Assembling and welding method for light combined platform plate

The welding method for lightweight combined platform plates addresses the limitations of ordinary aluminum alloy platforms by using 7046 aluminum alloy and specialized welding techniques, resulting in a durable, high-load-capable platform with efficient assembly and recycling.

CN119077191APending Publication Date: 2024-12-06NANNING CRRC ALUMINIUM PRECISION MACHINING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411168163.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Existing combined platforms made of ordinary aluminum alloy have low bending strength, small bearing capacity, large size, high cost, inconvenient assembly, and difficult recycling, making them unsuitable for rapid deployment and high-load applications.

Method used

A method for welding lightweight combined platform plates using 7046 aluminum alloy, involving cleaning, precise positioning, and specialized welding techniques to ensure gap resistance and efficient weld formation, using a MIG welder and tooling fixtures to maintain structural integrity and quality.

Benefits of technology

The method results in a lightweight, easily transportable, and durable platform with high load capacity, easy assembly, and efficient recycling, overcoming issues of plastic deformation and improving rapid response capabilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119077191A_ABST
    Figure CN119077191A_ABST
Patent Text Reader

Abstract

The invention discloses an assembling and welding method for a light combined platform plate, which comprises the following steps of: a preparation procedure: cleaning weld joint areas of all parts by adopting an organic solvent; the method comprises the steps of polishing a to-be-welded area until the to-be-welded area is bright white, welding a main cross beam, assembling a frame, checking the size of the frame, welding small accessories, carrying out full-length welding, carrying out section welding on a fixed flat plate, carrying out section welding on a welding seam between a I-shaped beam and the flat plate, welding an anti-slip strip and the flat plate, assembling and welding a lap lug and removing a blank, and assembling and welding parts prepared from 7046 aluminum alloy to obtain the light combined platform plate through the steps. The light combined platform plate welded through the assembling and welding method is convenient to transport, light in weight, convenient to assemble, durable, convenient to recycle and high in assembling efficiency, and the rapid response and emergency transfer capacity of troops is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of platform plate welding, and in particular to a method for welding a light combined platform plate. Background Art

[0002] Setting up platforms is essential for railway loading and transportation. In the absence of fixed platforms or insufficient fixed platforms, temporary platforms need to be quickly erected to ensure the loading and unloading of vehicles, artillery, tanks, etc. At present, the combined platforms used in China are mainly ordinary aluminum alloy combined platforms, but ordinary aluminum alloy combined platforms have the following problems: ordinary aluminum alloy combined platforms have low bending strength, small bearing capacity, and obvious plastic deformation. The parts of this type of platform are large in size, inconvenient to transport and install, expensive materials, high cost, high labor intensity in assembly, inconvenient assembly, and difficult to recycle.

[0003] Through technical research, 7046 aluminum alloy was developed, which has the characteristics of light weight, high lightness and excellent corrosion resistance. However, how to quickly and efficiently weld 7046 aluminum alloy to form a lightweight composite platform plate is an urgent problem that needs to be solved.

[0004] Based on this, a method for welding a light-weight combined platform plate of the present invention is proposed to solve the problems that occur in the assembly of the platform plate of the 7046 aluminum alloy. Summary of the invention

[0005] In order to solve the problems existing in the prior art, the present invention provides a method for welding a light-weight combined platform plate. In order to achieve the above-mentioned purpose, the present invention adopts the following technical solutions:

[0006] The method for welding a light-weight combined platform plate comprises the following steps:

[0007] (1) Preparation process: Use organic solvent to clean the weld area of ​​each component and polish the area to be welded until it is bright white;

[0008] (2) Welding the main beam: Press the two sides of the notch of the main beam until they are close together, spot weld the ends, first weld the two sections at a certain distance to fix them, and then fully weld the 5HV weld; then flanging the main beam for root cleaning, and after the weld root cleaning is qualified, fully weld the 5HV weld on the other side;

[0009] (3) Assembling the frame: Fix the main beam according to the tooling, place the main I-beam into the main beam, fix the two side panels with spot welding, then place several I-beams and position them with tooling:

[0010] (4) Check the frame size: measure the frame diagonal and confirm that the difference between the two diagonals is within a reasonable range; determine the distance between the I-beam and the main beam, the distance between the I-beams, and the outer width of the main beam;

