Pipe ditch construction method using original ditch side wall as support foundation
By using the original ditch side wall as the support foundation in metallurgical factories and installing support, pad plate and cross plate, the secondary excavation problem caused by the lag in the design of the energy medium pipeline support foundation is solved, and efficient construction and Reduce damage.
Patent Information
- Application Number
- CN202411020555.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-12-06
AI Technical Summary
In metallurgical factory design, the energy medium pipeline support foundation is usually designed to be lagged behind, resulting in the need to be excavated twice during the construction process, causing damage.
Using the original gutter side wall as the support foundation, a reliable support foundation is formed by installing support, pad plate and transverse plate on the side wall of the gutter, and welding is carried out to install pipe corridor support and trusses to reduce the original water. Destruction of the ditch.
Improve construction efficiency, shorten construction cycle, and reduce damage to the original ditch.
Smart Images

Figure CN119083482A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of civil engineering, in particular to a pipe trench construction technology, and specifically to a pipe trench construction method which utilizes the original ditch side wall as a support foundation. Background Art
[0002] At present, the routes of drainage ditches and support foundations of energy medium pipelines in metallurgical plants are usually close to the roadside, but the support foundations of energy medium pipelines are often designed with a lag. Since the support foundations are usually buried deep, during the construction process, under normal circumstances, the ditch construction is carried out after the support foundation construction is completed; if the ditch construction is completed and then the pipe gallery support foundation is constructed, the original ditch will be damaged due to the secondary excavation. Summary of the invention
[0003] The purpose of the present invention is to overcome the above-mentioned defects and to provide a pipe trench construction method which utilizes the original ditch side wall as a support foundation.
[0004] In order to achieve the above object, the present invention is achieved in the following ways: A pipe trench construction method using the original ditch side wall as a support foundation, comprising: Step 1: Use an ink fountain to lay out the location where the pipe gallery support needs to be set above the ditch according to the drawing; mark the support location; Step 2: After the position is determined, place the pre-processed support horizontally on the upper surface of the ditch side wall; Step 3: Use a water drill to drill holes on the side wall of the ditch according to the hole positions of the supports; Step 4: After drilling, clean the hole inside; temporarily fix the support to the side wall of the ditch with bolts; then place a pad on both sides of the side wall, and finally tighten the nut with a wrench; at this point, the connection and installation of the support and the side wall of the ditch are completed; Step 5: After all the bolts on the supports on both sides of the ditch are installed and tightened, install the cross plate; Step 6: Use a level to measure the elevation of the top surface of the support. After confirming that the elevations at both ends of the support are consistent, install the cross plate; Step 7: Place the horizontal plate on the support and make fine adjustments to ensure the center line is correct before welding. Step 8: Use an electric welder to weld the bottom surface of the horizontal plate to the top surface of the support; now the support and the horizontal plate form a reliable whole; Step 9: After the horizontal plate and the support are welded and installed, install the bottom of the pipe gallery support Step 10: Repeat the above steps 2 to 9 to install other pipe gallery brackets; Step 10: After the installation of one section of the pipe gallery support is completed, the upper truss is installed; Step 11: After the truss is installed, start laying the pipes.
[0005] In the pipe trench construction method using the original ditch side wall as the support foundation, in step 3, if the ditch has not been poured, the net distance of the support is processed according to the ditch width minus the plate thickness, and when pouring concrete, component one is directly poured into the ditch side wall.
[0006] The above-mentioned trench construction method using the original ditch side wall as the support foundation, the side projection of the support is a rectangle with an open bottom, it is clamped on the ditch side wall through the bottom opening, holes are opened on the two side walls of the support, corresponding holes are opened on the ditch side wall, the support is connected to the ditch side wall by inserting bolts, nuts are set at both ends of the bolts to prevent the bolts from falling out; a platform is set on the top of the support, and the platform is used to place the cross plate.
[0007] In the above-mentioned pipe trench construction method using the original ditch side wall as the support foundation, the cross plate is a box-shaped component made of steel plates.
[0008] The construction method proposed by the present invention of using the original ditch side wall as the support foundation can effectively improve the construction efficiency and shorten the construction period compared with the conventional construction method of re-excavating the pipe gallery support foundation next to the original ditch; and reduce the damage to the original ditch base caused by the secondary excavation. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 This is a schematic diagram of the pipe trench construction method proposed by the present invention.
[0010] Figure 2 It is a structural schematic diagram of the support in the present invention.
