Urban power distribution network power supply capacity calculation method and system based on multiple novel loads

The method and system optimize urban distribution networks by calculating power supply capacity through load distribution and topology reorganization, addressing inefficiencies and resource waste in existing networks.

CN119070303AInactive Publication Date: 2024-12-03STATE GRID TIANJIN ELECTRIC POWER CO CHENGXI POWER SUPPLY BRANCH +2
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411555028.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-04
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing distribution networks in urban areas face insufficient power supply capacity, leading to inefficiencies and waste in infrastructure expansion due to low utilization rates during off-peak periods and excessive channel resource occupation.

Method used

A method and system for calculating power supply capacity by optimizing load distribution and reorganizing line topology in urban distribution networks, using historical load data to evaluate load balance and fault impact, thereby improving scalability and reducing peak load volatility.

Benefits of technology

Enhances power supply capacity by optimizing load distribution and line topology, reducing peak load volatility, and avoiding wasteful resource allocation, while maintaining high utilization rates.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119070303A_ABST
    Figure CN119070303A_ABST
Patent Text Reader

Abstract

The invention discloses an urban power distribution network power supply capacity calculation method and system based on multiple novel loads. The method comprises the following steps: selecting a load area needing to be optimized; determining lines needing to be optimized, and forming a new topological region by the determined lines needing to be optimized; carrying out line topology recombination on a line needing to be optimized, and judging a fault influence type eij; carrying out in-station main transformer load balance degree calculation on the transformer substation after line topology recombination, and taking a calculation result as an evaluation index for evaluating the main transformer load balance degree of the whole power distribution system; and based on the historical load data of the power grid, carrying out line load balance calculation after line topology recombination, and taking a calculation result as an evaluation index for evaluating the line load balance degree of the whole power distribution system. According to the technical scheme, the defects that a traditional capacity increasing mode is extensive, limited pipeline resources are wasted and the like can be effectively overcome, the power supply capacity of the power distribution network under an existing power distribution network frame can be rapidly improved, and the method has remarkable generalizability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power distribution of power grids, and in particular to a method and system for calculating the power supply capacity of a city distribution network under multiple new loads. Background Art

[0002] As an important part of the entire power network, the distribution network is directly connected to the electricity users, which ultimately affects the quality of electricity consumption. With the rapid development of cities and the increase in power-consuming equipment, urban electricity consumption continues to grow, and the demand for access by various types of business expansion users continues to rise. With the access of new types of loads, the existing distribution network cannot fully meet the access needs of users. The problem of insufficient power supply capacity of the distribution network in some hot economic growth areas is particularly prominent.

[0003] At present, the measures to improve the power supply capacity of the distribution network are usually mainly to build or change interconnection switches and new interconnection lines in order to change the line structure of the distribution network and increase the installed capacity. Although the above methods meet the distribution network's requirement for line load rate N-1, they aggravate the problem of generally low utilization rate of existing power grid interconnection equipment during off-peak periods and a large amount of channel resources being occupied, and result in low return on investment in power grid project construction and waste of power grid construction investment. Summary of the invention

[0004] The purpose of the present invention is to provide a method and system for calculating the power supply capacity of an urban distribution network under various new loads, thereby reducing the peak value and volatility of line loads and improving the power supply capacity of the distribution network.

