Assembly mechanism for antenna tube material

By using liftable give-off blocks and cylinders in the reed assembly device of the antenna tube material assembly mechanism, the problem of the inability to place the first tube material stably is solved, and the production efficiency and product stability are improved.

CN119077356AInactive Publication Date: 2024-12-06WENZHOU JINZHIYUAN ELECTRIC CO LTD

Patent Information

Application Number
CN202411579229.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-07
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing antenna tube material assembly machine, the first clamping jaw cannot stably place the first tube material into the second clamping assembly when it is loosened, resulting in a reduced production efficiency.

Method used

An assembly mechanism for antenna pipe material including a discharge device, a hole punching device, a hole shrinking device, a reed assembly device and a station displacement device is designed, and the lifting and lowering can be provided on the second bearing plate of the reed assembly device. The give way block and cylinder ensure that the first pipe material is placed stably in the cavity when placed, and avoid waiting for the cylinder to be clamped.

Benefits of technology

Improve production efficiency, ensure product placement stability, and avoid reduction in production efficiency caused by waiting for the stability of the cylinder to be clamped.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119077356A_ABST
    Figure CN119077356A_ABST
Patent Text Reader

Abstract

The invention discloses an assembling mechanism for an antenna pipe material. The assembling mechanism for the antenna pipe material comprises an assembling mechanism and an assembling mechanism, the two discharging devices are used for conveying a single pipe material; the first pipe punching device is used for punching a first pipe, and the first pipe is arranged on one side of the discharging device; the second pipe material hole shrinkage device is used for hole shrinkage of a hole shrinkage part of the second pipe material, and the second pipe material hole shrinkage device is arranged on one side of the discharging device; and the reed assembling device is arranged on one side of the first pipe punching device. A piston rod of a first air cylinder retracts, a receding block sinks and is flush with a second groove, at the moment, a pneumatic claw of a first clamping air cylinder can enter the second groove, a first pipe material is stably placed in a cavity of a second bearing plate, the production efficiency is greatly improved, the first pipe material can be placed without waiting for the first clamping air cylinder to be stable, and the production cost is reduced. And the product has the advantage of stable placement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of antenna tube material processing equipment, and in particular to an antenna tube material assembly mechanism. Background Art

[0002] According to the "An Antenna Tube Material Assembly Machine" of the authorization announcement number CN219293274U, it includes an assembly platform, a tube material discharging device, a first tube material punching device, a second tube material shrinking device, a station transfer device, a material ejecting device, a spring installation device, a tube material docking device, a spring conveying device and a finished product collection device. The station transfer device includes a station platform assembly and a station shift assembly. The tube material discharging device is used to place the first tube material and the second tube material to be processed and to discharge the single first tube material and the second tube material at the same time. The advantages of the present invention are: high degree of automation, can replace manual punching, shrinking, and assembly methods, reduce the density of personnel, and the structural design of the station transfer device greatly improves the overall production and assembly efficiency, and is well suitable for the production and assembly of large quantities of antenna tube materials.

[0003] During the actual production process, the applicant discovered that the first clamping claw in the above technical solution can only be located above the second clamping group assembly of the first tube material. At the moment the first clamping claw is released, the first tube material cannot perfectly fall into the second clamping group assembly of the first tube material. In addition, in order to increase the stability of the first tube material falling therein, the first clamping claw needs to be stopped for a period of time after moving to prevent shaking, which will reduce production efficiency. Therefore, the applicant has made a beneficial design and found a solution to the above problem. The technical solution to be introduced below was produced in this context. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the above technical solutions and provide a product with stable placement.

