Impact drill with dustproof function for constructional engineering

By setting elastic airbags at the end of the dust cover of the impact drill for construction projects and automatically inflated with the inflatable assembly, the problem of dust leakage in the prior art is solved, and a more efficient dust protection effect is achieved and the complex shape of the working face is adapted.

CN119077681APending Publication Date: 2024-12-06SICHUAN ZHONGLIYUAN CONSTR ENG CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411483780.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-23
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The dust and particles generated by impact drilling in existing construction projects during drilling will leak through the gaps in the dustproof cover, affecting the dustproof effect, especially when there are depressions or protrusions on the working surface.

Method used

Elastic airbags are installed at the end of the dust cover and equipped with an inflatable assembly. When drilling, it will automatically inflate the airbag to fill the gap between the end face of the dust cover and the working face. The recessed part is filled with elastic expansion of the airbag to ensure dust protection. Effect.

Benefits of technology

It effectively avoids the leakage of debris and dust during drilling, significantly improves the dustproof performance of the impact drill, and adapts to the concave and convex changes in different working faces.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119077681A_ABST
    Figure CN119077681A_ABST
Patent Text Reader

Abstract

The percussion drill with the dustproof function for constructional engineering comprises a percussion drill body and a dustproof cover arranged at the drill bit end of the percussion drill body, a fixing sleeve is arranged on the end face of the dustproof cover, an elastic air bag is arranged on the end face, away from the dustproof cover, of the fixing sleeve, and an inflation assembly is arranged in the dustproof cover. The inflation assembly is used for inflating the air bag, and when the air bag is inflated and expands to fill the concave part of the working face, the inflation assembly is automatically deflated. According to the percussion drill, the elastic air bag is arranged at the end of the dust cover, during drilling, air is automatically inflated into the elastic air bag so as to fill a gap between the end face and the working face of the dust cover, then chippings and dust generated during drilling are prevented from leaking from the gap, and the dustproof effect of the percussion drill is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction tools, in particular to an impact drill for building engineering with a dustproof function. Background Art

[0002] In home improvement projects and other types of construction projects, handheld impact drills are usually used to drill holes in buildings. However, the use of impact drills will generate a lot of dust and particles, causing indoor air pollution, which will not only affect the operator's drilling vision, but also damage the operator's health if they are in a dusty environment for a long time.

[0003] The existing technology (such as patents with publication numbers CN2435193Y and CN201565938U) solves this problem by providing a dust cover at the front end of the drill bit. However, this method has the following problems: if the working surface is concave or convex, a gap will appear between the end face of the dust cover and the working surface, causing dust and debris to leak out of the gap, affecting the dustproof effect of the dust cover. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide an impact drill for construction projects with a dust-proof function. An elastic air bag is arranged at the end of the dust cover. When drilling, air is automatically inflated into the elastic air bag to fill the gap between the end face of the dust cover and the working surface, thereby preventing debris and dust generated by drilling from leaking through the gap, thereby greatly improving the dust-proof effect of the impact drill.

[0005] The objective of the present invention is achieved through the following technical solutions: A hammer drill for construction engineering with a dustproof function comprises an hammer drill body and a dust cover arranged at the drill bit end of the hammer drill body, the end face of the dust cover is provided with a fixing sleeve, the end face of the fixing sleeve away from the dust cover is provided with an elastic air bag, an inflation component is provided in the dust cover, the inflation component is used to inflate the air bag, and when the air bag is inflated to fill the concave part of the working surface, the inflation component automatically deflates.

