Insulation acquisition terminal and monitoring terminal for large shaft of large-scale hydro-generator
By designing large-axis insulation acquisition terminals and monitoring terminals for large-wheel generators, remote online monitoring is achieved using carbon brushes and bearing insulation monitoring units, the problem of difficulty in detecting large-axis insulation failures of large-wheel generators is solved, and the system is improved Stability and safety.
Patent Information
- Application Number
- CN202411240407.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-12-03
Smart Images

Figure CN119070561A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of large-scale hydro-generator monitoring, and in particular to a large-scale hydro-generator shaft insulation acquisition terminal and a monitoring terminal. Background Art
[0002] The uneven air gap between the stator and rotor of a large hydro-turbine generator, the large local magnetic resistance of the stator core, the asymmetric magnetic circuit and other reasons lead to an unbalanced stator magnetic field of the generator, which will cause alternating magnetic flux and axial induced potential, namely shaft voltage, to intersect with the shaft on the rotor of the generator. When the shaft voltage is too large, it will damage the insulation between the shaft collar and the main shaft, causing the upper conductor to burn due to heat.
[0003] At present, the large-scale turbine shaft insulation monitoring system at home and abroad cannot realize the remote online monitoring of the actual resistance value of the shaft insulation. When the shaft rotates, the constant force spring of the shaft carbon brush twitches for a long time, the spring is fatigued and aged, and the constant force spring coil of the shaft insulation carbon brush and the grounding carbon brush breaks, resulting in the spring falling off and the carbon brush being completely separated from the shaft. During the operation of the generator, it is difficult for the operation and maintenance personnel to find such faults through inspections. When a shaft insulation fault actually occurs, the shaft insulation monitoring device refuses to operate, which will cause the fault to expand and cause major faults such as burning of the tile. Summary of the invention
[0004] In view of the problems existing in the prior art, a large-scale hydro-generator shaft insulation data collection terminal and a monitoring terminal are provided, which can realize remote and real-time data collection and monitoring of the insulation condition of the generator shaft.
[0005] The first aspect of the present invention proposes a large-scale hydro-turbine generator shaft insulation collection terminal, which is applied to large-scale hydro-turbine generators, and includes a first carbon brush, a second carbon brush, a third carbon brush, a fourth carbon brush, an upper guide outer bearing insulation monitoring unit, an upper guide inner bearing insulation monitoring unit and a shaft voltage collection unit; wherein the first carbon brush, the second carbon brush, the third carbon brush and the fourth carbon brush are all in contact with the shaft, the first carbon brush and the second carbon brush are respectively installed in the generator head slip ring chamber, the third carbon brush and the fourth carbon brush are installed in the waterwheel chamber, the upper guide outer bearing insulation monitoring unit is respectively connected to the first carbon brush and the second carbon brush, and outputs the insulation resistance value between the first carbon brush and the second carbon brush; the upper guide inner bearing insulation monitoring unit is respectively connected to the second carbon brush and the third carbon brush, and outputs the insulation resistance value between the second carbon brush and the third carbon brush; the shaft voltage collection unit is connected to the fourth carbon brush for outputting the shaft voltage.
[0006] As a preferred solution, the first carbon brush is a shaft collar carbon brush, the second carbon brush is a copper foil carbon brush, and the third carbon brush is a large shaft carbon brush.
[0007] As a preferred solution, the fourth carbon brush is a shaft voltage monitoring carbon brush for collecting shaft voltage.
[0008] As a preferred solution, the first carbon brush, the second carbon brush and the fourth carbon brush are not grounded, and the third carbon brush is grounded.
[0009] As a preferred solution, the upper guide outer bearing insulation monitoring unit, the upper guide inner bearing insulation monitoring unit and the shaft voltage acquisition unit are output in the form of 4-20mA analog quantity, which reflects the insulation resistance value.
[0010] As a preferred solution, the upper guide outer bearing insulation monitoring unit and the upper guide inner bearing insulation monitoring unit are both implemented using SINEAX V604 universal programmable transmitter.
