding a DC-DC module. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0040] Figure 1 Schematic diagram of a control loop of a primary monitoring unit in an embodiment of the present invention;
[0041] Figure 2 This is a schematic diagram of a primary monitoring unit acquisition loop according to an embodiment of the present invention;
[0042] Figure 3 A schematic diagram of a battery cluster in an embodiment of the present invention;
[0043] Figure 4 This is a structural diagram of an energy storage operation system based on sodium ion batteries according to an embodiment of the present invention;
[0044] Figure 5 This is a structural diagram of an energy storage operation system based on sodium ion batteries according to another embodiment of the present invention. DETAILED DESCRIPTION
[0045] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0046] The purpose of the present invention is to provide an energy storage operation system and method based on sodium ion batteries. Without adding additional equipment, a sodium ion battery module is used to cut off the module where the faulty battery cell is located before it gets out of control, thereby avoiding single battery cell failure combustion and battery cell failure spread, reducing the risk of battery spontaneous combustion, and thus ensuring reliable operation of the system.
[0047] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0048] Example 1
[0049] like Figure 1-5 As shown, the energy storage operation system based on sodium ion batteries provided in an embodiment of the present invention includes multiple battery clusters;
[0050] The battery cluster includes multiple battery packs, a monitoring unit, a power supply and distribution module, and a cluster-level fire protection unit;
[0051] The battery pack includes at least two battery modules;
[0052] The power supply and distribution module is used for AC / DC conversion and cluster-level circuit protection;
[0053] The monitoring unit includes a primary control unit and a secondary control unit;
[0054] The primary control unit is arranged in the battery pack, and the primary control unit includes a signal acquisition circuit, a processor (optionally an FPGA chip), and a power control circuit. The power control circuit is used to put in or cut out the battery module to control the current direction in the battery pack, and the signal acquisition circuit is used to collect the battery cell data in the battery module; the processor is used to determine whether the battery module is abnormal according to the battery cell data collected by the signal acquisition circuit, so as to control the power control circuit;
[0055] The secondary control unit is arranged in the power supply and distribution module, and is connected to the primary control unit, and is used to receive various data of the primary control unit and calculate the cluster voltage, and control the operation and cutoff of a single battery cluster by judging whether the cluster voltage is lower than a set threshold.
[0056] In this embodiment, the power supply and distribution module further includes an inverter and an AC / DC power distribution circuit. The inverter is connected in series in the AC / DC power distribution circuit. The secondary control unit is also used to collect data of the inverter and various devices on the main circuit in the battery cluster.
[0057] In this embodiment, the power control circuit includes a plurality of switching devices, each battery module is configured with two switching devices, one switching device is connected in series with the battery module, and the other switching device is connected in parallel with the battery module; the switching devices here can be physical switches, such as circuit breakers, contactors, relays, etc., or electronic switches such as triodes, field effect transistors, IGBTs, etc. can also be selected.
[0058] In this embodiment, the battery cell data includes the internal temperature, air pressure, loop voltage, and current of the battery pack.
[0059] In this embodiment, the battery cluster further includes a backup battery pack for use when a battery module in the cluster is removed; the system further includes a backup battery cluster, and the secondary control circuit is a cluster controller.
[0060] In this embodiment, the acquisition circuit can be a BMS, which collects the temperature and voltage data of the battery cells through thermocouples and voltage acquisition lines respectively. The battery pack current value can be collected through a board-level current transformer, and the internal air pressure can be collected through a pressure sensor inside the pack.
[0061] Example 2
[0062] This embodiment provides an energy storage operation method based on a sodium ion battery, which is applied to the energy storage operation system based on a sodium ion battery described in Example 1, and includes the following steps:
[0063] S1, the signal acquisition circuit collects the battery cell data in the battery module, and the processor determines whether the battery module is abnormal according to the battery cell data;
[0064] S2. When a battery module is abnormal, the battery module is removed and the energy storage system operates normally;
[0065] S3. When all battery modules in a battery pack are detected to be abnormal, the battery pack is removed. At this time, the cluster voltage detected by the secondary control unit does not meet the input voltage requirement of the converter, so that the battery cluster in which the battery pack is located cannot continue to operate. Then, the battery cluster is removed, and the energy storage operation system still operates normally, but the capacity of the energy storage operation system is reduced.
