Electric power information processing method and device, nonvolatile storage medium and electronic equipment

By calculating the clutter disturbance deviation and information disturbance indicators in power information processing and adjusting the filtering intensity, the problem of clutter interference in power information is solved, the accuracy and reliability of power information is improved, and the stability of power information processing is enhanced .

CN119089117APending Publication Date: 2024-12-06STATE GRID BEIJING ELECTRIC POWER CO +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411237159.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The prior art is difficult to effectively deal with sudden and complex clutter interference in power information, resulting in poor accuracy of power information and affecting power supply quality and stability.

Method used

By collecting power information values ​​for the target station area at multiple time points, calculating the clutter disturbance deviation, determining the filtering key according to the deviation, adjusting the filtering intensity, and cutting the deviation queue using multiple cutting methods to generate sub-queues and calculate information The disturbance indicators and factors determine the filtering key, and finally obtain the filtering information value to improve the accuracy and reliability of power information.

Benefits of technology

Effectively suppress the impact of clutter disturbance on power information data, improve the accuracy and stability of power information processing, enhance the accuracy and reliability of data, and solve the problem of unsatisfactory power information accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119089117A_ABST
    Figure CN119089117A_ABST
Patent Text Reader

Abstract

The invention discloses an electric power information processing method and device, a nonvolatile storage medium and electronic equipment. The method comprises the following steps: acquiring electric power information values acquired by respectively acquiring a target transformer area at a plurality of time points; clutter disturbance deviations corresponding to the multiple time points are determined based on the difference values between the electric power information values corresponding to the multiple time points and a preset value; on the basis of the clutter disturbance deviations corresponding to the multiple time points, filtering criticality corresponding to the multiple time points is determined, and the filtering criticality is used for adjusting the filtering intensity of the corresponding time points on clutter disturbance; filtering the electric power information values respectively collected at the plurality of time points by adopting the filtering criticality respectively corresponding to the plurality of time points to obtain filtering information values corresponding to the plurality of time points; and on the basis of the filtering information values corresponding to the multiple time points, obtaining transformer area power information of the target transformer area. The technical problem that the accuracy of electric power information is not ideal in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power information processing, and in particular to a power information processing method, device, non-volatile storage medium and electronic device. Background Art

[0002] The purpose of collecting power information in the substation is to provide data support for the operation and maintenance of the power system. As the basic unit of the power network, the operation status of the substation directly affects the stability and efficiency of the entire power system. By collecting power information in the substation, such as voltage, current, power factor, load curve, etc., the power supply and demand in the substation can be monitored in real time, potential problems can be discovered in time, faults can be prevented, and power supply reliability and user satisfaction can be improved.

[0003] The noise in power information (such as electromagnetic interference, signal noise, etc.) will seriously affect the accuracy and reliability of data. For example, noise interferes with normal power signals, causing the collected data to deviate from the true value, affecting the analysis results, and affecting the quality and stability of power supply. The type and intensity of noise may change with time and environmental changes. At present, related technologies often have difficulty in effectively dealing with sudden and complex noise interference, and there is a problem that the accuracy of power information is reduced due to interference.

[0004] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention

[0005] The embodiments of the present invention provide a method and device for processing power information, a non-volatile storage medium and an electronic device, so as to at least solve the technical problem of unsatisfactory accuracy of power information in the related art.

[0006] According to one aspect of an embodiment of the present invention, a method for processing electric power information is provided, comprising: obtaining electric power information values ​​collected from a target substation at multiple time points, wherein the target substation is a power supply area affected by a target transformer; determining the clutter disturbance deviations corresponding to the multiple time points based on the differences between the electric power information values ​​corresponding to the multiple time points and a predetermined value, wherein the predetermined value is an electric power information value determined at the corresponding time point based on a predetermined power distribution plan; determining the filtering criticality corresponding to the multiple time points based on the clutter disturbance deviations corresponding to the multiple time points, wherein the filtering criticality is used to adjust the filtering strength of the clutter disturbance at the corresponding time point; filtering the electric power information values ​​collected at the multiple time points using the filtering criticality corresponding to the multiple time points to obtain the filtering information values ​​corresponding to the multiple time points; obtaining the substation electric power information of the target substation based on the filtering information values ​​corresponding to the multiple time points.

[0007] Optionally, determining the filtering criticalities corresponding to the multiple time points respectively based on the noise disturbance deviations respectively corresponding to the multiple time points includes: generating a deviation queue based on the noise disturbance deviations respectively corresponding to the multiple time points; cutting the deviation queue to obtain multiple sub-queues, wherein the multiple sub-queues respectively include a predetermined number of time points, and the predetermined number is the number of time points included in the sub-queue determined based on a cutting method that is least affected by the disturbance; determining an information disturbance index corresponding to each time point in the multiple sub-queues, wherein the information disturbance index represents the intensity of the noise disturbance effect at the corresponding time point; determining the filtering criticalities corresponding to the multiple time points respectively based on the information disturbance index corresponding to each time point in the multiple sub-queues.

[0008] Optionally, determining the information disturbance index corresponding to each time point in the multiple subqueues includes: for a target subqueue among the multiple subqueues, based on the power information value and the noise disturbance deviation corresponding to each time point in the target subqueue, and the power information value and the noise disturbance deviation corresponding to other time points, determining the information disturbance index corresponding to each time point, wherein the other time points are time points in the target subqueue other than each time point; and determining the information disturbance index corresponding to each time point in the multiple subqueues respectively by determining the information disturbance index corresponding to each time point in the target subqueue.

[0009] Optionally, the method also includes: using multiple cutting methods to cut the deviation queue to obtain candidate sub-queue combinations corresponding to the multiple cutting methods, wherein the number of time points obtained by the multiple cutting methods is different; based on the candidate sub-queue combinations corresponding to the multiple cutting methods, determining the information disturbance factors corresponding to the multiple cutting methods, wherein the information disturbance factor represents the intensity of the noise disturbance effect of the candidate sub-queue combination under the corresponding cutting method; among the multiple cutting methods, determining a target method with the smallest information disturbance factor; based on the target method, determining the predetermined number.

