Production equipment and process of steel pipe

By designing automated steel pipe production equipment, the automatic cutting of steel pipe billets is achieved using conveyors and transfer parts, solving the problem of manual loading and unloading, and improving production efficiency and operation convenience.

CN119077035APending Publication Date: 2024-12-06ZHEJIANG SANJI STEEL TUBE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411450999.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-17
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In the existing steel pipe manufacturing process, the end cutting device of the steel pipe billet requires manual loading and unloading, which wastes manpower and is inconvenient for operation.

Method used

A steel pipe production equipment is designed, including a workbench, a storage table and two cutting devices. Automatic loading and unloading of the first, second and third conveying parts and transfer parts are realized. The steel pipe billet is transported in the equipment along the length direction and automatically Cut both ends without manual operation.

Benefits of technology

It realizes automatic loading and unloading of steel pipe billets, saves manpower, improves production efficiency and operation convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119077035A_ABST
    Figure CN119077035A_ABST
Patent Text Reader

Abstract

The invention discloses steel pipe production equipment and a process thereof, and relates to the technical field of steel pipe production, the steel pipe production equipment has the advantage of automatic feeding and discharging, the key points of the technical scheme are that the steel pipe production equipment comprises a workbench, a storage table for storing steel pipes and two cutting devices, the workbench is opposite to the storage table in a front-back mode, and the two cutting devices are located on the left side and the right side of the workbench respectively; a first conveying part, a second conveying part and a third conveying part are arranged on the workbench, and the first conveying part, the second conveying part and the third conveying part are all used for driving steel pipes to be conveyed in the length direction of the workbench; the transferring piece is used for transferring the steel pipes on the storage table to the first conveying piece, the second conveying piece and the third conveying piece in sequence, and the two cutting devices correspond to the first conveying piece and the second conveying piece correspondingly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of steel pipe production, in particular to a steel pipe production device and a process thereof. Background Art

[0002] Steel pipe is a steel material with a hollow cross-section, whose length is much larger than its diameter or circumference. The manufacturing process of steel pipe is complicated. Before general steel pipe manufacturing, it is usually a steel pipe billet, and the two ends of the steel pipe billet are usually rough. In order to make the length and end roughness of the steel pipe billet meet the requirements of use, the two ends of the steel pipe billet need to be further cut.

[0003] At present, when using the cutting device for processing the two ends of the steel tube billet, the steel tube billet is mostly placed on the cutting device manually for loading, and then the steel tube billet is taken down manually for unloading after cutting. Manual loading and unloading wastes manpower and is inconvenient to use. Therefore, the applicant has developed a new technical solution in the actual production process to solve the above technical problems. Summary of the invention

[0004] In view of the above-mentioned technical deficiencies, the purpose of the present invention is to provide a steel pipe production equipment and process thereof, which has the advantages of automatic loading and unloading.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0006] The present invention provides a steel pipe production equipment, including a workbench, a storage table for storing steel pipes and two cutting devices, the workbench and the storage table are opposite to each other front and back, the two cutting devices are respectively located on the left and right sides of the workbench, the workbench is provided with a first conveying member, a second conveying member and a third conveying member, the first conveying member, the second conveying member and the third conveying member are all used to drive the steel pipe to be transported along the length direction of the workbench, the workbench is provided with a transfer member, and the transfer member is used to transfer the steel pipe on the storage table to the first conveying member, the second conveying member and the third conveying member in sequence, and the two cutting devices correspond to the first conveying member and the second conveying member respectively.

[0007] By adopting the above technical solution, when in use, the steel tube blank on the storage table is first transferred to the first conveying member by the transfer member, and then the steel tube blank is conveyed to the direction close to the corresponding cutting device by the first conveying member until one end of the steel tube blank is conveyed to the cutting device, and one end of the steel tube blank can be cut by the cutting device corresponding to the first conveying member. After the cutting of one end of the steel tube blank is completed, the steel tube blank is conveyed to the direction away from the cutting device by the first conveying member until the steel tube blank is separated from the cutting device, and then the steel tube blank on the first conveying member is transferred to the second conveying member by the transfer member, and then the steel tube blank is conveyed to the direction close to the corresponding cutting device by the second conveying member. The steel tube billet is conveyed in the direction of the cutting device until the other end of the steel tube billet is conveyed to the cutting device, and the other end of the steel tube billet can be cut by the cutting device corresponding to the second conveying member. After the other end of the steel tube billet is cut, the steel tube billet is conveyed in the direction away from the cutting device by the second conveying member until the steel tube billet is separated from the cutting device, and the cutting of the two ends of the steel tube billet can be completed at this time. After the cutting of the two ends of the steel tube billet is completed, the steel tube billet on the second conveying member is transferred to the third conveying member by the transfer member, and then the steel tube billet is conveyed out of the workbench by the third conveying member. There is no need to manually pick up and place the steel tube billet, which saves manpower and realizes automatic loading and unloading.

[0008] Preferably, the two cutting devices each include a cutting table and a vertical plate arranged on the top of the cutting table, one side of the vertical plate is vertically slidably connected to a mounting plate, and a cutting motor is arranged on the mounting plate, one end of a rotating shaft of the cutting motor is provided with a cutting saw blade, a first electric cylinder for pushing the mounting plate to move vertically up and down is arranged on the vertical plate, a boss is arranged on the top of the cutting table, the top of the cutting plate is horizontally slidably connected to a side plate, the side plate is opposite to the boss, and a screw is fixedly connected to a side of the side plate close to the boss, and an end of the screw away from the side plate passes through the boss, a nut is threadedly connected to the screw, and the nut is rotatably connected to one side of the boss;

[0009] The top of the cutting table is fixedly connected to a base plate, the bottom of the cutting table is provided with a second electric cylinder, and one end of a piston rod of the second electric cylinder passes through the cutting table and the base plate and is provided with a top plate located above the base plate, the top plate is used to press the steel pipe extending into the cutting table against the base plate, a collecting groove is provided at the top of the cutting table, a collecting box corresponding to the collecting groove is detachably connected to the bottom end of the cutting table, and the collecting groove is located below the cutting saw blade.

[0010] Preferably, the storage table includes a placement plate and a plurality of legs, each of which is arranged at the bottom end of the placement plate, the placement plate is located on one side of the workbench, and the placement plate is inclined downward at one end close to the workbench, a plurality of connecting grooves are provided on the top of the placement plate close to the workbench, and each connecting groove is spaced apart along the length direction of the placement plate, a plurality of blocking protrusions are provided on the top of the placement plate close to the workbench, and each blocking protrusion is staggered with each connecting groove, the steel pipe is placed on the placement plate and located above each connecting groove, at this time the steel pipe close to the blocking protrusion is in contact with the blocking protrusion, a partition is provided on the top of the placement plate, and the partition is located on one side of the steel pipe on the placement plate.

[0011] Preferably, the first conveying member includes a first slide groove opened at the top of the workbench along the length direction of the workbench, a plurality of groups of brackets are provided on one end of the workbench close to the first slide groove, and each group of brackets is spaced apart along the length direction of the first slide groove, each group of the brackets includes two first vertical plates relatively arranged at the top of the workbench, and the two first vertical plates are respectively located on both sides of the first slide groove, a first guide roller is rotatably connected between the two first vertical plates in each group of brackets, a slide plate is horizontally slidably connected in the first slide groove through a moving member, and a clamping member for clamping the steel pipe on the first guide roller is provided on the slide plate;

[0012] The second conveying member has the same structure as the first conveying member, and each of the first guide rollers includes two opposite first conical wheels, and the tips of the two first conical wheels are connected by a first connecting shaft, and the two first conical wheels are rotatably connected to the two first vertical plates respectively;

[0013] The third conveying member includes a plurality of second guide rollers, and the opposite sides of each second guide roller are rotatably connected with a second vertical plate, the bottom end of each second vertical plate is fixedly connected to the top of the workbench, and the second vertical plate on one side of each second guide roller is provided with a second rotating motor for driving the second guide roller to rotate, and each second guide roller includes two opposite second conical wheels, and the tips of the two second conical wheels are connected by a second connecting shaft, and the two second conical wheels are rotatably connected to the two second vertical plates respectively.