[0066] S4. If any battery module in the same battery pack returns to normal, the battery cluster to which the battery pack belongs restarts;
[0067] S5. If multiple battery modules in different battery packs in a battery cluster are detected as abnormal, these battery modules are removed. At this time, if the cluster voltage detected by the secondary control unit does not meet the input voltage requirement of the converter, the battery cluster is removed due to a fault.
[0068] S6. When two battery clusters are removed in succession, it will be determined that there is a tendency for the fault to spread, and the energy storage operation system will be restricted to automatically shut down. At this time, maintenance will be arranged, and the energy storage operation system will be restarted after the maintenance is completed.
[0069] In this embodiment, when a battery pack is removed, all switches of the power control loop are disconnected; when a cluster is removed, all switches of each battery pack are disconnected.
[0070] In this embodiment, the battery module can be judged to have abnormalities by setting data thresholds. For example, the battery cell temperature exceeds or falls below the set threshold, or the battery cell temperature rises rapidly and exceeds its threshold, or the battery cell voltage exceeds the set voltage threshold, or the collected data is lost, etc., all of which can be judged to be abnormal.
[0071] Further in this embodiment, the battery pack has two battery modules: battery module 1 and battery module 2, and the power control loop has four switch devices: switch device 1, switch device 2, switch device 3, and switch device 4. Then the power control loop of the battery pack has the following working modes:
[0072] Working mode 1 is: switches 1 and 4 are closed, switches 2 and 3 are open; when discharging, the negative electrode is input, passing through battery modules 1 and 2, and the positive electrode is output, and the direction is opposite when charging;
[0073] When it is determined that battery module 1 is abnormal, it is necessary to temporarily cut off the operation of battery module 1, and the control circuit enters working mode 2: switches 2 and 4 are closed, and switches 1 and 3 are opened. When discharging, the negative input only passes through battery module 2, and the positive output is in the opposite direction when charging; when module 1 recovers, the control circuit switches to working mode 1;
[0074] When it is determined that battery module 2 is abnormal, it is necessary to temporarily cut off the operation of battery module 2, and the control circuit enters working mode 3: switches 1 and 3 are closed, and switches 2 and 4 are opened. When discharging, the negative input only passes through battery module 1, and the positive output is in the opposite direction when charging; when battery module 2 recovers, the control circuit switches to working mode 1;
[0075] When it is determined that battery modules 1 and 2 are abnormal, battery modules 1 and 2 are temporarily cut off, and the control circuit enters working mode 4: switches 2 and 3 are closed, and switches 1 and 4 are opened; during discharge, the negative electrode is input without passing through the module, and the positive electrode is output, and the direction is opposite during charging; when only battery module 2 is restored, the control circuit switches to working mode 2, and when only module 1 is restored, the control circuit switches to working mode 3. When both battery modules 1 and 2 are restored, the control circuit switches to working mode 1.
[0076] Furthermore, in this embodiment, since some customers have high requirements for electric energy, it is forbidden to reduce the system capacity within a specific time period. At this time, partial system failure is allowed, but capacity reduction and shutdown are forbidden. To deal with this situation, on the basis of the rated configuration, an additional backup battery pack can be provided in each battery cluster, and a backup battery cluster can be provided in the system. Furthermore, the method further includes:
[0077] 1) The backup battery pack is in working mode 4 for a long time and is put into use only when a module in the battery cluster is removed;
[0078] 2) When the battery module 1 is removed, the battery module 1 in the backup battery pack is put into use, and the power control circuit enters the working mode 3;
[0079] 3) When both battery modules 1 and 2 in a battery pack are removed, the entire backup battery pack is put into use, and the power control circuit enters working mode 1 without single cluster removal; when any battery module of battery modules 1 and 2 is restored, battery module 2 of the backup battery pack is removed, and the power control circuit enters working mode 3; when both 1 and 2 are restored, the backup battery pack is removed, and the power control circuit of the battery pack enters working mode 4;
[0080] 4) When a major fault occurs in a battery cluster and more than 4 battery modules are removed, the battery cluster is restricted from being removed;
[0081] 5) The backup battery cluster is normally in standby mode. When the faulty battery cluster is removed, the backup battery cluster is immediately put into use to ensure that the system operates at rated capacity, thus avoiding the energy storage system from operating at reduced capacity.
[0082] 6) If a major accident occurs and two battery clusters are removed in succession, the energy storage operation system will automatically shut down regardless of whether the backup battery cluster is put into use.