[0010] Optionally, determining the filtering criticalities corresponding to the multiple time points respectively based on the information disturbance index corresponding to each time point in the multiple subqueues includes: for a target subqueue among the multiple subqueues, determining the maximum indicator of the target subqueue based on the information disturbance index corresponding to each time point in the target subqueue; determining the difference between the maximum indicator and the information disturbance index corresponding to each time point; determining the filtering criticality corresponding to each time point based on the ratio of the difference to the maximum indicator; and determining the filtering criticalities corresponding to the multiple time points respectively by adopting a method of determining the filtering criticality corresponding to each time point in the target subqueue.

[0011] Optionally, the filtering criticalities corresponding to the multiple time points are used to filter the power information values ​​collected at the multiple time points to obtain the filtering information values ​​corresponding to the multiple time points, including: determining the product values ​​of the filtering criticalities and the power information values ​​corresponding to the multiple time points; for a target time point among the multiple time points, determining the product values ​​corresponding to a predetermined number of time points after the target time point; determining the filtering information value corresponding to the target time point based on the product value corresponding to the target time point, the product values ​​corresponding to the predetermined number of time points, and the predetermined number; and obtaining the filtering information values ​​corresponding to the multiple time points by determining the filtering information value corresponding to the target time point.

[0012] Optionally, the power information value includes one of the following: a primary side voltage value, a primary side current value, a secondary side voltage value, and a secondary side current value.

[0013] According to another aspect of an embodiment of the present invention, there is provided an electric power information processing device, comprising: a collection module, for acquiring electric power information values ​​collected from a target substation at multiple time points, wherein the target substation is a power supply area affected by a target transformer; a disturbance deviation determination module, for determining the clutter disturbance deviations corresponding to the multiple time points based on the difference between the electric power information values ​​corresponding to the multiple time points and a predetermined value, wherein the predetermined value is an electric power information value determined at the corresponding time point based on a predetermined power distribution plan; a filtering determination module, for determining the filtering criticality corresponding to the multiple time points based on the clutter disturbance deviations corresponding to the multiple time points, wherein the filtering criticality is used to adjust the filtering strength of the clutter disturbance at the corresponding time point; a filtering execution module, for filtering the electric power information values ​​collected at the multiple time points using the filtering criticality corresponding to the multiple time points, to obtain the filtering information values ​​corresponding to the multiple time points; and a power information generation module, for obtaining the substation electric power information of the target substation based on the filtering information values ​​corresponding to the multiple time points.

[0014] According to another aspect of an embodiment of the present invention, a non-volatile storage medium is provided, wherein the non-volatile storage medium stores a plurality of instructions, wherein the instructions are suitable for being loaded by a processor and executing any one of the power information processing methods.

[0015] According to another aspect of an embodiment of the present invention, an electronic device is provided, comprising: one or more processors and a memory, wherein the memory is used to store one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement any one of the power information processing methods described.

[0016] In an embodiment of the present invention, the power information values ​​collected from the target substation at multiple time points are obtained, wherein the target substation is the power supply area affected by the target transformer; based on the difference between the power information values ​​corresponding to the multiple time points and the predetermined value, the clutter disturbance deviations corresponding to the multiple time points are determined, wherein the predetermined value is the power information value determined at the corresponding time point based on the predetermined power distribution plan; based on the clutter disturbance deviations corresponding to the multiple time points, the filtering criticality corresponding to the multiple time points is determined, wherein the filtering criticality is used to adjust the filtering strength of the clutter disturbance at the corresponding time point; the power information values ​​collected at the multiple time points are filtered using the filtering criticality corresponding to the multiple time points to obtain the filtering information values ​​corresponding to the multiple time points; based on the filtering information values ​​corresponding to the multiple time points, the substation power information of the target substation is obtained. The purpose of improving the accuracy and reliability of power information collection is achieved, the technical effect of effectively suppressing the influence of clutter disturbance on power information data and enhancing the accuracy and stability of power information processing is achieved, thereby solving the technical problem of unsatisfactory power information accuracy in the related technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0018] Figure 1 is a flow chart of an optional power information processing method provided according to an embodiment of the present invention;

[0019] Figure 2 is a principle block diagram of an optional power information processing method provided according to an embodiment of the present invention;

[0020] Figure 3 is a schematic flow chart of an optional power information processing method provided according to an embodiment of the present invention;

[0021] Figure 4 is a schematic diagram of an optional power information processing device provided according to an embodiment of the present invention. DETAILED DESCRIPTION

[0022] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0023] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0024] The distribution network refers to the power grid that receives electric energy from the transmission network or regional power plants and distributes it locally or step by step according to voltage to various users through distribution facilities. It is composed of overhead lines, cables, towers, distribution transformers, disconnectors, reactive power compensators and some ancillary facilities, and plays an important role in distributing electric energy in the power grid.

[0025] As for the power information of the distribution network, the technical solution currently adopted by the relevant technology is to rely on the communication between the substation power information processing terminal and the monitoring server, and the monitoring server is used to store the substation power information transmitted by the substation power information processing terminal.

[0026] During the period when the substation power information processing terminal collects and transmits the substation power information, due to special circumstances, the accuracy of the power information is often accompanied by sudden noise, which has a significant negative impact. At present, there is no research on the negative impact of sudden noise on the accuracy of substation power information in different time intervals.

[0027] In response to the above problems, according to an embodiment of the present invention, a method embodiment of power information processing is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although the logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0028] Figure 1 is a flow chart of an optional power information processing method according to an embodiment of the present invention, such as Figure 1 As shown, the method comprises the following steps:

[0029] Step S102, obtaining power information values ​​collected from target areas at multiple time points, wherein the target area is a power supply area affected by a target transformer;

[0030] It can be understood that at multiple different time points (also referred to as time points), the power information of the target area (i.e., the area powered by a specific transformer) is collected to obtain the power information value at each time point. The power information value may include key parameters such as voltage, current, and power. The above power information can be collected and transmitted by the power information processing terminal in the area.