[0011] The second aspect of the present invention proposes a large-scale hydro-turbine generator shaft insulation monitoring terminal, which is implemented on the basis of the large-scale hydro-turbine generator shaft insulation acquisition terminal described in the first aspect, and also includes an A / D conversion unit, a data processing unit, a D / A conversion unit, a power station monitoring system and a display unit connected in sequence; the A / D conversion unit simultaneously receives the parameters output by each unit with the upper guide outer bearing insulation monitoring unit, the upper guide inner bearing insulation monitoring unit, and the shaft voltage acquisition unit, and completes the analog-to-digital conversion; the data processing unit is used for data filtering and logic processing; the D / A conversion unit is used for analog-to-digital conversion; the power station monitoring system is used to receive and store the shaft insulation resistance value and shaft voltage output by the D / A conversion unit, wherein the shaft insulation resistance value includes the upper guide outer bearing insulation resistance value and the upper guide inner bearing insulation resistance value; the display unit is used to display the shaft insulation resistance value and the shaft voltage in real time.
[0012] As a preferred solution, it also includes an alarm unit connected to the power station monitoring system; the alarm unit is preset with a threshold range of the main shaft insulation resistance value and the shaft voltage, and is used to generate an alarm when the main shaft insulation resistance value and the shaft voltage exceed the threshold range.
[0013] As a preferred solution, in the alarm unit, a first alarm level, a second alarm level, and a third alarm level are set according to the set threshold range; wherein,
[0014] First alarm level: When the real-time large shaft insulation resistance value is less than the minimum value of its threshold range, and the real-time shaft voltage value is greater than the maximum value of its threshold range, it indicates that the insulation of the upper guide bearing has been reduced and the shaft voltage is abnormal, and it is necessary to stop the machine immediately for a comprehensive inspection;
[0015] Second alarm level: When the real-time large shaft insulation resistance value is less than the minimum value of its threshold range and the real-time shaft voltage value is less than the maximum value of its threshold range, it indicates that the insulation of the upper guide bearing has been reduced and the shaft voltage is normal. It is necessary to observe the operation of the unit and shut down for inspection if necessary.
[0016] Level 3: When the real-time measured main shaft insulation resistance value is greater than the maximum value of its threshold range and the real-time shaft voltage value is less than the maximum value of its threshold range, it indicates that the measurement circuit is abnormal or the main shaft insulation carbon brush is in poor contact with the main shaft, and the analog data acquisition circuit needs to be checked.
[0017] As a preferred solution, it also includes a printing unit, which is connected to the power station monitoring system and is used to print the large shaft insulation resistance value and shaft voltage obtained in real time.
[0018] Compared with the prior art, the beneficial effects of adopting the above technical solution are:
[0019] 1. The collected shaft insulation resistance and shaft voltage values are transmitted to the power station monitoring system through digital signals, realizing remote, online and real-time monitoring of the generator shaft insulation, effectively improving the operating stability and safety of the shaft insulation system.
[0020] 2. Through the alarm system, the alarm level is set to determine the main shaft insulation fault type and treatment measures, which solves the problem that the operation and maintenance personnel cannot timely discover such defects when the main shaft insulation measurement circuit is abnormal, the main shaft insulation carbon brush has poor contact or no contact with the main shaft. It ensures the operation stability and maintenance safety of the generator set, provides technical guarantee for the safe operation of large hydropower stations, and lays a good foundation for the safe and stable operation of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a schematic diagram of the insulation data collection terminal for the main shaft of a large hydro-turbine generator proposed in an embodiment of the present invention.
[0022] Figure 2 A schematic diagram of a large-scale hydro-generator shaft insulation monitoring terminal proposed in an embodiment of the present invention.
