Power distribution cabinet production material management system and method
Through RFID technology and environmental data analysis, the accurate management of distribution cabinet production materials is achieved, the problems of inaccurate data and inconsistent standards are solved, and the rationality and management efficiency of inventory are improved.
Patent Information
- Application Number
- CN202411068558.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-12-06
AI Technical Summary
There are problems such as inaccurate data, inconsistent material standards, and chaotic inventory management in the production materials management of distribution cabinets, which leads to prone to stockpiling or out of stock during purchase.
Use RFID tags and RFID readers to scan and manage material information, obtain environmental data and analyze material losses, predict transportation time, combine material demand and supply data to determine whether the inventory is sufficient, automatically adjust the purchase list, and ensure the accuracy of material management and Real-time.
It improves the accuracy and practicality of material management for distribution cabinet production, reduces the situation of insufficient or excessive inventory, and ensures the effective use of materials and the rationality of inventory.
Smart Images

Figure CN119090407A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of material management for power distribution cabinet production, and in particular to a management system and method for material management for power distribution cabinet production. Background Art
[0002] The power distribution cabinet is a general term for the motor control center and is the final equipment of the power distribution system. The power distribution cabinet plays a vital role in the use of the circuit, so the establishment and maintenance of the power distribution cabinet is inevitable. Since the power distribution cabinet involves a large amount of production materials, not all of them will be replaced during the maintenance process, only the damaged materials will be replaced. The production materials need to be managed, and reasonable procurement and use can better facilitate the production and maintenance of the power distribution cabinet.
[0003] In the related art, the management of production materials for power distribution cabinets is only to register the entry and exit of the warehouse, and manually estimate whether to purchase, which leads to inaccurate data on the purchase of production materials, resulting in excessive stockpiling and shortages. In addition, the material standards of different production companies are inconsistent, and unified storage will lead to confusion in production material information, making it difficult to obtain real management data, and there is room for improvement.
[0004] To this end, we propose a distribution cabinet production material management system and method to solve the above problems. Summary of the invention
[0005] The object of the present invention is to provide a system and method for managing materials for production of power distribution cabinets to solve the problems raised in the above-mentioned background technology.
[0006] In the first aspect, the present application provides a method for managing materials for power distribution cabinet production, which adopts the following technical solution:
[0007] Obtain relevant parameter information of the materials used to produce the power distribution cabinet, configure RFID tags, scan them with the RFID reader, store them in the warehouse, and obtain material information data;
[0008] Based on the material information data, the environment around the warehouse is acquired to obtain environmental data, and the impact of the environment on production materials is analyzed to obtain material depreciation data;
[0009] According to the environmental data, the quantity of materials in the surrounding distribution stations is obtained, and the types and quantities of damaged materials in the surrounding distribution stations are analyzed to obtain material demand data;
[0010] Based on the environmental data, multiple RFID readers are set up on the production line and transportation line to track the real-time location of production materials, predict transportation time, and obtain material supply data;
[0011] Based on the material demand data and the material supply data, it is determined whether the existing inventory in the warehouse is sufficient, and purchase is performed if insufficient.
[0012] By adopting the above technical solution, when purchasing materials for the production of distribution cabinets, it is difficult to distinguish the actual parameters of the production materials because the standards set by various suppliers for materials are different, resulting in confusion in the production material management information. In addition, the purchase of production materials is affected by the supply and demand relationship and the environment. Purchasing according to actual conditions reduces the occurrence of insufficient and excessive production materials, and improves the accuracy and practicality of the management of production materials for distribution cabinets.
[0013] Preferably, the step of obtaining relevant parameter information of the materials for producing the power distribution cabinet, configuring the RFID tag, scanning the material through the RFID reader, storing the material in the warehouse, and obtaining the material information data specifically includes the following steps:
[0014] Obtain the purchase list of production materials, obtain material standard data, and obtain the size, electromagnetic wave signal, and ultrasonic signal of production materials under standard materials;
[0015] Based on the material standard data, the name and size of the production materials are scanned before the production materials are put into storage, matched with the purchase list, and the material information is preliminarily confirmed to obtain preliminary information data;
[0016] According to the purchase list, if the production materials to be stored are not matched with the purchase list after the initial scan, they will enter the waiting area;
[0017] According to the preliminary information data, the electromagnetic wave signals and ultrasonic signals of the production materials are detected to confirm whether the production materials match the list. If they do not match, they enter the waiting area;
[0018] If there is a match, an RFID tag is configured, material-related information is stored, and after being read and written by an RFID reader, it is stored in a warehouse and the quantity is recorded to obtain the material information data.