[0031] In an optional embodiment, the power information value includes one of the following: a primary side voltage value, a primary side current value, a secondary side voltage value, and a secondary side current value.

[0032] It can be understood that the power information of the substation includes the voltage information or current information of the primary and secondary sides of the substation transformer in the distribution network. The voltage and current values ​​on the primary side (high voltage side) and the secondary side (low voltage side) are key parameters reflecting the operating status of the substation transformer and its power supply area. By monitoring these values ​​at the same time, we can fully and accurately understand the key information such as the power supply and demand situation, load changes, and transformer operating efficiency of the substation at different time points.

[0033] Step S104, determining the clutter disturbance deviations corresponding to the multiple time points respectively based on the differences between the power information values ​​corresponding to the multiple time points respectively and the predetermined value, wherein the predetermined value is the power information value determined at the corresponding time point based on the predetermined power distribution plan;

[0034] It can be understood that the power information value collected at each time point is compared with the predetermined value at the corresponding time point determined based on the predetermined power distribution plan. By calculating the difference between the two, the clutter disturbance deviation at each time point is determined. The clutter disturbance deviation reflects the degree of deviation between the actual collected value and the theoretical value, which is mainly caused by interference factors such as clutter.

[0035] Optionally, each area of ​​the distribution network has a corresponding distribution plan during the distribution period, and the distribution of the distribution network operates according to the distribution plan. The distribution plan also has power information for each time point of the distribution plan. In the distribution of the distribution network, the difference in power information obtained lies in the permitted scope of the corresponding power information at each time point of the distribution plan. The corresponding power information value at each time point of the distribution network area is defined as Ul, and the area power information value collected and transmitted by the area power information processing terminal is registered in the order of time points, and is defined as an area power information queue, defined as Ue={ue1, ue2, ..., ue p},ue1,ue2,ue p They respectively represent the substation power information values ​​collected and transmitted by the substation power information processing terminal at the 1st time point, the 2nd time point, and the pth time point.

[0036] Optionally, based on the substation power information value collected and transmitted by the substation power information processing terminal, the burst noise disturbance deviation of the power information value at each time point is obtained (i.e., collected), and the information burst noise disturbance deviation queue (i.e., deviation queue) is obtained. Based on the burst noise disturbance deviation, the lowest information burst disturbance effect area at each time point is obtained. The above-mentioned area refers to the data area, not the actual physical area.

[0037] The power information value has some differences (i.e., the noise disturbance deviation) from the power information (i.e., the predetermined value) at each time point of the power distribution plan of the corresponding power distribution network. Therefore, by comparing the power information value and the corresponding predetermined value at different time points, the noise disturbance deviation is calculated and used as the sudden environment noise disturbance identification information. It can be expressed in the following data forms, including:

[0038] Pt j =ue j -Ul

[0039] Among them, Pt j represents the sudden noise disturbance deviation (i.e., noise disturbance deviation) of the power information in the substation at the jth time point, ue j It represents the power information value of the substation (ie, the power information value) collected and transmitted by the power information processing terminal of the substation at the jth time point, and Ul represents the power information of the distribution plan of the distribution network at the corresponding time point (ie, the predetermined value).

[0040] Through the above mathematical expression, the sudden disturbance deviation of the substation power information can be calculated. The higher the difference between the substation power information value collected and transmitted by the substation power information processing terminal at the jth time point and the power information at the corresponding time point of the distribution plan of the distribution network (i.e., the noise disturbance deviation) is, the stronger the sudden noise disturbance is during the period when the power information processing terminal collects and transmits the substation power information value at that time point, and the amount of sudden noise disturbance deviation obtained by this calculation is also correspondingly not low.

[0041] Step S106, determining the filtering criticality corresponding to the multiple time points respectively based on the clutter disturbance deviations corresponding to the multiple time points respectively, wherein the filtering criticality is used to adjust the filtering strength of the clutter disturbance at the corresponding time points;

[0042] It can be understood that, based on the determined clutter disturbance deviation, a filtering criticality is assigned to each time point. This filtering criticality is used to guide the subsequent filtering process of the power information value, that is, to adjust the filtering intensity of the clutter disturbance at the corresponding time point according to the size of the deviation. The larger the deviation, the greater the filtering intensity.

[0043] Optionally, the sudden noise disturbance deviation of the power information of the substation obtained by calculation is arranged according to the order of corresponding time points, so as to obtain an information sudden noise disturbance deviation queue (ie deviation queue).

[0044] In an optional embodiment, based on the noise disturbance deviations corresponding to the multiple time points, respectively, the filtering criticalities corresponding to the multiple time points are determined, including: generating a deviation queue based on the noise disturbance deviations corresponding to the multiple time points; cutting the deviation queue to obtain multiple sub-queues, wherein the multiple sub-queues respectively include a predetermined number of time points, and the predetermined number is the number of time points included in the sub-queue determined based on a cutting method that is least affected by the disturbance; determining an information disturbance index corresponding to each time point in the multiple sub-queues, wherein the information disturbance index represents the intensity of the noise disturbance effect at the corresponding time point; determining the filtering criticalities corresponding to the multiple time points based on the information disturbance index corresponding to each time point in the multiple sub-queues.

[0045] It can be understood that based on the clutter disturbance deviations corresponding to multiple time points, the clutter disturbance deviations are arranged in chronological order to generate a deviation queue, which reflects the degree to which the power information is affected by clutter disturbances at different time points. The generated deviation queue is cut and divided into multiple sub-queues. Each sub-queue contains a predetermined number of time points, which is determined by analysis. The cutting method makes the time points in the sub-queue as little affected by clutter disturbances as possible, which helps to group time points with similar disturbance characteristics into a group for subsequent processing. For each time point in the sub-queue, the corresponding information disturbance index is calculated to quantify the intensity of the clutter disturbance at the time point, reflecting the degree of interference of the power information at the time point. Based on the information disturbance index corresponding to each time point, the filtering criticality corresponding to the multiple time points is determined, which is used to adjust the filtering intensity of the corresponding time point to the clutter disturbance in the subsequent data filtering process. The higher the information disturbance index of the time point, the higher the filtering criticality, which means that the power information value at the time point needs to be more strongly denoised during the filtering process.