[0005] To achieve the purpose of the present invention, the technical solution provided by the present invention is as follows: First aspect The present application provides a method for calculating the power supply capacity of an urban distribution network under multiple new loads, comprising the following steps: Step S1: Select a load area that needs to be optimized, and obtain historical load data of the power grid in the load area that needs to be optimized; Step S2: determining the lines that need to be optimized from the selected load area that needs to be optimized, and forming a new topological area with the determined lines that need to be optimized; Step S3: Reorganize the line topology of the line to be optimized and determine the type of fault impact e ij , when the fault affects the type e ij When the requirements are met, proceed to step S4; Specifically include: Step S3.1: Select the load area node rj, take rj as the starting point, and search the main path Pp(rj) of rj in reverse direction; Step S3.2: Taking the tie power source as the starting node, search backward to the intersection of the main path Pp (rj), and the intersection point is the switching area Rs (rj) corresponding to the tie power source of the load area node rj; if there is no tie power source, the switching area does not exist; if there are multiple tie power sources, the minimum switching area Rsmin (rj) in the switching area is taken according to the following formula: Rsmin(rj)∈{Rs(rj)}; Step S3.3: By judging the new topological region node ri and P p (r j ) to determine the relationship between ri and r j Type of failure impact e ij , when the fault affects the type e ij When the requirements are met, proceed to step S4; Step S4: Based on the historical load data of the power grid, the load balance of the main transformer in the substation after the line topology is reorganized is calculated, and the calculation result is used as an evaluation index for evaluating the load balance of the main transformer of the entire distribution system; Based on the historical load data of the power grid, the line load balance is calculated after the line topology is reorganized, and the calculation result is used as an evaluation index for evaluating the load balance of the lines of the entire distribution system.

[0006] Second aspect The present application provides a system for calculating the power supply capacity of a city distribution network under various new loads, including the following units: an optimized load area selection unit, an optimized line determination unit, a fault impact type e ij Judgment unit, main transformer load balance and line load balance calculation unit; The optimized load area selection unit is used to select the load area that needs to be optimized and obtain the historical load data of the power grid in the load area that needs to be optimized; The optimized line determination unit is used to determine the lines that need to be optimized from the selected load area that needs to be optimized, and form a new topological area with the determined lines that need to be optimized; The type of fault impact e ij The judgment unit is used to reorganize the line topology of the line that needs to be optimized and judge the type of fault impact e ij , when the fault affects the type e ij When the requirements are met, proceed to step S4; Specifically used to perform the following steps: Step S3.1: Select the load area node rj, take rj as the starting point, and search the main path Pp(rj) of rj in reverse direction; Step S3.2: Taking the tie power source as the starting node, search backward to the intersection of the main path Pp (rj), and the intersection point is the switching area Rs (rj) corresponding to the tie power source of the load area node rj; if there is no tie power source, the switching area does not exist; if there are multiple tie power sources, the minimum switching area Rsmin (rj) in the switching area is taken according to the following formula: Rsmin(rj)∈{Rs(rj)}; Step S3.3: By judging the new topological region node ri and P p (r j ) to determine the relationship between ri and r j Type of failure impact e ij , when the fault affects the type e ij When the requirements are met, the main transformer load balance and line load balance calculation unit is executed; The main transformer load balance and line load balance calculation unit is used to calculate the load balance of the main transformer in the substation after the line topology is reorganized based on the historical load data of the power grid, and use the calculation result as an evaluation index for evaluating the load balance of the main transformer of the entire distribution system; based on the historical load data of the power grid, the line load balance calculation is performed after the line topology is reorganized, and the calculation result is used as an evaluation index for evaluating the line load balance of the entire distribution system.

[0007] Compared with the prior art, the technical advantages of the solution of the present invention are as follows: The scheme of the present invention is based on the existing distribution network ring network to screen out the switch stations with a certain proportion of the same between the lines, optimize the load distribution points of the switch stations and intervals on the lines, and calculate the comprehensive evaluation index of each candidate scheme. At the same time, this technical scheme can effectively avoid the disadvantages of the traditional capacity increase method, such as extensive and wasteful limited pipeline resources, and can quickly improve the power supply capacity of the distribution network under the existing distribution network grid, and has relatively significant scalability. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] Figure 1 A schematic diagram of a method flow chart provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0009] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0010] like Figure 1As shown in the figure, this embodiment provides a method for calculating the power supply capacity of an urban distribution network under various new loads, including the following steps: Step S1: Select the load area to be optimized and obtain the historical load data of the power grid in the load area to be optimized; The historical load data of the power grid includes: the rated capacity Rij of the jth main transformer of the ith substation, the actual load Pij of the jth main transformer of the ith substation, the maximum load rate T of the main transformer of the ith substation imax , the minimum load rate T of the main transformer of the ith substation imin , the maximum unbalance degree a of the ith substation imax ; the rated capacity R of the xth outgoing line lx , the actual load magnitude P of the xth outgoing line lx , the maximum load rate T of the outgoing line max , the minimum load rate T of the outgoing line min , the maximum unbalance degree a of the outgoing line max ; where, 1 ≤ i < n; 1 ≤ j < m, m is the number of main transformers of the ith substation; 1 ≤ x ≤ γ, γ is the number of outgoing lines of substations with the same voltage level in the distribution system.