[0006] Further, the inflation assembly includes an inflation cylinder and a piston part, the inflation cylinder is connected to the fixed sleeve, an inflation cavity and a vent hole connected to the inflation cavity are provided in the inflation cylinder, the diameter of the inflation cavity is larger than the diameter of the vent hole, a first inflation hole is provided on the hole wall of the vent hole along the radial direction of the vent hole, one end of the first inflation hole is connected to the airbag, and the other end of the first inflation hole is connected to the inflation cavity; The piston part comprises a first plug rod, a first piston arranged at the end of the first plug rod, a second plug rod and a second piston arranged at the end of the second plug rod, the end of the first plug rod away from the first piston is connected to the end of the impact drill body, the end of the second plug rod away from the second piston is connected to the first piston, the first piston is adapted to the inflation chamber, and the second piston is adapted to the vent hole; The first piston comprises a connecting plate and a sleeve plate coaxially sleeved outside the connecting plate, the outer diameter of the sleeve plate is adapted to the inner diameter of the inflation chamber, and a locking assembly is provided on the sleeve plate, the locking assembly is used to fix the connecting plate and the sleeve plate when the first piston moves in the inflation chamber, and the connecting plate and the sleeve plate are separated when the first piston moves to the bottom of the inflation chamber; A second inflation hole is provided in the wall of the fixed sleeve, and the two ends of the second inflation hole are respectively connected to the first inflation hole and the elastic airbag; the second inflation hole is provided with an automatic deflation component, and the automatic deflation component is used to automatically deflate the inflation component when the airbag is inflated to fill the recessed part of the working surface.

[0007] Furthermore, a step hole is provided at one end of the sleeve plate close to the vent hole; The locking assembly includes a first wedge block, a second wedge block and a locking plate, the first wedge block is slidably connected to the bottom of the step hole, the locking plate is vertically connected to the first wedge block, a locking hole is provided on the locking plate, an elastic reset member is provided between the first wedge block and the wall of the step hole, the second wedge block is arranged at the bottom of the inflation cavity, and a locking column corresponding to the locking hole is provided on the second wedge block Furthermore, a through hole is provided on the side wall of the fixing sleeve, and the through hole is connected with the second inflation hole; The automatic deflation assembly comprises an exhaust plug, which is arranged in the through hole. An exhaust hole communicating with the through hole is arranged on the side wall of the exhaust plug, and a spring is arranged at the bottom of the exhaust plug.

[0008] Furthermore, the elastic return member is a spring.

[0009] Furthermore, the elastic airbag is made of rubber material.

[0010] Furthermore, the dust cover and the fixing sleeve are both made of transparent material.

[0011] The beneficial effects of the present invention are: The impact drill of the present invention arranges an elastic air bag at the end of the dust cover. When drilling, air is automatically inflated into the elastic air bag to fill the gap between the end face of the dust cover and the working surface, thereby preventing debris and dust generated by drilling from leaking through the gap, thereby greatly improving the dustproof effect of the impact drill. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 Schematic diagram of the overall structure of an impact drill for construction engineering with dustproof function in an embodiment of the present invention; Figure 2 for Figure 1 An enlarged schematic diagram of the local A in the middle; Figure 3 It is a schematic diagram of the specific structure of the dust cover and the fixed sleeve; Figure 4 for Figure 3 An enlarged schematic diagram of the local B in the middle; Figure 5 for Figure 3 An enlarged schematic diagram of the local C in the middle; In the figure, 1, impact drill body; 2, dust cover; 3, fixing sleeve; 4, inflation cylinder; 5, inflation chamber; 6, first inflation hole; 7, air bag; 8, first plug rod; 9, first piston; 10, second plug rod; 11, second piston; 12, connecting plate; 13, sleeve plate; 14, second inflation hole; 15, first wedge block; 16, second wedge block; 17, locking plate; 18, elastic reset member; 19, locking hole; 20, locking column; 21, through hole; 22, exhaust plug; 23, exhaust hole; 24, vent hole. DETAILED DESCRIPTION

[0013] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0014] See also Figure 1-Figure 5 , the present invention provides a technical solution: Example: like Figure 1-Figure 5 As shown, an impact drill with dustproof function for construction engineering includes an impact drill body 1 and a dust cover 2 arranged at the drill bit end of the impact drill body 1, a fixing sleeve 3 is arranged on the end face of the dust cover 2, an elastic air bag 7 is arranged on the end face of the fixing sleeve 3 away from the dust cover 2, an inflation component is arranged in the dust cover 2, the inflation component is used to inflate the air bag 7, and when the air bag 7 is inflated to fill the concave part of the working surface, the inflation component automatically deflates.