[0046] During the period when the power information processing terminal in the substation collects and transmits the power information value of the substation, it is often accompanied by sudden disturbances in the environment. Such sudden disturbances have a negative impact on the accuracy of the power information value at different time points, and as the time point changes, the negative effects at different time points are different. Therefore, in order to obtain the difference in the negative impact of sudden disturbances on the power information in the substation, it is necessary to start with obtaining the area with the lowest impact of sudden disturbances.

[0047] In an optional embodiment, determining an information disturbance index corresponding to each time point in a plurality of subqueues includes: for a target subqueue among the plurality of subqueues, based on the power information value and the noise disturbance deviation corresponding to each time point in the target subqueue, and the power information value and the noise disturbance deviation corresponding to other time points, determining the information disturbance index corresponding to each time point, wherein the other time points are time points other than each time point in the target subqueue; and determining the information disturbance index corresponding to each time point in the plurality of subqueues respectively by determining the information disturbance index corresponding to each time point in the target subqueue.

[0048] It can be understood that one is selected from multiple subqueues as a target subqueue for processing, and each subqueue contains a set of time points with a predetermined number, and the power information value corresponding to the time point. For each time point in the target subqueue, not only the power information value and the noise disturbance deviation corresponding to the time point are considered, but also the power information values ​​and the noise disturbance deviation corresponding to other time points in the subqueue (that is, all time points except the current time point) are considered at the same time. By comprehensively calculating the information disturbance index corresponding to the current time point, the intensity and characteristics of the influence of the noise disturbance on the time point are reflected. In the same way as above, each subqueue in the multiple subqueues is processed to determine the information disturbance index corresponding to each time point inside it. In this way, the information disturbance index corresponding to all time points can be obtained.

[0049] Optionally, the method for obtaining the information disturbance index may adopt the following method, for example: calculating the disturbance effect of the sudden clutter on the power information of the substation at different times, starting from the area with the lowest effect of the sudden disturbance of the information (that is, obtaining the target mode of the predetermined number, and the queue area determined according to the target mode), the substation power information queue is evenly cut into different segments (that is, sub-queues), and the number of elements in each segment (that is, the power information corresponding to the time point) is h zd , expressed in the following way:

[0050]

[0051] Where e represents the Euler number, n zd represents the number of elements in the area with the lowest impact of information burst disturbance (i.e., the predetermined number, indicating the number of time points in the sub-queue cut out in the target mode), ue j represents the power information of the substation at the jth time point (i.e., the power information value), Pt j represents the sudden clutter disturbance deviation at the jth time point (i.e., clutter disturbance deviation), EGU() represents the Haar wavelet transform algorithm, and EGU(ue j ) and EGU(Pt j ) represent the frequencies obtained by executing the Haar wavelet transform algorithm on the deviation value of the power information of the substation area and the sudden clutter disturbance at the jth time point, s j Represents the information disturbance index at time point j.

[0052] The above equation can be used to calculate the amount of information disturbance index at time point j. When the deviation value of the power information in the substation and the sudden clutter disturbance at time point j is very close to the frequency obtained after executing the Haar wavelet transform algorithm in an area with the lowest effect of information sudden disturbance, the amount of information disturbance index calculated should be very high, which means that the stronger the clutter disturbance on the power information in the substation at the current time point, the higher the deviation of the power information in the substation at the current time point.

[0053] In an optional embodiment, the method further includes: using multiple cutting methods to cut the deviation queue to obtain candidate sub-queue combinations corresponding to the multiple cutting methods, wherein the number of time points obtained by the multiple cutting methods is different; based on the candidate sub-queue combinations corresponding to the multiple cutting methods, determining the information disturbance factors corresponding to the multiple cutting methods, wherein the information disturbance factor represents the intensity of the noise disturbance effect of the candidate sub-queue combination under the corresponding cutting method; among the multiple cutting methods, determining the target method with the smallest information disturbance factor; and determining the predetermined number based on the target method.

[0054] It can be understood that a variety of different cutting methods are used to cut the deviation queue. The main difference between different cutting methods is that the number of time points in each obtained subqueue is different (that is, the number of elements is different). In this way, a variety of candidate subqueue combinations can be generated, each of which represents a different time point grouping method (that is, the number of elements in the subqueue is different). For each candidate subqueue combination corresponding to each cutting method, its information disturbance factor is calculated. The information disturbance factor is a quantitative indicator used to indicate the intensity of the clutter disturbance effect on the candidate subqueue combination as a whole under the cutting method, and comprehensively considers the power information value and clutter disturbance deviation at all time points in the subqueue, as well as the interaction between them. By comparing the information disturbance factors of each of the multiple cutting methods, the cutting method with the smallest information disturbance factor is determined as the target method. The target method represents the best cutting method that can minimize the impact of clutter disturbance under the current data conditions. Based on the target method, the predetermined number, that is, the number of time points to be included in each subqueue, is determined to obtain the predetermined number, and the above predetermined number will be used for subsequent subqueue cutting and data processing. Through the above processing, data distortion and errors caused by improper cutting can be reduced, which helps to improve the quality of power information data and provide a more accurate and reliable basis for subsequent data analysis and decision-making.

[0055] Optionally, the initial setting amount of the cutting method is h0=7, and the source information burst clutter disturbance deviation queue (ie, deviation queue) is cut into different sub-queue areas (ie, sub-queues in the candidate sub-queue combination) according to the initial setting amount.

[0056] If the number of elements in the subqueue area is insufficient, interpolation is performed to ensure that the number of elements in each subqueue area reaches the initially set number of elements.

[0057] Calculate the average of the elements in each different sub-queue area, and take the sub-queue area with the lowest average as the starting area. The method of cutting into different sub-queue area segments is to cut the source information burst clutter disturbance deviation queue into several segments, and the number of elements in each segment is the initial setting (that is, the number of time points is h0=7), and each segment is each sub-queue area.