[0011] (5) Welding small accessories: welding the flat fillet welds between the I-beam and the main I-beam, spot welding the stiffener 1, stiffener 2, and side panel cross bars;

[0012] (6) Full welding: Rotate the tooling 90°, PB weld the main I-beam, I-beam, stiffener 1, stiffener 2 and stiffener 3, then rotate the tooling 180°, PB weld the other side of the main I-beam, small I-beam, stiffener 1, stiffener 2 and stiffener 3, flip the tooling 90° to the reverse side facing up, and fully weld the side horizontal bars;

[0013] (7) Segment welding fixed plate: The rotating fixture faces upwards, and the plate is placed. The welds between the plate and the main beam and side plate are welded by the front PB segment welding;

[0014] (8) Segment welding of welds between I-beams and flat plates: With the reverse side of the rotating fixture facing upward, perform segment welding of welds between I-beams, main I-beams, main crossbeams and flat plates;

[0015] (9) Welding the anti-slip strips and the flat plate: Rotate the tooling 180° with the front side facing upward, spot weld the two ends of the anti-slip strips and fix them on the flat plate. After fully welding the anti-slip strips, fully weld the flat plate.

[0016] (10) Install and weld the lap ears: repair the welding of the side seams of the main I-beam, L-side plate and main beam on the back, grind the arc angle of the lap ears, and weld the lap ears;

[0017] (11) Demolding: The product is removed from the workpiece after cooling.

[0018] Preferably, the organic solvent is any one of isopropanol, ethanol and diethyl ether.

[0019] Preferably, in step (1), the area to be welded is polished to a bright white color within a range of 20-30 mm; and in step (2), the two sections are welded and fixed at 50 mm.

[0020] Preferably, in step (3), when the two side panels are fixed by spot welding, the side panels are flush with the cross section of the main beam, and the upper surface of the side panels is ensured to be on the same horizontal plane as the plane of the main beam after machining, and the number of I-beams added is not less than 20.

[0021] Preferably, in step (4), the reasonable range refers to a difference within 2 mm, the spacing between the I-beam and the main beam is 120 mm, the spacing between the I-beams is 150 mm, and the outer width of the main beam is determined to be 1110 mm.

[0022] Preferably, in step (6), the current of the PB welding main I-beam is 230A, the current of the I-beam is 200A, and the current of the stiffeners 01-03 is 200A.

[0023] Preferably, in step (7), the welding current is 220A.

[0024] Preferably, in step (8), the welding current is 200A, and front penetration is avoided during the welding process. During segment welding, the large flat plate is ensured to be welded flush with the I-beam, and the gap between the plate and the crossbeam is avoided to exceed 2mm. A 5mm distance is left between the welds at the corners of the I-beam, the main I-beam, and the L-side plate without welding.

[0025] Preferably, in step (9), the current for fully welding the anti-slip strips is 210A, and the anti-slip strips should be welded from the middle row to both sides. When welding a single anti-slip strip, the outer arc should be welded first, then the inner arc, and finally the two ends. The current for fully welding the flat plate is 210A.

[0026] Preferably, in step (10), the order of welding the ears is: pad the bottom of the ears with 6 series aluminum sheets with specifications of 1mm, 2mm, and 3mm, spot weld the ears, drill holes, blow aluminum chips, install bolts, tighten the bolts, fully weld the vertical surface of the ears, rotate the tooling, fully weld the weld at the bottom of the ears, and tighten the bolts of the holes according to the specified torque.

[0027] Before the above steps are assembled and welded, the ears, main I-beams, main crossbeams, flat plates, side plates, I-beams, anti-skid strips, stiffeners one, stiffeners two and stiffeners three, flat plates (and anti-skid strip grooves are processed) and side plate cross bars are prefabricated. The ears, main I-beams, main crossbeams, flat plates, side plates, I-beams, anti-skid strips, stiffeners one, stiffeners two and stiffeners three, flat plates (and anti-skid strip grooves are processed) and side plate cross bars are all made of 7046 aluminum alloy.

[0028] In summary, since the present invention adopts the above technical solution, the present invention has the following technical effects:

[0029] The present invention prefabricates components, sets a gap structure at the welding position of the components to be welded by means of special tooling, and adopts a MIG welder to perform welding. During the welding process, the gap between the components can resist the effect of tensile stress, maintain the size of the gap, and avoid as much as possible the situation in which the gap between the components gradually becomes smaller due to tensile stress, resulting in the molten pool being unable to penetrate the weld through the other side.