[0015] like Figure 2 and Figure 3As shown, the inflation assembly includes an inflation cylinder 4 and a piston part, the inflation cylinder 4 is connected to the fixed sleeve 3, an inflation cavity 5 and a vent hole 24 connected to the inflation cavity 5 are provided in the inflation cylinder 4, the diameter of the inflation cavity 5 is larger than the diameter of the vent hole 24, and a first inflation hole 6 is provided on the hole wall of the vent hole 24 along the radial direction of the vent hole 24, one end of the first inflation hole 6 is connected to the airbag 7, and the other end of the first inflation hole 6 is connected to the inflation cavity 5; The piston portion includes a first plug rod 8, a first piston 9 arranged at the end of the first plug rod 8, a second plug rod 10 and a second piston 11 arranged at the end of the second plug rod 10, the end of the first plug rod 8 away from the first piston 9 is connected to the end of the impact drill body 1, the end of the second plug rod 10 away from the second piston 11 is connected to the first piston 9, the first piston 9 is adapted to the inflation chamber 5, and the second piston 11 is adapted to the vent hole 24; The first piston 9 includes a connecting plate 12 and a sleeve plate 13 coaxially sleeved outside the connecting plate 12, the outer diameter of the sleeve plate 13 is adapted to the inner diameter of the inflation chamber 5, and a locking assembly is provided on the sleeve plate 13, the locking assembly is used to fix the connecting plate 12 and the sleeve plate 13 when the first piston 9 moves in the inflation chamber 5, and when the first piston 9 moves to the bottom of the inflation chamber 5, the connecting plate 12 and the sleeve plate 13 are separated; A second inflation hole 14 is provided in the wall of the fixed sleeve 3, and the two ends of the second inflation hole 14 are respectively connected to the first inflation hole 6 and the elastic airbag 7; the second inflation hole 14 is provided with an automatic deflation component, and the automatic deflation component is used to automatically deflate the inflation component when the airbag 7 is inflated to fill the recessed part of the working surface.

[0016] The sleeve plate 13 is provided with a step hole at one end close to the vent hole 24; like Figure 2-Figure 4 As shown, the locking assembly includes a first wedge block 15, a second wedge block 16 and a locking plate 17, the first wedge block 15 is slidably connected to the bottom of the step hole, the locking plate 17 is vertically connected to the first wedge block 15 (and the locking plate 17 extends to the end face of the connecting plate 12 away from one end of the first wedge block 15), a locking hole 19 is provided on the locking plate 17, an elastic reset member 18 is provided between the first wedge block 15 and the hole wall of the step hole, the second wedge block 16 is arranged at the bottom of the inflation cavity 5, and a locking column 20 corresponding to the locking hole 19 is provided on the second wedge block 16 (wherein the second wedge block 16 is provided with a mounting hole, the locking column 20 is slidably arranged in the mounting hole, the end of the locking column 20 extends out of the mounting hole, a spring is sleeved on the outside of the locking column 20, and the two ends of the spring are respectively fixedly connected to the outer wall of the locking column 20 and the hole wall of the mounting hole).

[0017] The side wall of the fixing sleeve 3 is provided with a through hole 21, and the through hole 21 is connected with the second inflation hole 14; like Figure 3 and Figure 5 As shown, the automatic deflation assembly includes an exhaust plug 22, and the exhaust plug 22 (sealing) is arranged in the through hole 21. The exhaust hole 23 connected to the through hole 21 is provided on the side wall of the exhaust plug 22, and a spring is provided at the bottom of the exhaust plug 22 (wherein, the two ends of the spring are respectively fixed to the bottom of the exhaust plug 22 and the hole wall of the through hole 21 (the outer wall of the bottom of the exhaust plug 22 is provided with a mounting groove, and the spring can also be sleeved outside the mounting groove)).

[0018] The elastic reset member 18 is a spring.

[0019] The elastic airbag 7 is made of rubber material.

[0020] The dust cover 2 and the fixing sleeve 3 are both made of transparent material.