[0019] By adopting the above technical solution, the in-and-out information of production materials is crucial to the actual inventory of production materials. Manually recording the in-and-out information of production materials is prone to untimely data updates and omissions. The RFID reader can adjust the inventory quantity in time, thereby improving the convenience of production material management in the distribution cabinet.
[0020] Preferably, the step of obtaining a purchase list of production materials, obtaining material standard data, and obtaining the size, electromagnetic wave signal, and ultrasonic signal of the production materials under the standard materials further includes the following steps:
[0021] Obtain the weather environment at the time of entry, obtain the warehouse environment at the time of entry, obtain the temperature data, and obtain the electromagnetic wave impact data based on the inverse coefficient between temperature and electromagnetic wave signal;
[0022] Based on the temperature data, an inverse coefficient between the temperature and the ultrasonic signal is obtained, the degree of influence of the ultrasonic wave on the production material is analyzed, and ultrasonic wave influence data is obtained;
[0023] Based on the electromagnetic wave impact data, a relationship curve between the electromagnetic wave signal and the ultrasonic signal is obtained, and the impact of the ultrasonic signal caused by the electromagnetic wave signal is obtained according to the positive and negative relationship within the frequency band, so as to obtain the impact data;
[0024] The electromagnetic wave impact data, the ultrasonic wave impact data and the impact data are combined, and actual parameter conditions of production materials are calculated and superimposed on the material standard data to update the real-time material standard data.
[0025] By adopting the above technical solution, it is difficult to effectively manage and compare materials due to the inconsistent naming conventions, units and specifications used by different suppliers, which may cause order errors and confusion in material distribution. Therefore, it is necessary to reconfigure the information of production materials according to the same standard before entering the warehouse, and identify the production material parameters through the size, electromagnetic wave signal and ultrasonic signal of the production material, thereby improving the intelligence of the production material management of the distribution cabinet.
[0026] Preferably, if there is a match, the step of configuring an RFID tag, storing material-related information, scanning with an RFID reader, storing the material in a warehouse and recording the quantity, and obtaining the material information data also includes the following steps:
[0027] According to the purchase list, the purchase quantity is obtained, and according to the storage quantity of the production materials, the purchase quantity is automatically reduced and adjusted to obtain the purchase quantity data;
[0028] Based on the purchase quantity data, when the number of production materials in the purchase list is 0, the relevant information of the production materials automatically disappears from the purchase list, and the purchase list is adjusted;
[0029] For the production materials in the waiting area, scan the name parameters of the production materials, sort them out, and obtain an unidentified list;
[0030] Based on the unidentified list and the purchase list, if the purchase list has not been cleared, the production materials are divided into a secondary analysis area; if the purchase list has been cleared, the production materials are placed in a pending area and wait for return processing.
[0031] Through the above technical solution, errors may occur during the transportation of production materials, resulting in errors in the type and quantity of transported materials. Before entering the warehouse, the materials need to be compared and inspected one by one to confirm whether they are purchased correctly. If there are purchase or transportation errors, they can be corrected in time. In order to reduce the unclear material identification caused by entering the warehouse, if the purchase list is not cleared, a secondary identification analysis is performed to put management issues in advance, reducing the error delay in the management of distribution cabinet production materials.
[0032] Preferably, the step of acquiring the warehouse surrounding environment based on the material information data, obtaining environmental data, analyzing the impact of the environment on production materials, and obtaining material depreciation data specifically includes the following steps:
[0033] Based on the material information data, the storage time of the production materials is obtained, and the depreciation degree of the production materials is analyzed according to the storage scan to obtain the initial depreciation data;
[0034] Based on the initial loss data, meteorological data is obtained, and according to the impact of the weather on the production materials, the daily loss degree of the production materials is calculated to obtain meteorological loss data;
[0035] According to the initial damage data, temperature and humidity data are obtained, and according to the negative correlation between temperature and humidity and production materials, the damage degree caused by daily temperature and humidity is analyzed to obtain temperature and humidity damage data;
[0036] The weather damage data and the temperature and humidity damage data are combined, and the damage degree of the production materials is analyzed according to the time accumulation to obtain the material damage data.