[0014] Preferably, one of the first vertical plates in each group of brackets is provided with a first rotating motor for driving the first guide roller to rotate.

[0015] Preferably, the moving member includes two first baffles arranged in the first slide groove, and a first screw rod is rotatably connected between the two first baffles, one end of the first screw rod passes through a slide plate and is threadedly connected to the slide plate, and the slide plate is located between the two first baffles, and a first driving motor for driving the first screw rod to rotate is provided on one of the first baffles;

[0016] The clamping member includes a supporting plate arranged at the top of the slide plate and a first clamping plate and a fixed plate arranged at the top of the supporting plate. The top of the supporting plate is horizontally slidably connected to a second clamping plate located between the first clamping plate and the fixed plate. The steel pipe on the first guide roller is located between the first clamping plate and the second clamping plate. The fixed plate is provided with a third electric cylinder for pushing the second clamping plate to move horizontally toward or away from the first clamping plate.

[0017] Preferably, the transfer member includes a plurality of swing plates arranged along the width direction of the workbench, and the swing plates are spaced apart along the length direction of the workbench, the bottom end of each of the swing plates is provided with a rotating shaft through a connecting plate, and two opposite turntables are rotatably connected to the rotating shaft, and the two turntables on each rotating shaft are fixedly connected to the top of the workbench, the side of each of the swing plates away from the rotating shaft is an inclined surface, and the end with the highest inclined surface on the swing plate is close to the storage table and located below the connecting groove, and the end with the lowest inclined surface on the swing plate is close to the third conveying member, and a triangular first side groove and a second side groove are provided on the upper side of one side of each of the swing plates, and the first side groove corresponds to the first conical wheel in the first conveying member away from the second guide roller, and the second side groove corresponds to the first conical wheel in the first conveying member away from the second guide roller, and the second side groove corresponds to the first conical wheel in the first conveying member away from the second guide roller. The groove corresponds to the first conical wheel away from the second guide roller in the second conveying member. Each of the rotating shafts is provided with an L-shaped driving rod on the side close to the storage table, and the end of each driving rod away from the rotating shaft is connected through a synchronous plate, and each of the driving rods is rotatably connected to the synchronous plate, and the synchronous plate is located below one side of the workbench table surface, and a hanging plate is vertically provided at the bottom end of the workbench, and a long box body is horizontally provided on one side of the hanging plate, and a slider is horizontally connected with the box body along the length direction of the box body, and a push groove is opened at the top center of the synchronous plate, and a push column is vertically provided at the top of the slider, and the top of the push column vertically passes through the push groove, and a fourth electric cylinder for pushing the slider to move horizontally in the box body is provided on the box body.

[0018] Preferably, the number of slide plates in the first chute is two, each of the first connecting shafts comprises two discs, and the two discs are respectively arranged on the two first conical wheels, with a gap between the two discs;

[0019] The moving member includes two second baffles arranged in the first slide groove, and a second screw rod is rotatably connected between the two second baffles, one end of the second screw rod passes through the two slide plates and is threadedly connected to the two slide plates, and the two slide plates are both located between the two second baffles, and a second driving motor for driving the second screw rod to rotate is provided on one of the second baffles;

[0020] The clamping member includes a horizontal plate arranged at the top of the slide plate, and an inverted U-shaped fixing frame is arranged at the top of the horizontal plate, a fifth electric cylinder is arranged at the top of the fixing frame, and one end of the piston rod of the fifth electric cylinder passes through the fixing frame and is provided with a moving box located above the fixing frame, two slide seats are horizontally slidably connected in the moving box along the length direction of the moving box, a third screw rod is rotatably connected between the opposite sides of the moving box, and one end of the third screw rod passes through the two slide seats and is threadedly connected to the two slide seats, the third screw rod has two threads with opposite rotation directions, and the two slide seats are respectively located at the two screw seats On the pattern, the moving box is provided with a motor for driving the third screw rod to rotate, the top ends of the two sliding seats are horizontally provided with long strip-shaped transition boxes along the width direction of the moving box, and the two transition boxes are horizontally slidably connected with transition blocks, the top ends of the two transition blocks are provided with inverted U-shaped pressure plates located outside the transition boxes, the two transition blocks are provided with reset springs on opposite sides, and the ends of the two reset springs away from the transition blocks are fixedly connected to the inner wall of the transition box, and two opposite limit blocks are provided on one side of the inner wall of the two transition boxes, and the transition block is located between the two limit blocks.

[0021] Preferably, the transfer member includes a first material picking plate and a second material picking plate arranged at the top of the two pressure plates, and the top surfaces of the first material picking plate and the second material picking plate are both inclined surfaces, the first material picking plate and the second material picking plate form a right-angled triangle material guide plate, the highest end of the inclined surface of the material guide plate is close to the storage table, and a stop block is vertically upwardly provided at the top of the first material picking plate, and the stop block corresponds to the first conical wheel in the first conveying member away from the second guide roller.

[0022] Another object of the present invention is to provide a production process for a steel pipe, comprising the following steps:

[0023] 1): The steel tube blank on the storage table is first transferred to the first conveying member by the transfer member, and then the steel tube blank is conveyed toward the cutting device corresponding thereto by the first conveying member until one end of the steel tube blank is conveyed to the cutting device, and one end of the steel tube blank can be cut by the cutting device corresponding to the first conveying member;

[0024] 2): After one end of the steel tube billet is cut, the steel tube billet is conveyed away from the cutting device by the first conveying member until the steel tube billet is separated from the cutting device, the steel tube billet on the first conveying member is transferred to the second conveying member by the transfer member, and then the steel tube billet is conveyed toward the cutting device corresponding thereto by the second conveying member until the other end of the steel tube billet is conveyed to the cutting device, and the other end of the steel tube billet can be cut by the cutting device corresponding to the second conveying member;

[0025] 3): After the other end of the steel tube billet is cut, the steel tube billet is transported away from the cutting device through the second conveyor until the steel tube billet is separated from the cutting device. At this time, the two ends of the steel tube billet can be cut off. After the two ends of the steel tube billet are cut off, the steel tube billet on the second conveyor is transferred to the third conveyor through the transfer member, and then the steel tube billet is transported out of the workbench through the third conveyor, realizing automatic loading and unloading.