[0021] Among them, 1. The impact drill body 1 is a prior art, and its specific structure and working principle are not described here. 2. Figure 4 As shown, the cross section of the end of the connecting plate 12 away from the second plug rod 10 is in an eight-shaped shape. With this arrangement, when the second plug rod 10 is reset, the sleeve plate 13 can be pulled to automatically reset. 3. The second piston 11 is used to prevent the gas in the inflation chamber 5 from leaking through the through hole 21 during inflation.

[0022] Working principle: (1) Positioning: Align the drill bit with the position to be drilled through the fixing sleeve 3, then hold the handle of the impact drill body 1 with one hand and hold the fixing sleeve 3 with the other hand to press and fix the fixing sleeve 3 on the work surface.

[0023] (2) Drilling and inflation to prevent leakage: When the impact drill body 1 is drilling, the impact drill body 1 is pushed forward. In this process, the impact drill body 1 drives the first plug rod 8 to be pushed forward. When the first plug rod 8 is pushed forward, the gas in the inflation chamber 5 is squeezed into the elastic airbag 7 through the first inflation hole 6 and the second inflation hole 14; the elastic airbag 7 expands to fill the concave part on the working surface, while the convex part on the working surface squeezes the elastic airbag 7, so that the elastic airbag 7 does not expand on the convex part of the working plane, thereby achieving the purpose of the concave-convex matching between the elastic airbag 7 and the working surface, so as to avoid the formation of a gap between the fixing sleeve 3 and the working surface.

[0024] During the inflation process, if the elastic airbag 7 has filled the recessed part of the working surface, the air pressure in the first inflation hole 6 and the second inflation hole 14 will rise. At this time, the air pressure in the through hole 21 will rise. When the force exerted on the exhaust plug 22 is greater than the spring tension, the exhaust plug 22 will be lifted up. When the exhaust hole 23 of the exhaust plug 22 is lifted up to be connected with the outside world, the gas in the inflation cavity 5 will be discharged through the first inflation hole 6, the second inflation hole 14 and the exhaust hole 23, thereby preventing the air pressure in the first inflation hole 6, the second inflation hole 14 and the elastic airbag 7 from continuing to increase.

[0025] When the inflation is completed, that is, when the first piston 9 moves to the bottom of the inflation chamber 5, the sleeve plate 13 is automatically separated from the connecting plate 12, and the sleeve plate 13 is fixed to the bottom of the inflation chamber 5 to seal the first inflation hole 6, thereby preventing gas leakage in the elastic airbag 7.

[0026] The separation process of the sleeve plate 13 and the connecting plate 12 is as follows: when the first piston 9 moves to the point where the inclined surface of the first wedge block 15 contacts the inclined surface of the second wedge block 16, as the first piston 9 continues to move, the first wedge block 15 compresses the elastic reset member 18 under the action of the inclined surface, thereby driving the locking plate 17 to move in a direction away from the connecting plate 12. When the sleeve plate 13 moves to the bottom of the inflation chamber 5, the sleeve plate 13 is sealed at the air inlet of the first inflation hole 6. At the same time, the locking column 20 corresponds to the locking hole 19. The locking column 20 extends into the locking hole 19 under the reset action of the spring (when the locking plate 17 approaches the second wedge block 16 with the first wedge block 15, the locking plate 17 first squeezes the locking column 20 to retract the locking column 20 into the mounting hole), and the friction between the locking column 20 and the locking hole 19 stabilizes the sleeve plate 13 at the bottom of the inflation chamber 5.

[0027] During drilling, since the gap between the fixing sleeve 3 and the working surface is filled with the elastic airbag 7, all the debris generated by drilling enters the dust cover and will not leak out.

[0028] At the end of drilling, during the process of pulling out the drill bit, the first plug rod 8 pulls the connecting plate 12 back. When the connecting plate 12 retreats to the sleeve plate 13, it drags the sleeve plate 13 (this process overcomes the friction between the locking column 20 and the locking hole 19) to move radially. When the locking column 20 is separated from the locking hole 19, the first wedge block 15 is automatically reset under the action of the elastic reset member 18, thereby reconnecting the sleeve plate 13 and the connecting plate 12 as a whole.

[0029] The impact drill of the present invention arranges an elastic air bag at the end of the dust cover. When drilling, air is automatically inflated into the elastic air bag to fill the gap between the end face of the dust cover and the working surface, thereby preventing debris and dust generated by drilling from leaking through the gap, thereby greatly improving the dustproof effect of the impact drill.