[0037] By adopting the above technical solution, the reason why production materials cannot be stored and purchased in large quantities is that even if the production materials are not used, they will be damaged by the environment. If they are stored for too long, they will become unusable. By testing the environment, we can pay real-time attention to the damage of production materials, clean up useless materials in time, and improve the real-time nature of the data of production material management of the distribution cabinet.
[0038] Preferably, the step of obtaining the quantity of materials in the surrounding distribution stations according to the environmental data, analyzing the types and quantities of damaged materials in the surrounding distribution stations, and obtaining material demand data specifically includes the following steps:
[0039] Obtain the number of surrounding distribution cabinets, calculate the total types and quantities of production materials for the distribution cabinets based on the number of distribution cabinets, and obtain material quantity data;
[0040] Based on the material quantity data, the service life of the materials is obtained, and according to the general use time of the production materials in the historical records, the replacement time of the production materials is analyzed to obtain the replacement time data;
[0041] Based on the replacement time data and the material depreciation data, the depreciation degree of the production materials is analyzed after superposition calculation, the damage time and quantity are obtained, and the material demand data is obtained.
[0042] By adopting the above technical solution, the purchase of materials for the production of distribution cabinets needs to be determined according to actual needs, otherwise there will be too much or too little inventory. According to the needs of surrounding distribution cabinets, the replacement time of distribution cabinet materials is predicted, and production materials are purchased around the replacement time, which reduces the loss of production materials due to stockpiling and improves the integrity of materials management for distribution cabinet production.
[0043] Preferably, the step of setting a plurality of RFID readers and writers on the production line and the transportation line based on the environmental data, tracking the real-time location of the production materials, predicting the transportation time, and obtaining the material supply data further includes the following steps:
[0044] Set RFID tags on transport vehicles to obtain the cargo transportation time. According to the RFID readers on the production line and transportation line, obtain the real-time distance and transportation time of the cargo and obtain the transportation data.
[0045] Based on the environmental data and the transportation data, the actual transportation time is analyzed according to the proportional coefficient between the severity of the weather and the transportation time to obtain the transportation time data;
[0046] The actual data of daily production materials is calculated and predicted based on the material information data and the transportation time data in combination with the daily warehouse in and out information to obtain the material supply data.
[0047] By adopting the above technical solution, before the distribution cabinet needs to replace the production materials, it is necessary to purchase the materials in advance. When purchasing materials, the transportation time also needs to be considered in order to more accurately calculate and analyze the daily inventory, thereby realizing a situation where supply exceeds demand, reducing the inconvenience caused by the inability of the distribution cabinet to operate due to insufficient supply, and thus improving the accuracy of the management of production materials for the distribution cabinet.
[0048] Preferably, the step of calculating and predicting actual data of daily production materials based on the material information data and the transportation time data in combination with daily warehouse in and out information to obtain the material supply data further includes the following steps:
[0049] For the production materials in the secondary analysis area, the purchase list is compared to obtain similarity, and a similarity threshold is set. Those exceeding the similarity threshold are preliminarily screened out to obtain preliminary screening data;
[0050] Based on the transportation data and the initial screening data, according to the degree of damage of the production materials caused by transportation, it is confirmed whether the production materials are damaged. If damage occurs, it can be matched with the purchase list. If not, it enters the waiting area;
[0051] After matching, the similarity is used as the depreciation degree for analysis to generate the initial depreciation data of the material, and the purchase list and the material supply data are updated.
[0052] By adopting the above technical solution, for some production materials that do not match the list, the production materials are slightly worn during the transportation process, which affects the warehousing identification. Combined with the actual transportation situation, the production materials are re-identified and analyzed to reduce the identification errors caused by transportation and improve the rigor of the production material management of the distribution cabinet.
[0053] Preferably, the step of judging whether the existing inventory in the warehouse is sufficient based on the material demand data and the material supply data, and purchasing if insufficient, further comprises the following steps:
[0054] Based on the material supply data and the material depreciation data, obtaining an available threshold value of the depreciation degree of production materials to obtain depreciation threshold data;
[0055] Based on the depreciation threshold data and the material information data, unavailable production materials in the material library are screened out, and the material supply data is updated;
[0056] According to the material demand data and the material supply data, a difference value is set in which the supply is greater than the demand, and difference data is obtained to determine whether the daily supply and demand reach the difference value;
[0057] If the requirement is met, there is no need to purchase production materials. If the requirement is not met, the purchase list is generated based on the difference.
