Arc light protection networking system and method for station power transformation of hydropower station

By adopting an arc protection networking system in the power transformation of hydropower plant, and using network connections and probe arc sensors, the space and engineering volume problems of traditional arc protection systems during the transformation are solved, and flexible and efficient fault handling is achieved, improving the improvement of the problem of the problem of traditional arc protection systems. The reliability and security of the system are achieved.

CN119070245APending Publication Date: 2024-12-03THREE GORGES JINSHAJIANG CHUANYUN HYDROPOWER DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411157118.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Traditional arc protection systems have problems such as installation space limitations, large engineering volume, high operation and maintenance risks and complex tripping circuit design in the power transformation of hydropower plants, resulting in extended transformation cycles and increased failure risks.

Method used

An arc protection networking system was designed, using a main control unit, current control unit and arc sensor. Through network connection and probe arc sensor, the operation selectivity of the main incoming line and the bus connection circuit breaker is realized, allowing for no power outage. Fault handling is carried out in the case of failure, reducing engineering volume and operation and maintenance risks.

Benefits of technology

Improves the efficiency of transformation work, improves the flexibility and safety of the system, reduces maintenance time and cost, ensures the accuracy of fault isolation, and reduces the risk of current loop maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119070245A_ABST
    Figure CN119070245A_ABST
Patent Text Reader

Abstract

The invention provides an arc light protection networking system and method for station power transformation of a hydropower station, relates to the technical field of power system protection, and solves the problem of inconvenience in operation and maintenance, transformation and fault processing of an existing arc light protection networking mode. A bus applied by the system is connected with at least one main incoming circuit breaker and a plurality of bus tie circuit breakers; the system comprises a main control unit, a current control unit and an arc light sensor, the main control unit is connected with a main incoming circuit breaker, the current control unit is connected with a bus tie circuit breaker, and the main control unit is in communication connection with the current control unit; the arc light sensor is arranged on a bus, is used for monitoring an arc light signal and is connected with the main control unit; the main control unit is used for collecting main incoming line current, and the current control unit is used for collecting bus line current; according to the method, the actions of the two types of circuit breakers have definite selectivity, fault processing can be achieved without power failure of the bus, and the transformation work efficiency and the intrinsic safety level are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system protection, and is applied to arc protection processes, and in particular to an arc protection networking system and method for power transformation of a hydropower station. Background Art

[0002] Arc protection is an important protection measure in the power system. It mainly relies on the arc signal generated when the primary power equipment fails as the main criterion, and uses other fault quantities such as current signals as auxiliary criteria to cut off the fault through rapid exit action, thereby effectively preventing the accident from expanding and reducing losses. In the protection of the power busbar of large hydropower stations, arc protection is usually used as one of the main protections to improve the reliability and sensitivity of the protection.

[0003] The traditional arc protection system is generally composed of a main control unit, which needs a separate panel for signal acquisition and processing. The main control unit collects arc signals on the bus and current signals from the main incoming cabinet and bus coupling cabinet, and determines whether the fault needs to be quickly removed according to the preset action criteria. When the detected arc signal and the corresponding current signal meet the preset conditions, the system will trigger the circuit breaker to trip, thereby cutting off the fault circuit.

[0004] However, in practical applications, especially for plant power systems that need to be modified, the configuration of traditional arc protection systems has certain limitations:

[0005] 1. Installation condition restrictions: The typical configuration of the arc protection system requires a separate panel, but in some renovation projects, there may not be additional installation space on site for setting up a dedicated panel cabinet, especially when the space in the original equipment cabinet is full.

[0006] 2. Increased engineering workload: In order to collect current signals, it is necessary to design and lay special current loop cables, which not only increases the workload of the project, but may also lead to an extension of the renovation cycle.

[0007] 3. Increased operation and maintenance risks: After the current circuit is led out from the main incoming line cabinet and the busbar cabinet, it needs to go through multiple series links. This structure increases the complexity of the current circuit, and thus increases the risk of failure during the operation and maintenance process.

[0008] 4. The tripping circuit design is complex: Similarly, the tripping circuit also needs to be designed and cabled separately, which also increases the amount of work and the renovation period.