[0030] The present invention uses a special tooling fixture to limit the bending of the main cross beam to ensure that the bend is not tilted, and a stainless steel pad is used for welding at the location with a larger gap, thereby overcoming the technical problem of incomplete weld penetration caused by the gradual reduction of the gap during the welding process, and can also reduce the labor intensity of workers in repairing the weld, thereby improving welding efficiency and welding quality.

[0031] The corner weld is changed to PB position welding, so as to solve the problem of poor corner weld formation. The welding gun does not need to make an inner right-angle turn during the welding process, and welding can be achieved even when the structural space is narrow, so as to ensure welding efficiency. It also provides space for the solder generated by subsequent welding work, which is conducive to improving the forming quality of the weld; making the overall welding in place, the welding stress is minimized throughout the process, and the welding quality is improved.

[0032] The welding method of the present invention only requires the welder's skills to be at the general level of the industry, and the standardization degree of each step is high, easy to operate, and highly operable. The welding method proposed by the present invention can achieve continuous arc transition at the corner, effectively avoiding the problem of decreased fatigue performance of the weld caused by arc stopping at the corner.

[0033] The light-weight combined platform plate welded by the assembly welding method of the present invention is easy to transport, light in weight, convenient to assemble and durable, easy to recycle, and has high assembly efficiency, which greatly improves the rapid response and emergency mobilization capabilities of the troops. It also has high load performance, with a wheeled axle load capacity of more than 13 tons and a crawler load capacity of more than 60 tons. It will not undergo plastic deformation and fracture under the maximum static load, has high strength, good performance, and good use effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a structural schematic diagram of a light-duty combined platform plate of the present invention;

[0035] Figure 2 is a top view of the light-weight combined platform plate of the present invention;

[0036] Figure 3 It is a left side view of the light combined platform plate of the present invention.

[0037] In the attached drawings, 1. ears; 2. main I-beam; 3. anti-slip strip; 4. main crossbeam 1; 5. flat plate; 6. main crossbeam 2; 7. side panel 1; 8. side panel 2; 9. I-beam; 10. fastening bolts; 11. reinforcing rib 1; 12. reinforcing rib 2; 13. reinforcing rib 3; 14. side panel cross bar. DETAILED DESCRIPTION

[0038] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and preferred embodiments. However, it should be noted that many details listed in the specification are only for the purpose of enabling the reader to have a thorough understanding of one or more aspects of the present invention, and these aspects of the present invention can be implemented even without these specific details.

[0039] The welding tool adopts the tool with patent publication number CN219521063U, and the patent name is a high-strength aluminum alloy light-weight combined platform plate welding tool for welding.

[0040] The method for welding a light-weight combined platform plate comprises the following steps:

[0041] (1) Preparation process: Use organic solvent to clean the weld area of ​​each component and polish the area to be welded until it is bright white;

[0042] (2) Welding the main beam: Press the two sides of the notch of the main beam until they are close together, spot weld the ends, first weld the two sections at a certain distance to fix them, and then fully weld the 5HV weld; then flanging the main beam for root cleaning, and after the weld root cleaning is qualified, fully weld the 5HV weld on the other side;

[0043] (3) Assembling the frame: Fix the main beam according to the tooling, place the main I-beam into the main beam, fix the two side panels with spot welding, then place several I-beams and position them with tooling:

[0044] (4) Check the frame size: measure the frame diagonal and confirm that the difference between the two diagonals is within a reasonable range; determine the distance between the I-beam and the main beam, the distance between the I-beams, and the outer width of the main beam;

[0045] (5) Welding small accessories: welding the flat fillet welds between the I-beam and the main I-beam, spot welding the stiffener 1, stiffener 2, and side panel cross bars;

[0046] (6) Full welding: Rotate the tooling 90°, PB weld the main I-beam, I-beam, stiffener 1, stiffener 2 and stiffener 3, then rotate the tooling 180°, PB weld the other side of the main I-beam, small I-beam, stiffener 1, stiffener 2 and stiffener 3, flip the tooling 90° to the reverse side facing up, and fully weld the side horizontal bars;

[0047] (7) Segment welding fixed plate: The rotating fixture faces upwards, and the plate is placed. The welds between the plate and the main beam and side plate are welded by the front PB segment welding;

[0048] (8) Segment welding of welds between I-beams and flat plates: With the reverse side of the rotating fixture facing upward, perform segment welding of welds between I-beams, main I-beams, main crossbeams and flat plates;

[0049] (9) Welding the anti-slip strips and the flat plate: Rotate the tooling 180° with the front side facing upward, spot weld the two ends of the anti-slip strips and fix them on the flat plate. After fully welding the anti-slip strips, fully weld the flat plate.