[0058] The information perturbation factor is calculated using the following equation:

[0059]

[0060] in, Represents the standard deviation of all elements in the subqueue area where the number of elements after the i-th cut is h, Represents that the number of elements after the i-th cut is h i The KL divergence of all elements in the subqueue area, It means that the number of elements not in the i-th cut is h i The number of elements formed by the additional elements in the subqueue area is l i The standard deviation of all elements, I li It means that the number of elements not in the i-th cut is h i The number of elements formed by the additional elements in the subqueue area is l i The KL divergence of all elements of Represents a pair of intra-region message queues The Euclidean metric of Represents that the number of elements after the i-th cut is h i The information deviation subqueue formed by all elements in the subqueue area, Represents that the number of elements after the i-th cut is l i The deviation queue to be cut is formed by all elements in the subqueue area. Represents the information disturbance factor after the i-th region cutting.

[0061] The above equation can be used to calculate the information disturbance factor after the i-th region cutting. The number of elements after cutting is h iThe lower the difference between the deviation values ​​of the overall sudden noise disturbance, the more stable the overall situation, then the standard deviation and KL divergence obtained in the calculated sub-queue area are lower, and the sudden noise disturbance suffered by the power information in the substation outside the area is very strong, then the higher the standard deviation and KL divergence obtained by the calculation, the higher the Euclidean measure of the information queue in the synchronized sub-queue area and the queue outside the sub-queue area, and the information disturbance factor obtained by the calculation will also be correspondingly lower, which means that the current sub-queue area is the area with the lowest impact of sudden noise disturbance.

[0062] In order to ensure the accuracy of the cutting and calculation of the minimum effect area of ​​information burst disturbance, the information disturbance configuration jump variable ζ = 1 is taken, and the number of elements in the sub-queue area after the i-th cutting is h i +i*ξ, continue to expand the number of elements in the sub-queue area until it is the same as the number of elements p in the information burst clutter disturbance deviation queue, that is, the total number at all time points.

[0063] For all subqueue regions with the same number of elements, the information disturbance factor can be calculated and the region with the lowest information disturbance factor is defined as the region with the lowest effect of information burst disturbance, and the number of elements in the region with the lowest effect of information burst disturbance is h zd (i.e. the predetermined number).

[0064] In an optional embodiment, based on the information disturbance index corresponding to each time point in multiple subqueues, the filtering criticalities corresponding to multiple time points are determined, including: for a target subqueue among the multiple subqueues, based on the information disturbance index corresponding to each time point in the target subqueue, determining the maximum indicator of the target subqueue; determining the difference between the maximum indicator and the information disturbance index corresponding to each time point; determining the filtering criticality corresponding to each time point based on the ratio of the difference to the maximum indicator; and determining the filtering criticalities corresponding to multiple time points by determining the filtering criticality corresponding to each time point in the target subqueue.

[0065] It can be understood that in the target sub-queue, based on the information disturbance index corresponding to each time point, the highest amount of the index in the sub-queue is identified, which refers to the maximum value of the information disturbance index in all time points of the sub-queue. The highest amount of the index is calculated, and the difference between the information disturbance index corresponding to each time point reflects the degree of deviation of the information disturbance degree at each time point relative to the strongest disturbance point in the sub-queue. Using the ratio between the difference calculated above and the highest amount of the index (i.e., the difference divided by the highest amount of the index), a filtering criticality is assigned to each time point, reflecting the importance of the information disturbance at the time point relative to the overall disturbance level of the sub-queue. The higher the ratio, the higher the information disturbance at the time point may not be the largest, but it is closer to the maximum disturbance, so more emphasis may need to be given when filtering. By assigning filtering criticality to each time point, it is possible to more accurately identify which time points have the most significant or most concerning data disturbances, so that these key points can be prioritized during data filtering, cleaning or analysis, improving the efficiency and accuracy of the overall processing. By effectively filtering out or reducing the impact of time points with greater information disturbance, the overall quality of the data set can be further improved, providing a reliable data foundation for subsequent data analysis.

[0066] Step S108, using the filtering criticalities corresponding to the multiple time points, respectively, to filter the power information values ​​collected at the multiple time points, to obtain the filtering information values ​​corresponding to the multiple time points;

[0067] It can be understood that the power information value collected at each time point is filtered by using the filtering criticality. By reducing or eliminating the clutter components, a purer and more accurate filtering information value is obtained. By introducing the calculation of clutter disturbance deviation and the determination of filtering criticality, the interference factors in the power information collection process can be reduced or eliminated in a targeted manner, thereby significantly improving the accuracy and reliability of the data.

[0068] In an optional embodiment, filter criticalities corresponding to multiple time points are used to filter power information values ​​collected at multiple time points to obtain filter information values ​​corresponding to multiple time points, including: determining the product values ​​of the filter criticalities and power information values ​​corresponding to the multiple time points; for a target time point among the multiple time points, determining the product values ​​corresponding to a predetermined number of time points after the target time point; determining the filter information value corresponding to the target time point based on the product value corresponding to the target time point, the product values ​​corresponding to the predetermined number of time points, and the predetermined number; obtaining the filter information values ​​corresponding to the multiple time points by determining the filter information value corresponding to the target time point.

[0069] It can be understood that for each time point, the product value of the corresponding filter criticality and the power information value collected at the time point is calculated, and the influence of the power information value is adjusted according to the importance of each time point (represented by the filter criticality). For each target time point, the product value corresponding to the predetermined number of time points (such as T) after the time point is calculated and determined. Consider the change trend or stability of the power information within a period of time after the target time point, so as to more accurately evaluate the power information value at the target time point. Based on the product value of the target time point itself, the product value of the predetermined number of time points thereafter, and this predetermined number, the filter information value corresponding to the target time point is obtained to reflect the degree of influence of different time points on the information value of the target time point. Using the above method for determining the filter information value of the target time point, each time point is processed in the same way, so as to obtain the filter information values ​​corresponding to all time points. By considering the filter criticality of each time point and the change trend of the power information within a period of time thereafter, the actual state of the power system can be more accurately reflected, and the error caused by abnormal or fluctuating data at a single time point can be reduced. Using information from multiple time points to filter and calculate the filtered information value at the target time point can effectively smooth data fluctuations and improve data stability and reliability.