[0011] Figure 3 It is a structural schematic diagram of the horizontal plate in the present invention. DETAILED DESCRIPTION
[0012] The technical solutions of the embodiments of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field without creative work based on the embodiments in the embodiments of the present application are within the scope of protection requested by the present application. Example
[0013] like Figure 1~Figure 3 A pipe trench construction method using the original ditch side wall as a support foundation, comprising: Step 1: Use an ink fountain to lay out the location where the pipe gallery support needs to be set above the ditch according to the drawing; mark the support location; Step 2: After the position is determined, the pre-processed support 1 is placed horizontally on the upper surface of the ditch side wall; Step 3: Use a water drill to drill holes on the side wall of the ditch according to the hole positions of the support 1; Step 4: After drilling, clean the hole inside; temporarily fix the support 1 to the side wall of the ditch with bolts 2; then place a pad on both sides of the side wall, and finally tighten the nut with a wrench; at this point, the connection and installation between the support 1 and the side wall of the ditch are completed; Step 5: After all the bolts 2 on the supports 1 on both sides of the ditch are installed and tightened, the cross plate 3 is installed; Step 6: Use a level to measure the elevation of the top surface of the support. After confirming that the elevations at both ends of the support are consistent, install the cross plate; Step 7: Place the horizontal plate on the support and make fine adjustments to ensure the center line is correct before welding. Step 8: Use an electric welder to weld the bottom surface of the horizontal plate to the top surface of the support; now the support and the horizontal plate form a reliable whole; Step 9: After the horizontal plate and the support are welded and installed, install the bottom of the pipe gallery support Step 10: Repeat the above steps 2 to 9 to install other pipe gallery brackets; Step 10: After the installation of one section of the pipe gallery support is completed, the upper truss is installed; Step 11: After the truss is installed, start laying the pipes.
[0014] In the pipe trench construction method using the original ditch side wall as the support foundation, in step 3, if the ditch has not been poured, the net distance of the support is processed according to the ditch width minus the plate thickness, and when pouring concrete, component one is directly poured into the ditch side wall.
[0015] The above-mentioned trench construction method using the original ditch side wall as the support foundation, the side projection of the support is a rectangle with an open bottom, it is clamped on the ditch side wall through the bottom opening, holes are opened on the two side walls of the support, corresponding holes are opened on the ditch side wall, the support is connected to the ditch side wall by inserting bolts, nuts are set at both ends of the bolts to prevent the bolts from falling out; a platform is set on the top of the support, and the platform is used to place the cross plate.
[0016] In actual construction, the support is assembled by welding two 1000mm*400mm*14mm steel plates (with a φ24mm hole on the steel plate) and one 1000mm*250mm*14mm steel plate.
[0017] In the above-mentioned pipe trench construction method using the original ditch side wall as the support foundation, the cross plate is a box-shaped component made of steel plates.
[0018] In actual construction, the cross plate is made of two 2300mm*1000mm*16mm steel plates as panels, with 120mm*16mm wide steel plates welded around them.
[0019] The construction method proposed by the present invention of using the original ditch side wall as the support foundation can effectively improve the construction efficiency and shorten the construction period compared with the conventional construction method of re-excavating the pipe gallery support foundation next to the original ditch; and reduce the damage to the original ditch base caused by the secondary excavation.
[0020] The above are only embodiments provided for the present application and are not intended to limit the present application. Although the present application is described in detail with reference to the embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. However, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A pipe trench construction method using the existing ditch sidewall as a support foundation, characterized by: include Step 1: Use an ink fountain to lay out the location where the pipe gallery support needs to be set above the ditch according to the drawing; mark the support location; Step 2: After the position is determined, place the pre-processed support horizontally on the upper surface of the ditch side wall; Step 3: Use a water drill to drill holes on the side wall of the ditch according to the hole positions of the supports; Step 4: After drilling, clean the inside of the hole; Temporarily fix the support to the side wall of the ditch with bolts; then place a pad on both sides of the inner and outer sides of the side wall, and finally tighten the nut with a wrench; at this point, the connection and installation of the support and the side wall of the ditch are completed; Step 5: After all the bolts on the supports on both sides of the ditch are installed and tightened, install the cross plate; Step 6: Use a level to measure the elevation of the top surface of the support. After confirming that the elevations at both ends of the support are consistent, install the cross plate; Step 7: Place the horizontal plate on the support and make fine adjustments to ensure the center line is correct before welding. Step 8: Use an electric welder to weld the bottom surface of the horizontal plate to the top surface of the support; now the support and the horizontal plate form a reliable whole; Step 9: After the horizontal plate and the support are welded and installed, install the bottom of the pipe gallery support Step 10: Repeat the above steps 2 to 9 to install other pipe gallery brackets; Step 10: After the installation of one section of the pipe gallery support is completed, the upper truss is installed; Step 11: After the truss is installed, start laying the pipes.
2. The method for constructing a pipe trench using the existing ditch sidewall as a support foundation according to claim 1, characterized in that: In step 3, if the ditch has not been poured, the net distance of the support is processed according to the ditch width minus the plate thickness. When pouring concrete, cast component one directly into the side wall of the ditch.
3. The method for constructing a pipe trench using the existing ditch sidewall as a support foundation according to claim 1 or 2, characterized in that: The side projection of the support is a rectangle with an open bottom. It is clamped on the side wall of the ditch through the opening at the bottom. Holes are opened on the two side walls of the support and corresponding holes are opened on the side wall of the ditch. The support is connected to the side wall of the ditch by inserting bolts, and nuts are set at both ends of the bolts to prevent the bolts from falling out.
4. The method for constructing a pipe trench using the existing ditch sidewall as a support foundation according to claim 3, characterized in that: A platform is arranged on the top of the support, and the platform is used for placing the cross board.
5. The method for constructing a pipe trench using the existing ditch sidewall as a support foundation according to claim 1 or 4, characterized in that: The cross plate is a box-shaped component made of steel plate.