[0005] An antenna tube material assembly mechanism comprises: two discharging devices for conveying a single tube material; a first tube material punching device for punching holes in a first tube material, the first tube material being arranged on one side of the discharging device; a second tube material shrinking hole device for shrinking holes in a shrinking portion of a second tube material, the second tube material shrinking hole device being arranged on one side of the discharging device; a reed assembly device, the reed assembly device being arranged on one side of the first tube material punching device, the reed assembly device comprising a second bearing plate and a fixing plate, the fixing plate being mounted and fixed on the second bearing plate and being in a vertical relationship with the second bearing plate, the second bearing plate being provided with a second groove, a liftable giving block being provided in the middle of the second groove, the second bearing plate and the giving block being provided with a cavity for accommodating the first tube material, the fixing plate The plate is also provided with a first cylinder, which is provided with a pull rod and connected to the clearance block; a waste cutting device, which is arranged in front of the reed assembly device; a material belt conveying device, which is used to convey the reed material belt to the waste cutting device, which is arranged on one side of the waste cutting device, and the waste cutting device is used to cut off the connected part of the reed material belt; a material pushing device, which is used to push the first tube material equipped with the reed into the second tube material, and the material pushing device is arranged behind the waste cutting device; a tube material docking device, which is used to position and fix the assembled tube material assembly; a work station displacement device, which is used to clamp the first tube material and the second tube material and transport them to the specified position, and the work station displacement device is arranged above the discharging device, the first tube material punching device, the second tube material shrinking device, the reed assembly device, and the tube material docking device.

[0006] Preferably, the fixed plate is provided with a guide rail, the guide rail is provided with a reed slider, the reed slider is provided with a support block, the support block is provided with a reed bending cylinder, the reed bending cylinder is provided with a first bending portion and a second bending portion moving inward, and is arranged at the cavity outlet of the second supporting plate, the first bending portion is provided with a guide block, the second bending portion is provided with a guide groove for inserting the guide block, the fixed plate is also provided with a second cylinder, the piston rod of the second cylinder is connected to the support block, and the pull rod passes through the support block.

[0007] Preferably, the discharging device comprises a container capable of accommodating the pipe material, a discharging plate and a discharging cylinder arranged below the discharge port of the container, and the piston rod of the discharging cylinder is connected and fixed to the discharging plate.

[0008] Preferably, the first pipe material punching device includes a first supporting plate, a clamping assembly, a punching cylinder, a punching connecting block, and a punching base. The clamping assembly is provided with a first groove. The punching connecting block is fixedly connected to the piston rod of the punching cylinder. Punching push blocks are provided on both sides of the punching connecting block. The punching push blocks are slidably arranged on both sides of the punching base. Inwardly retracted punching sliders are provided on both sides of the punching base and are linked with the punching push block. The punching slider is provided with a punching head, and the clamping assembly is arranged directly in front of the punching head.

[0009] Preferably, the second pipe material shrinkage device comprises a shrinkage cylinder and a shrinkage slider connected to the piston rod of the shrinkage cylinder, the shrinkage slider is provided with a conical groove, and a guide column is provided in the conical groove.

[0010] Preferably, the waste cutting device comprises a processing table, a cutting cylinder and a cutting knife. The processing table is provided with a channel for the waste to pass through. The piston rod of the cutting cylinder is connected and fixed to the cutting knife. The cutting knife is arranged above the channel.

[0011] Preferably, the ejection device comprises a first ejection cylinder, the piston rod of the first ejection cylinder is provided with a ejection slider, the ejection slider is provided with a hollow tube, the ejection slider is provided with a second ejection cylinder, the piston rod of the second ejection cylinder is provided with a ejection rod and passes through the hollow tube.

[0012] Preferably, the pipe-to-material docking device comprises a docking cylinder and a docking slider connected to the piston rod of the docking cylinder, and the docking slider is provided with a bearing hole for the second pipe to pass through.

[0013] Preferably, the workpiece shifting device includes a displacement cylinder and a linkage block, the piston rod of the displacement cylinder is connected and fixed to the linkage block, two liftable first clamping cylinders are provided on one side of the linkage block and are arranged above the first groove and the second groove, and three liftable second clamping cylinders are provided on the other side of the linkage block.

