Internal circulation load adjusting system and method

Through the internal circulation load regulation system, the water circulation load regulation between the active and passive chambers is achieved in the ship or floating fan through the internal circulation load regulation system, which solves the blockage problem caused by sea organisms and improves the response of the load regulation system Speed ​​and stability reduce costs.

CN119079016APending Publication Date: 2024-12-06SHANGHAI ORIENTAL MARITIME ENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411198384.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In the prior art, ships and floating fans are blocked in the water inlet and outlet due to sea organisms during load regulation, which affects the stability and response speed of the load regulation system.

Method used

The internal circulation load adjustment system is adopted to monitor the attitude of the carrier through attitude sensors, and the pressure control device and the air compartment are used to realize the water circulation and load adjustment between the active load adjustment chamber and the passive load adjustment chamber, reducing dependence on external seawater and avoiding the problem of sea organisms.

Benefits of technology

It improves the response speed and controllability of the load adjustment system, reduces the water volume requirement, avoids blockage of water inlet and outlet, and ensures that the load adjustment can be carried out in time under extreme working conditions, which has the advantages of high safety, high reliability and low cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119079016A_ABST
    Figure CN119079016A_ABST
Patent Text Reader

Abstract

The invention provides an internal circulation load adjusting system and method. The system comprises an attitude sensor, a pressure control device, an air cabin and a load adjusting cabin, the attitude sensor is arranged at the central position of a carrier of the system; the pressure control device is arranged at the central position of the carrier or in a cabin body of the carrier; an air cabin and a load adjusting cabin are arranged in any cabin body; the air cabin is divided into a first air cabin sub-cabin and a second air cabin sub-cabin; one of the first air cabin sub-cabin and the second air cabin sub-cabin is communicated with a pressure control device; the first air cabin sub-cabin and the second air cabin sub-cabin are both communicated with the load adjusting cabin; and the load adjusting cabin in any cabin body is communicated with the load adjusting cabin in the other cabin body through a second load adjusting pipeline. According to the scheme, timely load adjustment between the load adjustment cabins can be achieved through attitude judgment and internal circulation, the situation that the water inlet and the water outlet are blocked due to intermodulation of the load adjustment cabins and external seawater is avoided, and the advantages of being high in safety and reliability and low in cost are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of load regulation technology, and in particular to an internal circulation load regulation system and method. Background Art

[0002] At present, load adjustment technology is widely used in the technical fields of ships and wind power systems. During the load adjustment process, load adjustment pumps or load adjustment equipment are often used as power sources, and then the loads of ships and floating wind turbines are adjusted through load adjustment pipelines and external water sources.

[0003] In the prior art, Jiangsu University of Science and Technology's invention patent application number 2022100047074, "Ship load adjustment system, method and storage medium", uses a pump group to realize the filling and discharge of water between the ballast water tank and the external environment, to dynamically adjust the water demand of each ballast water tank of the ship to maintain the buoyancy and draft stability of the ship; Sichuan Honghua Petroleum Equipment Co., Ltd.'s invention patent application number 2022100079643, "Floating foundation and its active ballast system", uses load adjustment equipment to achieve mutual adjustment between the fan ballast tank and the external seawater.

[0004] However, in the prior art, both ships and floating wind turbines are load-adjusted by adjusting the ballast water tanks and the external seawater. Therefore, during the implementation process, the inlet and outlet are often blocked due to the attachment of marine organisms. Therefore, it is necessary to propose a system and method for adjusting the load between the load-adjusting tanks to ensure the stability of the hull or wind turbine. Summary of the invention

[0005] In view of the defects in the prior art, the purpose of the present invention is to provide an internal circulation load adjustment system and method, which can realize timely load adjustment between load adjustment tanks through posture judgment and internal circulation, avoid the blockage of water inlets and outlets caused by the mutual adjustment between the load adjustment tanks and the external seawater, and has the advantages of high safety, high reliability and low cost.