[0011] It should be noted that the load area to be optimized can be a town or an industrial and commercial area. The grid structure and historical power consumption data in the optimized area are the basic data.

[0012] All substation buses connected to each line, each section of bus M1, M2, M3 ··· Mn; All intervals connected to each substation bus, each section of interval k1, k2, k3 ··· kn; There are n substations in the area, and the number of main transformers of each substation is N1, N2, ···, N n , according to the definition, the in-station power supply capacity C of the substation can be expressed as: ; Among them, R α,β is the connection relationship between the αth main transformer and the βth main transformer. When there is a connection relationship, R α,β = 1, otherwise R α,β = 0, and each row corresponds to a main transformer connection unit.

[0013] Step S2: Determine the lines to be optimized from the selected load area to be optimized, and form a new topological area with the determined lines to be optimized; It should be noted that the lines to be optimized are two or more lines belonging to the same loop network.

[0014] Among them, in step S2, determining the lines to be optimized from the selected load area to be optimized specifically includes: The selected lines in the load optimization area are judged in pairs as follows: Step S2.1: Calculate the proportion of the same busbars, the formula is as follows: ; Step S2.2: Determination n s Is it in N SET within; among them, N SET ∈{60%, 100%}; n θa-s , n θb-s are the sum of busbars of line a and line b respectively, N SET To optimize the threshold value of the regional line ratio.

[0015] Step S3: Reorganize the line topology of the line to be optimized and determine the type of fault impact e ij , when the fault affects the type e ij When the requirements are met, proceed to step S4; Specifically include: Step S3.1: Select the load area node rj, take rj as the starting point, and search the main path Pp(rj) of rj in reverse direction; Step S3.2: Taking the tie power source as the starting node, search backward to the intersection of the main path Pp (rj), and the intersection point is the switching area Rs (rj) corresponding to the tie power source of the load area node rj; if there is no tie power source, the switching area does not exist; if there are multiple tie power sources, the minimum switching area Rsmin (rj) in the switching area is taken according to the following formula: Rsmin(rj)∈{Rs(rj)}; Step S3.3: By judging the new topological region node ri and P p (r j ) to judge the relationship between ri and r j Type of failure impact e ij , when the fault affects the type e ij When the requirements are met, proceed to step S4; The step S3.3 specifically includes: Step S3.3.1: By judging the new topological region node ri and P p (r j) to judge the relationship between ri and r j Type of failure impact e ij , as follows: If r i ∈P p (r j ), and r can be determined by the following formula i R j Type of failure impact e ij : ; Among them, Z1 is the node set on the main path, and Z2 is the node set on the non-main path; When the backup power supply is not present or i ∈P p (R smin (r j )),r j It is not possible to switch to the backup power supply, so the downtime is the fault repair time; the main channel P p (r j ) on other regional nodes: P p (r j )-P p (R smin (r j )) When a regional node fails, r j Can switch to backup power supply and can be switched according to the contact switch S t and r i The type of faulty switch determines whether to operate; If ri P p (r j ), and r can be determined by the following formula i R j Type of failure impact e ij : ; When j After a fault occurs, the contact switch of the main path and the switch on the non-main path are activated; if r i Not r j Node on the main path, and r j The non-main path contains r j Nodes on the main path, automatic switch action will cause outage j , through r i Manual switches at boundary points can isolate faults, so r i R j The fault impact type is 3; if r iThe main pathway contains r j The node on the main path, the coincident switch action will cause r j Out of service, through r i The automatic switch at the boundary point of the non-main channel can isolate the fault, so r i R j The fault impact type is 5; if r i With r j When any regional nodes on the main path are on different paths, r i The fault pair j No impact, e ij is 6; Step S3.3.2: For e ij When it is 6 or 5, e ij If the requirements are met, proceed to step S4.