[0050] (10) Install and weld the lap ears: repair the welding of the side seams of the main I-beam, L-side plate and main beam on the back, grind the arc angle of the lap ears, and weld the lap ears;

[0051] (11) Demolding: The product is removed from the workpiece after cooling.

[0052] Preferably, the organic solvent is any one of isopropanol, ethanol and diethyl ether.

[0053] Preferably, in step (1), the area to be welded is polished to a bright white color within a range of 20-30 mm; and in step (2), the two sections are welded and fixed at 50 mm.

[0054] Preferably, in step (3), when the two side panels are fixed by spot welding, the side panels are flush with the cross section of the main beam, and the upper surface of the side panels is ensured to be on the same horizontal plane as the plane of the main beam after machining, and the number of I-beams added is not less than 20.

[0055] Preferably, in step (4), the reasonable range refers to a difference within 2 mm, the spacing between the I-beam and the main beam is 120 mm, the spacing between the I-beams is 150 mm, and the outer width of the main beam is determined to be 1110 mm.

[0056] Preferably, in step (6), the current of the PB welding main I-beam is 230A, the current of the I-beam is 200A, and the current of the stiffeners 01-03 is 200A.

[0057] Preferably, in step (7), the welding current is 220A.

[0058] Preferably, in step (8), the welding current is 200A, and front penetration is avoided during the welding process. During segment welding, the large flat plate is ensured to be welded flush with the I-beam, and the gap between the plate and the crossbeam is avoided to exceed 2mm. A 5mm distance is left between the welds at the corners of the I-beam, the main I-beam, and the L-side plate without welding.

[0059] Preferably, in step (9), the current for fully welding the anti-slip strips is 210A, and the anti-slip strips should be welded from the middle row to both sides. When welding a single anti-slip strip, the outer arc should be welded first, then the inner arc, and finally the two ends. The current for fully welding the flat plate is 210A.

[0060] Preferably, in step (10), the order of welding the ears is: pad the bottom of the ears with 6 series aluminum sheets with specifications of 1mm, 2mm, and 3mm, spot weld the ears, drill holes, blow aluminum chips, install bolts, tighten the bolts, fully weld the vertical surface of the ears, rotate the tooling, fully weld the weld at the bottom of the ears, and tighten the bolts of the holes according to the specified torque.

[0061] Before the above steps are assembled and welded, the ears, main I-beams, main crossbeams, flat plates, side plates, I-beams, anti-skid strips, stiffeners one, stiffeners two and stiffeners three, flat plates (and anti-skid strip grooves are processed) and side plate cross bars are prefabricated. The ears, main I-beams, main crossbeams, flat plates, side plates, I-beams, anti-skid strips, stiffeners one, stiffeners two and stiffeners three, flat plates (and anti-skid strip grooves are processed) and side plate cross bars are all made of 7046 aluminum alloy.

[0062] Example 1

[0063] The present invention provides a method for welding a light-duty combined platform plate, wherein the prefabricated lugs, main I-beams, main cross beams, flat plates, side plates, I-beams, anti-slip strips, reinforcing ribs 1, 2 and 3, flat plates (and processing anti-slip strip grooves) and side plate cross bars are welded into a Figure 1-3 The welding method of the light composite platform plate shown in the figure comprises the following steps:

[0064] (1) Preparation process: Use isopropyl alcohol to clean the weld area of ​​each component and polish the area to be welded within 20 mm to a bright white color;

[0065] (2) Welding the main beam: Weld the main beam (see Figure 2 The main beam 1 (4) and main beam 2 (6) are pressed tightly on both sides of the notch, and the ends are spot welded. First, the two sections are welded 50mm to fix them, and then the 5HV weld is fully welded; then the main beam is flanging and the root is cleaned. After the weld root cleaning is qualified, the 5HV weld on the other side is fully welded;