[0009] Therefore, in view of the above problems, it is necessary to develop a new arc protection system configuration scheme to overcome the shortcomings of the existing technology and provide a more flexible, efficient and easy-to-maintain solution. Summary of the invention

[0010] Based on the current status of the background technology, the purpose of the present invention is to solve the inconvenience of the existing arc protection networking mode for operation and maintenance, transformation and fault handling, and therefore proposes an arc protection networking system and method for power transformation of hydropower stations. The present invention has clear selectivity for the actions of the main incoming line circuit breaker and the bus tie circuit breaker, and the busbar can be fault-handled without power outage, which improves the efficiency of the transformation work and enhances the intrinsic safety level.

[0011] The present invention adopts the following technical solutions to achieve the purpose:

[0012] An arc protection networking system for power transformation of a hydropower station, wherein a busbar used in the system is connected with at least one main incoming line circuit breaker and a plurality of bus tie circuit breakers; the system comprises a main control unit, a current control unit and an arc sensor, wherein the main control unit is correspondingly connected to the main incoming line circuit breaker, the current control unit is correspondingly connected to the bus tie circuit breaker, and the main control unit is communicatively connected to the current control unit; the arc sensor is correspondingly arranged on the busbar and used to monitor the arc signal of the busbar, and the arc sensor is connected to the main control unit; the main control unit is also used to collect the main incoming line current, and the current control unit is also used to collect the bus tie line current.

[0013] Preferably, there are multiple arc sensors, all of which are probe-type arc sensors; the multiple arc sensors are installed inside the corresponding multiple low-voltage chambers of switch cabinets on the busbar through openings; each arc sensor is connected to the main control unit through an arc optical fiber, thereby transmitting the arc signal monitored inside the low-voltage chamber of the switch cabinet to the main control unit.

[0014] The present invention also provides an arc protection networking method for power transformation of a hydropower station, the hardware basis of the method being the aforementioned arc protection networking system; a preset action criterion parameter value is set, and when the busbar is powered by a main incoming line circuit breaker, a main control unit collects a main incoming line cabinet current signal in real time; when an arc sensor monitors an arc signal, and the arc signal is greater than a corresponding threshold value in a first action criterion parameter value, the main control unit forwards the arc action signal to a current control unit and simultaneously obtains the currently collected main incoming line cabinet current signal; if the main incoming line cabinet current signal at this time is also greater than the corresponding threshold value in the action criterion parameter value, the main control unit is actuated to trip the corresponding main incoming line circuit breaker.

[0015] Furthermore, when the busbar is powered by the bus tie circuit breaker, the current control unit collects the current signal of the bus tie cabinet in real time; if the current control unit receives the arc action signal forwarded by the main control unit, it obtains the currently collected current signal of the bus tie cabinet; if the current signal of the bus tie cabinet at this time is also greater than the corresponding threshold in the action criterion parameter value, the current control unit is actuated to trip the corresponding bus tie circuit breaker.

[0016] In summary, due to the adoption of this technical solution, the beneficial effects of the present invention are as follows:

[0017] In the present invention, the main control unit and the current control unit are connected through a network, which can adapt to different factory power consumption modes, thereby improving the flexibility and application scope of the system. By introducing a probe-type arc sensor and installing it by opening a hole in the low-voltage room of the switch cabinet, the present invention makes the operation and maintenance work more flexible and convenient. Once a sensor fails, it can be quickly replaced without power outage, greatly reducing maintenance time and cost.

[0018] In the present invention, both the main control unit and the current control unit adopt the action logic of arc light and current dual judgment criteria, which improves the overall reliability of the system and the selectivity of fault identification. Specifically, after the main control unit is actuated, only the main incoming line circuit breaker is tripped, and after the current control unit is actuated, only the corresponding bus tie circuit breaker is tripped, ensuring the accuracy of fault isolation.

[0019] In the present invention, the circuit breaker trip control cable and the current signal acquisition cable can make full use of the old resources, thereby reducing the renovation cost of the old system and reducing the safety hazards caused by the laying of new cables. The workload of cable laying and maintenance is relatively reduced under this solution, reducing the risk of current loop maintenance and improving the inherent safety of the system from the design level. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 Schematic diagram of the connection structure of the system of the present invention.