[0016] Step S4: Based on the historical load data of the power grid, the load balance of the main transformer in the substation after the line topology is reorganized is calculated, and the calculation result is used as an evaluation index for evaluating the load balance of the main transformer of the entire distribution system; Based on the historical load data of the power grid, the line load balance is calculated after the line topology is reorganized, and the calculation result is used as an evaluation index for evaluating the load balance of the lines of the entire distribution system.

[0017] Among them, based on the historical load data of the power grid, the load balance degree of the main transformer in the substation after the line topology reorganization is calculated, and the calculation result is used as an evaluation index for evaluating the load balance degree of the main transformer of the entire distribution system; specifically including: Step 41.1: Calculate the maximum unbalance degree of the main transformer in each substation in turn a imax ; ; in, a imax The smaller the value, the higher the load balance between the main transformers in the substation. a imax It can be used as an evaluation index to reflect the load balance of the main transformer in the substation; Step 41.2: Calculate the average load balance of each station a avg ; ; in, a avg The smaller the value is, the higher the load balance of the main transformers in the distribution system of this voltage level is. a avgThe value of can be used as an evaluation index to measure the load balance of the main transformers in the entire distribution system of the relevant voltage level. n means that there are n substations in the distribution system of a certain voltage level. Wherein, based on the historical load data of the power grid, the line load balance calculation is performed after the line topology is reorganized, and the calculation result is used as an evaluation index for evaluating the line load balance of the entire distribution system; specifically as follows: ; Among them, the line load scale a max The smaller the value of is, the higher the line load balance of the distribution system at this voltage level is. max The value of can be used as an evaluation index to measure the line load balance of the entire distribution system at the relevant voltage level.

[0018] In addition, the embodiment of the present invention also provides a system for calculating the power supply capacity of a city distribution network under various new loads, including the following units: an optimized load area selection unit, an optimized line determination unit, a fault impact type e ij Judgment unit, main transformer load balance and line load balance calculation unit; The optimized load area selection unit is used to select the load area that needs to be optimized and obtain the historical load data of the power grid in the load area that needs to be optimized; The optimized line determination unit is used to determine the lines that need to be optimized from the selected load area that needs to be optimized, and form a new topological area with the determined lines that need to be optimized; The type of fault impact e ij The judgment unit is used to reorganize the line topology of the line that needs to be optimized and judge the type of fault impact e ij , when the fault affects the type e ij When the requirements are met, proceed to step S4; Specifically used to perform the following steps: Step S3.1: Select the load area node rj, take rj as the starting point, and search the main path Pp(rj) of rj in reverse direction; Step S3.2: Taking the tie power source as the starting node, search backward to the intersection of the main path Pp (rj), and the intersection point is the switching area Rs (rj) corresponding to the tie power source of the load area node rj; if there is no tie power source, the switching area does not exist; if there are multiple tie power sources, the minimum switching area Rsmin (rj) in the switching area is taken according to the following formula: Rsmin(rj)∈{Rs(rj)}; Step S3.3: By judging the new topological region node ri and P p (rj ) to judge the relationship between ri and r j Type of failure impact e ij , when the fault affects the type e ij When the requirements are met, the main transformer load balance and line load balance calculation unit is executed; The main transformer load balance and line load balance calculation unit is used to calculate the load balance of the main transformer in the substation after the line topology is reorganized based on the historical load data of the power grid, and use the calculation result as an evaluation index for evaluating the load balance of the main transformer of the entire distribution system; based on the historical load data of the power grid, the line load balance calculation is performed after the line topology is reorganized, and the calculation result is used as an evaluation index for evaluating the line load balance of the entire distribution system.

