Roof large-diameter drilling and deep hole blasting combined pre-pressure-relief method
Through the combination of pre-pressure relief method of large diameter drilling holes and deep hole blasting of the roof plate, combined with the key layer and rock-covered breaking angle theory, more blasting free surfaces are provided, solving the problem of unsatisfactory pre-cracking effect of the roof plate and achieving a more efficient roof plate Pre-pressure relief effect reduces mining risks.
Patent Information
- Application Number
- CN202411297873.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-12-06
AI Technical Summary
The existing deep hole blasting pressure relief method has poor effect on the top plate pre-cracking, resulting in insufficient release of the elastic performance of the top plate, and the risk of impact ground pressure, and the scope of application of the traditional method is limited.
The pre-relieving method of combining large-diameter drilling holes on the roof plate and deep hole blasting is adopted. By adding large-diameter drilling holes between the drilling holes, more blasting free surfaces are provided, combining the key layer theory, S-R instability theory and rock-covered breaking angle theory, Determine the drilling depth and angle, and adopt double detonator detonation technology to achieve more effective pre-relieving pressure.
The pre-pressure relief effect of the roof plate is improved, the total amount of explosives is reduced, the labor intensity of workers is reduced, and more effective through-break formation is achieved, which enhances the safety and efficiency of mining projects.
Smart Images

Figure CN119085433A_ABST
Abstract
Description
Technical Field
[0001] The invention discloses a pre-pressure relief method combining large-diameter roof drilling and deep-hole blasting, belonging to the technical field of rock burst prevention and control. Background Art
[0002] Active pressure relief and anti-bumping are key measures to strengthen the source control of rock burst in coal mines. In order to increase the cracks in the roof rock mass, destroy the integrity and continuity of the roof, and release the elastic energy stored in the roof, the roof needs to be pre-cracked by deep hole blasting to cut the top for pressure relief. At present, the existing deep hole blasting pressure relief method has problems such as poor penetration effect of adjacent hole cracks. The pre-crack operation time of the roof is long, which makes it difficult for the roof to produce the blasting cracks required by the design, so that the elastic energy release of the roof cannot meet the design requirements, and there is still a risk of rock burst. Practice has proved that there are large differences between the actual measured results of deep hole blasting and cutting the top in many coal mines and the results of the estimated method according to the "Measurement, Monitoring and Prevention of Rock Burst", and the applicability of the empirical formula is questionable. In summary, it is believed that the traditional pressure relief method that relies on single deep hole blasting and cutting the top is limited in scope of application. The method based on the key layer theory, SR instability theory and overburden fracture angle theory, combined with large diameter drilling to provide a blasting free surface, is more objective. Based on the above analysis, taking into account factors such as mining height, mining range, and mechanical properties of overburden, a pre-depressurization and emergency relief method using a combination of large-diameter roof drilling and deep-hole blasting is proposed. Summary of the invention
[0003] The purpose of the present invention is to provide a pre-decompression method combining large-diameter roof drilling and deep hole blasting, by adding large-diameter holes between blasting holes, more free surfaces are provided for deep blasting holes in rock formations, so as to solve the problem in the prior art that the effect of roof pre-splitting blasting is generally unsatisfactory.
[0004] A pre-decompression method combining large-diameter roof drilling and deep-hole blasting, comprising:
[0005] S1. Determine the key layer positions based on the borehole columnar diagram, overburden lithology, and old top load formula;
[0006] S2. Calculate the main key layer position based on the sliding and rotation deformation instability conditions of the key blocks of the masonry beam, determine the blasting height, repeat step S1, and determine all the key layers in the overlying rock formation;
[0007] S3. Calculate the overburden breaking angle by overburden breaking angle theory and Coulomb criterion, and determine the drilling angle;
[0008] S4. Determine the depth and angle of deep hole blasting drilling based on the calculation results of S2 and S3 and the working surface parameters;
[0009] S5. Determine the large-diameter drilling and deep-hole blasting technology for the roof.
