Gabion check dam structure for debris flow treatment
By designing the gabion valley structure, combining the drainage trough and drainage canal, using the flexible structure and shrub solid soil plants, the stability and cost problems of traditional valley floors and barrier dams are solved, and effective interception and regulation of mudslide flow is achieved. Reduced the harm and construction costs of mudslides to surrounding areas.
Patent Information
- Application Number
- CN202411429760.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2024-12-06
AI Technical Summary
Traditional Tugufang and Chaishigufang cannot withstand the impact of mudslides, have poor stability, and the rigid structure of mortar masonry or concrete barrier dams has weak adaptability to deformation, complex construction and high cost, so they cannot effectively intercept and control mudslideslides.
Design a gabion valley structure, a mudslide flow management structural unit consisting of continuous gabion valley, drainage trough and drainage canal, adopting a more flexible structure of the gabion and mortar-masoned stone diversion dam, combined with shrubs Soil solid plants have good intercepting solid matter and impact resistance, strong adaptability to deformation, good water permeability and self-drainability, convenient construction and low cost.
It has achieved the intercept of solid matter in mudslide flow, reduce the discharge flow and flood peak flow, regulate the flood peak of mudslide flow, avoid mountain erosion, promote vegetation recovery, reduce soil erosion and harm of mudslide flow, improve management efficiency, and reduce costs.
Smart Images

Figure CN119083373A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a gabion valley structure for debris flow control, which is used for intercepting sediment, draining water and consolidating soil, and preventing gully development, and belongs to the technical field of geological disaster prevention and control. Background Art
[0002] Debris flow is a very destructive natural disaster. It is a phenomenon in which loose rock debris layers and clay form mud under the mixing of water. Due to vibration or stimulation by heavy rain, melting ice and snow, etc., it flows suddenly along the slope or trough. Debris flow rushes into villages and towns, destroys buildings, drowns people and livestock, destroys land, harms people's lives, causes serious economic losses, threatens people's life and property safety, and affects local economic and social development. my country began to prevent and control debris flow in the 1950s. Since then, it has formed a comprehensive debris flow basin management system based on "stabilization, interception, and drainage". The interception project plays an important role in stabilizing water and soil and controlling debris flow.
[0003] Valley arches are common in retaining projects. They can raise the erosion base point of the ditch bottom, prevent the ditch bottom from cutting and the ditch bank from expanding, and make the ditch slope gentler, intercept sand and gravel, reduce the solid runoff input into the main river channel, slow down the water flow in the ditch, reduce the harm of downstream mountain torrents, and gradually form usable terraces in the ditch. At present, traditional earth valley arches and firewood and stone valley arches cannot withstand the impact of debris flow, have poor stability, and cannot intercept and control debris flow; although mortar-made stone or concrete retaining dams can withstand the impact of mountain torrents and ensure the safety of the project, they are rigid retaining structures with high requirements for materials and foundations, weak ability to adapt to deformation, and more complex construction and high cost.
[0004] To this end, the present invention proposes a gabion valley structure for debris flow control. The gabion valley can intercept solid matter in the debris flow and reduce the harm of the debris flow to the downstream. The drainage groove and drainage channel are used to drain the debris flow to avoid the impact on the surrounding mountains. The gabion valley structure system is a relatively flexible structure with strong adaptability to deformation, good ability to intercept solid matter and impact resistance, simple structure, permeability and self-drainage, convenient construction and low cost. At the same time, while adapting to deformation, the gaps in the gabion will create conditions for the growth of soil and vegetation, which is in line with the concept of ecological management. Summary of the invention
[0005] In view of the above problems, the present invention designs a gabion check dam structure for debris flow control, aiming to solve the deficiencies of traditional check dams or retaining dams, intercept solid substances in debris flows, reduce the discharge and density of the downstream debris flows, regulate the peak discharge of downstream debris flows, and at the same time guide the debris flows into a predetermined channel through a drainage trough and a drainage channel, avoiding scouring of mountain bodies and bank slopes, and combining with vegetation restoration methods to reduce soil erosion and debris flow hazards.
[0006] The technical solution adopted by the present invention is as follows: A gabion check dam structure for debris flow control is continuously provided with gabion check dams, drainage troughs and drainage channels from upstream to downstream. The gabion check dams, drainage troughs and drainage channels form a debris flow control structure unit, and multiple debris flow control structure units are continuously provided from upstream to downstream;
[0007] The gabion check dam is composed of multiple layers of gabions. There is 1 layer underground and N layers above the ground. Each layer above the ground has the same height. The gabions are arranged in a "pin" shape, with a trapezoidal interface, and the two ends of the dam shoulders are embedded in the bank slope; an overflow trough is provided in the middle of the gabion check dam;
[0008] The drainage trough is composed of masonry diversion dams on both sides and a rubble concrete anti-scouring rib wall in the middle. Dry rubble is laid on the rubble concrete anti-scouring rib wall;
[0009] The drainage channel is arranged at a location where the width of the downstream gully of the gabion check dam increases by more than 15%. It is composed of gabions, and the top elevation of the channel is equal to the bottom elevation of the overflow trough of the gabion check dam.