[0014] Preferably, a first support block is provided at the other end of the first supporting plate and the second supporting plate, and the first supporting block is also provided with a second supporting block, and a distance between the first supporting block and the first supporting block is maintained for clamping by a second clamping cylinder, and the first supporting plate, the first supporting block and the second supporting block are provided with a cavity, and the first supporting block is provided with a fixed cylinder, and the fixed cylinder is provided with a push rod and is arranged above the cavity of the first support block. Beneficial Effects

[0015] Compared with the prior art, the present invention has the following beneficial effects: In the present invention, when the workpiece shifting device places the first pipe material after punching in front of the reed assembly device, the piston rod of the first cylinder retracts, causing the clearance block to sink and be flush with the second groove. At this time, the second groove can be used for the air claws of the first clamping cylinder to enter therein and stably place the first pipe material in the cavity of the second supporting plate, thereby greatly improving the production efficiency. In addition, the first pipe material can be placed without waiting for the first clamping cylinder to be stable, thereby overcoming the problems raised by the background technology and giving the product the advantage of stable placement. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 The structure of the antenna tube assembly mechanism of the present invention is shown in FIG. Figure 1 ; Figure 2 The structure of the antenna tube assembly mechanism of the present invention is shown in FIG. Figure 2 ; Figure 3 It is a structural schematic diagram of a spring assembly device of an antenna tube assembly mechanism of the present invention; Figure 4 It is a structural schematic diagram of a material ejecting device of an antenna tube material assembly mechanism of the present invention; Figure 5 It is a structural schematic diagram of a first tube punching device of an antenna tube assembly mechanism of the present invention; Figure 6 It is a structural schematic diagram of a reed bending cylinder of an antenna tube assembly mechanism of the present invention; Figure 7 It is a structural schematic diagram of a second tube shrinkage device of an antenna tube assembly mechanism of the present invention; Figure 8 For the present invention Figure 7 A partial structure enlarged diagram of an antenna tube assembly mechanism; Fig. 9 It is a structural schematic diagram of a workstation displacement device of an antenna tube assembly mechanism of the present invention; Fig.10 It is a structural schematic diagram of a discharging device of an antenna tube assembly mechanism of the present invention; The corresponding relationship between the illustrations and component names in the figure is as follows: Reference numerals: 1, discharging device; 2, first tube punching device; 3, second tube shrinking device; 4, spring assembly device; 5, material belt conveying device; 6, waste cutting device; 7, material ejecting device; 8, tube docking device; 9, workstation shifting device; 901, cavity; 902, first support block; 903, second support block; 11. Container; 12. Discharging plate; 13. Discharging cylinder; 21. first bearing plate; 22. clamping assembly; 23. punching cylinder; 24. punching connecting block; 25. punching base; 26. punching push block; 27. punching slider; 28. punching head; 221, first groove; 31. Shrinkage cylinder; 32. Shrinkage slider; 321, tapered groove; 322, guide post; 41. Second bearing plate; 42. Fixing plate; 43. Displacement block; 44. First cylinder; 45. Guide rail; 46. Support block; 47. Reed bending cylinder; 48. Second cylinder; 411, second groove; 441, pull rod; 451, reed slider; 471, first bending portion; 472, second bending portion; 473, guide block; 474, guide groove; 61. Processing table; 62. Cutting cylinder; 63. Cutting knife; 611, channel; 71. First ejection cylinder; 72. Ejection slider; 73. Hollow tube; 74. Second ejection cylinder; 75. Ejection rod; 81. Docking cylinder; 82. Docking slide block; 83. Bearing hole; 91. displacement cylinder; 92. linkage block; 93. first clamping cylinder; 94. second clamping cylinder; 9021, fixed cylinder; 9022, push rod. DETAILED DESCRIPTION