[0021] The meanings of the symbols in the accompanying drawings are as follows:

[0022] 1- Main control unit, 2- Current control unit, 3- Arc sensor, 4- Communication optical fiber, 5- Arc optical fiber, 6- Circuit breaker trip control cable, 7- Current signal acquisition cable. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0024] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] Example 1

[0026] An arc protection networking system for power transformation of hydropower stations. Figure 1 The connection structure of the system is shown, in which the busbar used in the system is connected with at least one main incoming line circuit breaker and multiple bus tie circuit breakers; the main incoming line circuit breaker is the main switchgear that introduces external power into the factory power supply. It is responsible for receiving electrical energy from the power grid or other external power sources and transmitting it to the internal busbar. Usually, at least one main incoming line circuit breaker is connected to the busbar; in some cases, in order to improve the reliability and flexibility of the system, two or more main incoming line circuit breakers may be set to provide redundant paths.

[0027] A bus tie breaker is a switchgear used to connect different bus sections. In a complex power distribution system, there are multiple bus sections, which are connected by bus tie breakers. When a bus fails, the load can be transferred to another healthy bus through the bus tie breaker, thus maintaining the normal operation of the power system.

[0028] For the above application basis, such as Figure 1 As shown, the arc protection networking system of this embodiment includes a main control unit 1, a current control unit 2 and an arc sensor 3. The main control unit 1 is correspondingly connected to the main incoming line circuit breaker, the current control unit 2 is correspondingly connected to the bus tie circuit breaker, and the main control unit 1 is communicatively connected to the current control unit 2; the arc sensor 3 is correspondingly arranged on the bus to monitor the arc signal of the bus, and the arc sensor 3 is connected to the main control unit 1; the main control unit 1 is also used to collect the main incoming line current, and the current control unit 2 is also used to collect the bus tie line current.

[0029] The main incoming line circuit breaker and the main control unit 1 are both installed in the main incoming line cabinet. The action of the main control unit 1 will adopt the dual judgment method of arc light and current start. Therefore, a first current transformer is also provided in the main incoming line cabinet, and the main control unit 1 is connected to the first current transformer to collect the current signal of the main incoming line cabinet.

[0030] The key to realizing arc protection of the main control unit 1 is: based on the arc signal monitored by the arc sensor 3 and the main incoming cabinet current signal collected by the first current transformer, when both are greater than the preset action threshold, the main control unit 1 will act quickly and trip the corresponding main incoming circuit breaker.

[0031] In addition to the above actions, the main control unit 1 of this embodiment is connected to the current control unit 2 through the communication optical fiber 4, and according to the arc signal monitored by the arc sensor 3, when the arc signal is greater than the preset action threshold, the arc action signal is forwarded to the current control unit 2 through the communication optical fiber 4. In this embodiment, the current control unit 2 does not have data signal interaction with the arc sensor 3. The communication optical fiber 4 can achieve its functional effect by using a single-mode optical fiber.

[0032] As for the current control unit 2, the busbar circuit breaker and the current control unit 2 are both installed in the busbar cabinet, and the action of the current control unit 2 will also adopt the dual judgment method of arc light and current start. Therefore, a second current transformer is also provided in the busbar cabinet, and the current control unit 2 is connected to the second current transformer to collect the current signal of the busbar cabinet.

[0033] The current control unit 2 realizes arc protection of the bus tie part. The key is: based on the arc action signal forwarded by the main control unit 1 and the bus tie cabinet current signal collected by the second current transformer, when the arc action signal exists and the bus tie cabinet current signal is greater than the preset action threshold, the current control unit 2 will act quickly to trip the corresponding bus tie circuit breaker.

[0034] In this embodiment, the main control unit 1 and the main incoming line circuit breaker, and the current control unit 2 and the bus tie circuit breaker are connected by a circuit breaker trip control cable 6, which is used to output the main incoming line circuit breaker trip output signal and the bus tie circuit breaker trip output signal respectively. The circuit breaker trip control cable 6 can be realized by using the original cables in the main incoming line cabinet or the bus tie cabinet, so as to upgrade the old system without laying new connection cables.