[0058] Through the above technical solution, when the supply is lower than the demand, it is necessary to purchase production materials. In order to cope with emergencies, the supply generally needs to be slightly greater than the demand. According to the changes in supply and demand, users are reminded to purchase in time to reduce the inconvenience caused by out-of-stock and improve the intelligence of the management of production materials for distribution cabinets.
[0059] In the second aspect, the present application provides a distribution cabinet production material management system, which adopts the following technical solution:
[0060] A production material management system for a power distribution cabinet comprises a scanning module, a detection module, an analysis module and a storage module, wherein the scanning module is used to scan production materials and output material information data after identifying information; the detection module is used to detect the surrounding environment of a warehouse and output environmental data; the analysis module is signal-connected to the scanning module and the detection module, and is used to receive the material information data and the environmental data, analyze the supply and demand of production materials, and then sort out and output a purchase list; the storage module is signal-connected to the scanning module, the detection module and the analysis module, and is used to receive and store the material information data, the environmental data and the purchase list.
[0061] Through the above technical solution, electronic equipment is used to confirm the purchase list, track the inventory status, and analyze the supply and demand relationship to determine whether purchases are needed. This reduces the waste of human resources, makes management data more accurate, and makes the management process more convenient, thereby improving the practicality of distribution cabinet production material management.
[0062] In summary, the present application includes at least one of the following beneficial technical effects:
[0063] 1. When purchasing materials for the production of power distribution cabinets, it is difficult to distinguish the actual parameters of the production materials because the standards set by various suppliers for materials are different, resulting in confusion in the production material management information. In addition, the purchase of production materials is affected by the supply and demand relationship and the environment. Purchasing according to actual conditions reduces the occurrence of insufficient and excessive production materials, and improves the accuracy and practicality of the management of production materials for power distribution cabinets.
[0064] 2. Due to the inconsistency of naming conventions, units and specifications used by different suppliers, it is difficult to effectively manage and compare materials, which may cause order errors and confusion in material distribution. Therefore, it is necessary to reconfigure the information of production materials according to the same standard before warehousing, and identify the production material parameters through the size, electromagnetic wave signal and ultrasonic signal of the production material, which improves the intelligence of the production material management of the distribution cabinet.
[0065] 3. The purchase of materials for the production of distribution cabinets needs to be determined according to actual needs, otherwise there will be too much or too little inventory. According to the needs of surrounding distribution cabinets, the replacement time of distribution cabinet materials is predicted, and production materials are purchased around the replacement time, which reduces the loss of production materials due to stockpiling and improves the integrity of the materials managed for distribution cabinet production. BRIEF DESCRIPTION OF THE DRAWINGS
[0066] Figure 1 It is a schematic diagram of specific steps of a method for managing materials for power distribution cabinet production according to the present invention;
[0067] Figure 2It is a schematic diagram of specific steps of step 1 of a method for managing materials for production of a power distribution cabinet of the present invention;
[0068] Figure 3 It is a schematic diagram of specific steps of step 11 and step 15 of a method for managing materials for production of a power distribution cabinet of the present invention;
[0069] Figure 4 It is a schematic diagram of specific steps of step 2 and step 5 of a method for managing materials for production of a power distribution cabinet of the present invention;
[0070] Figure 5 It is a schematic diagram of the specific steps of step 4 of a method for managing materials for production of power distribution cabinets of the present invention. DETAILED DESCRIPTION
[0071] The following is combined with the embodiments and attached Figure 1-5 The present invention is further described in detail, but the embodiments of the present invention are not limited thereto.