[0017] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by the terms "up", "down", "left" and "right" are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0019] In the embodiments of the present invention, "and / or" is only a description of the association relationship of the associated objects, indicating that three relationships may exist. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0020] Reference example Figures 1 to 10, an antenna tube material assembly mechanism, comprising: two discharging devices 1, used to convey a single tube material; a first tube material punching device 2, used to punch holes in the first tube material, the first tube material is arranged on one side of the discharging device 1; a second tube material shrinking device 3, used to shrink holes in the shrinking part of the second tube material, the second tube material is arranged on one side of the discharging device 1; a reed assembly device 4, the reed assembly device 4 is arranged on one side of the first tube material punching device 2, the reed assembly device 4 comprises a second bearing plate 41, a fixing plate 42, the fixing plate 42 is mounted and fixed on the second bearing plate 41, and is connected to the second bearing plate 4 1 is in a vertical relationship, the second bearing plate 41 is provided with a second groove 411, a liftable clearance block 43 is provided in the middle of the second groove 411, the second bearing plate 41 and the clearance block 43 are provided with a cavity 901 for accommodating the first pipe material, the fixing plate 42 is further provided with a first cylinder 44, the first cylinder 44 is provided with a pull rod 441, and is connected to the clearance block 43; a waste cutting device 6, the waste cutting device 6 is arranged in front of the spring assembly device 4; a material belt conveying device 5, used for conveying the spring material belt to the waste cutting device 6, the material belt conveying device 5 is arranged on one side of the waste cutting device 6, and the waste cutting device 6 is used The connecting part of the reed strip is cut off; the pushing device 7 is used to push the first tube material equipped with the reed into the second tube material, and the pushing device 7 is arranged behind the waste cutting device 6; the tube material docking device 8 is used to position and fix the assembled tube material assembly; the work shifting device 9 is used to clamp the first tube material and the second tube material and transport them to the designated position, and the work shifting device 9 is arranged above the discharging device 1, the first tube material punching device 2, the second tube material shrinking device 3, the reed assembly device 4, and the tube material docking device 8. When the work shifting device 9 places the punched first tube material in the second groove 41 1, the piston rod of the first cylinder 44 is retracted, so that the clearance block 43 sinks and is flush with the second groove 411. At this time, the second groove 411 can be used for the air claw of the first clamping cylinder 93 to enter and stably place the first pipe material in the cavity 901 of the second carrier plate 41, which greatly improves the production efficiency. In addition, the first pipe material can be placed without waiting for the first clamping cylinder 93 to be stable. After the first pipe material is placed in the second groove 411, the piston rod of the first cylinder 44 extends, so that the clearance block 43 rises and its cavity 901 is flush with the cavity 901 of the second groove 411; It is worth mentioning that the fixed plate 42 is provided with a guide rail 45, the guide rail 45 is provided with a reed slider 451, the reed slider 451 is provided with a support block 46, the support block 46 is provided with a reed bending cylinder 47, the reed bending cylinder 47 is provided with a first bending portion 471 and a second bending portion 472 moving inward, and is arranged at the exit of the cavity 901 of the second bearing plate 41, the first bending portion 471 is provided with a guide block 473, the second bending portion 472 is provided with a guide groove 474 for inserting the guide block 473, and the fixed plate 42 is also provided with a first bending portion 471 and a second bending portion 472. The second cylinder 48, the piston rod of the second cylinder 48 is connected to the support block 46, the pull rod 441 passes through the support block 46, the guide rail 45 provides a guide for the spring slider 451, and the support block 46 provides a support and fixation for the spring bending cylinder 47. The second cylinder 48 drives the support block 46 to move, thereby driving the spring bending cylinder 47 to move up and down. The guide groove 474 provides a guide for the guide block 473 to ensure that the first bending portion 471 is closely abutted against the second bending portion 472 to prevent the occurrence of height misalignment; It is worth mentioning that the discharging device 1 includes a container 11 for accommodating pipe materials, a discharging plate 12 and a discharging cylinder 13 arranged below the discharge port of the container 11. The piston rod of the discharging cylinder 13 is connected and fixed to the discharging plate 12. The discharging cylinder 13 drives the discharging plate 12 to reciprocate back and forth at the discharge port of the container 11, so that the pipe materials in the container 11 fall onto the discharging plate 12 under the influence of gravity. It is worth mentioning that the first pipe material punching device 2 includes a first bearing plate 21, a clamping assembly 22, a punching cylinder 23, a punching connection block 24, and a punching base 25. The clamping assembly 22 is provided with a first groove 221. The punching connection block 24 is connected and fixed to the piston rod of the punching cylinder 23. Punching push blocks 26 are provided on both sides of the punching connection block 24. The punching push blocks 26 are slidably arranged on both sides of the punching base 25. Punching sliders 27 that retract inwardly are provided on both sides of the punching base 25, and are linked with the punching push blocks 26. The