[0006] In order to solve the above technical problems, this application provides the following technical solutions:

[0007] According to a first aspect of an embodiment of the present application, there is provided an internal circulation load adjustment system, comprising a posture sensor, a pressure control device, an air cabin and a load adjustment cabin;

[0008] The posture sensor is arranged at the center of the carrier of the system and is used to monitor the posture information of the carrier;

[0009] The pressure control device is arranged at the center of the carrier or in the cabin of the carrier, and is used to provide gas to control the system pressure;

[0010] The air tank and the trimming tank are provided in any of the cabins; the air tank is divided into a first air tank sub-chamber and a second air tank sub-chamber; one of the first air tank sub-chamber and the second air tank sub-chamber is connected to the pressure control device, and is used to store the high-pressure gas delivered by the pressure control device; and the first air tank sub-chamber and the second air tank sub-chamber are both connected to the trimming tank, and are respectively used to pressurize the trimming tank during the trimming process and relieve the pressure of the trimming tank after the trimming is completed; the trimming tank in any of the cabins is connected to the trimming tank in the other of the cabins through a second trimming pipeline, and is used to transport the trimming water in any of the trimming tanks to the other of the trimming tanks, so as to realize internal circulation trimming.

[0011] Furthermore, a redundant cabin is provided in the cabin body, a third connecting pipeline is provided in the redundant cabin, one end of the third connecting pipeline is connected to the first load adjustment pipeline, and the other end is connected to the second load adjustment pipeline, and a third control valve is provided on the third connecting pipeline.

[0012] Furthermore, at least one of the redundant compartments is also provided with a fourth connecting pipeline, one end of the fourth connecting pipeline is connected with the first load adjustment pipeline and the third connecting pipeline, and the other end is connected with the outside, and a fourth control valve is provided on the fourth connecting pipeline.

[0013] Furthermore, the first gas tank compartment is connected to the load adjustment compartment through a first connecting pipeline, and a first control valve is provided on the first connecting pipeline; the second gas tank compartment is connected to the load adjustment compartment through a second connecting pipeline, and a second control valve is provided on the second connecting pipeline.

[0014] Furthermore, the number of the pressure control device is at least one, and the pressure control device includes a second filter, a load adjustment device and a gas pipeline. One end of the second filter is connected to the outside, and the other end is connected to the load adjustment device. The load adjustment device is connected to the gas cabin through the gas pipeline, and a gas control valve is provided on the gas pipeline.

[0015] Furthermore, the load adjustment device adopts a load adjustment pump or an air compressor unit.

[0016] Furthermore, a liquid level sensor is provided in the load trimming tank for detecting changes in the water level in the load trimming tank.

[0017] Furthermore, a first filter is also provided on the fourth connecting pipeline.

[0018] Furthermore, an equipment cabin is also provided in the cabin, for installing the pressure control device when the pressure control device is provided in the cabin.

[0019] Furthermore, the carrier is a ship or a floating wind turbine.

[0020] According to a second aspect of an embodiment of the present application, an internal circulation load adjustment method is provided, which is applied to any one of the internal circulation load adjustment systems described above, comprising:

[0021] Receiving first posture information sent by the posture sensor;

[0022] Determining a load adjustment command based on the first posture information;

[0023] Based on the load adjustment command, determine the active load adjustment cabin, the passive load adjustment cabin and the load adjustment parameter information;

[0024] Based on the load adjustment parameter information, the active air chamber corresponding to the active load adjustment chamber is controlled to pressurize the active load adjustment chamber, and at the same time, the passive load adjustment chamber is controlled to release pressure to the passive air chamber corresponding to the passive adjustment chamber, so that the load adjustment water in the active load adjustment chamber is transported to the passive load adjustment chamber; the high-pressure gas in the active air chamber is provided by the pressure control device;

[0025] receiving second posture information sent by the posture sensor;

[0026] Based on the second posture information, determining whether the loading instruction is completed;

[0027] When it is determined that the load adjustment instruction is completed, the load adjustment water delivery action of the active load adjustment tank, the pressurization action of the active air tank, and the pressure relief action of the passive load adjustment tank are stopped, and the pressure relief action of the active load adjustment tank is started;