[0072] Example:
[0073] The present invention discloses a method for managing materials for power distribution cabinet production, referring to Figure 1 , specifically including the following steps:
[0074] Step S1, obtaining relevant parameter information of the production materials of the power distribution cabinet, configuring RFID tags, scanning by the RFID reader, storing in the warehouse, and obtaining material information data;
[0075] Step S2, based on the material information data, obtain the warehouse surrounding environment, obtain environmental data, analyze the impact of the environment on the production materials, and obtain material depreciation data;
[0076] Step S3, obtaining the quantity of materials in the surrounding distribution stations according to the environmental data, analyzing the types and quantities of damaged materials in the surrounding distribution stations, and obtaining material demand data;
[0077] Step S4, based on the environmental data, multiple RFID readers are set up on the production line and the transportation line to track the real-time location of the production materials, predict the transportation time, and obtain the material supply data;
[0078] Step S5, based on the material demand data and the material supply data, determine whether the existing inventory in the warehouse is sufficient, and purchase if insufficient.
[0079] In actual use, the production materials of the distribution cabinet need to be replaced in time due to the service life to ensure the normal use of the distribution cabinet. The production materials of the distribution cabinet cannot be stored blindly. The production materials will be damaged due to environmental reasons, so the time and quantity of purchase are very important. On the other hand, due to different standards of suppliers, the names and specifications of the production materials will be different, resulting in confusion of production materials. For example, when the accuracy of X material of Company A is ±0.1, it is grade A, and when the accuracy of X material of Company B is ±0.1, it is grade B. Then when it is necessary to purchase X material with an accuracy of ±0.1, it is purchased from both Company A and Company B, but one batch of goods received is A accuracy and the other batch is B accuracy. Entering the warehouse with different accuracy will cause confusion of material information, because the two are the same material and should be set to the same specification. At this time, it should be entered into the warehouse according to the specifications of the X material of ±0.1 specified by the warehouse.
[0080] Reference Figure 2 , obtain the relevant parameter information of the production materials of the distribution cabinet, configure the RFID tag, scan it through the RFID reader, store it in the warehouse, and obtain the material information data, which specifically includes the following steps:
[0081] Step S11, obtaining a purchase list of production materials, obtaining material standard data, and obtaining the size, electromagnetic wave signal, and ultrasonic signal of the production materials under the standard materials;
[0082] Step S12, based on the material standard data, the production material name and size are scanned before the production material is put into storage, matched with the purchase list, and the material information is preliminarily confirmed to obtain preliminary information data;
[0083] Step S13, according to the purchase list, if the production materials to be stored are initially scanned and do not match the purchase list, they enter the waiting area;
[0084] Step S14, based on the preliminary information data, the electromagnetic wave signal and ultrasonic signal of the production material are detected to confirm whether the production material matches the list, and if not, the production material enters the waiting area;
[0085] Step S15, if it matches, configure the RFID tag, store the material related information, scan it with the RFID reader, store it in the warehouse and record the quantity to obtain the material information data.
[0086] In actual use, the manual registration of in and out of the warehouse will cause data delays on the one hand, and on the other hand, the manual error rate will be higher, which is easy to cause omissions, resulting in inaccurate actual inventory data and inconvenience in supply. Through the read-write scanning of the RFID reader, the types and quantities of production materials in and out of the warehouse can be quickly obtained, and real-time data can be obtained. For example, employee A retrieves a batch of X material data from the warehouse for outbound delivery. Through manual registration, it is necessary to integrate it before knowing the reduction of X material. However, through scanning with the RFID reader, the outbound information can be read at the first time, the inventory quantity can be updated, and more accurate data can be obtained. In addition, manual registration is prone to registration errors, resulting in data errors.
[0087] Reference Figure 3 , obtaining a purchase list of production materials, obtaining material standard data, and obtaining the size, electromagnetic wave signal, and ultrasonic signal of the production materials under the standard materials, and also includes the following steps:
[0088] Step S111, obtaining the weather environment at the time of entry, obtaining the warehouse environment at the time of entry, obtaining temperature data, and obtaining electromagnetic wave impact data according to the inverse coefficient between temperature and electromagnetic wave signal;
[0089] Step S112, based on the temperature data, obtaining the inverse coefficient of the temperature and the ultrasonic signal, analyzing the degree of influence of the production material by the ultrasonic wave, and obtaining the ultrasonic wave influence data;
[0090] Step S113, based on the electromagnetic wave impact data, a relationship curve between the electromagnetic wave signal and the ultrasonic signal is obtained, and the impact of the electromagnetic wave signal on the ultrasonic signal is obtained according to the positive and negative relationship within the frequency band, to obtain the impact data;
[0091] Step S114, combining the electromagnetic wave impact data, the ultrasonic wave impact data and the impact data, superimposing and calculating the actual parameter conditions of the production material on the basis of the material standard data, and updating the real-time material standard data.