[0066] (3) Assembling the frame: Position and fix the main cross beam according to the tooling (welding tooling as shown in patent publication number CN219521063U), and assemble the main I-beam (see Figure 1 The main I-beam 2) is placed into the main crossbeam, and the two side panels are fixed by spot welding (see Figure 2 Side panel 1 (7, side panel 2 (8)) (Note: when fixed, the side panel should be flush with the main beam section, and the upper surface of the side panel should be on the same level as the plane of the main beam after machining), and then put in 20 I-beams (see Figure 3 I-beam 9), use tooling to position it:

[0067] (4) Check the frame size: measure the frame diagonal and confirm that the difference between the two diagonals is within 2 mm; determine that the distance between the I-beam and the main beam is 120 mm, the distance between the I-beams is 150 mm, and the outer width of the main beam is 1110 mm;

[0068] (5) Welding small parts: welding I-beam and main I-beam flat angle weld (current: 220-230A), spot welding reinforcement ribs 1 and 2 (the reinforcement ribs coincide with the center line of the I-beam), side panel cross bars (see Figure 2 Side panel bar 14); reinforcing rib 1 (see Figure 1 Reinforcement 11), Reinforcement 2 (see Figure 1 Reinforcement 2 (12)

[0069] (6) Full welding: Rotate the tooling 90°, PB weld the main I-beam (current 230A), I-beam (current 200A), stiffener 1, stiffener 2 and stiffener 3 (current 200A), rotate the tooling 180°, PB weld the other side of the main I-beam (current 230A), small I-beam (current 200A), stiffener 1, stiffener 2 and stiffener 3 (current 200A), turn the tooling 90° to the reverse side facing up, and fully weld the side horizontal bars (current 200A); stiffener 1 (see Figure 1 Reinforcement 11), Reinforcement 2 (see Figure 1 Reinforcement 2 (12) and reinforcement 3 (see Figure 2 Reinforcement 313)

[0070] (7) Segment welding of fixed plate: Place the plate with the front side of the rotating fixture facing upwards, and perform the front PB segment welding of the welds between the plate and the main beam and side plate (current 200A);

[0071] (8) Segment welding of the weld between the I-beam and the plate: With the reverse side of the rotating fixture facing upward, perform PB segment welding of the weld between the I-beam, main I-beam, main crossbeam and the plate (current 200A, try to avoid frontal penetration); during segment welding, ensure that the large plate is welded flat against the I-beam, avoid a gap of more than 2mm between the plate and the crossbeam, and leave a 5mm gap between the I-beam, main I-beam and L side plate corner weld (40 length) without welding;

[0072] (9) Welding the anti-slip strip and the plate: Rotate the fixture 180° with the front side facing upward, and spot weld the two ends of the anti-slip strip to the plate (see Figure 2 On the flat plate 5), the anti-slip strips are fully welded (see Figure 2 Anti-slip strip 3) (current: 210A, the anti-slip strip should be welded from the middle row to both sides. When welding a single anti-slip strip, the outer arc should be welded first, then the inner arc, and finally the two ends), fully weld the flat plate (current: 210A);

[0073] (10) Installation and welding of lap ears: Repair welding of the side seams of the main I-beam, L side plate and main crossbeam on the back, grinding the arc angle of the lap ear assembly, and welding the lap ears (current: 230A); lap ears (see Figure 1 1) Welding sequence of the lug: pad the lug bottom and vertical surface with 6 series aluminum sheet (specifications are 1mm, 2mm, 3mm. If the 1mm plate cannot be inserted, it is not necessary to plug it. The vertical surface should not be padded as much as possible) - spot weld the lug - drill the hinged hole - blow the aluminum chips - install the hinged bolt - tighten the hinged bolt - fully weld the lug vertical surface - rotate the tooling - fully weld the lug bottom weld - tighten the hinged hole bolt according to the specified torque (42.7Nm or the test data during mass production) (see Figure 3 Tighten the bolts 10).

[0074] (11) Demolding: The product is removed from the workpiece after cooling.