punching slider 27 is provided with a punching The head 28, the clamping assembly 22 is arranged in front of the punching head 28, the first groove 221 is convenient for the air claw of the first clamping cylinder 93 to clamp the first tube material and place it in the clamping assembly 22, the clamping assembly 22 fixes the first tube material, when the punching cylinder 23 extends the piston rod, drives the punching connection block 24 to move forward, the punching slider 27 is linked by the punching push block 26, so that the punching slider 27 moves to the middle direction, the punching head 28 punches the first tube material, and the punching base 25 further provides a guiding role for the punching push block 26 and the punching slider 27; It is worth mentioning that the second pipe shrinking device 3 includes a shrinking cylinder 31 and a shrinking slider 32 connected to the piston rod of the shrinking cylinder 31. The shrinking slider 32 is provided with a tapered groove 321, and a guide column 322 is provided in the tapered groove 321. When the second pipe is placed in the cavity 901 of the first support block 902 of the first supporting plate 21, the piston rod of the fixing cylinder 9021 extends, so that the push rod 9022 fixes the second pipe, and then the piston rod of the shrinking cylinder 31 extends to drive the punching slider 27 to move in the direction of the second pipe. The guide column 322 is preferentially inserted into the second pipe to provide a guide for the second pipe to enter the tapered groove 321. Since the deeper the tapered groove 321 is, the smaller the diameter is, the shrinking part of the second pipe shrinks inward. It is worth mentioning that the waste cutting device 6 includes a processing table 61, a cutting cylinder 62, and a cutting knife 63. The processing table 61 is provided with a channel 611 for waste to pass through. The piston rod of the cutting cylinder 62 is connected and fixed to the cutting knife 63. The cutting knife 63 is arranged above the channel 611. When the conjoined part of the reed strip is placed on the processing table 61, the cutting cylinder 62 extends the piston rod to drive the cutting knife 63 to sink, and the conjoined part of the reed strip is cut off, thereby obtaining an independent reed. It is worth mentioning that the ejection device 7 includes a first ejection cylinder 71, a piston rod of the first ejection cylinder 71 is provided with an ejection slider 72, the ejection slider 72 is provided with a hollow tube 73, the ejection slider 72 is provided with a second ejection cylinder 74, the piston rod of the second ejection cylinder 74 is provided with an ejection rod 75, and passes through the hollow tube 73. When the spring sheet and the first pipe material are assembled, the piston rod of the first ejection cylinder 71 extends to drive the ejection slider 72 to move toward the processing table 61, and the hollow tube 73 provides strong support and guidance for the ejection rod 75. The piston rod of the second ejection cylinder 74 extends to drive the ejection rod 75 to pass through the processing table 61, and push the assembled first pipe material into the first support block 902 and the second support block 903 of the second carrier plate 41. It is worth mentioning that the pipe docking device 8 includes a docking cylinder 81 and a docking slider 82 connected to the piston rod of the docking cylinder 81. The docking slider 82 is provided with a bearing hole 83 for the second pipe to pass through. When the ejection device 7 is running, the docking cylinder 81 will also run at the same time, driving the docking slider 82 to move toward the ejection rod 75, and the second pipe with the shrink hole completed enters the bearing hole 83 to bear the support force for it. At the same time, the docking slider 82 also provides support force for the end face of the second pipe, which is convenient for the ejection rod 75 to insert the first pipe into the second pipe to complete the assembly; It is worth mentioning that the work shifting device 9 includes a displacement cylinder 91 and a linkage block 92. The piston rod of the displacement cylinder 91 is connected and fixed to the linkage block 92. Two liftable first clamping cylinders 93 are provided on one side of the linkage block 92 and are arranged above the first groove 221 and the second groove 411. Three liftable second clamping cylinders 94 are provided on the other side of the linkage block 92. The displacement cylinder 91 drives the linkage block 92 to operate, thereby driving the first clamping cylinder 93 and the second clamping cylinder 94 to move simultaneously. The first clamping cylinder 93 mainly clamps the first pipe material and transports it to the first pipe material punching device 2 and the reed assembly device 4. The second clamping cylinder 94 mainly clamps the second pipe material and transports it to the second pipe material shrinking hole device 3 and the pipe material docking device 8. When the first pipe material and the second pipe material are assembled, the second clamping cylinder 94 also places the assembled pipe material in the finished product frame. It is worth mentioning that the other end of the first supporting plate 21 and the second supporting plate 41 is provided with a first supporting block 902, and the first supporting block 902 is also provided with a second supporting block 903, and a spacing is maintained between the first supporting block 902 and the second supporting block 903 for clamping by the second clamping cylinder 94, the first supporting plate 21, the first supporting block 902, and the second supporting block 903 are provided with a cavity 901, the first supporting block 902 is provided with a fixed cylinder 9021, the fixed cylinder 9021 is provided with a push rod 9022, and is arranged above the cavity 901 of the first supporting block 902, the first supporting block 902 provides support for the fixed cylinder 9021, and the cavity 901 is arc-shaped, which better fits the outer wall shape of the first pipe material and the second pipe material to prevent the first pipe material and the second pipe material from detaching from the cavity 901 due to vibration.