[0092] In actual use, due to the different standards set by various suppliers, the naming, units and specifications of production materials are different. It is necessary to unify the standards when actually entering the warehouse, otherwise the inventory data will be confused and unclear. On the one hand, manual identification and registration requires a lot of manpower and time, and the speed will be slower. On the other hand, it is impossible for humans to judge and identify some things that are too detailed by naked eyes. It is faster and more accurate to identify electromagnetic wave signals and ultrasonic signals of production materials. For example, the electromagnetic wave signals of different materials will be different. Metal materials have a strong absorption capacity for electromagnetic waves, so electromagnetic wave signals will be greatly attenuated when propagating in metal materials. Different materials have different reflection and refraction capabilities for ultrasonic waves, so ultrasonic signals will be different when propagating in different materials. Metal materials will partially reflect ultrasonic waves, while plastic materials will absorb ultrasonic waves to a certain extent. Electromagnetic wave signals and ultrasonic signals will be affected by the environment, and the specific parameters of production materials need to be analyzed according to the environment.
[0093] Reference Figure 3 If a match is found, the RFID tag is configured, the material-related information is stored, the material is scanned by the RFID reader, the material is stored in the warehouse and the quantity is recorded, and the step of obtaining the material information data also includes the following steps:
[0094] Step S151, according to the purchase list, the purchase quantity is obtained, and the purchase quantity is automatically reduced and adjusted according to the storage quantity of the production materials to obtain the purchase quantity data;
[0095] Step S152, based on the purchase quantity data, when the number of production materials in the purchase list is 0, the production material related information automatically disappears from the purchase list, and the purchase list is adjusted;
[0096] Step S153, for the production materials in the area to be processed, scan the name parameters of the production materials, sort them out, and obtain an unrecognized list;
[0097] Step S154, based on the unidentified list and the purchase list, if the purchase list has not been cleared, the production materials are divided into the secondary analysis area, if the purchase list has been cleared, they are in the pending area waiting for return processing.
[0098] In actual use, the production materials entering the warehouse need to be checked against the purchase list, otherwise problems such as shipping errors and purchase errors are easily overlooked, causing problems in the supply of subsequent production materials. For example, if 10 pieces of material X need to be purchased on the purchase list, if 5 pieces of material X are scanned and entered into the warehouse, the quantity becomes 5, because only 5 pieces of material X are actually needed. When all 10 pieces of material X are entered into the warehouse, the name of material X disappears from the purchase list, indicating that material X has been purchased. If there is still one piece of material X to be identified and scanned at this time, it cannot be matched with the purchase list, because material X is no longer needed. If the purchase list has been cleared, it means that the purchase has been completed, and the remaining unidentified materials are all redundant materials. If the purchase list is not cleared, it means that there may be a situation where the production materials have been damaged due to transportation and have not been identified, and secondary identification is required.
[0099] Reference Figure 4 Based on the material information data, the surrounding environment of the warehouse is obtained to obtain environmental data, the impact of the environment on the production materials is analyzed, and the steps of obtaining material depreciation data are specifically including the following steps:
[0100] Step S21, based on the material information data, obtain the storage time of the production materials, analyze the depreciation degree of the production materials according to the storage scan, and obtain the initial depreciation data;
[0101] Step S22, based on the initial loss data, meteorological data is obtained, and according to the impact of the weather on the production materials, the daily loss degree of the production materials is calculated to obtain meteorological loss data;
[0102] Step S23, obtaining temperature and humidity data according to the initial damage data, analyzing the damage degree caused by daily temperature and humidity according to the negative correlation between temperature and humidity and production materials, and obtaining temperature and humidity damage data;
[0103] Step S24, combining the meteorological damage data and the temperature and humidity damage data, and analyzing the damage degree of the production materials according to the time accumulation, to obtain the material damage data.