[0028] When the pressure relief action of the active load adjustment cabin is completed, the pressure control device replenishes air for each of the air cabins for the next load adjustment.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] The internal circulation load adjustment system provided by the present invention is provided with a posture sensor, a pressure control device, an air cabin and a load adjustment cabin, wherein the air cabin is divided into two air cabin sub-compartments, one air cabin sub-compartment is inflated by the pressure control device, and the other air cabin sub-compartment is not connected to the pressure control device, so that when the posture sensor detects that load adjustment is needed, the active load adjustment cabin uses the high-pressure gas in one air cabin sub-compartment to apply pressure to the active load adjustment cabin, and the passive load adjustment cabin uses the other air cabin sub-compartment to depressurize the passive load adjustment cabin, thereby allowing the load adjustment water in the active load adjustment cabin to be transported to the passive load adjustment cabin, thereby realizing the internal circulation load adjustment of the carrier. Compared with the external input type load adjustment system, the internal circulation load adjustment system can achieve the same load adjustment effect by reducing the load adjustment water volume by half, thereby improving the response speed of the load adjustment system, and the total water volume and water quality conditions are both under control, which can improve the controllability of the load adjustment system over the carrier and reduce systemic risks. Since the technical solution adopts the internal circulation method for load adjustment, there is no need to use operation and maintenance ships or other transportation tools as a medium to transport load adjustment water during the load adjustment process. Therefore, even under poor working conditions or even extreme working conditions, timely load adjustment can be achieved. Moreover, since the load adjustment system does not need to absorb seawater for load adjustment, it can also avoid the blockage of the water inlet and outlet due to the attachment of marine organisms. When the blockage is serious, it may even cause the load adjustment system to be paralyzed. It has achieved the effect of solving the problems of slow load adjustment response, actual use being affected by marine organisms, and loss of load adjustment ability under extreme working conditions. It has the advantages of fast load adjustment response speed, short load adjustment time, high safety, high reliability and low cost. In addition, by setting up a pipeline connected to the outside world, the technical solution can realize timely replenishment of load adjustment water according to demand and unloading under extreme working conditions.

[0031] The present invention also provides an internal-loop load adjustment method, which is implemented by the above-mentioned internal-loop load adjustment system. Since the internal-loop load adjustment method includes the technical solution of the above-mentioned internal-loop load adjustment system, it has corresponding technical effects. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0033] Figure 1 A partial structural diagram of an internal circulation load regulation system provided in an embodiment of the present invention Figure 1 ;

[0034] Figure 2 A partial structural diagram of an internal circulation load regulation system provided in an embodiment of the present invention Figure 2 ;

[0035] Figure 3 A schematic diagram of a specific implementation of an internal circulation load regulation system provided by an embodiment of the present invention;

[0036] Figure 4 A schematic flow chart of an internal loop load adjustment method provided in an embodiment of the present invention;

[0037] Figure 5 A schematic diagram of the actual workflow of an inner loop load adjustment method provided in an embodiment of the present invention.

[0038] In the figure:

[0039] 1. Pressure control device; 101. Second filter; 102. Load adjustment device; 103. Gas pipeline; 1031. Gas control valve;

[0040] 2. Cabin; 201. Equipment cabin; 202. Air cabin; 2021. First air cabin sub-cabin; 2022. First control valve; 2023. First connecting pipeline; 2024. Second air cabin sub-cabin; 2025. Second control valve; 2026. Second connecting pipeline; 203. Load adjustment cabin; 2031. First load adjustment pipeline; 204. Redundant cabin; 2041. Third connecting pipeline; 2042. Third control valve; 2043. Fourth connecting pipeline; 2044. Fourth control valve; 2045. First filter;

[0041] 3. The second load-adjusting pipeline. DETAILED DESCRIPTION

[0042] The present invention is described in detail below in conjunction with specific embodiments. The following embodiments will help those skilled in the art to further understand the present invention, but are not intended to limit the present invention in any form. It should be noted that, for those of ordinary skill in the art, several changes and improvements can also be made without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0043] Embodiment 1:

[0044] See also Figure 1-Figure 3 , an internal circulation load adjustment system provided in an embodiment of the present application includes a posture sensor, a pressure control device 1, an air cabin 202 and a load adjustment cabin 203;

[0045] The attitude sensor is set at the center of the carrier of the system to monitor the attitude information of the carrier;

[0046] The pressure control device 1 is arranged at the center of the carrier or in the cabin 2 of the carrier, and is used to provide gas to control the system pressure;

[0047] An air cabin 202 and a load trimming cabin 203 are provided in any cabin body 2; the air cabin 202 is divided into a first air cabin sub-cabin 2021 and a second air cabin sub-cabin 2024; one of the first air cabin sub-cabin 2021 and the second air cabin sub-cabin 2024 is connected to the pressure control device 1, and is used to store the high-pressure gas delivered by the pressure control device 1; and the first air cabin sub-cabin 2021 and the second air cabin sub-cabin 2024 are both connected to the load trimming cabin 203, and are respectively used to pressurize the load trimming cabin 203 during the load trimming process and relieve the pressure of the load trimming cabin 203 after the load trimming is completed; the load trimming cabin 203 in any cabin body 2 is connected to the load trimming cabin 203 in another cabin body 2 through the second load trimming pipeline 3, and is used to transport the load trimming water in any load trimming cabin 203 to the other load trimming cabin 203, so as to realize internal circulation load trimming.