[0023] Figure markings: 1-first carbon brush, 2-second carbon brush, 3-third carbon brush, 4-upper guide outer bearing insulation monitoring unit, 5-upper guide inner bearing insulation monitoring unit, 6-fourth carbon brush, 7-axis voltage acquisition unit, 8-A / D conversion unit, 9-data processing unit, 10-D / A conversion unit, 11-power station monitoring system, 12-alarm unit, 13-printing unit, 14-display unit. DETAILED DESCRIPTION
[0024] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar modules or modules with the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be construed as limitations on the present application. On the contrary, the embodiments of the present application include all changes, modifications and equivalents that fall within the spirit and connotation of the appended claims.
[0025] In order to monitor the insulation condition of the main shaft in real time, an embodiment of the present invention proposes a large-scale hydro-turbine generator main shaft insulation collection terminal, which is applied to the large-scale hydro-turbine generator and can collect the insulation resistance value of the main shaft for subsequent judgment of the insulation condition and improve the timeliness of fault handling.
[0026] For details, please refer to Figure 1 The acquisition terminal includes a first carbon brush 1, a second carbon brush 2, a third carbon brush 3, a fourth carbon brush 6, an upper guide outer bearing insulation monitoring unit 4, an upper guide inner bearing insulation monitoring unit 5 and a shaft voltage acquisition unit 7; wherein the first carbon brush 1, the second carbon brush 2, the third carbon brush 3, and the fourth carbon brush 6 are all in contact with the main shaft, the first carbon brush 1 and the second carbon brush 2 are respectively installed in the generator head slip ring room, the third carbon brush 3 and the fourth carbon brush 6 are installed in the waterwheel room, the upper guide outer bearing insulation monitoring unit 4 is respectively connected to the first carbon brush 1 and the second carbon brush 2, and outputs the insulation resistance value between the first carbon brush and the second carbon brush; the upper guide inner bearing insulation monitoring unit 5 is respectively connected to the second carbon brush 2 and the third carbon brush 3, and outputs the insulation resistance value between the second carbon brush and the third carbon brush; the shaft voltage acquisition unit 7 is connected to the fourth carbon brush 6 for outputting the shaft voltage.
[0027] In this embodiment, the first carbon brush 1 is a shaft collar carbon brush, the second carbon brush 2 is a copper foil carbon brush, the third carbon brush 3 is a large shaft carbon brush, and the fourth carbon brush 6 is a shaft voltage monitoring carbon brush for collecting shaft voltage. In actual testing, the first carbon brush 1, the second carbon brush 2, and the fourth carbon brush 6 are not grounded, and the third carbon brush 3 is grounded.
[0028] The generator bearing insulation condition is collected through the upper guide outer bearing insulation monitoring unit 4 and the upper guide inner bearing insulation monitoring unit 5, and outputted in the form of 4-20mA analog quantity. Specifically, the upper guide outer bearing insulation monitoring unit 4 and the upper guide inner bearing insulation monitoring unit 5 monitor different parts of the main shaft. The upper guide outer bearing insulation monitoring unit 4 is respectively connected to the first carbon brush 1 and the second carbon brush 2 to monitor the insulation of the outer bearing and output a 4-20mA analog quantity, which can reflect the insulation resistance value of the outer bearing. Similarly, the upper guide inner bearing insulation monitoring unit 4 is respectively connected to the second carbon brush 2 and the third carbon brush 3 to monitor the insulation of the inner bearing and output a 4-20mA analog quantity, which can reflect the insulation resistance value of the inner bearing. In one embodiment, the upper guide outer bearing insulation monitoring unit 4 and the upper guide inner bearing insulation monitoring unit 5 can be implemented using the SINEAX V604 universal programmable transmitter.
[0029] At the same time, the shaft voltage acquisition unit 7 cooperates with the shaft voltage monitoring carbon brush to complete the shaft voltage acquisition and output it in the form of 4-20mA analog quantity.
[0030] The insulation data and shaft voltage of the generator bearing can be collected in real time through the upper outer bearing insulation monitoring unit 4, the upper inner bearing insulation monitoring unit 5 and the shaft voltage collection unit 7.