[0010] The gabion is a cage-like structure formed by weaving iron wires into a cylindrical cage and then adding filled stones. The iron wires are provided with a galvanized anti-corrosion layer, the tensile strength of the mesh surface is 50 KN / m, which meets the EN10223-3 standard. The filled stones are weather-resistant hard rock blocks, with a strength grade ≥ MU30, a non-softening coefficient ≥ 0.85, and a particle size of 200-300 mm.
[0011] The foundation of the gabion check dam is buried 1.5 m deep, and a geotextile is laid below it; each layer of gabion is equipped with φ200 mm cement pipes with a spacing of 0.4 m.
[0012] Shrub soil-fixing plants are planted in the backfill areas of the gabion check dams, drainage troughs and drainage channels.
[0013] The shrub soil-fixing plants are Amorpha fruticosa shrub plants, with a plant spacing of 1.5 m.
[0014] The height of the overflow trough is 1 m.
[0015] The thickness of the dry-laid rubble is 0.4 m.
[0016] For two adjacent debris flow control structure units, the top of the next crib check dam is at the same elevation as the base of the previous crib check dam.
[0017] The grouted stone diversion dike has a trapezoidal cross-section, and its height is flush with the bottom of the overflow trough of the crib check dam.
[0018] The beneficial effects of the present invention are as follows:
[0019] 1. The crib check dam has a trapezoidal cross-section, a relatively thick and large cross-section, a relatively deep foundation embedment depth, and is arranged in a "pin" shape. The two ends of the dam shoulder are embedded in the bank slope, increasing the stability of the check dam.
[0020] 2. The crib check dam selects rubble as the filling material, with low cost and high water permeability. Compared with the existing traditional check dams, it has a wider application range.
[0021] 3. Drainage holes and cement pipes are left between each layer of crib cages, forming multiple drainage channels, achieving the effect of draining water and consolidating soil.
[0022] 4. Plants with strong soil consolidation ability such as Amorpha fruticosa are planted in the backfill area of the crib check dam, which can intercept sediment, beautify the environment, and the intercepted small particle sediment can also be used as nutrients for plants, enhancing the stability and ecological function of the check dam.
[0023] 5. A drainage trough and a drainage channel are connected downstream of the crib check dam, so that the debris flow is drained according to the predetermined channel, avoiding scouring of the mountain body and improving the treatment efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic structural diagram of the present invention;
[0025] Figure 2 It is a cross-sectional view of the crib check dam;
[0026] Figure 3 It is a front view of the crib check dam;
[0027] Figure 4 It is a front view of the crib check dam with an overflow trough;
[0028] Figure 5 It is a sectional view of the drainage trough;
[0029] Figure 6 It is a cross-sectional view of the drainage channel;
[0030] Figure 7 It is a schematic layout diagram of planted plants;
[0031] Figure 8 It is a schematic sectional layout diagram of the check dam. DETAILED DESCRIPTION OF THE INVENTION
[0032] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention.
[0033] Embodiment 1:
[0034] Taking the actual situation of a debris flow geological disaster control project in Fushun City as an example:
[0035] Combined with Figures 1 to 8 , a gabion check dam structure for debris flow control is continuously provided with gabion check dams 1, drainage channels 2 and drainage canals 3 from upstream to downstream. The gabion check dams 1, drainage channels 2 and drainage canals 3 form a debris flow control structure unit, and multiple debris flow control structure units are continuously provided along the upstream to downstream.
[0036] The gabion check dam 1 is composed of multiple layers of gabion cages 5. There is 1 layer underground and N layers above the ground. Each layer above the ground has the same height. The gabion cages 5 are arranged in a "pin" shape, with a trapezoidal interface, and the two ends of the dam shoulders are embedded in the bank slopes. To prevent the accumulated water from spreading to the gully banks on both sides when pouring, causing the flood to overflow and wash away the check dam, an overflow trough 6 is provided in the middle of the gabion check dam 1, and the height of the overflow trough 6 is 1 m. The gabion cage 5 is a cage structure formed by weaving iron wires into a cylindrical cage and then adding filled stones. The iron wires are provided with a galvanized anti-corrosion layer, the tensile strength of the mesh surface is 50 KN / m, meeting the EN10223-3 standard. The filled stones are weather-resistant hard rock blocks, with a strength grade ≥ MU30, a non-softening coefficient ≥ 0.85, and a particle size of 200 - 300 mm. During layout, it is required to be densely piled to reduce pores, so as to increase the self-weight and stability of the check dam. The foundation of the gabion check dam 1 is buried 1.5 m deep, and a geotextile is laid below it; each layer of gabion is installed with φ200 mm cement pipes with a spacing of 0.4 m. For two adjacent debris flow control structure units, the top of the next gabion check dam 1 is at the same height as the base of the previous gabion check dam 1.