[0010] S1 includes the load (q n )1 is:
[0011]
[0012] In the formula, E n is the elastic modulus of the nth rock layer, h n is the thickness of the nth rock layer, γ n is the volume force of the nth rock layer;
[0013] When (q i-1 )1>(q i )1, the i-th rock layer has no effect on the first layer load, and the i-th rock layer is the key layer 1.
[0014] S2 includes, assuming that key layer 1 is the main key layer, then the height of the separation space Δh1 below the key layer 1 is:
[0015] Δh1=m-(K Z -1)∑h1;
[0016] Where m is the height of the coal seam, K Z is the expansion coefficient of the collapsed rock layer, and its value is between 1.33 and 1.5. ∑h1 is the height from the top of the coal seam to the bottom of the key layer 1.
[0017] S2 includes, the SR instability theory sliding condition is:
[0018]
[0019] Where h is the thickness of the rock block, L is the length of the rock block, and a is the limit span of the key layer along the advancing direction of the working face. is the rock friction angle, The value is between 0.8 and 1.
[0020] S2 includes, the SR instability theory deformation condition is:
[0021]
[0022] Where Δh is the height of the separation space below the key layer, Δ is the maximum rotation height allowed for the masonry beam to rotate the rock block to maintain stability, and σ t is the tensile strength, K is the ratio of the rock block extrusion strength to the compressive strength, and its value is between and Between p is the compression strength between rock blocks, q is the unit area load borne by the rock blocks, and α is the intermediate parameter angle.
[0023] If key layer 1 satisfies both the sliding condition and the deformation condition of the SR instability theory, then key layer 1 is not the main key layer. Repeat step S2 until key layer i does not satisfy one of the conditions of the SR instability theory, then key layer i is the main key layer.
[0024] S3 includes the overburden fracture angle β:
[0025]
[0026] In the formula, The value is between 38° and 45°, L' is the span length of the rock beam, and h' is the height of the rock beam.
[0027] S4 includes determining the main key layer closest to the working face by S2, the blasting hole needs to reach the layer of the main key layer closest to the working face, and inferring the breaking angle of the main key layer closest to the working face by S3.
[0028] S5 includes, the method of large-diameter drilling and deep-hole blasting for decompression of the roof is that the diameter of the blasthole is 75mm. After the drilling is completed, large-diameter drilling is carried out at intervals of 2.5m, the hole diameter is 150mm, the spacing between adjacent holes is 2.5m, the spacing between blast holes is 5m, the diameter of the explosive is 65mm, and the charge of the blasthole is 3.3kg.
[0029] S5 includes: the depth of the blast hole is determined by the end hole position of S4, and the sealing hole length is not less than 1 / 3 of the blast hole depth;
[0030] The blast hole inclination is determined by the fracture angle of the S4 key layer. When the blast hole inclination is greater than 30°, anti-slip measures should be formulated;
[0031] Double detonators are used for detonation, and the detonator leads are connected in parallel within the hole and in series between holes.
[0032] Compared with the prior art, the present invention has the following beneficial effects: it reduces the total amount of explosives used for decompression, reduces the labor intensity of on-site workers, and the large-diameter boreholes between the blasting holes provide more free surfaces for the explosion of explosives, making it easier to form through cracks inside the pre-decompression rock formation, achieving the purpose of overall cutting, effectively improving the pre-decompression effect, and providing a scientific basis for the safe and efficient development of mining projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 The mine pressure model of the stope of the present invention refers to the simulation model diagram of similar materials;
[0034] Figure 2 It is the plan view of the blast hole;
[0035] Figure 3 This is a cross-section diagram of the blasting hole. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention is described clearly and completely below. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] A pre-decompression method combining large-diameter roof drilling and deep-hole blasting, comprising:
[0038] S1. Determine the key layer positions based on the borehole columnar diagram, overburden lithology, and old top load formula;
[0039] S2. Calculate the main key layer position by the sliding and rotation deformation instability conditions of the key blocks of the masonry beam, determine the blasting height, repeat step S1, determine all the key layers in the overlying rock formation, and refer to the simulation model of similar materials in the stope pressure model of the present invention. Figure 1 As shown;
[0040] S3. Calculate the overburden breaking angle by overburden breaking angle theory and Coulomb criterion, and determine the drilling angle;
[0041] S4. Based on the calculation results of S2 and S3, combined with the working surface parameters, determine the deep hole blasting drilling depth and angle. The blasting hole plane is as follows: Figure 2 The blast hole profile is shown in Figure 3 shown.