[0048] In an optional embodiment, the air chamber 202 and the load-adjusting chamber 203 may be distributed longitudinally, such as the air chamber 202 being located above the load-adjusting chamber 203 (e.g. Figure 1-Figure 2 As shown) or below, it can also be distributed laterally according to the load calculation results, such as the air cabin 202 is located on the left or right of the load adjustment cabin 203.

[0049] In an optional embodiment, an equipment cabin 201 is further provided in the cabin 2 for installing equipment according to design requirements, and the pressure control device 1 is installed when the pressure control device 1 is provided in the cabin 2, so as to achieve the protection effect on the equipment and the pressure control device 1. The specific layout of the equipment cabin 201 can be designed according to the load calculation results.

[0050] In an optional embodiment, the cabin 2 is provided with an equipment cabin 201, an air cabin 202 and a load adjustment cabin 203 from top to bottom. When the pressure control device 1 is arranged at the center of the carrier, the pressure control device 1 passes through the equipment cabin 201 and communicates with the air cabin 202 (e.g. Figure 1-Figure 2 As shown), or, the pressure control device 1 is directly connected to the gas cabin 202.

[0051] In an optional embodiment, a redundant cabin 204 is further provided in the cabin body 2. The specific arrangement of the redundant cabin 204 can be designed according to the requirements. A third connecting pipeline 2041 is provided in the redundant cabin 204. One end of the third connecting pipeline 2041 is connected to the first load adjustment pipeline 2031, and the other end is connected to the second load adjustment pipeline 3. A third control valve 2042 is provided on the third connecting pipeline 2041.

[0052] A fourth connecting pipeline 2043 is also provided in at least one redundant compartment 204 , one end of the fourth connecting pipeline 2043 is connected to the first load adjustment pipeline 2031 and the third connecting pipeline 2041 , and the other end is connected to the outside. A fourth control valve 2044 is provided on the fourth connecting pipeline 2043 .

[0053] In an optional embodiment, the number of the pressure control device 1 is at least one, that is, the number of the pressure control device 1 can be one or more, so as to achieve one use and one backup or one use and multiple backups or multiple uses and one backup or multiple uses and multiple backups.

[0054] In an optional embodiment, the carrier is a ship or a floating wind turbine.

[0055] In a specific embodiment, the carrier is a ship, the attitude sensor is located at the center of the ship, a plurality of cabins 2 are arranged in the ship, and the cabins 2 are provided with an equipment cabin 201, an air cabin 202, a load adjustment cabin 203 and a redundant cabin 204 from top to bottom; the pressure control device 1 is arranged at the center of the ship, and the number of the pressure control devices 1 is two, so as to realize one for use and one for backup. When one of them has a problem, the other can be put into use immediately, thereby improving the stability of the system;

[0056] Some of the pipes of the pressure control device 3 (such as Figure 1-Figure 2 shown) and other equipment;

[0057] The gas cabin 202 includes a first gas cabin compartment 2021 and a second gas cabin compartment 2024, both of which adopt an airtight cabin structure. The first gas cabin compartment 2021 is connected to the load adjustment cabin 203 through a first connecting pipeline 2023, and a first control valve 2022 is provided on the first connecting pipeline 2023; the second gas cabin compartment 2024 is connected to the load adjustment cabin 203 through a second connecting pipeline 2026, and a second control valve 2025 is provided on the second connecting pipeline 2026; wherein, the first gas cabin compartment 2021 is connected to the pressure control device 1 for storing high-pressure gas, and the second gas cabin compartment 2024 is not connected to the pressure control device 1, and is used for depressurizing the load adjustment cabin 203;

[0058] The trimming tank 203 is used to store trimming water, and its storage capacity is determined by the trimming capacity of the ship. The more adjustable water capacity, the greater the capacity of the adjustable inclination angle. A liquid level sensor is also provided in the trimming tank 203 to detect the change of the water level in the trimming tank 203, so as to assist in determining the amount of trimming capacity.