[0031] Furthermore, this embodiment also proposes a large-scale hydro-turbine generator shaft insulation monitoring terminal, which is used to judge the shaft insulation status and issue an alarm based on the data collected by the collection terminal. Figure 2 The monitoring terminal mainly includes an A / D conversion unit 8, a data processing unit 9, a D / A conversion unit 10, a power station monitoring system 11 and a display unit 14 which are connected in sequence; the A / D conversion unit 8 simultaneously receives the parameters output by each unit with the upper guide outer bearing insulation monitoring unit, the upper guide inner bearing insulation monitoring unit 5 and the shaft voltage acquisition unit 7, and completes the analog-to-digital conversion; the data processing unit 9 is used for data filtering and logic processing; the D / A conversion unit 10 is used for analog-to-digital conversion; the power station monitoring system 11 is used to receive and store the large shaft insulation resistance value and shaft voltage output by the D / A conversion unit 10, wherein the large shaft insulation resistance value includes the insulation resistance value of the upper guide outer bearing (obtained by the upper guide outer bearing insulation monitoring unit) and the insulation resistance value of the upper guide inner bearing (obtained by the upper guide inner bearing insulation monitoring unit); the display unit 14 is used to display the insulation resistance value and shaft voltage of the large shaft in real time, which can more intuitively understand the operation of the large generator.
[0032] In the monitoring terminal, the large shaft insulation analog quantity collected by the collection terminal can be displayed in real time on the display unit 14 after A / D conversion, data processing, and D / A conversion. Similarly, the shaft voltage analog quantity collected by the collection terminal can be displayed in real time on the display unit 14 after A / D conversion, data processing, and D / A conversion.
[0033] In practical applications, it can be remotely transmitted after being converted into digital quantities. In other words, the monitoring terminal can be set up in a split type, and the A / D conversion unit 8 and the data processing unit 9 can be set up on site with the acquisition terminal to convert its output analog quantity into digital quantity, and do preliminary processing, and then transmit the digital quantity signal, and convert it into analog quantity after the remote end receives it. Through the transmission of digital quantity signals, interference in the transmission process is avoided, and the problem of frequent false alarms of 4-20mA analog quantity due to interference from external environmental factors is solved, ensuring the correctness and reliability of the transmitted data. In one embodiment, the data processing unit can be a CPU, a memory, a clock, a human-machine interface, etc., to realize the use of data filtering, logical processing of collected data, saving data, and viewing data.
[0034] In one embodiment, the monitoring terminal further includes an alarm unit 12, which is connected to the power station monitoring system 11; the alarm unit 12 is preset with a threshold range of the main shaft insulation resistance value and the shaft voltage, and is used to generate an alarm when the main shaft insulation resistance value and the shaft voltage exceed the threshold range. Specifically, according to the preset threshold range, three alarm levels are provided in this embodiment, namely, the first alarm level, the second alarm level, and the third alarm level; wherein,
[0035] First alarm level: When the real-time main shaft insulation resistance value is less than the minimum value of its threshold range, and the real-time shaft voltage value is greater than the maximum value of its threshold range, it indicates that the insulation of the upper guide bearing has been reduced and the shaft voltage is abnormal, and the machine needs to be shut down immediately for a comprehensive inspection. In one embodiment, the minimum value of the main shaft insulation resistance value threshold range is 2.5 kilo-ohms; the maximum value of the shaft voltage value threshold range is set to 30V.
[0036] Second alarm level: When the real-time large shaft insulation resistance value is less than the minimum value of its threshold range and the real-time shaft voltage value is less than the maximum value of its threshold range, it indicates that the insulation of the upper guide bearing has been reduced and the shaft voltage is normal. It is necessary to observe the operation of the unit and shut down for inspection if necessary.
[0037] The third alarm level: When the real-time measured main shaft insulation resistance value is greater than the maximum value of its threshold range and the real-time shaft voltage value is less than the maximum value of its threshold range, it indicates that the measurement circuit is abnormal or the main shaft insulation carbon brush and the main shaft have poor contact, and the analog data acquisition circuit needs to be checked.