[0035] In this embodiment, the main control unit 1 and the current control unit 2 respectively collect the current signal of the main incoming cabinet and the current signal of the bus coupling cabinet through the corresponding current signal acquisition cable 7. For the main incoming cabinet, the main control unit 1 is connected to the first current transformer through the current signal acquisition cable 7; for the bus coupling cabinet, the current control unit 2 is connected to the second current transformer through the current signal acquisition cable 7. Similarly, the current signal acquisition cable 7 can be implemented using the original cable in the main incoming cabinet or the bus coupling cabinet, thereby upgrading the old system without laying new connecting cables.

[0036] This embodiment also makes a preferred design for the arc sensor 3 as follows: there are multiple arc sensors 3, all of which are probe-type arc sensors; multiple arc sensors 3 are installed in the corresponding multiple switch cabinet low-voltage rooms on the busbar through openings, which can effectively avoid monitoring dead zones. Each arc sensor 3 is connected to the main control unit 1 through an arc optical fiber 5, so that the arc signal monitored in the low-voltage room of the switch cabinet is transmitted to the main control unit 1.

[0037] Example 2

[0038] Based on Example 1, this example introduces an arc protection networking method for power transformation of a hydropower station, which uses the arc protection networking system in Example 1 as the hardware basis. In this method, two working conditions with different bus power supply modes are involved.

[0039] In the first operating condition, the busbar is powered through the main incoming circuit breaker.

[0040] First, the action criterion parameter value needs to be preset. In this embodiment, the arc action threshold range is: 5klx-20klx or 1mW / cm 2 -10mW / cm 2 The current setting range is: 0.6In-6In. And the action time of the main control unit 1 and the current control unit 2 is required to be ≤20ms.

[0041] The main control unit 1 collects the current signal of the main incoming line cabinet in real time; when the arc sensor monitors the arc signal and the arc signal is greater than the set value in the arc action threshold range, the main control unit 1 forwards the arc action signal to the current control unit 2 and simultaneously obtains the currently collected main incoming line cabinet current signal.

[0042] If a main incoming line related fault does occur, the main incoming line cabinet current signal at this time is also greater than the set value in the current setting range. The main control unit 1 outputs the main incoming line circuit breaker tripping output signal through the circuit breaker tripping control cable 6, and the main incoming line circuit breaker trips to eliminate the fault.

[0043] Although the main control unit 1 forwards the arc action signal to the current control unit 2, since there is no corresponding busbar fault current at the current control unit 2 at this time, the current control unit 2 will not malfunction, and the arc protection achieves its selectivity.

[0044] In the second operating condition, the busbar is powered through the bus tie breaker.

[0045] The situation of the preset action criterion parameter value is the same as the first working condition. When the arc sensor monitors the arc signal and the arc signal is greater than the set value in the arc action threshold range, the main control unit 1 forwards the arc action signal to the current control unit 2 and simultaneously obtains the current signal of the main incoming cabinet currently collected.

[0046] Since there is no fault in the main incoming line at this time, there is no corresponding main incoming line cabinet fault current at the main control unit 1, so the main control unit 1 will not malfunction.

[0047] The current control unit 2 collects the current signal of the bus coupling cabinet in real time; if a bus coupling line-related fault does occur, the current control unit 2 will receive the arc action signal forwarded by the main control unit, and then obtain the currently collected bus coupling cabinet current signal; when the bus coupling cabinet current signal is greater than the set value in the current setting range, the current control unit 2 will be activated and output the bus coupling circuit breaker tripping output signal through the circuit breaker tripping control cable 6, thereby quickly eliminating the fault.

[0048] In summary, the arc protection networking system and method provided by the present invention, by introducing network management, adopting probe-type arc sensors, optimizing action logic, etc., not only solves the problems of space and engineering workload encountered in the transformation of traditional arc protection systems, but also significantly improves the flexibility, reliability and safety of the system, which is an effective improvement and development of the existing technology.

Claims

1. An arc protection networking system for power transformation of a hydropower station, wherein the busbar used in the system is connected with at least one main incoming line circuit breaker and multiple bus tie circuit breakers; Features: The system comprises a main control unit (1), a current control unit (2) and an arc sensor (3); the main control unit (1) is correspondingly connected to a main incoming line circuit breaker, the current control unit (2) is correspondingly connected to a bus tie circuit breaker, and the main control unit (1) and the current control unit (2) are communicatively connected; the arc sensor (3) is correspondingly arranged on the bus and is used to monitor the arc signal of the bus, and the arc sensor (3) is connected to the main control unit (1); the main control unit (1) is also used to collect the main incoming line current, and the current control unit (2) is also used to collect the bus tie line current.