[0026] The beneficial effect of the present invention is that when in use, the steel tube blank on the storage table is first transferred to the first conveying member by the transfer member, and then the steel tube blank is conveyed to the direction close to the corresponding cutting device by the first conveying member until one end of the steel tube blank is conveyed to the cutting device, and one end of the steel tube blank can be cut by the cutting device corresponding to the first conveying member. After the cutting of one end of the steel tube blank is completed, the steel tube blank is conveyed to the direction away from the cutting device by the first conveying member until the steel tube blank is separated from the cutting device, and then the steel tube blank on the first conveying member is transferred to the second conveying member by the transfer member, and then the steel tube blank is conveyed to the direction close to the corresponding cutting device by the second conveying member. The steel tube billet is conveyed in the direction of the cutting device until the other end of the steel tube billet is conveyed to the cutting device, and the other end of the steel tube billet can be cut by the cutting device corresponding to the second conveying member. After the other end of the steel tube billet is cut, the steel tube billet is conveyed in the direction away from the cutting device by the second conveying member until the steel tube billet is separated from the cutting device, and the cutting of the two ends of the steel tube billet can be completed at this time. After the cutting of the two ends of the steel tube billet is completed, the steel tube billet on the second conveying member is transferred to the third conveying member by the transfer member, and then the steel tube billet is conveyed out of the workbench by the third conveying member. There is no need to manually pick up and place the steel tube billet, which saves manpower and realizes automatic loading and unloading. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0028] Figure 1 It is a structural schematic diagram of this embodiment;

[0029] Figure 2 This is a schematic diagram of the structure of the collecting tank in this embodiment;

[0030] Figure 3 This is a schematic diagram of the structure of the connecting groove in this embodiment;

[0031] Figure 4This is a schematic diagram of the structure of the synchronization board in this embodiment;

[0032] Figure 5 This is a schematic diagram of the structure of the first side groove of this embodiment;

[0033] Figure 6 for Figure 4 A schematic diagram of the structure of the middle A part;

[0034] Figure 7 This is a schematic diagram of the structure of the support plate of this embodiment;

[0035] Figure 8 This is a schematic diagram of the structure of the horizontal plate in this embodiment;

[0036] Fig. 9 This is a schematic diagram of the structure of the mobile box in this embodiment;

[0037] Fig.10 A schematic diagram of a guide plate placing a steel tube blank on a first guide roller in a first conveying member;

[0038] Fig.11 This is a schematic diagram of the structure of the fixing frame of this embodiment;

[0039] Fig.12 This is a schematic diagram of the structure of the guide plate of this embodiment;

[0040] Fig.13 This is a schematic diagram of the structure of the stopper in this embodiment;

[0041] Fig.14 It is a schematic diagram of a pressing plate pressing a steel tube billet onto a first guide roller in a first conveying member.

[0042] Description of reference numerals:

[0043] In the figure: 1, workbench; 2, storage table; 3, cutting device; 4, cutting table; 5, vertical plate; 6, mounting plate; 7, cutting motor; 8, cutting saw blade; 9, first electric cylinder; 10, boss; 12, side plate; 13, screw; 14, nut; 15, bottom plate; 16, second electric cylinder; 17, top plate; 18, collecting trough; 19, collecting box; 20, placement plate; 21, support leg; 22, connecting groove; 23, blocking convex block; 24, partition; 25, first slide groove; 26, first vertical plate; 27, first guide roller; 28, slide plate; 29, first conical wheel; 30, first connecting shaft; 31, second guide roller; 32, second vertical plate; 33, second rotating motor; 34, second conical wheel; 35, second connecting shaft; 36, first rotating motor; 37, first baffle; 38, first screw rod; 39 , the first driving motor; 40, the supporting plate; 41, the first clamping plate; 42, the fixing plate; 43, the second clamping plate; 44, the third electric cylinder; 45, the swing plate; 47, the rotating shaft; 48, the turntable; 49, the first side groove; 50, the second side groove; 51, the driving rod; 52, the synchronous plate; 53, the hanging plate; 54, the box body; 55, the slider; 56, the push groove; 57, the push column; 58, the fourth electric cylinder; 59, the second baffle plate; 60, the second screw rod; 61, the second driving motor; 62, the horizontal plate; 63, the fixing frame; 64, the fifth electric cylinder; 65, the moving box; 66, the sliding seat; 67, the third screw rod; 68, the motor; 69, the transition box; 70, the transition block; 71, the pressure plate; 72, the reset spring; 73, the limit block; 74, the first feeding plate; 75, the second feeding plate; 76, the guide plate; 77, the stop block. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] Embodiment 1: A steel pipe production equipment, such as Figure 1 , including a workbench 1, a storage table 2 for storing steel pipes and two cutting devices 3. The workbench 1 and the storage table 2 are opposite to each other front and back. The two cutting devices 3 are respectively located on the left and right sides of the workbench 1. The workbench 1 is provided with a first conveying member, a second conveying member and a third conveying member. The first conveying member, the second conveying member and the third conveying member are all used to drive the steel pipe to be transported along the length direction of the workbench 1. The workbench 1 is provided with a transfer member, and the transfer member is used to transfer the steel pipe on the storage table 2 to the first conveying member, the second conveying member and the third conveying member in sequence. The two cutting devices 3 correspond to the first conveying member and the second conveying member respectively.

[0046] like Figure 1 When in use, the steel tube blank on the storage table 2 is first transferred to the first conveying member by the transfer member, and then the steel tube blank is conveyed to the direction close to the corresponding cutting device 3 by the first conveying member, until one end of the steel tube blank is conveyed to the cutting device 3, and one end of the steel tube blank can be cut by the cutting device 3 corresponding to the first conveying member. After the cutting of one end of the steel tube blank is completed, the steel tube blank is conveyed away from the cutting device 3 by the first conveying member, until the steel tube blank is separated from the cutting device 3, and then the steel tube blank on the first conveying member is transferred to the second conveying member by the transfer member, and then the steel tube blank is conveyed to the direction close to the corresponding cutting device by the second conveying member. 3 directions until the other end of the steel tube billet is conveyed to the cutting device 3, and the other end of the steel tube billet can be cut by the cutting device 3 corresponding to the second conveying member. After the other end of the steel tube billet is cut, the steel tube billet is conveyed away from the cutting device 3 by the second conveying member until the steel tube billet is separated from the cutting device 3, and the cutting of the two ends of the steel tube billet can be completed at this time. After the cutting of the two ends of the steel tube billet is completed, the steel tube billet on the second conveying member is transferred to the third conveying member by the transfer member, and then the steel tube billet is conveyed out of the workbench 1 by the third conveying member, without the need to manually pick up and place the steel tube billet, which saves manpower and realizes automatic loading and unloading.

[0047] like Figure 1 and Figure 2 , the two cutting devices 3 each include a cutting table 4 and a vertical plate 5 arranged at the top of the cutting table 4, one side of the vertical plate 5 is vertically slidably connected with a mounting plate 6, and a cutting motor 7 is arranged on the mounting plate 6, a cutting saw blade 8 is arranged at one end of the rotating shaft of the cutting motor 7, and a first electric cylinder 9 for pushing the mounting plate 6 to move vertically up and down is arranged on the vertical plate 5, a boss 10 is arranged at the top of the cutting table 4, and a side plate 12 is horizontally slidably connected to the top of the cutting table, the side plate 12 is opposite to the boss 10, and a screw 13 is fixedly connected to the side of the side plate 12 close to the boss 10, and the end of the screw 13 away from the side plate 12 passes through the boss 10, a nut 14 is threadedly connected to the screw 13, and the nut 14 is rotatably connected to one side of the boss 10;

[0048] The top of the cutting table 4 is fixedly connected to the base plate 15, and the bottom end of the cutting table 4 is provided with a second electric cylinder 16. One end of the piston rod of the second electric cylinder 16 passes through the cutting table 4 and the base plate 15 and is provided with a top plate 17 located above the base plate 15. The top plate 17 is used to press the steel pipe extending into the cutting table 4 onto the base plate 15. A collecting groove 18 is opened at the top of the cutting table 4, and a collecting box 19 corresponding to the collecting groove 18 is detachably connected to the bottom end of the cutting table 4. The collecting groove 18 is located below the cutting saw blade 8.

[0049] The first conveyor or the second conveyor conveys one end of the steel tube billet to the cutting table 4, and makes the end of the steel tube billet to be cut collide with the side plate 12. At this time, one end of the steel tube billet passes between the top plate 17 and the bottom plate 15, and then the piston rod of the second electric cylinder 16 drives the top plate 17 to move downward until the top plate 17 and the bottom plate 15 clamp the steel tube billet. At this time, the displacement of the steel pipe during cutting can be reduced, and then the cutting saw blade 8 is driven to rotate by the rotating shaft of the cutting motor 7, and the piston rod of the first electric cylinder 9 pushes the mounting plate 6 to move vertically downward. At this time, one end of the steel tube billet can be cut by the cutting saw blade 8, and the cut waste falls into the collection box 19 through the collection trough 18 for collection. It is simple and convenient to use.