[0042] S5. Determine the large-diameter drilling and deep-hole blasting technology for the roof.
[0043] S1 includes the load (q n )1 is:
[0044]
[0045] In the formula, E n is the elastic modulus of the nth rock layer, h n is the thickness of the nth rock layer, γ n is the volume force of the nth rock layer;
[0046] When (q i-1 )1>(q i )1, the i-th rock layer has no effect on the first layer load, and the i-th rock layer is the key layer 1.
[0047] S2 includes, assuming that key layer 1 is the main key layer, then the height of the separation space Δh1 below the key layer 1 is:
[0048] Δh1=m-(K Z-1)∑h1;
[0049] Where m is the height of the coal seam, K Z is the expansion coefficient of the collapsed rock layer, and its value is between 1.33 and 1.5. ∑h1 is the height from the top of the coal seam to the bottom of the key layer 1.
[0050] S2 includes, the SR instability theory sliding condition is:
[0051]
[0052] Where h is the thickness of the rock block, L is the length of the rock block, and a is the limit span of the key layer along the advancing direction of the working face. is the rock friction angle, The value is between 0.8 and 1.
[0053] S2 includes, the SR instability theory deformation condition is:
[0054]
[0055] Where Δh is the height of the separation space below the key layer, Δ is the maximum rotation height allowed for the masonry beam to rotate the rock block to maintain stability, and σ t is the tensile strength, K is the ratio of the rock block extrusion strength to the compressive strength, and its value is between and Between p is the compression strength between rock blocks, q is the unit area load borne by the rock blocks, and α is the intermediate parameter angle.
[0056] If key layer 1 satisfies both the sliding condition and the deformation condition of the SR instability theory, then key layer 1 is not the main key layer. Repeat step S2 until key layer i does not satisfy one of the conditions of the SR instability theory, then key layer i is the main key layer.
[0057] S3 includes the overburden fracture angle β:
[0058]
[0059] In the formula, The value is between 38° and 45°, L' is the span length of the rock beam, and h' is the height of the rock beam.
[0060] S4 includes determining the main key layer closest to the working face by S2, the blasting hole needs to reach the layer of the main key layer closest to the working face, and inferring the breaking angle of the main key layer closest to the working face by S3.
[0061] S5 includes, the method of large-diameter drilling and deep-hole blasting for decompression of the roof is that the diameter of the blasthole is 75mm. After the drilling is completed, large-diameter drilling is carried out at intervals of 2.5m, the hole diameter is 150mm, the spacing between adjacent holes is 2.5m, the spacing between blast holes is 5m, the diameter of the explosive is 65mm, and the charge of the blasthole is 3.3kg.
[0062] S5 includes: the depth of the blast hole is determined by the end hole position of S4, and the sealing hole length is not less than 1 / 3 of the blast hole depth;
[0063] The blast hole inclination is determined by the fracture angle of the S4 key layer. When the blast hole inclination is greater than 30°, anti-slip measures should be formulated;
[0064] Double detonators are used for detonation, and the detonator leads are connected in parallel within the hole and in series between holes.
[0065] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some or all of the technical features may be replaced by equivalents, and these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for pre-decompression by combining large-diameter roof drilling and deep-hole blasting, characterized in that: include: S1. Determine the key layer positions based on the borehole columnar diagram, overburden lithology, and old top load formula; S2. Calculate the main key layer position based on the sliding and rotation deformation instability conditions of the key blocks of the masonry beam, determine the blasting height, repeat step S1, and determine all the key layers in the overlying rock formation; S3. Calculate the overburden breaking angle by overburden breaking angle theory and Coulomb criterion, and determine the drilling angle; S4. Determine the depth and angle of deep hole blasting drilling based on the calculation results of S2 and S3 and the working surface parameters; S5. Determine the large-diameter drilling and deep-hole blasting technology for the roof.