[0038] In actual applications, the alarm conditions can be adjusted as needed. For example, if the insulation resistance value of the upper inner bearing and the insulation resistance value of the upper outer bearing are both less than 2.5 kilo-ohms, and the shaft voltage is less than 30V, it is necessary to strengthen inspections and check after shutdown. If any one of the insulation resistance values of the upper inner bearing and the upper outer bearing is less than 2.5 kilo-ohms or the shaft voltage is greater than 30V, one of the three conditions is met, and the shaft insulation abnormality is reported.
[0039] In order to facilitate data collection and analysis during a fault, in one embodiment, the monitoring terminal further includes a printing unit 13, which is connected to the power station monitoring system 11 and is used to print the large shaft insulation resistance value and shaft voltage obtained in real time. In a preferred embodiment, the printing unit 13 is implemented by a printer.
[0040] The large-scale hydro-turbine generator shaft insulation data acquisition terminal and monitoring terminal proposed in the present invention can realize remote, online and real-time monitoring of the shaft insulation resistance value and shaft voltage value by real-time data acquisition of the shaft insulation resistance value and shaft voltage value and transmitting the data to the power station monitoring system through a digital channel. When the real-time measured shaft insulation resistance value and shaft voltage value are out of the set value range, the monitoring system will immediately alarm, which effectively improves the operation stability and maintenance safety of the shaft insulation system.
[0041] Example 1
[0042] This embodiment proposes a large-scale hydro-turbine generator shaft insulation collection terminal, which is applied to large-scale hydro-turbine generators, including a first carbon brush, a second carbon brush, a third carbon brush, a fourth carbon brush, an upper guide outer bearing insulation monitoring unit, an upper guide inner bearing insulation monitoring unit and a shaft voltage collection unit; wherein the first carbon brush, the second carbon brush, the third carbon brush and the fourth carbon brush are all in contact with the shaft, the first carbon brush and the second carbon brush are respectively installed in the generator head slip ring chamber, the third carbon brush and the fourth carbon brush are installed in the waterwheel chamber, the upper guide outer bearing insulation monitoring unit is respectively connected to the first carbon brush and the second carbon brush, and outputs the insulation resistance value between the first carbon brush and the second carbon brush; the upper guide inner bearing insulation monitoring unit is respectively connected to the second carbon brush and the third carbon brush, and outputs the insulation resistance value between the second carbon brush and the third carbon brush; the shaft voltage collection unit is connected to the fourth carbon brush for outputting the shaft voltage.
[0043] Example 2
[0044] On the basis of Example 1, in this embodiment, the first carbon brush is a shaft collar carbon brush, the second carbon brush is a copper foil carbon brush, and the third carbon brush is a large shaft carbon brush.
[0045] Example 3
[0046] On the basis of Example 1, the fourth carbon brush in this embodiment is a shaft voltage monitoring carbon brush, which is used to collect the shaft voltage.
[0047] Example 4
[0048] On the basis of Example 1, in this embodiment, the first carbon brush, the second carbon brush and the fourth carbon brush are not grounded, and the third carbon brush is grounded.
[0049] Example 5
[0050] On the basis of Example 1, in this embodiment, the upper guide outer bearing insulation monitoring unit, the upper guide inner bearing insulation monitoring unit and the shaft voltage acquisition unit are output in the form of 4-20mA analog quantity, which reflects the insulation resistance value.
[0051] Example 6
[0052] On the basis of Example 1, the upper guide outer bearing insulation monitoring unit and the upper guide inner bearing insulation monitoring unit described in this embodiment are both implemented using SINEAX V604 universal programmable transmitter.