[0083] In summary, the energy storage operation system and method based on sodium ion batteries provided by the present invention, due to the characteristics of sodium batteries, only cluster-level fire-fighting equipment is provided in the battery cluster to deal with electrical fires, and there is no need to set up package-level fire-fighting equipment and supporting pipelines; it can effectively solve the problem of fault clusters being removed due to minor faults (faults that will not spread) occurring at different points in the cluster at the same time, and the system operating at low capacity or shutting down due to battery cluster faults. Redundant configuration can effectively reduce the probability of inter-cluster faults and further improve system stability.
[0084] The remaining technical features in this embodiment can be flexibly selected by those skilled in the art according to actual conditions to meet different specific practical needs. However, it is obvious to those skilled in the art that it is not necessary to adopt these specific details to implement the present invention. In other examples, in order to avoid confusing the present invention, the well-known components, structures or parts are not specifically described, which are all within the technical protection scope defined by the technical solution claimed for protection in the claims of the present invention.
[0085] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connection", etc. are all in a broad sense and should be understood by those skilled in the art in a broad sense. For example, it can be a fixed connection, a movable connection, or an integral connection, or a partial connection, a mechanical connection, or an electrical connection, a direct connection, or an indirect connection through an intermediate medium, or the internal connection of two components, etc. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances, that is, the expression of textual language and the implementation of actual technology can correspond flexibly, and the expression of the textual language (including drawings) of the specification of the present invention does not constitute any single restrictive interpretation of the claims.
[0086] Modifications and changes made by those skilled in the art that do not depart from the spirit and scope of the present invention should be within the scope of protection of the claims attached to the present invention. In the above description, a large number of specific details are set forth in order to provide a thorough understanding of the present invention. However, it is obvious to those of ordinary skill in the art that these specific details are not necessary to practice the present invention. In other examples, in order to avoid confusing the present invention, well-known technologies, such as specific construction details, operating conditions and other technical conditions, are not specifically described.
[0087] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of the present invention. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A sodium ion battery-based energy storage operation system, characterized in that: including a plurality of battery clusters; The battery cluster includes multiple battery packs, a monitoring unit, a power supply and distribution module, and a cluster-level fire protection unit; The battery pack includes at least two battery modules; The power supply and distribution module is used for AC / DC conversion and cluster-level circuit protection; The monitoring unit includes a primary control unit and a secondary control unit; The primary control unit is arranged in the battery pack, and includes a signal acquisition circuit, a processor, and a power control circuit. The power control circuit is used to put in or cut out the battery module to control the current direction in the battery pack, and the signal acquisition circuit is used to collect the battery cell data in the battery module; the processor is used to determine whether the battery module is abnormal according to the battery cell data collected by the signal acquisition circuit, so as to control the power control circuit; The secondary control unit is arranged in the power supply and distribution module, and is connected to the primary control unit, and is used to receive various data of the primary control unit and calculate the cluster voltage, and control the operation and cutoff of a single battery cluster by judging whether the cluster voltage is lower than a set threshold.
2. The energy storage operation system based on sodium ion batteries according to claim 1, characterized in that: The power supply and distribution module also includes an inverter and an AC / DC power distribution circuit. The inverter is connected in series in the AC / DC power distribution circuit. The secondary control unit is also used to collect data of the inverter and various devices on the main circuit in the battery cluster.
3. The energy storage operation system based on sodium ion batteries according to claim 1, characterized in that: The power control loop includes a plurality of switch devices. Each battery module is configured with two switch devices, one switch device is connected in series with the battery module, and the other switch device is connected in parallel with the battery module.
4. The energy storage operation system based on sodium ion batteries according to claim 1, characterized in that: The battery cluster also includes a backup battery pack for use when a battery module in the cluster is removed; the system also includes a backup battery cluster.
5. The energy storage operation system based on sodium ion batteries according to claim 1, characterized in that: The battery cell data includes the internal temperature, air pressure, circuit voltage and current.