2. A method for pre-decompression by combining large-diameter roof drilling and deep-hole blasting according to claim 1, characterized in that: S1 includes the load (q n )1 is: In the formula, E n is the elastic modulus of the nth rock layer, h n is the thickness of the nth rock layer, γ n is the volume force of the nth rock layer; When (q i-1 )1>(q i )1, the i-th rock layer has no effect on the first layer load, and the i-th rock layer is the key layer 1.
3. A method for pre-decompression by combining large-diameter roof drilling and deep-hole blasting according to claim 2, characterized in that: S2 includes, assuming that key layer 1 is the main key layer, then the height of the separation space Δh1 below the key layer 1 is: Δh1=m-(K Z -1)∑h1; Where m is the height of the coal seam, K Z is the expansion coefficient of the collapsed rock layer, and its value is between 1.33 and 1.
5. ∑h1 is the height from the top of the coal seam to the bottom of the key layer 1.
4. A method for pre-decompression by combining large-diameter roof drilling and deep-hole blasting according to claim 3, characterized in that: S2 includes, the SR instability theory sliding condition is: Where h is the thickness of the rock block, L is the length of the rock block, and a is the limit span of the key layer along the advancing direction of the working face. is the rock friction angle, The value is between 0.8 and 1.
5. A method for pre-decompression by combining large-diameter roof drilling and deep-hole blasting according to claim 4, characterized in that: S2 includes, the SR instability theory deformation condition is: Where Δh is the height of the separation space below the key layer, Δ is the maximum rotation height allowed for the masonry beam to rotate the rock block to maintain stability, and σ t is the tensile strength, K is the ratio of the rock block extrusion strength to the compressive strength, and its value is between and Between p is the compression strength between rock blocks, q is the unit area load borne by the rock blocks, and α is the intermediate parameter angle.
6. A method for pre-decompression by combining large-diameter roof drilling and deep-hole blasting according to claim 4, characterized in that: If key layer 1 satisfies both the sliding condition and the deformation condition of the SR instability theory, then key layer 1 is not the main key layer. Repeat step S2 until key layer i does not satisfy one of the conditions of the SR instability theory, then key layer i is the main key layer.
7. A method for pre-decompression by combining large-diameter roof drilling and deep-hole blasting according to claim 6, characterized in that: S3 includes the overburden fracture angle β: In the formula, The value is between 38° and 45°, L' is the span length of the rock beam, and h' is the height of the rock beam.
8. A method for pre-decompression by combining large-diameter roof drilling and deep-hole blasting according to claim 7, characterized in that: S4 includes determining the main key layer closest to the working face by S2, the blasting hole needs to reach the layer of the main key layer closest to the working face, and inferring the breaking angle of the main key layer closest to the working face by S3.
9. A method for pre-decompression by combining large-diameter roof drilling and deep-hole blasting according to claim 8, characterized in that: S5 includes, the method of large-diameter drilling and deep-hole blasting for decompression of the roof is that the diameter of the blasthole is 75mm. After the drilling is completed, large-diameter drilling is carried out at intervals of 2.5m, the hole diameter is 150mm, the spacing between adjacent holes is 2.5m, the spacing between blast holes is 5m, the diameter of the explosive is 65mm, and the charge of the blasthole is 3.3kg.
10. A method for pre-decompression by combining large-diameter roof drilling and deep-hole blasting according to claim 9, characterized in that: S5 includes: the depth of the blast hole is determined by the end hole position of S4, and the sealing hole length is not less than 1 / 3 of the blast hole depth; The blast hole inclination is determined by the fracture angle of the S4 key layer. When the blast hole inclination is greater than 30°, anti-slip measures should be formulated; Double detonators are used for detonation, and the detonator leads are connected in parallel within the hole and in series between holes.