[0050] like Figure 1 and Figure 3 The storage table 2 includes a placement plate 20 and a plurality of legs 21, each of which is arranged at the bottom of the placement plate 20. The placement plate 20 is located on one side of the workbench 1, and the end of the placement plate 20 close to the workbench 1 is inclined downward. A plurality of connecting grooves 22 are provided on the top of the placement plate 20 close to the workbench 1, and each connecting groove 22 is spaced apart along the length direction of the placement plate 20. A plurality of blocking protrusions 23 are provided on the top of the placement plate 20 close to the workbench 1, and each blocking protrusion 23 is staggered with each connecting groove 22. The steel pipe is placed on the placement plate 20 and is located above each connecting groove 22. At this time, the steel pipe is close to the placement plate 20. The steel pipe with the blocking protrusion 23 is in contact with the blocking protrusion 23. A partition 24 is provided at the top of the placing plate 20, and the partition 24 is located on one side of the steel pipe on the placing plate 20. The purpose of this setting is that the transfer member transfers the steel pipe billet close to the blocking protrusion 23 to the first conveying member. Because the placing plate 20 is arranged at an angle, when the transfer member transfers the steel pipe billet close to the blocking protrusion 23 to the first conveying member, the next steel pipe billet on the placing plate 20 will roll along the placing plate 20 until it contacts the blocking protrusion 23. At this time, it is convenient for the transfer member to transfer the steel pipe billet close to the blocking protrusion 23 to the first conveying member next time. It is simple and convenient to use.

[0051] like Figure 1 and Figure 4, the first conveying member includes a first slide 25 opened at the top of the workbench 1 along the length direction of the workbench 1, a plurality of groups of brackets are provided at one end of the workbench 1 close to the first slide 25, and each group of brackets is spaced apart along the length direction of the first slide 25, each group of brackets includes two first vertical plates 26 relatively arranged at the top of the workbench 1, and the two first vertical plates 26 are respectively located on both sides of the first slide 25, and a first guide roller 27 is rotatably connected between the two first vertical plates 26 in each group of brackets, a slide plate 28 is horizontally slidably connected in the first slide 25 through a moving member, and a clamping member for clamping the steel pipe on the first guide roller 27 is provided on the slide plate 28, the second conveying member has the same structure as the first conveying member, each first guide roller 27 includes two opposite first conical wheels 29, and the tips of the two first conical wheels 29 are connected by a first connecting shaft 30, and the two first conical wheels 29 are rotatably connected to the two first vertical plates 26 respectively;

[0052] The third conveying member includes a plurality of second guide rollers 31, and the opposite sides of each second guide roller 31 are rotatably connected to a second vertical plate 32, the bottom end of each second vertical plate 32 is fixedly connected to the top of the workbench 1, and the second vertical plate 32 on one side of each second guide roller 31 is provided with a second rotating motor 33 for driving the second guide roller 31 to rotate, and each second guide roller 31 includes two opposite second conical wheels 34, and the tips of the two second conical wheels 34 are connected by a second connecting shaft 35, and the two second conical wheels 34 are rotatably connected to the two second vertical plates 32 respectively.

[0053] like Figure 1 and Figure 4 , the transfer member transfers the steel tube billet to each first guide roller 27 on the first conveying member, and then the steel tube billet is clamped by the clamping member on the slide 28 in the first conveying member, and then the slide 28 is pushed by the moving member to move horizontally in the first chute 25. At this time, the steel tube billet can be conveyed to the cutting device 3 corresponding to the first conveying member through the clamping member, the slide 28, the moving member and each first guide roller 27 in the first conveying member. After one end of the steel tube billet is cut, the steel tube billet is moved away from the cutting device 3 through the cooperation of the clamping member, the slide 28, the moving member and each first guide roller 27 until the steel tube billet is separated from the cutting device 3, and then the clamping member releases the clamping of the steel tube billet;

[0054] Then, the steel tube blank on the first conveying member is transferred to each first guide roller 27 on the second conveying member, and then the steel tube blank is clamped by the clamping member on the slide 28 in the second conveying member, and then the slide 28 is pushed by the moving member in the second conveying member to move horizontally in the first slide 25. At this time, the steel tube blank can be conveyed to the cutting device 3 corresponding to the second conveying member through the clamping member, the slide 28, the moving member and each first guide roller 27 in the second conveying member. After the other end of the steel tube blank is cut, the steel tube blank is moved away from the cutting device 3 through the cooperation of the clamping member, the slide 28, the moving member and each first guide roller 27 until the steel tube blank is separated from the cutting device 3, and then the clamping member is released from the steel tube blank;

[0055] Then, the steel tube blank on the second conveyor is transferred to each second guide roller 31 of the third conveyor through the transfer member, and then the second guide roller 31 is driven to rotate by the rotating shaft of the second rotating motor 33, and the steel tube blank on the second guide roller 31 is conveyed out of the workbench 1 to complete the unloading. The steel tube blank can also be conveyed to the next process for processing through the second guide roller 31. When one end of the steel tube blank is conveyed to the cutting device 3 for cutting, the displacement of the steel tube during cutting can be further reduced by the clamping member, which is simple and convenient to use.

[0056] like Figure 1 A first rotating motor 36 for driving the first guide roller 27 to rotate is provided on one of the first vertical plates 26 in each group of brackets. When the steel tube billet is placed on the first guide roller 27, the first rotating motor 36 drives the first guide roller 27 to rotate. At this time, the steel tube billet on the first guide roller 27 can be easily transported toward the cutting device 3. At this time, after the first guide roller 27 transports one end of the steel tube billet into the cutting device 3, the clamping member clamps the steel tube billet, which is simple and convenient to use.

[0057] like Figure 1 and Figure 4 and Figure 7 The movable member includes two first baffles 37 arranged in the first slide groove 25, and a first screw rod 38 is rotatably connected between the two first baffles 37, one end of the first screw rod 38 passes through the slide plate 28 and is threadedly connected to the slide plate 28. At this time, the slide plate 28 is located between the two first baffles 37, and a first driving motor 39 for driving the first screw rod 38 to rotate is provided on one of the first baffles 37. By turning on the first driving motor 39, the rotating shaft of the first driving motor 39 drives the first screw rod 38 to rotate. At this time, because one end of the first screw rod 38 passes through the slide plate 28 and is threadedly connected to the slide plate 28, when the first screw rod 38 rotates, the slide plate 28 can be pushed to move horizontally in the first slide groove 25 toward or away from the cutting device 3.

[0058] like Figure 1 and Figure 4 and Figure 5and Figure 7 The clamping member includes a support plate 40 arranged at the top of the slide plate 28, and a first clamping plate 41 and a fixed plate 42 arranged at the top of the support plate 40. The top of the support plate 40 is horizontally slidably connected with a second clamping plate 43 located between the first clamping plate 41 and the fixed plate 42. The steel pipe on the first guide roller 27 is located between the first clamping plate 41 and the second clamping plate 43. The fixed plate 42 is provided with a third electric cylinder 44 for pushing the second clamping plate 43 to move horizontally toward or away from the first clamping plate 41. The purpose of this arrangement is to When the transfer member transfers the steel tube blank to each first guide roller 27 of the first conveyor, the steel tube blank will be located between the first clamping plate 41 and the second clamping plate 43 in the first conveyor. When the steel tube blank needs to be clamped, the piston rod of the third electric cylinder 44 pushes the second clamping plate 43 to move horizontally in the direction close to the first clamping plate 41 until the first clamping plate 41 and the second clamping plate 43 clamp the steel tube blank. The first clamping plate 41 and the second clamping plate 43 are both provided with anti-slip pads (not shown in the figure) on the sides where they are close to each other.