[0019] Wherein, the step S3.3 specifically includes: Step S3.3.1: By judging the new topological region node ri and P p (r j ) to judge the relationship between ri and r j Type of failure impact e ij , as follows: If r i ∈P p (r j ), and r can be determined by the following formula i R j Type of failure impact e ij : ; Among them, Z1 is the node set on the main path, and Z2 is the node set on the non-main path; When the backup power supply is not present or i ∈P p (R smin (r j )),r j It is not possible to switch to the backup power supply, so the downtime is the fault repair time; the main channel P p (r j ) on other regional nodes: P p (r j )-P p (R smin (r j )) When a regional node fails, r j Can switch to backup power supply and can be switched according to the contact switch S t and r i The type of faulty switch determines whether to operate; If ri P p (r j ), and r can be determined by the following formula i R j Type of failure impact e ij : ; When j After a fault occurs, the contact switch of the main path and the switch on the non-main path are activated; if r i Not r j Node on the main path, and r j The non-main path contains r j Nodes on the main path, automatic switch action will cause outage j , through r i Manual switches at boundary points can isolate faults, so r i R j The fault impact type is 3; if r i The main pathway contains r j The node on the main path, the coincident switch action will cause r j Out of service, through r i The automatic switch at the boundary point of the non-main channel can isolate the fault, so r i R j The fault impact type is 5; if r i With r j When any regional nodes on the main path are on different paths, r i The fault pair j No impact, e ij is 6; Step S3.3.2: For e ij When it is 6 or 5, e ij If the requirements are met, the main transformer load balance and line load balance calculation unit is executed.

[0020] Finally, it should be noted that the above embodiments are only used to illustrate and explain the present invention, and are not intended to limit the present invention to the scope of the described embodiments. In addition, those skilled in the art can understand that the present invention is not limited to the above embodiments, and more variations and modifications can be made according to the teachings of the present invention, and these variations and modifications all fall within the scope of the protection claimed by the present invention.

Claims

1. A method for calculating the power supply capacity of an urban distribution network under multiple new loads, characterized in that: The following steps are involved: Step S1: Select a load area that needs to be optimized, and obtain historical load data of the power grid in the load area that needs to be optimized; Step S2: determining the lines that need to be optimized from the selected load area that needs to be optimized, and forming a new topological area with the determined lines that need to be optimized; Step S3: Reorganize the line topology of the line to be optimized and determine the type of fault impact e ij , when the fault affects the type e ij When the requirements are met, proceed to step S4; Specifically include: Step S3.1: Select the load area node rj, take rj as the starting point, and search the main path Pp(rj) of rj in reverse direction; Step S3.2: Taking the tie power source as the starting node, search backward to the intersection of the main path Pp (rj), and the intersection point is the switching area Rs (rj) corresponding to the tie power source of the load area node rj; if there is no tie power source, the switching area does not exist; if there are multiple tie power sources, the minimum switching area Rsmin (rj) in the switching area is taken according to the following formula: Rsmin(rj)∈{Rs(rj)}; Step S3.3: By judging the new topological region node ri and P p (r j ) to determine the relationship between ri and r j Type of failure impact e ij , when the fault affects the type e ij When the requirements are met, proceed to step S4; Step S4: Based on the historical load data of the power grid, the load balance of the main transformer in the substation after the line topology is reorganized is calculated, and the calculation result is used as an evaluation index for evaluating the load balance of the main transformer of the entire distribution system; Based on the historical load data of the power grid, the line load balance is calculated after the line topology is reorganized, and the calculation result is used as an evaluation index for evaluating the load balance of the lines of the entire distribution system.