[0075] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for welding a light-weight combined platform plate, characterized in that: The steps include: (1) Preparation process: Use organic solvent to clean the weld area of ​​each component and polish the area to be welded until it is bright white; (2) Welding the main beam: Press the two sides of the notch of the main beam until they are close together, spot weld the ends, first weld the two sections at a certain distance to fix them, and then fully weld the 5HV weld; then flanging the main beam for root cleaning, and after the weld root cleaning is qualified, fully weld the 5HV weld on the other side; (3) Assembling the frame: Fix the main beam according to the tooling, place the main I-beam into the main beam, fix the two side panels with spot welding, then place several I-beams and position them with tooling: (4) Check the frame size: measure the frame diagonal and confirm that the difference between the two diagonals is within a reasonable range; determine the distance between the I-beam and the main beam, the distance between the I-beams, and the outer width of the main beam; (5) Welding small accessories: welding the flat fillet welds between the I-beam and the main I-beam, spot welding the stiffener 1, stiffener 2, and side panel cross bars; (6) Full welding: Rotate the tooling 90°, PB weld the main I-beam, I-beam, stiffener 1, stiffener 2 and stiffener 3, then rotate the tooling 180°, PB weld the other side of the main I-beam, small I-beam, stiffener 1, stiffener 2 and stiffener 3, flip the tooling 90° to the reverse side facing up, and fully weld the side horizontal bars; (7) Segment welding fixed plate: The rotating fixture faces upwards, and the plate is placed. The welds between the plate and the main beam and side plate are welded by the front PB segment welding; (8) Segment welding of welds between I-beams and flat plates: With the reverse side of the rotating fixture facing upward, perform segment welding of welds between I-beams, main I-beams, main crossbeams and flat plates; (9) Welding the anti-slip strips and the flat plate: Rotate the tooling 180° with the front side facing upward, spot weld the two ends of the anti-slip strips and fix them on the flat plate. After fully welding the anti-slip strips, fully weld the flat plate. (10) Install and weld the lap ears: repair the welding of the side seams of the main I-beam, L-side plate and main beam on the back, grind the arc angle of the lap ears, and weld the lap ears; (11) Demolding: The product is removed from the workpiece after cooling.

2. The method for welding a light-weight combined platform plate according to claim 1 is characterized in that: The organic solvent is any one of isopropanol, ethanol and ether.

3. The method for welding a light-weight combined platform plate according to claim 1 is characterized in that: In step (1), the area to be welded is polished to a bright white color within a range of 20-30 mm; in step (2), the two sections are welded and fixed at 50 mm.

4. The method for welding a light-weight combined platform plate according to claim 1, characterized in that: In step (3), when the two side panels are fixed by spot welding, the side panels must be flush with the cross section of the main beam, and the upper surface of the side panels must be on the same level as the plane of the main beam after machining. The number of I-beams added must be no less than 20.

5. The method for welding a light-weight combined platform plate according to claim 1 is characterized in that: In step (4), the reasonable range refers to the difference within 2 mm, the spacing between the I-beam and the main beam is 120 mm, the spacing between the I-beams is 150 mm, and the outer width of the main beam is determined to be 1110 mm.

6. The method for welding a light-weight combined platform plate according to claim 1, characterized in that: In step (6), the current of PB welding the main I-beam is 230A, the current of the I-beam is 200A, and the current of the stiffeners 01-03 is 200A.

7. The method for welding a light-weight combined platform plate according to claim 1, characterized in that: In step (7), the welding current is 220A.

8. The method for welding a light-weight combined platform plate according to claim 1, characterized in that: In step (8), the welding current is 200A. Avoid frontal penetration during the welding process. Ensure that the large flat plate is welded flush with the I-beam during segment welding. Avoid a gap between the plate and the beam exceeding 2mm. Leave a 5mm distance between the I-beam and the main I-beam and the L-side plate corners without welding.

9. The method for welding a light-weight combined platform plate according to claim 1, characterized in that: In step (9), the current for fully welding the anti-slip strips is 210A. The anti-slip strips should be welded from the middle row to both sides. When welding a single anti-slip strip, the outer arc should be welded first, then the inner arc, and finally the two ends. The current for fully welding the flat plate is 210A.

10. The method for welding a light-weight combined platform plate according to claim 1, characterized in that: In step (10), the order of welding the ears is as follows: pad the bottom of the ears with 6 series aluminum sheets with specifications of 1mm, 2mm, and 3mm, spot weld the ears, drill holes, blow aluminum chips, install bolts, tighten the bolts, fully weld the vertical surface of the ears, rotate the tooling, fully weld the weld at the bottom of the ears, and tighten the bolts of the holes according to the specified torque.