2. The arc protection networking system for power transformation of a hydropower station according to claim 1, Features: The main incoming line circuit breaker and the main control unit (1) are both installed in the main incoming line cabinet. A first current transformer is also provided in the main incoming line cabinet. The main control unit (1) is connected to the first current transformer to collect the main incoming line cabinet current signal.

3. The arc protection networking system for power transformation of a hydropower station according to claim 2, Features: The main control unit (1) is used to trip the corresponding main incoming line circuit breaker based on the arc signal monitored by the arc sensor (3) and the main incoming line cabinet current signal collected by the first current transformer when both are greater than a preset action threshold.

4. The arc protection networking system for power transformation of a hydropower station according to claim 1, Features: The bus tie circuit breaker and the current control unit (2) are both installed in the bus tie cabinet. A second current transformer is also provided in the bus tie cabinet. The current control unit (2) is connected to the second current transformer so as to collect the current signal of the bus tie cabinet.

5. The arc protection networking system for power transformation of a hydropower station according to claim 4, Features: The main control unit (1) is connected to the current control unit (2) via a communication optical fiber (4); the main control unit (1) is used to forward an arc action signal to the current control unit (2) via the communication optical fiber (4) based on an arc signal monitored by an arc sensor (3) when the arc signal is greater than a preset action threshold.

6. The arc protection networking system for power transformation of a hydropower station according to claim 5, Features: The current control unit (2) is used to trip the corresponding bus tie circuit breaker based on the arc action signal forwarded by the main control unit (1) and the bus tie cabinet current signal collected by the second current transformer when the arc action signal exists and the bus tie cabinet current signal is greater than a preset action threshold.

7. The arc protection networking system for power transformation of a hydropower station according to claim 1, Features: A circuit breaker trip control cable (6) is used to connect the main control unit (1) and the main incoming line circuit breaker, and the current control unit (2) and the bus tie circuit breaker. The circuit breaker trip control cable (6) is used to output the main incoming line circuit breaker trip output signal and the bus tie circuit breaker trip output signal respectively. The main control unit (1) and the current control unit (2) respectively collect the main incoming line cabinet current signal and the bus tie cabinet current signal through the corresponding current signal collection cable (7).

8. The arc protection networking system for power transformation of a hydropower station according to claim 1, Features: There are a plurality of arc sensors (3), all of which are probe-type arc sensors; the plurality of arc sensors (3) are installed in the corresponding plurality of switch cabinet low-voltage chambers on the busbar by means of openings; each arc sensor (3) is connected to a main control unit (1) via an arc optical fiber (5), thereby transmitting arc signals monitored in the low-voltage chamber of the switch cabinet to the main control unit (1).

9. A method for arc protection networking for power transformation of hydropower stations. Features: The hardware basis of the method is the arc protection networking system described in claim 1; The action criterion parameter value is preset. When the bus is powered by the main incoming circuit breaker, the main control unit collects the main incoming cabinet current signal in real time; when the arc sensor monitors the arc signal, and the arc signal is greater than the corresponding threshold value in the first action criterion parameter value, the main control unit forwards the arc action signal to the current control unit and simultaneously obtains the currently collected main incoming cabinet current signal; if the main incoming cabinet current signal at this time is also greater than the corresponding threshold value in the action criterion parameter value, the main control unit acts and trips the corresponding main incoming circuit breaker.

10. The arc protection networking method for power transformation of a hydropower station according to claim 9, Features: When the busbar is powered by the bus tie circuit breaker, the current control unit collects the current signal of the bus tie cabinet in real time; if the current control unit receives the arc action signal forwarded by the main control unit, it obtains the currently collected current signal of the bus tie cabinet; if the current signal of the bus tie cabinet at this time is also greater than the corresponding threshold in the action criterion parameter value, the current control unit operates and trips the corresponding bus tie circuit breaker.