[0059] When a pressure difference is formed between the air chamber 202 and the load trimming chamber 203, the air pressure will push the load trimming water in the active load trimming chamber to flow into the passive load trimming chamber; Figure 3 As shown, under the action of air pressure, the trimming water in the trimming tank 203 of cabin A flows into the trimming tank 203 of cabin B, the trimming water level of the trimming tank 203 of cabin A decreases, and the trimming water level of the trimming tank 203 of cabin B increases;

[0060] A third connecting pipeline 2041 is provided in the redundant tank 204, one end of the third connecting pipeline 2041 is connected to the first load-adjusting pipeline 2031, and the other end is connected to the second load-adjusting pipeline 3, and a third control valve 2042 is provided on the third connecting pipeline 2041 to realize the transmission of the load-adjusting water in each load-adjusting tank 203; a fourth connecting pipeline 2043 is also provided in at least one redundant tank 204, one end of the fourth connecting pipeline 2043 is connected to the first load-adjusting pipeline 2031 and the third connecting pipeline 2041, and the other end is connected to the outside, and a third control valve 2042 is provided on the fourth connecting pipeline 2043. A fourth control valve 2044 is provided for replenishing the load-adjusting water into the load-adjusting tank 203 according to demand, or for unloading the load-adjusting water in the load-adjusting tank 203 under extreme working conditions where unloading is required, and a first filter 2045 is also provided on the fourth connecting pipeline 2043 for filtering the replenished load-adjusting water to prevent impurities from entering the internal circulation load-adjusting system and affecting the operation of the system. In addition, a flow meter may be provided on the fourth connecting pipeline 2043 to assist in determining the amount of the load-adjusting volume; the redundant tank 204 is used as a separate isolation tank to facilitate the maintenance and repair of the equipment;

[0061] The pressure control device 1 includes a second filter 101, a load regulating device 102 and a gas pipeline 103. One end of the second filter 101 is connected to the outside, and the other end is connected to the load regulating device 102. The load regulating device 102 is connected to the gas cabin 202 through the gas pipeline 103, and a gas control valve 1031 is provided on the gas pipeline 103. After being filtered by the second filter 101, the air enters the load regulating device 102 for pressurization, becomes high-pressure gas, and is further transported to the gas cabin 202 for storage. Optionally, the load regulating device 102 adopts a load regulating pump or an air compressor unit.

[0062] In another specific embodiment, the carrier is a floating wind turbine, which adopts a structure based on three evenly distributed cabins 2, and the cabins 2 are provided with an equipment cabin 201, an air cabin 202, a load adjustment cabin 203 and a redundant cabin 204 from top to bottom; the pressure control device 1 is arranged in the middle column of the floating wind turbine, and the number of the pressure control devices 1 is two, so that one is used and the other is reserved. When one of them has a problem, the other can be put into use immediately, thereby improving the stability of the system;

[0063] Part of the pipeline of the pressure control device 1 (such as Figure 1-Figure 2 shown) and other equipment;

[0064] The gas cabin 202 includes a first gas cabin compartment 2021 and a second gas cabin compartment 2024, both of which adopt an airtight cabin structure. The first gas cabin compartment 2021 is connected to the load adjustment cabin 203 through a first connecting pipeline 2023, and a first control valve 2022 is provided on the first connecting pipeline 2023; the second gas cabin compartment 2024 is connected to the load adjustment cabin 203 through a second connecting pipeline 2026, and a second control valve 2025 is provided on the second connecting pipeline 2026; wherein, the first gas cabin compartment 2021 is connected to the pressure control device 1 for storing high-pressure gas, and the second gas cabin compartment 2024 is not connected to the pressure control device 3, and is used for depressurizing the load adjustment cabin 203;

[0065] The load adjustment tank 203 is used to store load adjustment water, and its storage capacity is determined by the load adjustment capacity of the floating wind turbine. The more adjustable water capacity, the greater the adjustable load inclination capacity. A liquid level sensor is also provided in the load adjustment tank 203 to detect the change of the water level in the load adjustment tank 203, so as to assist in determining the amount of the load adjustment.