[0021] The above design scheme can enable the product to achieve the advantage of stable placement.

[0022] The above content is a further detailed description of the present invention in combination with specific implementation methods. It cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as belonging to the scope of protection determined by the claims submitted for the present invention.

Claims

1. An assembly mechanism for antenna tube material, characterized in that: include; Two discharging devices (1) for conveying a single pipe; A first pipe material punching device (2), used for punching holes in a first pipe material, the first pipe material being arranged on one side of the discharge device (1); A second pipe material shrinkage hole device (3) is used for shrinking the shrinkage hole of the second pipe material, and the second pipe material shrinkage hole device (3) is arranged on one side of the discharge device (1); A reed assembly device (4), the reed assembly device (4) being arranged on one side of the first tube punching device (2), the reed assembly device (4) comprising a second bearing plate (41) and a fixing plate (42), the fixing plate (42) being mounted and fixed on the second bearing plate (41) and being in a vertical relationship with the second bearing plate (41), the second bearing plate (41) being provided with a second groove (411), a liftable clearance block (43) being provided in the middle of the second groove (411), the second bearing plate (41) and the clearance block (43) being provided with a cavity (901) for accommodating the first tube, the fixing plate (42) being further provided with a first cylinder (44), the first cylinder (44) being provided with a pull rod (441) and being connected to the clearance block (43); A waste cutting device (6), wherein the waste cutting device (6) is arranged directly in front of the reed assembly device (4); A material belt conveying device (5) for conveying the reed material belt to the waste cutting device (6), wherein the material belt conveying device (5) is arranged on one side of the waste cutting device (6), and the waste cutting device (6) is used to cut off the connected part of the reed material belt; A material pushing device (7) for pushing the first tube material equipped with the reed into the second tube material, the material pushing device (7) being arranged behind the waste cutting device (6); A pipe-to-material docking device (8) is used to position and fix the assembled pipe-to-material assembly; The workstation shifting device (9) is used to clamp the first pipe material and the second pipe material and transport them to a designated position, and the workstation shifting device (9) is arranged above the discharging device (1), the first pipe material punching device (2), the second pipe material shrinking device (3), the reed assembly device (4), and the pipe material docking device (8).

2. The antenna tube assembly mechanism according to claim 1, characterized in that: The fixed plate (42) is provided with a guide rail (45), the guide rail (45) is provided with a reed slider (451), the reed slider (451) is provided with a support block (46), the support block (46) is provided with a reed bending cylinder (47), the reed bending cylinder (47) is provided with a first bending portion (471) and a second bending portion (472) moving inwards, and is arranged at the outlet of the cavity (901) of the second bearing plate (41), the first bending portion (471) is provided with a guide block (473), the second bending portion (472) is provided with a guide groove (474) for inserting the guide block (473), the fixed plate (42) is also provided with a second cylinder (48), the piston rod of the second cylinder (48) is connected to the support block (46), and the pull rod (441) passes through the support block (46).