2. The method for calculating the power supply capacity of the urban distribution network under multiple new loads according to claim 1 is characterized in that: The step S3.3 specifically includes: Step S3.3.1: By judging the new topological region node ri and P p (r j ) to determine the relationship between ri and r j Type of failure impact e ij , as follows: If r i ∈P p (r j ), and r can be determined by the following formula i R j Type of failure impact e ij : ; Among them, Z1 is the node set on the main path, and Z2 is the node set on the non-main path; When the backup power supply is not present or i ∈P p (R smin (r j )),r j It is not possible to switch to the backup power supply, so the downtime is the fault repair time; the main channel P p (r j ) on other regional nodes: P p (r j )-P p (R smin (r j )) When a regional node fails, r j Able to switch to backup power supply and can be switched according to the contact switch S t and r i The type of faulty switch determines whether to operate; If ri P p (r j ), and r can be determined by the following formula i R j Type of failure impact e ij : ; When j After a fault occurs, the contact switch of the main path and the switch on the non-main path are activated; if r i Not r j Nodes on the main path, and r j The non-main path contains r j Nodes on the main path, automatic switch action will cause outage j , through r i Manual switches at boundary points can isolate faults, so r i R j The fault impact type is 3; if r i The main pathway contains r j The node on the main path, the coincident switch action will cause r j Out of service, through r i The automatic switch at the boundary point of the non-main channel can isolate the fault, so r i R j The fault impact type is 5; if r i With r j When any regional nodes on the main path are on different paths, r i The fault pair j No impact, e ij is 6; Step S3.3.2: For e ij When it is 6 or 5, e ij If the requirements are met, proceed to step S4.

3. The method for calculating the power supply capacity of the urban distribution network under multiple new loads according to claim 2 is characterized in that: The historical load data of the power grid includes: the rated capacity Rij of the j-th main transformer of the i-th substation, the actual load Pij of the j-th main transformer of the i-th substation, the maximum load rate T of the main transformer of the i-th substation imax , the minimum load rate T of the main transformer of the i-th substation imin , the maximum unbalance degree a of the i-th substation imax ; the rated capacity R of the x-th outgoing line lx , the actual load magnitude P of the x-th outgoing line lx is, the maximum load rate T of the outgoing line max , the minimum load rate T of the outgoing line min , the maximum unbalance degree a of the outgoing line max ; where, 1 ≤ i < n; 1 ≤ j < m, m is the number of main transformers of the i-th substation; 1 ≤ x ≤ γ, γ is the number of outgoing lines of substations with the same voltage level in the distribution system.

4. The method for calculating the power supply capacity of the urban distribution network under multiple new loads according to claim 3 is characterized in that: In step S2, the lines to be optimized are determined from the selected load area to be optimized, specifically including: The selected lines in the load optimization area are judged in pairs as follows: Step S2.1: Calculate the proportion of the same busbars, the formula is as follows: ; Step S2.2: Determination n s Is it in N SET within; among them, N SET ∈{60%, 100%}; n θa-s , n θb-s are the sum of busbars of line a and line b respectively, N SET To optimize the threshold value of the regional line ratio.

5. The method for calculating the power supply capacity of the urban distribution network under multiple new loads according to claim 4 is characterized in that: In step S4, based on the historical load data of the power grid, the load balance degree of the main transformer in the substation after the line topology reorganization is calculated, and the calculation result is used as an evaluation index for evaluating the load balance degree of the main transformer of the entire distribution system; specifically include: Step 41.1: Calculate the maximum unbalance degree of the main transformer in each substation in turn a imax ; ; in, a imax The smaller the value, the higher the load balance between the main transformers in the substation. a imax It can be used as an evaluation index to reflect the load balance of the main transformer in the substation; Step 41.2: Calculate the average load balance of each station a avg ; ; in, a avg The smaller the value is, the higher the load balance of the main transformers in the distribution system of this voltage level is. a avg The value of can be used as an evaluation index to measure the load balance of the main transformers in the entire distribution system of the relevant voltage level. n means that there are n substations in the distribution system of a certain voltage level.

6. The method for calculating the power supply capacity of the urban distribution network under multiple new loads according to claim 5 is characterized in that: In step S4, based on the historical load data of the power grid, the line load balance calculation after the line topology reorganization is performed, and the calculation result is used as an evaluation index for evaluating the line load balance of the entire distribution system; the details are as follows: ; Among them, the line load scale a max The smaller the value of is, the higher the line load balance of the distribution system at this voltage level is. max The value of can be used as an evaluation index to measure the line load balance of the entire distribution system at the relevant voltage level.