6. A sodium ion battery-based energy storage operation method, applied to the sodium ion battery-based energy storage operation system according to any one of claims 1 to 5, characterized in that: The following steps are involved: S1, the signal acquisition circuit collects the battery cell data in the battery module, and the processor determines whether the battery module is abnormal according to the battery cell data; S2. When a battery module is abnormal, the battery module is removed and the energy storage system operates normally; S3. When all battery modules in a battery pack are detected to be abnormal, the battery pack is removed. At this time, the cluster voltage detected by the secondary control unit does not meet the input voltage requirement of the converter, so that the battery cluster in which the battery pack is located cannot continue to operate. Then, the battery cluster is removed, and the energy storage operation system still operates normally, but the capacity of the energy storage operation system is reduced. S4. If any battery module in the same battery pack returns to normal, the battery cluster to which the battery pack belongs restarts; S5. If multiple battery modules in different battery packs in a battery cluster are detected as abnormal, these battery modules are removed. At this time, if the cluster voltage detected by the secondary control unit does not meet the input voltage requirement of the converter, the battery cluster is removed due to a fault. S6. When two battery clusters are removed in succession, it will be determined that there is a tendency for the fault to spread, and the energy storage operation system will be restricted to automatically shut down. At this time, maintenance will be arranged, and the energy storage operation system will be restarted after the maintenance is completed.
7. The energy storage operation method based on sodium ion battery according to claim 6, characterized in that: When a battery pack is cut off, all switch devices of the power control loop are disconnected; when a cluster is cut off, all switch devices of each battery pack are disconnected.
8. The energy storage operation method based on sodium ion battery according to claim 6, characterized in that: The battery pack has two battery modules: battery module 1 and battery module 2. The power control loop has four switch devices: switch device 1, switch device 2, switch device 3, and switch device 4. The power control loop of the battery pack has the following working modes: Working mode 1 is: switch devices 1 and 4 are closed, and switch devices 2 and 3 are open; when discharging, the negative electrode is input, passes through battery modules 1 and 2, and the positive electrode is output, and the direction is opposite when charging; When it is determined that the battery module 1 is abnormal, it is necessary to temporarily cut off the operation of the battery module 1, and the power control circuit enters the working mode 2: the switch devices 2 and 4 are closed, and the switch devices 1 and 3 are disconnected; during discharge, the negative electrode input only passes through the battery module 2, and the positive electrode output is in the opposite direction during charging; when the battery module 1 recovers, the power control circuit switches to the working mode 1; When it is determined that the battery module 2 is abnormal, it is necessary to temporarily cut off the operation of the battery module 2, and the power control circuit enters the working mode 3: the switch devices 1 and 3 are closed, and the switch devices 2 and 4 are disconnected; during discharge, the negative electrode input only passes through the battery module 1, and the positive electrode output is in the opposite direction during charging; when the battery module 2 recovers, the power control circuit switches to the working mode 1; When it is determined that battery modules 1 and 2 are abnormal, battery modules 1 and 2 are temporarily cut off, and the power control circuit enters working mode 4: switch devices 2 and 3 are closed, and switch devices 1 and 4 are disconnected; during discharge, the negative electrode is input without passing through the module, and the positive electrode is output, and the direction is opposite during charging; when only battery module 2 is restored, the power control circuit switches to working mode 2, and when only battery module 1 is restored, the power control circuit switches to working mode 3. When both battery modules 1 and 2 are restored, the power control circuit switches to working mode 1.
9. The energy storage operation method based on sodium ion battery according to claim 8, characterized in that: The method also includes a control scheme for the backup battery pack and the backup battery cluster, including the following steps: 1) The backup battery pack is in working mode 4 for a long time and is put into use only when a battery module in the battery cluster is removed; 2) When the battery module 1 is removed, the battery module 1 in the backup battery pack is put into use, and the power control circuit enters the working mode 3; 3) When both battery modules 1 and 2 in a battery pack are removed, the entire backup battery pack is put into use, and the power control circuit enters working mode 1 without single cluster removal; when any battery module of battery modules 1 and 2 is restored, battery module 2 of the backup battery pack is removed, and the power control circuit enters working mode 3; when both battery modules 1 and 2 are restored, the backup battery pack is removed, and the power control circuit of the battery pack enters working mode 4; 4) When a major fault occurs in the battery cluster and more than 4 battery modules are removed, battery cluster A is restricted from being removed; 5) The backup battery cluster is normally in standby mode. When the faulty battery cluster is removed, the backup battery cluster is immediately put into use to avoid the energy storage system from operating at reduced capacity; 6) If a major accident occurs and two battery clusters are removed in succession, the energy storage operation system will automatically shut down regardless of whether the backup battery cluster is put into use.