[0059] When the transfer member transfers the steel tube blank to each first guide roller 27 of the second conveying member, the steel tube blank will be located between the first clamping plate 41 and the second clamping plate 43 in the second conveying member, which is simple and convenient to use.

[0060] like Figure 1 and Figure 4 and Figure 5 and Figure 6The transfer member includes a plurality of swing plates 45 arranged along the width direction of the workbench 1, and each swing plate 45 is spaced apart along the length direction of the workbench 1, a rotating shaft 47 is provided at the bottom end of each swing plate 45 through a connecting plate, and two opposite turntables 48 are rotatably connected to the rotating shaft 47, and the two turntables 48 on each rotating shaft 47 are fixedly connected to the top of the workbench 1, and a side of each swing plate 45 away from the rotating shaft 47 is an inclined surface, and the highest end of the inclined surface on the swing plate 45 is close to the storage table 2 and is located below the connecting groove 22, and the lowest end of the inclined surface on the swing plate 45 is close to the third conveying member, and a triangular first side groove 49 and a second side groove 50 are provided on the upper side of one side of each swing plate 45, and the first side groove 49 corresponds to the first conical wheel 29 in the first conveying member away from the second guide roller 31, and the second side groove 50 corresponds to the second conveying member. Corresponding to the first conical wheel 29 away from the second guide roller 31 in the feeding, each rotating shaft 47 is provided with an L-shaped driving rod 51 on the side close to the storage table 2, and the end of each driving rod 51 away from the rotating shaft 47 is connected through a synchronous plate 52, and each driving rod 51 is rotatably connected to the synchronous plate 52, and the synchronous plate 52 is located below one side of the table surface of the workbench 1, and a hanging plate 53 is vertically provided at the bottom end of the workbench 1, and a long strip box body 54 is horizontally provided on one side of the hanging plate 53, and a slider 55 is horizontally connected to the box body 54 along the length direction of the box body 54, and a push groove 56 is opened at the top center of the synchronous plate 52, and a push column 57 is vertically provided at the top of the slider 55, and the top of the push column 57 vertically passes through the push groove 56, and a fourth electric cylinder 58 is provided on the box body 54 for pushing the slider 55 to move horizontally in the box body 54.

[0061] like Figure 1 and Figure 4 and Figure 5 and Figure 6 When the first steel tube blank on the storage table 2 needs to be transferred to the first guide roller 27 of the first conveyor, it is only necessary to push the slider 55 to move horizontally in the box body 54 through the fourth electric cylinder 58. At this time, the slider 55 will drive the push column 57 to move. At this time, the push column 57 will drive the synchronous plate 52 to move through the push groove 56. At this time, because the synchronous plate 52 is rotatably connected with each driving rod 51, when the push column 57 drives the synchronous plate 52 to move through the push groove 56, the synchronous plate 52 will drive the rotating shaft 47 to rotate on the turntable 48 through each driving rod 51. At this time, the rotating shaft 47 will drive the swing plate 45 to swing along the rotation circumference of the rotating shaft 47 through the connecting plate;

[0062] When the swing plate 45 swings upward to a vertical state, the inclined surface on the swing plate 45 will contact the first steel tube blank on the placement plate 20 in the storage table 2 and drive the steel tube blank to move upward until the steel tube blank is separated from the blocking protrusion 23 in the storage table 2. At this time, the first steel tube will roll along the inclined surface on the swing plate 45 in the direction close to the first side groove 49. When the first steel tube rolls into the first side groove 49, the swing plate 45 swings downward through the cooperation of the fourth electric cylinder 58, the slider 55, the push column 57, the push groove 56, the synchronous plate 52, the driving rod 51, the rotating shaft 47 and the connecting plate until the steel tube blank on the first side groove 49 is placed on the first guide roller 27 of the first conveyor. At this time, the first steel tube blank on the storage table 2 can be transferred to the first guide roller 27 of the first conveyor.

[0063] When one end of the first steel pipe is cut, the first steel pipe needs to be transferred to the first guide roller 27 of the second conveyor, and the swing plate 45 is swung upward again through the cooperation of the fourth electric cylinder 58, the slider 55, the push column 57, the push groove 56, the synchronous plate 52, the driving rod 51, the rotating shaft 47 and the connecting plate. When the swing plate 45 swings upward to a vertical state, because the first side groove 49 corresponds to the first conical wheel 29 in the first conveyor away from the second guide roller 31, and the second side groove 50 corresponds to the first conical wheel 29 in the second conveyor away from the second guide roller 31, when the swing plate 45 swings upward to a vertical state, the inclined surface on the swing plate 45 will align with the first side groove 49 in the first conveyor. The first steel tube billet on the guide roller 27 contacts and lifts the first steel tube billet out of the first guide roller 27 and the clamping member of the first conveyor. At this time, the first steel tube billet will roll toward the second side groove 50 along the inclined surface of the swing plate 45. In the process of the first steel tube billet rolling the second side groove 50, the second steel tube billet on the storage table 2 will roll toward the first side groove 49 through the inclined surface of the swing plate 45. When the first steel tube billet rolls into the second side groove 50 and the second steel tube billet rolls into the first side groove 49, the swing plate 45 swings downward. At this time, the first steel tube billet can be placed on the first guide roller 27 of the second conveyor, and the second steel tube billet can be placed on the first guide roller 27 of the first conveyor (such as Figure 5 );

[0064] Then, when one end of the second steel tube billet and the other end of the first steel tube billet are cut, the swing plate 45 is swung upward again until the swing plate 45 swings to a vertical state. At this time, the swing plate 45 will lift the first and second steel tube billets out of the first guide roller 27 and the clamping member. Then, the first steel tube billet will roll to the second guide roller 31 of the third conveyor through the swing plate 45, and the second steel tube billet will roll to the second side groove 50. The third steel tube billet on the storage table 2 will roll to the first side groove 49 through the swing plate 45, and so on. Automatic loading and unloading can be achieved, and it is simple and convenient to use.

[0065] like Figure 8 and Fig. 9 and Fig.10 and Fig.11 and Fig.12 , the number of slide plates 28 in the first slide groove 25 is two, each first connecting shaft 30 includes two discs, and the two discs are respectively arranged on two first conical wheels 29, and there is a gap between the two discs;

[0066] Alternatively, the moving member includes two second baffles 59 arranged in the first slide groove 25, and a second screw rod 60 is rotatably connected between the two second baffles 59, one end of the second screw rod 60 passes through the two slide plates 28 and is threadedly connected to the two slide plates 28, at this time, the two slide plates 28 are both located between the two second baffles 59, and a second driving motor 61 for driving the second screw rod 60 to rotate is provided on one of the second baffles 59;

[0067] Alternatively, the clamping member includes a horizontal plate 62 arranged at the top of the slide plate 28, and an inverted U-shaped fixing frame 63 is provided at the top of the horizontal plate 62, a fifth electric cylinder 64 is provided at the top of the fixing frame 63, and one end of the piston rod of the fifth electric cylinder 64 passes through the fixing frame 63 and is provided with a moving box 65 located above the fixing frame 63, two slide seats 66 are horizontally slidably connected in the moving box 65 along the length direction of the moving box 65, a third screw rod 67 is rotatably connected between the opposite sides of the moving box 65, and one end of the third screw rod 67 passes through the two slide seats 66 and is threadedly connected to the two slide seats 66, the third screw rod 67 has two threads with opposite rotation directions, and the two slide seats 66 are respectively located at two On a thread, a motor 68 for driving the third screw rod 67 to rotate is provided on the moving box 65, and the top ends of the two slide seats 66 are horizontally provided with a long strip transition box 69 along the width direction of the moving box 65, and the two transition boxes 69 are horizontally slidably connected with transition blocks 70, and the top ends of the two transition blocks 70 are provided with an inverted U-shaped pressure plate 71 located outside the transition box 69, and the two transition blocks 70 are provided with return springs 72 on opposite sides, and the ends of the two return springs 72 away from the transition blocks 70 are fixedly connected to the inner wall of the transition box 69, and two opposite limit blocks 73 are provided on one side of the inner wall of the two transition boxes 69, and the transition block 70 is located between the two limit blocks 73;