[0104] In actual use, after the production materials enter the warehouse for storage, they do not remain unchanged. The surrounding environment will cause a certain amount of depreciation of the production materials. When the depreciation is too much, the production materials will be scrapped and cannot be used. Therefore, it is necessary to always pay attention to the depreciation of production materials, reduce the inventory reduction caused by the scrapping of production materials, and purchase and replenish in time. For example, the inventory of material X in 2020 is 10 pieces, but 5 of the X materials in 2023 are scrapped due to environmental problems, so the inventory of material X in 2023 should be updated to 5 pieces. If 10 pieces of material X are needed in stock, then 5 more pieces of material X should be purchased in 2023. If the availability of production materials is not detected according to the environment, the inventory information will not be updated, which will lead to insufficient inventory of material X, affecting the subsequent supply of material X.
[0105] Reference Figure 1 ,According to the environmental data, the quantity of materials in the surrounding distribution stations is obtained, the types and quantities of damaged materials in the surrounding distribution stations are analyzed, and the steps of obtaining material demand data specifically include the following steps:
[0106] Step S31, obtaining the number of surrounding distribution cabinets, calculating the total types and quantities of production materials in the distribution cabinets according to the number of distribution cabinets, and obtaining material quantity data;
[0107] Step S32, based on the material quantity data, the material service life is obtained, and according to the general use time of the production materials in the historical records, the replacement time of the production materials is analyzed to obtain the replacement time data;
[0108] Step S33, based on the replacement time data and the material depreciation data, the depreciation degree of the production materials is analyzed after superimposed calculation, the damage time and quantity are obtained, and the material demand data is obtained.
[0109] In actual use, the purchase of production materials needs to be analyzed according to actual demand. If the actual demand is large, but not enough production materials are purchased, it will affect the normal use of the distribution cabinet and the use of electricity by residents. If the actual demand is small, but excessive production materials are purchased, it will lead to the storage of excess production materials, causing damage to materials and waste of resources. For example, according to environmental forecasts, 50 pieces of material X are needed in 2022 and 60 pieces in 2023. When purchasing production materials, only 50 pieces need to be purchased in 2022, and 60 pieces in 2023. This can reduce the storage time of production materials, reduce the depreciation of materials, and extend the use time of materials.
[0110] Reference Figure 5 , based on environmental data, multiple RFID readers are set up on production lines and transportation lines to track the real-time location of production materials, predict transportation time, and obtain material supply data, and the following steps are also included:
[0111] Step S41, setting RFID tags for transport vehicles, obtaining cargo transportation time, obtaining real-time distance and transportation time of cargo according to RFID readers on production lines and transport lines, and obtaining transportation data;
[0112] Step S42, based on the environmental data and the transportation data, according to the proportional coefficient between the severity of the weather and the transportation time, the actual transportation time is analyzed to obtain the transportation time data;
[0113] Step S43, based on the material information data and the transportation time data, combined with the daily warehouse in and out information, calculate and predict the actual data of daily production materials to obtain material supply data.
[0114] In actual use, production materials cannot be immediately put into storage after purchase. They need to be transported, which takes a certain amount of time. The transportation time is not fixed and needs to be combined with the actual situation. The shorter the storage time, the more conducive to the management of production materials. For example, if it is analyzed that 100 pieces of X material are needed on the 20th, and the transportation time is predicted to be 5 days, then the purchase should be made on the 15th. At this time, the purchased production materials can be placed at the entrance of the warehouse to facilitate outbound transportation and reduce the cumbersome situation of inbound and outbound transportation. If the purchase is made on the 10th, X material needs to be stored for 5 days. During this period, other materials need to be put into storage. In order not to hinder the storage of other materials, X material needs to be stored further inside the warehouse, which increases the storage time and causes inconvenience in storage. The transportation time needs to be analyzed according to the actual weather. Determining the accurate transportation time is conducive to convenient management.
[0115] Reference Figure 5 The step of calculating and predicting the actual data of daily production materials based on the material information data and the transportation time data in combination with the daily in-and-out warehouse information to obtain the material supply data also includes the following steps:
[0116] Step S431, for the production materials in the secondary analysis area, compare them with the purchase list to obtain similarity, set a similarity threshold, and preliminarily screen out those that exceed the similarity threshold to obtain preliminary screening data;
[0117] Step S432, based on the transportation data and the initial screening data, according to the degree of damage of the production materials caused by transportation, confirm whether the production materials have been damaged. If damaged, they can be matched with the purchase list. If not, they enter the waiting area;
[0118] Step S433, after matching, the similarity is used as the depreciation degree for analysis, the initial depreciation data of the material is generated, and the purchase list and material supply data are updated.