[0066] When a pressure difference is formed between the air chamber 202 and the load trimming chamber 203, the air pressure will push the load trimming water in the active load trimming chamber to flow into the passive load trimming chamber; Figure 3 As shown, under the action of air pressure, the trimming water in the trimming tank 203 of cabin A flows into the trimming tank 203 of cabin B, the trimming water level of the trimming tank 203 of cabin A decreases, and the trimming water level of the trimming tank 203 of cabin B increases;

[0067] A third connecting pipeline 2041 is provided in the redundant tank 204, one end of the third connecting pipeline 2041 is connected to the first load-adjusting pipeline 2031, and the other end is connected to the second load-adjusting pipeline 3, and a third control valve 2042 is provided on the third connecting pipeline 2041 to realize the transmission of the load-adjusting water in each load-adjusting tank 203; a fourth connecting pipeline 2043 is also provided in at least one redundant tank 204, one end of the fourth connecting pipeline 2043 is connected to the first load-adjusting pipeline 2031 and the third connecting pipeline 2041, and the other end is connected to the outside, and a third control valve 2042 is provided on the fourth connecting pipeline 2043. A fourth control valve 2044 is provided for replenishing the load-adjusting water into the load-adjusting tank 203 according to demand, or for unloading the load-adjusting water in the load-adjusting tank 203 under extreme working conditions where unloading is required, and a first filter 2045 is also provided on the fourth connecting pipeline 2043 for filtering the replenished load-adjusting water to prevent impurities from entering the internal circulation load-adjusting system and affecting the operation of the system. In addition, a flow meter may be provided on the fourth connecting pipeline 2043 to assist in determining the amount of the load-adjusting volume; the redundant tank 204 is used as a separate isolation tank to facilitate the maintenance and repair of the equipment;

[0068] The pressure control device 1 includes a second filter 101, a load regulating device 102 and a gas pipeline 103. One end of the second filter 101 is connected to the outside, and the other end is connected to the load regulating device 102. The load regulating device 102 is connected to the gas cabin 202 through the gas pipeline 103, and a gas control valve 1031 is provided on the gas pipeline 103. After being filtered by the second filter 101, the air enters the load regulating device 102 for pressurization, becomes high-pressure gas, and is further transported to the gas cabin 202 for storage. Optionally, the load regulating device 102 adopts a load regulating pump or an air compressor unit.

[0069] In this embodiment, in order to solve the problems of slow response to load adjustment, being affected by marine organisms in actual use, and loss of load adjustment capability under extreme working conditions, this internal circulation load adjustment system uses posture judgment and sets an air chamber 202 in the cabin 2, uses the load adjustment equipment 102 to replenish air in the air chamber 202 to provide load adjustment power, and then uses the change in the pressure difference in the load adjustment chamber 203 to achieve mutual adjustment of the load adjustment water in the cabin. Through the design of the pipeline system, the two sets of load adjustment equipment 102 are used as backup for each other to improve the stability of the system.

[0070] The load-adjusting water in each cabin 2 is mutually load-adjusted in the load-adjusting cabin 203, so that the amount of water can be reduced by half when the same load-adjusting state is achieved, thereby improving the response speed of the system. In addition, since the load-adjusting water in the load-adjusting cabin 203 is internally circulated, the total water volume and water quality conditions can be controlled. The control of the total water volume can ensure that the overall impact of the load-adjusting system on the floating wind turbine is in a controllable state. Even if the load-adjusting system fails and causes excessive load adjustment, the risk can be constrained within a controllable range and will not cause systemic risks. The control of water quality conditions can eliminate the impact of marine organisms on the load-adjusting water system and prevent the load-adjusting equipment from being damaged or unable to work due to the attachment of marine organisms. At the same time, the control of water quality conditions can also improve water quality, reduce the pipeline resistance of the load-adjusting system, and make the load-adjusting system more energy-efficient, longer in use, and more reliable.

[0071] Embodiment 2:

[0072] See also Figure 4 The embodiment of the present application also provides an inner loop load adjustment method, including:

[0073] Step S1: receiving first posture information sent by a posture sensor;

[0074] Step S2: determining a load adjustment command based on the first posture information;

[0075] Step S3: Based on the load adjustment command, determine the active load adjustment cabin, the passive load adjustment cabin and the load adjustment parameter information;

[0076] Step S4: Based on the load adjustment parameter information, the active air chamber corresponding to the active load adjustment chamber is controlled to pressurize the active load adjustment chamber, and at the same time, the passive load adjustment chamber is controlled to release pressure to the passive air chamber corresponding to the passive adjustment chamber, so that the load adjustment water in the active load adjustment chamber is transported to the passive load adjustment chamber; the high-pressure gas in the active air chamber is provided by the pressure control device 1;

[0077] Step S5: receiving second posture information sent by the posture sensor;

[0078] Step S6: Based on the second posture information, determine whether the load adjustment instruction is completed;

[0079] Step S7: when it is determined that the load adjustment instruction is completed, the load adjustment water delivery action of the active load adjustment tank, the pressurization action of the active air tank, and the pressure relief action of the passive load adjustment tank are stopped, and the pressure relief action of the active load adjustment tank is started;

[0080] Step S8: When the pressure relief action of the active load adjustment cabin is completed, the pressure control device 1 replenishes air to each air cabin 202 for the next load adjustment.