[0053] Example 7
[0054] This embodiment proposes a large-scale hydro-turbine generator shaft insulation monitoring terminal, which is implemented on the basis of the large-scale hydro-turbine generator shaft insulation acquisition terminal described in Example 1, and also includes an A / D conversion unit, a data processing unit, a D / A conversion unit, a power station monitoring system and a display unit connected in sequence; the A / D conversion unit simultaneously receives the parameters output by each unit with the upper guide outer bearing insulation monitoring unit, the upper guide inner bearing insulation monitoring unit, and the shaft voltage acquisition unit, and completes analog-to-digital conversion; the data processing unit is used for data filtering and logic processing; the D / A conversion unit is used for analog-to-digital conversion; the power station monitoring system is used to receive and store the shaft insulation resistance value and shaft voltage output by the D / A conversion unit, wherein the shaft insulation resistance value includes the upper guide outer bearing insulation resistance value and the upper guide inner bearing insulation resistance value; the display unit is used to display the shaft insulation resistance value and the shaft voltage in real time.
[0055] Example 8
[0056] Based on Example 7, this embodiment also includes an alarm unit connected to the power station monitoring system; the alarm unit is preset with a threshold range of the main shaft insulation resistance value and the shaft voltage, and is used to generate an alarm when the main shaft insulation resistance value and the shaft voltage exceed the threshold range.
[0057] Example 9
[0058] On the basis of Example 8, in the alarm unit of this embodiment, a first alarm level, a second alarm level, and a third alarm level are set according to the set threshold range; wherein,
[0059] First alarm level: When the real-time large shaft insulation resistance value is less than the minimum value of its threshold range, and the real-time shaft voltage value is greater than the maximum value of its threshold range, it indicates that the insulation of the upper guide bearing has been reduced and the shaft voltage is abnormal, and it is necessary to stop the machine immediately for a comprehensive inspection;
[0060] Second alarm level: When the real-time large shaft insulation resistance value is less than the minimum value of its threshold range and the real-time shaft voltage value is less than the maximum value of its threshold range, it indicates that the insulation of the upper guide bearing has been reduced and the shaft voltage is normal. It is necessary to observe the operation of the unit and shut down for inspection if necessary.
[0061] Level 3: When the real-time measured main shaft insulation resistance value is greater than the maximum value of its threshold range and the real-time shaft voltage value is less than the maximum value of its threshold range, it indicates that the measurement circuit is abnormal or the main shaft insulation carbon brush is in poor contact with the main shaft, and the analog data acquisition circuit needs to be checked.
[0062] Example 10
[0063] On the basis of Example 6, this embodiment further includes a printing unit, which is connected to the power station monitoring system and is used to print the large shaft insulation resistance value and shaft voltage obtained in real time.
[0064] The present invention can be better implemented through Examples 1 to 10.
[0065] It should be noted that in the description of the embodiments of the present invention, unless otherwise clearly specified and limited, the terms "setting" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances; the drawings in the embodiments are used to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings herein can be arranged and designed in various different configurations.
[0066] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.
Claims
1. A large-scale hydro-generator shaft insulation collection terminal, characterized in that: It is used in large-scale hydro-turbine generators, including a first carbon brush, a second carbon brush, a third carbon brush, a fourth carbon brush, an upper guide outer bearing insulation monitoring unit, an upper guide inner bearing insulation monitoring unit and a shaft voltage acquisition unit; wherein the first carbon brush, the second carbon brush, the third carbon brush and the fourth carbon brush are all in contact with the main shaft, the first carbon brush and the second carbon brush are respectively installed in the generator head slip ring chamber, the third carbon brush and the fourth carbon brush are installed in the waterwheel chamber, the upper guide outer bearing insulation monitoring unit is respectively connected to the first carbon brush and the second carbon brush, and outputs the insulation resistance value between the first carbon brush and the second carbon brush; the upper guide inner bearing insulation monitoring unit is respectively connected to the second carbon brush and the third carbon brush, and outputs the insulation resistance value between the second carbon brush and the third carbon brush; the shaft voltage acquisition unit is connected to the fourth carbon brush for outputting the shaft voltage.