[0068] Alternatively, the transfer member includes a first material picking plate 74 and a second material picking plate 75 arranged at the top ends of the two pressure plates 71, and the top end surfaces of the first material picking plate 74 and the second material picking plate 75 are both inclined surfaces, and the first material picking plate 74 and the second material picking plate 75 form a right-angled triangle material guide plate 76, and the highest end of the inclined surface of the material guide plate 76 is close to the storage table 2, and a stop block 77 is vertically upwardly provided at the top end of the first material picking plate 74, and the stop block 77 corresponds to the first conical wheel 29 in the first conveying member away from the second guide roller 31.

[0069] like Figure 8 and Fig. 9 and Fig.10 and Fig.11 and Fig.12 When the second drive motor 61 is working, the rotating shaft of the second drive motor 61 will drive the second screw rod 60 to rotate. At this time, because one end of the second screw rod 60 passes through the two slide plates 28 and is threadedly connected to the two slide plates 28, when the second screw rod 60 rotates, the two slide plates 28 can be horizontally moved in the first slide groove 25 in the direction close to the cutting device 3 at the same time. At this time, the fifth electric cylinder 64, the moving box 65, the fixed frame 63, the slide seat 66, the transition box 69, the transition block 70, the pressure plate 71, the stopper 77 and the guide plate 76 will follow the slide plate 28 to move horizontally;

[0070] When the fifth electric cylinder 64 is working, the piston rod of the fifth electric cylinder 64 pushes the moving box 65 to move upward or downward, and at this time, the slide 66, the motor 68, the third screw rod 67, the slide 66, the transition box 69, the transition block 70, the pressure plate 71, the stopper 77 and the guide plate 76 will move vertically with the moving box 65;

[0071] When the motor 68 is working, the rotating shaft of the motor 68 drives the third screw rod 67 to rotate. At this time, because one end of the third screw rod 67 passes through the two slides 66, and the third screw rod 67 has two threads with opposite rotation directions, the two slides 66 are respectively located on the two threads. Therefore, when the third screw rod 67 rotates, the two slides 66 can be driven to move away from or close to each other at the same time. At this time, the transition box 69, the transition block 70 and the pressure plate 71 will move with the slide 66;

[0072] In the first step, the mobile box 65 is moved upward by the fifth electric cylinder 64 in the clamping member on the first conveying member until the first material picking plate 74 in the guide plate 76 contacts the two steel tube billets on the storage platform 2, and the two steel tube billets are lifted upward. When the steel tube billets are lifted to the top of the blocking protrusion 23, the two steel tube billets will roll along the inclined surface on the guide plate 76 in the direction close to the stopper 77 until one of the steel tube billets contacts the stopper 77, and then the mobile box 65 is moved downward by the fifth electric cylinder 64 until the two steel tube billets are placed on the first conical wheel 29 corresponding to the stopper 77, and then the mobile box 65 continues to move downward until the steel tube billets are separated from the stopper 77, at which time the two steel tube billets will respectively roll onto the two discs in the first connecting shaft 30 and contact the two first conical wheels 29 in the first guide roller 27, and at this time the two steel tube billets on the storage platform 2 can be simultaneously transferred to the first guide roller 27 of the first conveying member (such as Fig.10 );

[0073] In the second step, the motor 68, the third screw rod 67 and the two slides 66 are coordinated to move the two slides 66 away from each other to a suitable position, at which time the first feeding plate 74 and the second feeding plate 75 will move away from each other, and then the fifth electric cylinder 64 is used to move the moving box 65 upward, at which time the two steel tube billets will pass between the first feeding plate 74 and the second feeding plate 75 and between the two pressing plates 71, until the two steel tube billets on the first guide roller 27 are both located below between the two pressing plates 71, and at this time the top of the guide plate 76 is not in contact with the steel tube billets on the storage table 2;

[0074] In the third step, the two slide seats 66 are moved closer to each other until the two pressing plates 71 contact each other. At this time, the ends of the two pressing plates 71 that contact each other correspond to the two steel tube blanks. Then the moving box 65 moves downward. At this time, the ends of the two pressing plates 71 that contact each other are inserted between the two steel tube blanks to separate the two steel tube blanks. At this time, the two steel tube blanks correspond to the two pressing plates 71 respectively. Then the moving box 65 continues to move downward until the two steel tube blanks enter the two pressing plates 71 respectively and are tightly pressed against the top ends of the two pressing plates 71 (such as Fig.13 and Fig.14 ), the top of the pressing plate 71 is provided with an anti-slip pad (not shown in the figure) that is tightly pressed against the outer wall of the steel tube blank;

[0075] In the fourth step, the second driving motor 61, the second screw rod 60 and the two slide plates 28 cooperate to make the two slide plates 28 move simultaneously in the first slide groove 25 toward the direction close to the cutting device 3. At this time, because the pressing plate 71 is pressed against the steel pipe billet, the two steel pipe billets will follow the pressing plate 71 and the slide plate 28 to approach the cutting device 3, and the two steel pipe billets can be clamped and transported.

[0076] Step 5. When one end of the two steel tube billets are in contact with the side plate 12 in the cutting device 3, the two slide plates 28 continue to move toward the cutting device 3. At this time, because the pressing plate 71 is in close contact with the steel tube billet, as the slide plate 28 approaches the cutting device 3, the transition block 70 will slide in the transition box 69. At this time, one of the return springs 72 in the transition box 69 is stretched, and the other return spring 72 is compressed until the transition block 70 is in contact with one side of one of the limit blocks 73 in the transition box 69. Then, the cutting device 3 can be used to cut the ends of the two steel tube billets that are in contact with the side plate 12, thereby improving the stability of the steel tube billet during cutting, and two steel tube billets can be cut at the same time, thereby improving the cutting efficiency.

[0077] Step 6: After the cutting of one end of the two steel tube blanks is completed, the two slide plates 28 are moved away from the cutting device 3 until the two steel tube blanks are separated from the cutting device 3, and then the two steel tube blanks are conveyed to correspond side by side with the clamping member in the second conveying member through the cooperation of the clamping member in the first conveying member and the moving member;

[0078] Step 7: Then, the two slides 66 are moved away from each other to a suitable position through the cooperation of the motor 68, the third screw rod 67 and the two slides 66, and then the mobile box 65 is moved downward by the fifth electric cylinder 64. At this time, the two steel tube billets will pass between the two pressing plates 71 until the two steel tube billets on the first guide roller 27 are located above the first feeding plate 74 and the second feeding plate 75, and then the two slides 66 are close to each other until the two pressing plates 71 contact each other, and then the clamping of the steel tube billets can be released;

[0079] Step 8, repeat the first step, at this time, the two steel tube blanks on the first guide roller 27 in the first conveyor will roll to the first guide roller 27 in the second conveyor through the guide plate 76, and then through the moving member and the clamping member in the second conveyor, repeat the second step, the third step, the fourth step, and the fifth step in sequence. After the other ends of the two steel tube blanks are cut, the two slide plates 28 are away from the cutting device 3 until the two steel tube blanks are separated from the cutting device 3, and then through the clamping member in the second conveyor, repeat the seventh step and the first step in sequence. At this time, through the guide plate 76 in the second conveyor, the two steel tube blanks on the first guide roller 27 in the second conveyor can be transferred to the second guide roller 31 in the third conveyor, and then the two steel tube blanks are transported out of the workbench 1 through the second guide roller 31;