[0081] In a specific embodiment, the method may further include a step of replenishing the load-adjusting water in the load-adjusting tank 203 after the internally circulated load-adjusting water is consumed by evaporation or the like, as follows:

[0082] Receiving liquid level information transmitted by a liquid level sensor in the load trimming cabin 203;

[0083] When the liquid level information meets the preset conditions, the regulating water is added to the regulating water tank 203 through the fourth connecting pipeline 2043 .

[0084] In a specific embodiment, the method may further include the step of unloading the load water under the extreme working condition where unloading is required, as follows:

[0085] receiving third posture information sent by the posture sensor;

[0086] Based on the third posture information, the unloading amount is calculated;

[0087] The trim water in the trim tank 203 is unloaded to the outside through the fourth connecting pipeline 2043.

[0088] See also Figure 5 In a practical application scenario, the implementation steps of this method are as follows:

[0089] Step 1: The air compressor unit completes the air replenishment operation when on standby;

[0090] Step 2: The system receives the load adjustment command;

[0091] Step 3: The pressurizing valve of the load-adjusting tank is opened, and at the same time, the exhaust valve of the load-adjusting tank is opened;

[0092] Step 4: The drain valves in the load-adjusting tank and the load-adjusting tank are opened;

[0093] Step 5: Start load adjustment operation under the action of gas pressure;

[0094] Step 6: The attitude sensor determines whether the load adjustment is terminated;

[0095] Step 7: Receive the load adjustment instruction;

[0096] Step 8: The drain valve is closed, the pressure valve of the load-adjusting tank is closed, the exhaust valve of the load-adjusting tank is opened, and the exhaust valve of the load-adjusting tank is closed;

[0097] Step 9: After the load adjustment is completed, the air compressor unit is replenished with air and prepared for the next load adjustment.

[0098] In this embodiment, it is assumed that the carrier is a floating wind turbine, which includes three cabins A, B, and C. When a load adjustment command is received, if the load needs to be adjusted from cabin A to cabin B, the corresponding pressurizing valve of cabin A is opened, and the corresponding exhaust valve of cabin B is opened. After waiting for a while, when the pressurized air in the air cabin of cabin A flows into the load adjustment cabin and stabilizes, the drain valve in the redundant cabin and the drain valve in the redundant cabin of cabin B are opened. At this time, the pipelines are interconnected. Under the action of air pressure, the load adjustment water in the load adjustment cabin of cabin A will be transported to the load adjustment cabin of cabin B. According to the data collected by the attitude sensor of the system to determine whether the load adjustment is in place, after the load adjustment is in place, the drain valves in the load adjustment cabin of cabin A and the load adjustment cabin of cabin B are closed, and the pressurizing valve of the air cabin of cabin A and the exhaust valve of the load adjustment cabin of cabin B are closed. The exhaust valve in the load adjustment cabin of cabin A is opened to discharge the excess high-pressure gas in the load adjustment cabin of cabin A to prepare for the next load adjustment.

[0099] The above describes the specific embodiments of the present invention. It should be understood that the present invention is not limited to the above specific embodiments, and those skilled in the art can make various changes or modifications within the scope of the claims, which does not affect the essence of the present invention. In the absence of conflict, the embodiments of the present application and the features in the embodiments can be combined with each other arbitrarily.

Claims

1. An internal circulation load adjustment system, characterized in that: It comprises a posture sensor, a pressure control device (1), an air cabin (202) and a load adjustment cabin (203); The posture sensor is arranged at the center of the carrier of the system and is used to monitor the posture information of the carrier; The pressure control device (1) is arranged at the center of the carrier or in the cabin (2) of the carrier, and is used to provide gas to control the system pressure; The gas cabin (202) and the load adjustment cabin (203) are arranged in any of the cabin bodies (2); the gas cabin (202) is divided into a first gas cabin compartment (2021) and a second gas cabin compartment (2024); one of the first gas cabin compartment (2021) and the second gas cabin compartment (2024) is connected to the pressure control device (1) for storing high-pressure gas delivered by the pressure control device (1); and the first gas cabin compartment (2021) and the second gas cabin compartment (2024) are connected to the pressure control device (1) for storing high-pressure gas delivered by the pressure control device (1); (2024) are both connected to the trimming tank (203), and are used to apply pressure to the trimming tank (203) during the trimming process and to relieve pressure on the trimming tank (203) after the trimming is completed; the trimming tank (203) in any one of the cabins (2) is connected to the trimming tank (203) in another one of the cabins (2) through a second trimming pipeline (3), and is used to transport the trimming water in any one of the trimming tanks (203) to another one of the trimming tanks (203), thereby realizing internal circulation trimming.