[0070] Optionally, because the disturbance effect of sudden disturbance clutter on the power information of the substation has a different amount (i.e., clutter disturbance deviation) at different time points, the number of elements T (i.e., the predetermined number) for filtering defined in advance is taken as the number of elements in the area with the lowest effect of the information sudden disturbance, and the verification and filtering algorithm is executed on the source substation power information (i.e., the substation power information value collected and transmitted by the substation power information processing terminal), and the specific algorithm is the following equation:

[0071]

[0072] Among them, ZGs j represents the highest value of T information disturbance indicators starting from the element at time point j (i.e., the highest value of the indicator), ψ j represents the criticality of disturbance filtering of power information in the substation at that time, ul j Represents the filtered information at time point j.

[0073] To obtain the filtered information at different time points, it is necessary to move backward a span of one time point respectively, and calculate the filtered information at all different time points. For the elements at the time points where the sudden noise disturbance is very strong, the disturbance filtering criticality is not high, and the efficiency of the filtered information calculation is not high; therefore, the filtered information at different time points can be calculated through the above equation, and the filtered information queue is arranged in the order of time points to achieve the filtering of the power information in the substation.

[0074] Step S110, obtaining the substation power information of the target substation based on the filtering information values ​​corresponding to the multiple time points.

[0075] It can be understood that the filter information values ​​at multiple time points are integrated to obtain the overall power information of the target substation. The processed power information of the substation is not only more accurate and reliable, but also provides strong data support for the operation and management of the power system. By assigning different filter criticalities to each time point and filtering the power information values ​​according to these criticalities, the impact of clutter disturbances on the data can be effectively suppressed, ensuring that the final power information is purer and more accurate.

[0076] Through the above step S102, the power information values ​​collected from the target substation at multiple time points are obtained, wherein the target substation is the power supply area affected by the target transformer; step S104, based on the difference between the power information values ​​corresponding to the multiple time points and the predetermined value, the clutter disturbance deviation corresponding to the multiple time points is determined, wherein the predetermined value is the power information value determined based on the predetermined power distribution plan at the corresponding time point; step S106, based on the clutter disturbance deviation corresponding to the multiple time points, the filtering criticality corresponding to the multiple time points is determined, wherein the filtering criticality is used to adjust the filtering strength of the clutter disturbance at the corresponding time point; step S108, using the filtering criticality corresponding to the multiple time points, the power information values ​​collected at the multiple time points are filtered to obtain the filtering information values ​​corresponding to the multiple time points; step S110, based on the filtering information values ​​corresponding to the multiple time points, the substation power information of the target substation is obtained. The purpose of improving the accuracy and reliability of power information collection is achieved, and the influence of clutter disturbance on power information data is effectively suppressed, thereby solving the technical problem of unsatisfactory power information accuracy in the related technology.

[0077] Based on the above embodiments and optional embodiments, the present invention proposes an optional implementation mode: Figure 2 is a principle block diagram of an optional power information processing method provided according to an embodiment of the present invention, such as Figure 2 As shown, the substation power information processing terminal is connected to the monitoring server in communication, and the monitoring server is used to check the substation power information transmitted by the substation power information processing terminal of the distribution network, and then store the checked substation power information. The modules running on the monitoring server include: acquisition module 1, acquisition module 2, calculation module, and filtering module.

[0078] Figure 3 is a schematic flow chart of an optional power information processing method provided according to an embodiment of the present invention, such as Figure 3 The process shown can be executed in the following ways:

[0079] The first acquisition module is used to execute step S1 to acquire the power information value of the area collected and transmitted by the area power information processing terminal;

[0080] The second acquisition module is used to execute step S2, based on the power information value of the area collected and transmitted by the area power information processing terminal, obtain the sudden clutter disturbance deviation of the area power information at each time point, and the information sudden clutter disturbance deviation queue, and obtain the minimum effect area of ​​the information sudden disturbance at each time point according to the sudden clutter disturbance deviation;

[0081] A calculation module, which is used to execute step S3, calculate the information disturbance index at each time point according to the lowest effect area of ​​the information sudden disturbance, and calculate the disturbance filtering criticality of the power information of the substation at each time point according to the information disturbance index;

[0082] The filtering module is used to execute step S4, obtain the filtered information at each time point according to the criticality of the power information disturbance filtering in the substation, and obtain the filtered information queue according to the filtered information to achieve the filtering and processing of the power information in the substation. The filtered information queue forms the verified power information in the substation.

[0083] The above optional implementation method at least achieves the following effects: based on the power information value of the substation area collected and transmitted by the power information processing terminal of the substation area, the power information burst clutter disturbance deviation at each time point is first identified and calculated, and then the information burst clutter disturbance deviation queue is constructed. Subsequently, these deviation data are used to determine the lowest action area of ​​the information burst disturbance at each time point. On this basis, the disturbance clutter deviation encountered by the substation power information processing terminal in the process of collecting and transmitting power information is preliminarily quantitatively analyzed and expressed. By further analyzing the sudden environment clutter disturbance deviation queue, the lowest action area of ​​the information burst disturbance is accurately delineated, and the information disturbance index is calculated accordingly. Using these information disturbance indicators, the different clutter disturbance action conditions encountered by the substation power information processing terminal in the process of collecting and transmitting power information can be deeply analyzed, and the substation power information can be filtered accordingly. This process fully considers the influence of different intensity burst disturbance clutter on the power information value collected and transmitted by the substation power information processing terminal, thereby effectively improving the filtering processing accuracy of the substation power information processing terminal when collecting and transmitting power information values, and ensuring the accuracy and reliability of power information.

[0084] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0085] In this embodiment, a power information processing device is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the terms "module" and "device" can implement a combination of software and / or hardware for a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceived.