7. A system for calculating the power supply capacity of urban distribution networks under multiple new loads, characterized in that: It includes the following units: optimized load area selection unit, optimized line determination unit, fault impact type e ij Judgment unit, main transformer load balance and line load balance calculation unit; The optimized load area selection unit is used to select the load area that needs to be optimized and obtain the historical load data of the power grid in the load area that needs to be optimized; The optimized line determination unit is used to determine the lines that need to be optimized from the selected load area that needs to be optimized, and form a new topological area with the determined lines that need to be optimized; The type of fault impact e ij The judgment unit is used to reorganize the line topology of the line that needs to be optimized and judge the type of fault impact e ij , when the fault affects the type e ij When the requirements are met, proceed to step S4; Specifically used to perform the following steps: Step S3.1: Select the load area node rj, take rj as the starting point, and search the main path Pp(rj) of rj in reverse direction; Step S3.2: Taking the tie power source as the starting node, search backward to the intersection of the main path Pp (rj), and the intersection point is the switching area Rs (rj) corresponding to the tie power source of the load area node rj; if there is no tie power source, the switching area does not exist; if there are multiple tie power sources, the minimum switching area Rsmin (rj) in the switching area is taken according to the following formula: Rsmin(rj)∈{Rs(rj)}; Step S3.3: By judging the new topological region node ri and P p (r j ) to determine the relationship between ri and r j Type of failure impact e ij , when the fault affects the type e ij When the requirements are met, the main transformer load balance and line load balance calculation unit is executed; The main transformer load balance and line load balance calculation unit is used to calculate the load balance of the main transformer in the substation after the line topology is reorganized based on the historical load data of the power grid, and use the calculation result as an evaluation index for evaluating the load balance of the main transformer of the entire distribution system; Based on the historical load data of the power grid, the line load balance calculation is performed after the line topology is reorganized, and the calculation result is used as an evaluation index for evaluating the line load balance of the entire distribution system.

8. The system for calculating the power supply capacity of the urban distribution network under various new loads according to claim 7 is characterized in that: The step S3.3 specifically includes: Step S3.3.1: By judging the new topological region node ri and P p (r j ) to determine the relationship between ri and r j Type of failure impact e ij , as follows: If r i ∈P p (r j ), and r can be determined by the following formula i R j Type of failure impact e ij : ; Among them, Z1 is the node set on the main path, and Z2 is the node set on the non-main path; When the backup power supply is not present or i ∈P p (R smin (r j )),r j It is not possible to switch to the backup power supply, so the downtime is the fault repair time; the main channel P p (r j ) on other regional nodes: P p (r j )-P p (R smin (r j )) When a regional node fails, r j Able to switch to backup power supply and can be switched according to the contact switch S t and r i The type of faulty switch determines whether to operate; If ri P p (r j ), and r can be determined by the following formula i R j Type of failure impact e ij : ; When j After a fault occurs, the contact switch of the main path and the switch on the non-main path are activated; if r i Not r j Nodes on the main path, and r j The non-main path contains r j Nodes on the main path, automatic switch action will cause outage j , through r i Manual switches at boundary points can isolate faults, so r i R j The fault impact type is 3; if r i The main pathway contains r j The node on the main path, the coincident switch action will cause r j Out of service, through r i The automatic switch at the boundary point of the non-main channel can isolate the fault, so r i R j The fault impact type is 5; if r i With r j When any regional nodes on the main path are on different paths, r i The fault pair j No impact, e ij is 6; Step S3.3.2: For e ij When it is 6 or 5, e ij If the requirements are met, the main transformer load balance and line load balance calculation unit is executed.

Citation Information

Patent Citations

  • Urban power distribution network power supply capacity potential tapping method based on line load recombination

    CN110490464A

  • Power distribution system power supply capability evaluation method considering influence of multiple times of transfer on reliability

    CN112434905A

  • Distribution network feeder group mutual aid operation optimization method

    CN117913818A