2. The large-scale hydro-generator shaft insulation acquisition terminal according to claim 1 is characterized in that: The first carbon brush is a shaft collar carbon brush, the second carbon brush is a copper foil carbon brush, and the third carbon brush is a large shaft carbon brush.
3. The large-scale hydro-generator shaft insulation acquisition terminal according to claim 1 is characterized in that: The fourth carbon brush is a shaft voltage monitoring carbon brush, which is used to collect shaft voltage.
4. The large-scale hydro-generator shaft insulation acquisition terminal according to claim 1 is characterized in that: The first carbon brush, the second carbon brush and the fourth carbon brush are not grounded, and the third carbon brush is grounded.
5. The large-scale hydro-generator shaft insulation acquisition terminal according to claim 1 is characterized in that: The upper guide outer bearing insulation monitoring unit, the upper guide inner bearing insulation monitoring unit and the shaft voltage acquisition unit are output in the form of 4-20mA analog quantity, and the analog quantity reflects the insulation resistance value.
6. The large-scale hydro-generator shaft insulation acquisition terminal according to claim 1 is characterized in that: The upper guide outer bearing insulation monitoring unit and the upper guide inner bearing insulation monitoring unit are both implemented using SINEAX V604 universal programmable transmitter.
7. A large-scale hydro-turbine generator shaft insulation monitoring terminal, implemented on the basis of the large-scale hydro-turbine generator shaft insulation acquisition terminal according to any one of claims 1 to 6, characterized in that: It also includes an A / D conversion unit, a data processing unit, a D / A conversion unit, a power station monitoring system and a display unit connected in sequence; the A / D conversion unit simultaneously receives the parameters output by each unit together with the upper guide outer bearing insulation monitoring unit, the upper guide inner bearing insulation monitoring unit and the shaft voltage acquisition unit, and completes the analog-to-digital conversion; the data processing unit is used for data filtering and logic processing; the D / A conversion unit is used for analog-to-digital conversion; the power station monitoring system is used to receive and store the large shaft insulation resistance value and shaft voltage output by the D / A conversion unit, wherein the large shaft insulation resistance value includes the upper guide outer bearing insulation resistance value and the upper guide inner bearing insulation resistance value; the display unit is used to display the large shaft insulation resistance value and the shaft voltage in real time.
8. The large-scale hydro-generator shaft insulation monitoring terminal according to claim 7 is characterized in that: It also includes an alarm unit connected to the power station monitoring system; the alarm unit is preset with a threshold range of the main shaft insulation resistance value and the shaft voltage, and is used to generate an alarm when the main shaft insulation resistance value and the shaft voltage exceed the threshold range.
9. The large-scale hydro-generator shaft insulation monitoring terminal according to claim 8 is characterized in that: In the alarm unit, a first alarm level, a second alarm level, and a third alarm level are set according to the set threshold range; wherein, First alarm level: When the real-time large shaft insulation resistance value is less than the minimum value of its threshold range, and the real-time shaft voltage value is greater than the maximum value of its threshold range, it indicates that the insulation of the upper guide bearing has been reduced and the shaft voltage is abnormal, and it is necessary to stop the machine immediately for a comprehensive inspection; Second alarm level: When the real-time large shaft insulation resistance value is less than the minimum value of its threshold range and the real-time shaft voltage value is less than the maximum value of its threshold range, it indicates that the insulation of the upper guide bearing has been reduced and the shaft voltage is normal. It is necessary to observe the operation of the unit and shut down for inspection if necessary. Level 3: When the real-time measured main shaft insulation resistance value is greater than the maximum value of its threshold range and the real-time shaft voltage value is less than the maximum value of its threshold range, it indicates that the measurement circuit is abnormal or the main shaft insulation carbon brush is in poor contact with the main shaft, and the analog data acquisition circuit needs to be checked.
10. The large-scale hydro-generator shaft insulation monitoring terminal according to claim 7, characterized in that: It also includes a printing unit, which is connected to the power station monitoring system and is used to print the large shaft insulation resistance value and shaft voltage obtained in real time.