[0086] According to an embodiment of the present invention, there is also provided an apparatus embodiment for implementing the power information processing method. Figure 4 is a schematic diagram of a power information processing device according to an embodiment of the present invention. Figure 4 As shown, the above-mentioned power information processing device includes: a collection module 402, a collection module 404, a filtering determination module 406, a filtering execution module 408, and a power information generation module 410. The device is described below.

[0087] The collection module 402 is used to obtain power information values ​​collected from target areas at multiple time points, wherein the target area is a power supply area affected by a target transformer;

[0088] The disturbance deviation determination module 404 is connected to the acquisition module 402, and is used to determine the clutter disturbance deviations corresponding to the multiple time points respectively based on the difference between the power information values ​​corresponding to the multiple time points and the predetermined value, wherein the predetermined value is the power information value determined at the corresponding time point based on the predetermined power distribution plan;

[0089] The filtering determination module 406 is connected to the disturbance deviation determination module 404, and is used to determine the filtering criticality corresponding to the multiple time points based on the clutter disturbance deviations corresponding to the multiple time points, wherein the filtering criticality is used to adjust the filtering strength of the clutter disturbance at the corresponding time point;

[0090] The filtering execution module 408 is connected to the filtering determination module 406 and is used to filter the power information values ​​collected at the multiple time points by using the filtering criticalities corresponding to the multiple time points to obtain the filtering information values ​​corresponding to the multiple time points;

[0091] The power information generation module 410 is connected to the filtering execution module 408 and is used to obtain the substation power information of the target substation based on the filtering information values ​​corresponding to multiple time points.

[0092] In a power information processing device provided by an embodiment of the present invention, a collection module 402 is set to obtain power information values ​​collected from a target area at multiple time points, wherein the target area is a power supply area affected by a target transformer; a disturbance deviation determination module 404 is connected to the collection module 402, and is used to determine the clutter disturbance deviations corresponding to the multiple time points based on the difference between the power information values ​​corresponding to the multiple time points and the predetermined value, wherein the predetermined value is the power information value determined at the corresponding time point based on the predetermined power distribution plan; a filtering determination module 406 is connected to the disturbance deviation determination module 40 4 is connected to determine the filtering criticality corresponding to the multiple time points based on the clutter disturbance deviations corresponding to the multiple time points, wherein the filtering criticality is used to adjust the filtering strength of the clutter disturbance at the corresponding time point; the filtering execution module 408 is connected to the filtering determination module 406, and is used to filter the power information values ​​collected at the multiple time points using the filtering criticality corresponding to the multiple time points to obtain the filtering information values ​​corresponding to the multiple time points; the power information generation module 410 is connected to the filtering execution module 408, and is used to obtain the substation power information of the target substation based on the filtering information values ​​corresponding to the multiple time points. The purpose of improving the accuracy and reliability of power information collection is achieved, and the influence of clutter disturbance on power information data is effectively suppressed, thereby solving the technical problem of unsatisfactory accuracy of power information in the related technology.

[0093] It should be noted that the above modules can be implemented by software or hardware. For example, for the latter, it can be implemented in the following ways: the above modules can be located in the same processor; or the above modules can be located in different processors in any combination.

[0094] It should be noted that the above-mentioned acquisition module 402, acquisition module 404, filter determination module 406, filter execution module 408, and power information generation module 410 correspond to steps S102 to S110 in the embodiment, and the examples and application scenarios implemented by the above-mentioned modules and corresponding steps are the same, but are not limited to the contents disclosed in the above-mentioned embodiment. It should be noted that the above-mentioned modules can be run in a computer terminal as part of the device.

[0095] It should be noted that the optional or preferred implementation of this embodiment can refer to the relevant description in the embodiment, which will not be repeated here.

[0096] The above-mentioned power information processing device may also include a processor and a memory. The acquisition module 402, the acquisition module 404, the filtering determination module 406, the filtering execution module 408, the power information generation module 410, etc. are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize the corresponding functions.

[0097] The processor includes a kernel, which retrieves the corresponding program unit from the memory. There can be one or more kernels. The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one storage chip.

[0098] An embodiment of the present invention provides a non-volatile storage medium on which a program is stored. When the program is executed by a processor, a power information processing method is implemented.

[0099] An embodiment of the present invention provides an electronic device, which includes a processor, a memory, and a program stored in the memory and can be run on the processor. When the processor executes the program, the following steps are implemented: obtaining power information values ​​collected from a target area at multiple time points, wherein the target area is the power supply area affected by the target transformer; determining the clutter disturbance deviations corresponding to the multiple time points based on the difference between the power information values ​​corresponding to the multiple time points and the predetermined value, wherein the predetermined value is the power information value determined at the corresponding time point based on the predetermined power distribution plan; determining the filtering criticality corresponding to the multiple time points based on the clutter disturbance deviations corresponding to the multiple time points, wherein the filtering criticality is used to adjust the filtering strength of the clutter disturbance at the corresponding time point; using the filtering criticality corresponding to the multiple time points, filtering the power information values ​​collected at the multiple time points, and obtaining the filtering information values ​​corresponding to the multiple time points; obtaining the area power information of the target area based on the filtering information values ​​corresponding to the multiple time points. The device in this article can be a server, a PC, etc.

[0100] The present invention also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program that is initialized with the following method steps: obtaining power information values ​​collected from a target substation at multiple time points, wherein the target substation is the power supply area affected by a target transformer; determining the clutter disturbance deviations corresponding to the multiple time points based on the differences between the power information values ​​corresponding to the multiple time points and a predetermined value, wherein the predetermined value is the power information value determined at the corresponding time point based on a predetermined power distribution plan; determining the filtering criticality corresponding to the multiple time points based on the clutter disturbance deviations corresponding to the multiple time points, wherein the filtering criticality is used to adjust the filtering strength of the clutter disturbance at the corresponding time point; using the filtering criticality corresponding to the multiple time points, filtering the power information values ​​collected at the multiple time points to obtain the filtering information values ​​corresponding to the multiple time points; obtaining the substation power information of the target substation based on the filtering information values ​​corresponding to the multiple time points.