[0080] In the fifth step, when one end of the two steel tube billets are not flush, one end of one of the steel tube billets will first contact the side plate 12, and then the two slides 28 continue to cut the device 3. At this time, one of the steel tube billets that is pressed against the side plate 12 in the cutting device 3 will stop moving, and the other steel tube billet that is not pressed against the side plate 12 will continue to follow the pressing plate 71 and the slide 28 to approach the side plate 12. At this time, the transition block 70 corresponding to the steel tube billet that has stopped moving will slide in the transition box 69 until the other steel tube billet is pressed against the side plate 12 in the cutting device 3, and then the fifth electric cylinder 64 is used to move the moving box 65 upward, so that the two The top ends in the pressure plates 71 are separated from the steel tube blanks, and the reset springs 72 push the transition blocks 70 to move back to their original positions in the transition box 69. At this time, the two transition blocks 70 are opposite to each other, and then the fifth electric cylinder 64 is used to move the moving box 65 downward, so that the top ends in the two pressure plates 71 are pressed tightly against the steel tube blanks, and then the two slides 28 move toward the direction close to the cutting device 3, so that the two transition blocks 70 respectively contact one side of the limit blocks 73 in the two transition boxes 69, and then the cutting device 3 is used to cut the ends of the two steel tube blanks that contact the side plate 12, and the steel tube blanks with two unaligned ends can be cut at the same time.

[0081] Embodiment 2: A production process for a steel pipe, using the production equipment for the steel pipe in the above embodiment 1, comprises the following steps:

[0082] 1): The steel tube blank on the storage table 2 is first transferred to the first conveying member by the transfer member, and then the steel tube blank is conveyed toward the cutting device 3 corresponding thereto by the first conveying member until one end of the steel tube blank is conveyed to the cutting device 3, and one end of the steel tube blank can be cut by the cutting device 3 corresponding to the first conveying member;

[0083] 2): After one end of the steel tube billet is cut, the steel tube billet is conveyed away from the cutting device 3 by the first conveying member until the steel tube billet is separated from the cutting device 3, and the steel tube billet on the first conveying member is transferred to the second conveying member by the transfer member, and then the steel tube billet is conveyed toward the cutting device 3 corresponding thereto by the second conveying member until the other end of the steel tube billet is conveyed to the cutting device 3, and the other end of the steel tube billet can be cut by the cutting device 3 corresponding to the second conveying member;

[0084] 3): After the other end of the steel tube billet is cut, the steel tube billet is transported away from the cutting device 3 by the second conveyor until the steel tube billet is separated from the cutting device 3. At this time, the cutting of the two ends of the steel tube billet can be completed. After the cutting of the two ends of the steel tube billet is completed, the steel tube billet on the second conveyor is transferred to the third conveyor by the transfer member, and then the steel tube billet is transported out of the workbench 1 by the third conveyor, thereby realizing automatic loading and unloading.

[0085] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A steel pipe production equipment, characterized in that: The invention comprises a workbench (1), a storage table (2) for storing steel pipes, and two cutting devices (3); the workbench (1) and the storage table (2) are opposite to each other front and back; the two cutting devices (3) are respectively located on the left and right sides of the workbench (1); the workbench (1) is provided with a first conveying member, a second conveying member, and a third conveying member; the first conveying member, the second conveying member, and the third conveying member are all used to drive the steel pipe to be conveyed along the length direction of the workbench (1); the workbench (1) is provided with a transfer member, and the transfer member is used to transfer the steel pipe on the storage table (2) to the first conveying member, the second conveying member, and the third conveying member in sequence; the two cutting devices (3) correspond to the first conveying member and the second conveying member respectively.

2. A steel pipe production equipment as claimed in claim 1, characterized in that: The two cutting devices (3) each comprise a cutting table (4) and a vertical plate (5) arranged at the top of the cutting table (4); one side of the vertical plate (5) is vertically slidably connected to a mounting plate (6), and a cutting motor (7) is arranged on the mounting plate (6); one end of the rotating shaft of the cutting motor (7) is provided with a cutting saw blade (8); the vertical plate (5) is provided with a first electric cylinder (9) for pushing the mounting plate (6) to move vertically up and down; the top of the cutting table (4) is provided with a boss (10); the top of the cutting table (4) is horizontally slidably connected to a side plate (12); the side plate (12) is opposite to the boss (10); a screw rod (13) is fixedly connected to a side of the side plate (12) close to the boss (10); an end of the screw rod (13) away from the side plate (12) passes through the boss (10); a nut (14) is threadedly connected to the screw rod (13), and the nut (14) is rotatably connected to one side of the boss (10); The top of the cutting table (4) is fixedly connected to a bottom plate (15), the bottom of the cutting table (4) is provided with a second electric cylinder (16), one end of a piston rod of the second electric cylinder (16) passes through the cutting table (4) and the bottom plate (15) and is provided with a top plate (17) located above the bottom plate (15), the top plate (17) is used to press a steel pipe extending into the cutting table (4) onto the bottom plate (15), the top of the cutting table (4) is provided with a collecting groove (18), the bottom of the cutting table (4) is detachably connected with a collecting box (19) corresponding to the collecting groove (18), and the collecting groove (18) is located below the cutting saw blade (8).

3. A steel pipe production equipment as claimed in claim 2, characterized in that: The storage table (2) comprises a placement plate (20) and a plurality of legs (21), each of the legs (21) being arranged at the bottom end of the placement plate (20), the placement plate (20) being located at one side of the workbench (1), and the end of the placement plate (20) close to the workbench (1) being inclined downward, and a plurality of connecting grooves (22) being provided at the top end of the placement plate (20) close to the workbench (1), and each of the connecting grooves (22) being distributed at intervals along the length direction of the placement plate (20), A plurality of blocking protrusions (23) are provided on the top of the placement plate (20) on the side close to the workbench (1), and each blocking protrusion (23) is staggered with each connecting groove (22). The steel pipe is placed on the placement plate (20) and is located above each connecting groove (22). At this time, the steel pipe close to the blocking protrusion (23) contacts the blocking protrusion (23). A partition plate (24) is provided on the top of the placement plate (20), and the partition plate (24) is located on one side of the steel pipe on the placement plate (20).

4. A steel pipe production equipment as claimed in claim 3, characterized in that: The first conveying member comprises a first slide groove (25) opened at the top of the workbench (1) along the length direction of the workbench (1); a plurality of groups of brackets are arranged at one end of the workbench (1) close to the first slide groove (25), and each group of brackets is spaced apart along the length direction of the first slide groove (25); each group of the brackets comprises two first vertical plates (26) arranged relatively at the top of the workbench (1), and the two first vertical plates (26) are respectively located on both sides of the first slide groove (25); a first guide roller (27) is rotatably connected between the two first vertical plates (26) in each group of brackets; a slide plate (28) is horizontally slidably connected in the first slide groove (25) through a moving member, and a clamping member for clamping the steel pipe on the first guide roller (27) is provided on the slide plate (28); The second conveying member has the same structure as the first conveying member, each of the first guide rollers (27) comprises two opposite first conical wheels (29), the tips of the two first conical wheels (29) are connected via a first connecting shaft (30), and the two first conical wheels (29) are rotatably connected to the two first vertical plates (26) respectively; The third conveying member comprises a plurality of second guide rollers (31), and the opposite sides of each second guide roller (31) are rotatably connected to a second vertical plate (32), the bottom end of each second vertical plate (32) is fixedly connected to the top end of the workbench (1), and the second vertical plate (32) on one side of each second guide roller (31) is provided with a second rotating motor (33) for driving the second guide roller (31) to rotate, and each second guide roller (31) comprises two opposite second conical wheels (34), and the tips of the two second conical wheels (34) are connected by a second connecting shaft (35), and the two second conical wheels (34) are rotatably connected to the two second vertical plates (32) respectively.