[0037] The drainage channel 2 is composed of the masonry diversion dams 2-1 on both sides and the rubble concrete anti-scour rib wall 2-2 in the middle. Dry-laid rubble 2-3 is laid on the rubble concrete anti-scour rib wall 2-2, and the thickness of the dry-laid rubble 2-3 is 0.4 m. The masonry diversion dam 2-1 has a trapezoidal cross-section, and its height is flush with the bottom of the overflow trough 6 of the gabion check dam 1.
[0038] The drainage canal 3 is arranged at a place where the width of the downstream gully of the gabion check dam 1 increases by more than 15%, and is composed of gabion cages 5. The top elevation of the canal is equal to the bottom elevation of the overflow trough 6 of the gabion check dam 1.
[0039] Shrub soil-fixing plants are planted in the backfill areas of the gabion check dam 1, drainage channel 2 and drainage canal 3. The shrub soil-fixing plants are Amorpha fruticosa shrub plants, with a plant spacing of 1.5 m, which are used to intercept sediment, beautify the environment, enhance the stability and ecological function of the check dam.
[0040] After use, it can be seen that the above structure can intercept a large amount of sediment and debris, regulate the peak flow of debris flow, promote vegetation recovery, increase biodiversity, reduce the harm of debris flow to surrounding areas, reduce the losses caused by debris flow, and bring a series of social and economic benefits.
Claims
1. A gabion structure for debris flow control, characterized in that: From upstream to downstream, gabion check dams (1), drainage channels (2) and drainage canals (3) are successively arranged. The gabion check dams (1), drainage channels (2) and drainage canals (3) form a debris flow control structure unit, and multiple debris flow control structure units are successively arranged from upstream to downstream. The gabion check dam (1) is composed of multiple layers of gabions (5). There is 1 layer underground and N layers above the ground. Each layer above the ground has the same height. The gabions (5) are arranged in a "pin" shape, with a trapezoidal interface, and the two ends of the dam shoulders are embedded in the bank slopes. An overflow trough (6) is provided in the middle of the gabion check dam (1). The drainage channel (2) is composed of the masonry diversion dams (2-1) on both sides and the rubble concrete anti-scour rib wall (2-2) in the middle. Dry-laid rubble (2-3) is laid on the rubble concrete anti-scour rib wall (2-2). The drainage canal (3) is arranged at a location where the width of the downstream gully of the gabion check dam (1) increases by more than 15%. It is composed of gabions (5), and the elevation of the canal top is equal to the bottom elevation of the overflow trough (6) of the gabion check dam (1).
2. The gabion structure for debris flow control according to claim 1, characterized in that: The gabion is a cage-like structure formed by interweaving iron wires into a cylindrical cage and then adding filled stones. The iron wires are provided with galvanized anti-corrosion coatings. The tensile strength of the mesh surface is 50 KN / m, meeting the EN10223-3 standard. The filled stones are weather-resistant hard rock blocks, with a strength grade ≥ MU30 and a non-softening coefficient ≥ 0.85, and a particle size of 200-300 mm.
3. The gabion structure for debris flow control according to claim 1, characterized in that: The foundation of the gabion check dam (1) is buried 1.5 m deep, and a geotextile is laid below it. Each layer of gabion is equipped with φ200 mm cement pipes with a spacing of 0.4 m.
4. The gabion structure for debris flow control according to claim 1, characterized in that: Shrub soil-fixing plants are planted in the backfill areas of the gabion check dam (1), drainage channel (2) and drainage canal (3).
5. The gabion structure for debris flow control according to claim 4, characterized in that: The shrub soil-fixing plants are Amorpha fruticosa shrub plants, with a plant spacing of 1.5 m.
6. The gabion structure for debris flow control according to claim 1, characterized in that: The height of the overflow trough (6) is 1 m.
7. The gabion structure for debris flow control according to claim 1, characterized in that: The thickness of the dry-laid rubble (2-3) is 0.4 m.
8. The gabion structure for debris flow control according to claim 1, characterized in that: For two adjacent debris flow control structure units, the top of the next gabion check dam (1) is at the same elevation as the base of the previous gabion check dam (1).
9. The gabion structure for debris flow control according to claim 1, characterized in that: The masonry diversion dam (2-1) has a trapezoidal cross-section, and its height is flush with the bottom of the overflow trough (6) of the gabion check dam (1).