[0101] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0102] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0103] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0104] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0105] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0106] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0107] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0108] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0109] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.

[0110] The above are only embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of the claims of the present invention.

Claims

1. A method for processing power information, It is characterized in that include: Acquire power information values ​​collected from target areas at multiple time points, wherein the target area is a power supply area affected by a target transformer; Determine the clutter disturbance deviations corresponding to the multiple time points respectively based on the differences between the power information values ​​corresponding to the multiple time points respectively and the predetermined value, wherein the predetermined value is the power information value determined at the corresponding time point based on the predetermined power distribution plan; Based on the clutter disturbance deviations respectively corresponding to the multiple time points, determining the filtering criticalities respectively corresponding to the multiple time points, wherein the filtering criticalities are used to adjust the filtering strength of the clutter disturbance at the corresponding time points; Using the filtering criticalities corresponding to the multiple time points, respectively, to filter the power information values ​​collected at the multiple time points, respectively, to obtain the filtering information values ​​corresponding to the multiple time points; Based on the filtering information values ​​corresponding to the multiple time points, the substation power information of the target substation is obtained.

2. The method according to claim 1, It is characterized in that The determining, based on the clutter disturbance deviations respectively corresponding to the multiple time points, the filtering criticalities respectively corresponding to the multiple time points comprises: Generate a deviation queue based on the clutter disturbance deviations respectively corresponding to the multiple time points; Cutting the deviation queue to obtain a plurality of subqueues, wherein the plurality of subqueues respectively include a predetermined number of time points, and the predetermined number is the number of time points included in the subqueue determined based on a cutting method that is least affected by the disturbance; Determine an information disturbance index corresponding to each time point in the multiple subqueues, wherein the information disturbance index represents the intensity of the clutter disturbance effect at the corresponding time point; Based on the information disturbance index corresponding to each time point in the multiple sub-queues, the filtering criticalities corresponding to the multiple time points are determined.

3. The method according to claim 2, It is characterized in that The determining of the information disturbance index corresponding to each time point in the plurality of subqueues includes: For a target subqueue among the multiple subqueues, based on the power information value and the clutter disturbance deviation corresponding to each time point in the target subqueue, and the power information value and the clutter disturbance deviation corresponding to other time points, determine the information disturbance index corresponding to each time point, wherein the other time points are time points in the target subqueue other than each time point; The information disturbance index corresponding to each time point in the target sub-queue is determined in such a manner that the information disturbance index corresponding to each time point in the multiple sub-queues is determined respectively.

4. The method according to claim 2, It is characterized in that The method further comprises: Using multiple cutting methods to cut the deviation queue, to obtain candidate sub-queue combinations corresponding to the multiple cutting methods, wherein the number of time points obtained by the multiple cutting methods is different; Based on the candidate sub-queue combinations corresponding to the multiple cutting modes, respectively, determining the information disturbance factors corresponding to the multiple cutting modes respectively, wherein the information disturbance factor represents the intensity of the clutter disturbance effect of the candidate sub-queue combination under the corresponding cutting mode; Among the multiple cutting methods, determining a target method with the smallest information disturbance factor; Based on the target mode, the predetermined number is determined.

5. The method according to claim 2, It is characterized in that The determining, based on the information disturbance index corresponding to each time point in the multiple subqueues, the filtering criticality corresponding to the multiple time points respectively includes: For a target subqueue among the multiple subqueues, determining a maximum index amount of the target subqueue based on the information disturbance index corresponding to each time point in the target subqueue; Determine the difference between the highest value of the indicator and the information disturbance indicator corresponding to each time point; Determine the filtering criticality corresponding to each time point based on the ratio of the difference to the highest value of the indicator; The filtering criticality corresponding to each time point in the target sub-queue is determined to determine the filtering criticality corresponding to each time point.

6. The method according to claim 1, It is characterized in that The filtering criticalities corresponding to the multiple time points are respectively used to filter the power information values ​​collected at the multiple time points to obtain the filtering information values ​​corresponding to the multiple time points, including: Determine the product values ​​of the filter criticality and the power information value corresponding to the multiple time points respectively; For a target time point among the multiple time points, determining product values ​​corresponding to a predetermined number of time points after the target time point; Determine the filtering information value corresponding to the target time point based on the product value corresponding to the target time point, the product values ​​corresponding to the predetermined number of time points, and the predetermined number; The filtering information values ​​corresponding to the multiple time points are obtained by determining the filtering information value corresponding to the target time point.

7. The method according to any one of claims 1 to 6, It is characterized in that The power information value includes one of the following: a primary side voltage value, a primary side current value, a secondary side voltage value, and a secondary side current value.

8. A power information processing device, It is characterized in that include: A collection module, used to obtain power information values ​​collected from a target area at multiple time points, wherein the target area is a power supply area affected by a target transformer; A disturbance deviation determination module, used to determine the clutter disturbance deviations corresponding to the multiple time points respectively based on the difference between the power information values ​​corresponding to the multiple time points respectively and a predetermined value, wherein the predetermined value is the power information value determined at the corresponding time point based on a predetermined power distribution plan; A filtering determination module, used to determine the filtering criticality corresponding to the multiple time points respectively based on the clutter disturbance deviations corresponding to the multiple time points respectively, wherein the filtering criticality is used to adjust the filtering strength of the clutter disturbance at the corresponding time points; A filtering execution module, configured to filter the power information values ​​collected at the multiple time points respectively by using the filtering criticalities respectively corresponding to the multiple time points, so as to obtain the filtering information values ​​corresponding to the multiple time points; The power information generation module is used to obtain the area power information of the target area based on the filtering information values ​​corresponding to the multiple time points.

9. A non-volatile storage medium, It is characterized in that The non-volatile storage medium stores a plurality of instructions, and the instructions are suitable for being loaded by a processor and executing the power information processing method described in any one of claims 1 to 7.

10. An electronic device, It is characterized in that include: One or more processors and a memory, wherein the memory is used to store one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement the power information processing method described in any one of claims 1 to 7.