3. The antenna tube assembly mechanism according to claim 1, characterized in that: The discharging device (1) comprises a container (11) capable of accommodating pipe materials, a discharging plate (12) arranged below a discharge port of the container (11), and a discharging cylinder (13), wherein a piston rod of the discharging cylinder (13) is connected and fixed to the discharging plate (12).

4. The antenna tube assembly mechanism according to claim 1, characterized in that: The first pipe material punching device (2) comprises a first bearing plate (21), a clamping assembly (22), a punching cylinder (23), a punching connection block (24), and a punching base (25); the clamping assembly (22) is provided with a first groove (221); the punching connection block (24) is fixedly connected to the piston rod of the punching cylinder (23); punching push blocks (26) are provided on both sides of the punching connection block (24); the punching push blocks (26) are slidably arranged on both sides of the punching base (25); inwardly contracting punching sliders (27) are provided on both sides of the punching base (25) and are linked to the punching push blocks (26); the punching slider (27) is provided with a punching head (28); and the clamping assembly (22) is arranged directly in front of the punching head (28).

5. The antenna tube assembly mechanism according to claim 1, characterized in that: The second pipe material shrinkage device comprises a shrinkage cylinder (31) and a shrinkage slider (32) connected to the piston rod of the shrinkage cylinder (31), the shrinkage slider (32) being provided with a tapered groove (321), and a guide column (322) being provided in the tapered groove (321).

6. The antenna tube assembly mechanism according to claim 1, characterized in that: The waste cutting device (6) comprises a processing table (61), a cutting cylinder (62), and a cutting knife (63); the processing table (61) is provided with a passage (611) for waste to pass through; a piston rod of the cutting cylinder (62) is connected and fixed to the cutting knife (63); and the cutting knife (63) is arranged above the passage (611).

7. The antenna tube assembly mechanism according to claim 1, characterized in that: The ejection device (7) comprises a first ejection cylinder (71), the piston rod of the first ejection cylinder (71) is provided with an ejection slider (72), the ejection slider (72) is provided with a hollow tube (73), the ejection slider (72) is provided with a second ejection cylinder (74), the piston rod of the second ejection cylinder (74) is provided with an ejection rod (75) which passes through the hollow tube (73).

8. The antenna tube assembly mechanism according to claim 1, characterized in that: The pipe-to-material docking device (8) comprises a docking cylinder (81) and a docking slide block (82) connected to the piston rod of the docking cylinder (81); the docking slide block (82) is provided with a bearing hole (83) for the second pipe to pass through.

9. The antenna tube assembly mechanism according to claim 1, characterized in that: The workpiece displacement device (9) comprises a displacement cylinder (91) and a linkage block (92); a piston rod of the displacement cylinder (91) is connected and fixed to the linkage block (92); two liftable first clamping cylinders (93) are provided on one side of the linkage block (92) and are arranged above the first groove (221) and the second groove (411); and three liftable second clamping cylinders (94) are provided on the other side of the linkage block (92).

10. The antenna tube assembly mechanism according to any one of claims 2 to 9, characterized in that: A first support block (902) is provided at the other end of the first supporting plate (21) and the second supporting plate (41); the first supporting block (902) is also provided with a second supporting block (903) and a spacing is maintained between the first supporting block (902) and the second supporting block (903) for clamping by a second clamping cylinder (94); the first supporting plate (21), the first supporting block (902) and the second supporting block (903) are provided with a cavity (901); the first supporting block (902) is provided with a fixed cylinder (9021); the fixed cylinder (9021) is provided with a push rod (9022) and is arranged above the cavity (901) of the first supporting block (902).

Citation Information

Patent Citations

  • Annular fastener material taking assembly

    CN108946142A

  • Plastic part stub bar cutting device

    CN215283172U

  • Multifunctional full-automatic processing machine

    CN216324658U

  • Antenna tube material assembly machine

    CN219293274U

  • Antenna tube punching device

    CN219401915U

Cited By

  • Automatic assembling mechanism for antenna tube material production

    CN120619840A