5. The production equipment of a steel pipe according to claim 4, characterized in that: One of the first vertical plates (26) in each group of brackets is provided with a first rotating motor (36) for driving the first guide roller (27) to rotate.

6. The steel pipe production equipment according to claim 4, characterized in that: The moving member comprises two first baffles (37) arranged in the first slide groove (25), and a first screw rod (38) is rotatably connected between the two first baffles (37), one end of the first screw rod (38) passes through the slide plate (28) and is threadedly connected to the slide plate (28), and the slide plate (28) is located between the two first baffles (37), and a first driving motor (39) for driving the first screw rod (38) to rotate is provided on one of the first baffles (37); The clamping member comprises a support plate (40) arranged at the top of the slide plate (28) and a first clamping plate (41) and a fixed plate (42) arranged at the top of the support plate (40); the top of the support plate (40) is horizontally slidably connected to a second clamping plate (43) located between the first clamping plate (41) and the fixed plate (42); the steel pipe on the first guide roller (27) is located between the first clamping plate (41) and the second clamping plate (43); and the fixed plate (42) is provided with a third electric cylinder (44) for pushing the second clamping plate (43) to move horizontally toward or away from the first clamping plate (41).

7. The production equipment of a steel pipe according to claim 6, characterized in that: The transfer member comprises a plurality of swing plates (45) arranged along the width direction of the workbench (1), and each swing plate (45) is spaced apart along the length direction of the workbench (1), a rotating shaft (47) is provided at the bottom end of each swing plate (45) through a connecting plate, and two opposite rotating tables (48) are rotatably connected to the rotating shaft (47), and the two rotating tables (48) on each rotating shaft (47) are fixedly connected to the top end of the workbench (1), and each swing plate (45) is away from the rotating shaft (47). One side surface is an inclined surface, and the highest end of the inclined surface on the swing plate (45) is close to the storage platform (2) and is located below the connecting groove (22), and the lowest end of the inclined surface on the swing plate (45) is close to the third conveying member. A triangular first side groove (49) and a second side groove (50) are provided above one side of each swing plate (45), and the first side groove (49) corresponds to the first conical wheel (29) in the first conveying member away from the second guide roller (31), and the second side groove (50) corresponds to the first conical wheel (29) in the second conveying member away from the second guide roller (31). The guide roller (31) corresponds to the first conical wheel (29) of the guide roller (31), and each of the rotating shafts (47) is provided with an L-shaped driving rod (51) on one side close to the storage table (2), and each of the driving rods (51) is connected to the storage table (2) through a synchronous plate (52) at one end away from the rotating shaft (47). Each of the driving rods (51) is rotatably connected to the synchronous plate (52), and the synchronous plate (52) is located below one side of the table surface of the workbench (1). A hanging plate (53) is vertically provided at the bottom end of the workbench (1), and the hanging plate (53) is 3), a long strip box body (54) is horizontally arranged on one side, a slider (55) is horizontally slidably connected in the box body (54) along the length direction of the box body (54), a push groove (56) is opened at the center of the top end of the synchronization plate (52), a push column (57) is vertically arranged at the top end of the slider (55), and the top end of the push column (57) vertically passes through the push groove (56), and a fourth electric cylinder (58) is arranged on the box body (54) for pushing the slider (55) to move horizontally in the box body (54).

8. The steel pipe production equipment according to claim 4, characterized in that: The number of slide plates (28) in the first slide groove (25) is two, each of the first connecting shafts (30) comprises two discs, and the two discs are respectively arranged on two first conical wheels (29), and there is a gap between the two discs; The moving member comprises two second baffles (59) arranged in the first slide groove (25), and a second screw rod (60) is rotatably connected between the two second baffles (59), one end of the second screw rod (60) passes through the two slide plates (28) and is threadedly connected to the two slide plates (28), and at this time, the two slide plates (28) are both located between the two second baffles (59), and one of the second baffles (59) is provided with a second driving motor (61) for driving the second screw rod (60) to rotate; The clamping member comprises a horizontal plate (62) arranged at the top of the slide plate (28), and an inverted U-shaped fixing frame (63) is arranged at the top of the horizontal plate (62), a fifth electric cylinder (64) is arranged at the top of the fixing frame (63), and one end of the piston rod of the fifth electric cylinder (64) passes through the fixing frame (63) and is provided with a moving box (65) located above the fixing frame (63), two slide seats (66) are horizontally slidably connected in the moving box (65) along the length direction of the moving box (65), a third screw rod (67) is rotatably connected between opposite sides of the moving box (65), and one end of the third screw rod (67) passes through the two slide seats (66) and is threadedly connected to the two slide seats (66), the third screw rod (67) has two threads with opposite rotation directions, and the two slide seats (66) are respectively located at the two screw threads. On the groove, the movable box (65) is provided with a motor (68) for driving the third screw rod (67) to rotate, the top ends of the two slide seats (66) are horizontally provided with a long strip transition box (69) along the width direction of the movable box (65), and the two transition boxes (69) are horizontally slidably connected with transition blocks (70), the top ends of the two transition blocks (70) are provided with an inverted U-shaped pressure plate (71) located outside the transition box (69), the two transition blocks (70) are provided with reset springs (72) on opposite sides, and the ends of the two reset springs (72) away from the transition blocks (70) are fixedly connected to the inner wall of the transition box (69), and two opposite limit blocks (73) are provided on one side of the inner wall of the two transition boxes (69), and the transition block (70) is located between the two limit blocks (73).

9. The steel pipe production equipment according to claim 8, characterized in that: The transfer member comprises a first material picking plate (74) and a second material picking plate (75) arranged at the top ends of the two pressure plates (71), and the top ends of the first material picking plate (74) and the second material picking plate (75) are both inclined surfaces, and the first material picking plate (74) and the second material picking plate (75) form a right-angled triangle material guide plate (76), and the highest end of the inclined surface of the material guide plate (76) is close to the storage table (2), and a stopper (77) is vertically upwardly provided at the top end of the first material picking plate (74), and the stopper (77) corresponds to a first conical wheel (29) in the first conveying member away from the second guide roller (31).

10. A production process using a steel pipe production device according to any one of claims 1 to 9, characterized in that: The following steps are involved: 1): The steel tube blank on the storage table (2) is first transferred to the first conveying member by the transfer member, and then the steel tube blank is conveyed toward the cutting device (3) corresponding thereto by the first conveying member until one end of the steel tube blank is conveyed to the cutting device (3), and one end of the steel tube blank can be cut by the cutting device (3) corresponding to the first conveying member; 2): After one end of the steel tube billet is cut, the steel tube billet is conveyed away from the cutting device (3) by the first conveying member until the steel tube billet is separated from the cutting device (3), the steel tube billet on the first conveying member is transferred to the second conveying member by the transfer member, and then the steel tube billet is conveyed toward the cutting device (3) corresponding thereto by the second conveying member until the other end of the steel tube billet is conveyed to the cutting device (3), and the other end of the steel tube billet can be cut by the cutting device (3) corresponding to the second conveying member; 3): After the other end of the steel tube billet is cut, the steel tube billet is transported away from the cutting device (3) by the second conveying member until the steel tube billet is separated from the cutting device (3). At this time, the cutting of the two ends of the steel tube billet is completed. After the cutting of the two ends of the steel tube billet is completed, the steel tube billet on the second conveying member is transferred to the third conveying member by the transfer member, and then the steel tube billet is transported out of the workbench (1) by the third conveying member, thereby realizing automatic loading and unloading.