2. The internal circulation load adjustment system according to claim 1 is characterized in that: A redundant cabin (204) is also provided in the cabin body (2), and a third connecting pipeline (2041) is provided in the redundant cabin (204); one end of the third connecting pipeline (2041) is connected to the first load adjustment pipeline (2031), and the other end is connected to the second load adjustment pipeline (3); and a third control valve (2042) is provided on the third connecting pipeline (2041).

3. The internal circulation load adjustment system according to claim 2 is characterized in that: A fourth connecting pipeline (2043) is further provided in at least one of the redundant compartments (204); one end of the fourth connecting pipeline (2043) is connected to the first load adjustment pipeline (2031) and the third connecting pipeline (2041), and the other end is connected to the outside; and a fourth control valve (2044) is provided on the fourth connecting pipeline (2043).

4. The internal circulation load adjustment system according to claim 1, characterized in that: The first gas cabin sub-compartment (2021) is connected to the load trimming cabin (203) via a first connecting pipeline (2023), and a first control valve (2022) is provided on the first connecting pipeline (2023); the second gas cabin sub-compartment (2024) is connected to the load trimming cabin (203) via a second connecting pipeline (2026), and a second control valve (2025) is provided on the second connecting pipeline (2026).

5. The internal circulation load adjustment system according to claim 1, characterized in that: The number of the pressure control device (3) is at least one. The pressure control device (1) comprises a second filter (101), a load regulating device (102) and a gas pipeline (103). One end of the second filter (101) is in communication with the outside, and the other end is in communication with the load regulating device (102). The load regulating device (102) is in communication with the gas cabin (202) via the gas pipeline (103). A gas control valve (1031) is provided on the gas pipeline (103).

6. The internal circulation load adjustment system according to claim 5, characterized in that: The load adjustment device (102) adopts a load adjustment pump or an air compressor unit.

7. The internal circulation load adjustment system according to claim 1, characterized in that: A liquid level sensor is also provided in the load trimming chamber (203) for detecting changes in the water level in the load trimming chamber (203).

8. The internal circulation load adjustment system according to claim 3 is characterized in that: The fourth connecting pipeline (2043) is also provided with a first filter (2045).

9. The internal circulation load adjustment system according to any one of claims 1 to 8, characterized in that: An equipment cabin (201) is also provided in the cabin body (2) and is used for installing the pressure control device (1) when the pressure control device (1) is arranged in the cabin body (2).

10. The internal circulation load adjustment system according to claim 9, characterized in that: The carrier is a ship or a floating wind turbine.

11. An internal circulation load adjustment method, applied to the internal circulation load adjustment system according to any one of claims 1 to 10, characterized in that: include: Receiving first posture information sent by the posture sensor; Determining a load adjustment command based on the first posture information; Based on the load adjustment command, determine the active load adjustment cabin, the passive load adjustment cabin and the load adjustment parameter information; Based on the load adjustment parameter information, the active air chamber corresponding to the active load adjustment chamber is controlled to pressurize the active load adjustment chamber, and at the same time, the passive load adjustment chamber is controlled to release pressure to the passive air chamber corresponding to the passive adjustment chamber, so that the load adjustment water in the active load adjustment chamber is transported to the passive load adjustment chamber; the high-pressure gas in the active air chamber is provided by the pressure control device (1); receiving second posture information sent by the posture sensor; Based on the second posture information, determining whether the load adjustment instruction is completed; When it is determined that the load adjustment instruction is completed, the load adjustment water delivery action of the active load adjustment tank, the pressurization action of the active air tank, and the pressure relief action of the passive load adjustment tank are stopped, and the pressure relief action of the active load adjustment tank is started; When the pressure relief action of the active load adjustment cabin is completed, the pressure control device (1) replenishes air for each of the air cabins (202) for the next load adjustment.