[0030] The above is only a preferred embodiment of the present invention. It should be understood that the present invention is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art shall not deviate from the spirit and scope of the present invention, and shall be within the scope of protection of the claims attached to the present invention.

Claims

1. A construction engineering impact drill with dustproof function, comprising an impact drill body and a dust cover arranged at the drill head end of the impact drill body, characterized in that: The end face of the dust cover is provided with a fixing sleeve, the end face of the fixing sleeve away from the dust cover is provided with an elastic airbag, an inflation component is provided inside the dust cover, the inflation component is used to inflate the airbag, and when the airbag is inflated to fill the concave part of the working surface, the inflation component automatically deflates.

2. The impact drill for construction engineering with dustproof function according to claim 1, characterized in that: The inflation assembly comprises an inflation cylinder and a piston part, the inflation cylinder is connected to the fixing sleeve, an inflation cavity and a vent hole connected to the inflation cavity are arranged in the inflation cylinder, the diameter of the inflation cavity is larger than the diameter of the vent hole, a first inflation hole is arranged on the hole wall of the vent hole along the radial direction of the vent hole, one end of the first inflation hole is connected to the airbag, and the other end of the first inflation hole is connected to the inflation cavity; The piston part comprises a first plug rod, a first piston arranged at the end of the first plug rod, a second plug rod and a second piston arranged at the end of the second plug rod, the end of the first plug rod away from the first piston is connected to the end of the impact drill body, the end of the second plug rod away from the second piston is connected to the first piston, the first piston is adapted to the inflation chamber, and the second piston is adapted to the vent hole; The first piston comprises a connecting plate and a sleeve plate coaxially sleeved outside the connecting plate, the outer diameter of the sleeve plate is adapted to the inner diameter of the inflation chamber, and a locking assembly is provided on the sleeve plate, the locking assembly is used to fix the connecting plate and the sleeve plate when the first piston moves in the inflation chamber, and the connecting plate and the sleeve plate are separated when the first piston moves to the bottom of the inflation chamber; A second inflation hole is provided in the wall of the fixed sleeve, and the two ends of the second inflation hole are respectively connected to the first inflation hole and the elastic airbag; the second inflation hole is provided with an automatic deflation component, and the automatic deflation component is used to automatically deflate the inflation component when the airbag is inflated to fill the recessed part of the working surface.

3. The impact drill for construction engineering with dustproof function according to claim 2, characterized in that: The sleeve plate is provided with a step hole at one end close to the vent hole; The locking assembly includes a first wedge block, a second wedge block and a locking plate, the first wedge block is slidably connected to the bottom of the step hole, the locking plate is vertically connected to the first wedge block, a locking hole is provided on the locking plate, an elastic reset member is provided between the first wedge block and the wall of the step hole, the second wedge block is arranged at the bottom of the inflation cavity, and a locking column corresponding to the locking hole is provided on the second wedge block.

4. The impact drill for construction engineering with dustproof function according to claim 2, characterized in that: A through hole is provided on the side wall of the fixing sleeve, and the through hole is communicated with the second inflation hole; The automatic deflation assembly comprises an exhaust plug, which is arranged in the through hole. An exhaust hole communicating with the through hole is arranged on the side wall of the exhaust plug, and a spring is arranged at the bottom of the exhaust plug.

5. The impact drill for construction engineering with dustproof function according to claim 3, characterized in that: The elastic reset member is a spring.

6. The construction engineering impact drill with dustproof function according to claim 1, characterized in that: The elastic airbag is made of rubber material.

7. The impact drill for construction engineering with dustproof function according to claim 1, characterized in that: The dust cover and the fixing sleeve are both made of transparent material.

Citation Information

Patent Citations

  • Punching electric drill dustproof protection device for constructional engineering and using method thereof

    CN112377125A

  • Electric drill convenient to operate

    CN113996841A

  • Electric hammer protection structure

    CN217801534U

  • Dust collector

    JP2019063890A

  • Fluid operable hammer

    US4062268A