[0119] In actual use, the production materials may be slightly bumped during transportation, causing slight damage to the production materials. For damaged materials, it is impossible to match the purchase list 100%, which will result in unrecognizable situations. According to the transportation situation, the depreciation degree of the production materials is obtained, and then identified according to the actual similarity, which improves the convenience of warehousing and reduces the recognition errors of warehousing. Setting a similarity threshold is conducive to secondary identification and screening of production materials. For example, if the similarity is set to 90%, on the one hand, other materials can be screened out, and on the other hand, if the similarity is lower than 90%, the production materials have been scrapped and cannot be used, and there is no point in warehousing them.
[0120] Reference Figure 4 Based on the material demand data and material supply data, it is determined whether the existing inventory in the warehouse is sufficient, and if not, purchase is performed, which also includes the following steps:
[0121] Step S51, based on the material supply data and the material depreciation data, obtaining the available threshold value of the depreciation degree of the production material, and obtaining depreciation threshold data;
[0122] Step S52, based on the damage threshold data and the material information data, screening out the unavailable production materials in the material library and updating the material supply data;
[0123] Step S53, according to the material demand data and the material supply data, set the difference value of supply greater than demand, obtain the difference data, and judge whether the daily supply and demand reach the difference value;
[0124] Step S54: if the requirement is met, there is no need to purchase production materials; if not, a purchase list is generated based on the difference.
[0125] In actual use, purchases need to be analyzed based on actual needs, and manual analysis of whether purchases are needed is subjective and will lead to inaccurate purchase data. Analysis based on actual conditions will make purchases more reasonable. For example, 100 pieces of material X are needed on the 20th, but they have not been purchased, and there are only 20 pieces in stock. At this time, purchase is needed. In order to cope with the emergency needs of material X, 10 pieces should be stored. At this time, 90 pieces of material X need to be purchased. Purchase on the 15th and put into storage 5 days later. After purchase on the 15th, the inventory of material X on the 20th is 110 pieces.
[0126] A production material management system for a power distribution cabinet includes a scanning module, a detection module, an analysis module and a storage module. The scanning module is used to scan production materials and output material information data after identifying information. The detection module is used to detect the surrounding environment of the warehouse and output environmental data. The analysis module is signal-connected with the scanning module and the detection module, and is used to receive material information data and environmental data to analyze the supply and demand of production materials and then sort out and output a purchase list. The storage module is signal-connected with the scanning module, the detection module and the analysis module, and is used to receive material information data, environmental data and a purchase list and store them.
[0127] In actual application, the use of electronic modules to manage the production materials of distribution cabinets can reduce the consumption of human resources, and the analysis will be more objective without the subjective influence of staff. Purchase according to actual needs, unify standards for warehousing, and obtain accurate inventory information, which improves the convenience and practicality of the management of production materials of distribution cabinets.
[0128] The implementation principle of this system is: first, the production materials entering the warehouse are scanned by the scanning module, the standard information of the production materials on the purchase list is obtained, and the materials entering the warehouse are matched one by one. The standard information of the production materials includes size, electromagnetic wave signal and ultrasonic signal. The standard information is adjusted according to the weather temperature at the time of entry detected by the detection module. The production materials consistent with the standard information can be matched successfully. The successfully matched production materials are equipped with RFID tags, scanned into the warehouse by the RFID reader, and the purchase list is updated. If the purchase list is matched, the excess production materials enter the waiting area for return. If the purchase list is not complete, the excess production materials enter the secondary analysis area and wait for secondary identification. Based on the environmental data obtained by the detection module, the analysis module analyzes the availability of production materials in the warehouse, screens out scrapped materials, and updates the inventory data. On the other hand, it analyzes the quantity and time of production materials that need to be replaced after the surrounding distribution stations are affected by the environment, analyzes the purchase situation according to the supply and demand relationship, and obtains the purchase list for purchase. All data are stored in the storage module for subsequent search and call.
[0129] In addition, adjustments to inventory data need to take into account purchasing conditions, and the arrival time of purchased production materials needs to take into account the impact of the environment on transportation.
[0130] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for managing materials for power distribution cabinet production, characterized in that: The specific steps include: Obtain relevant parameter information of the materials used to produce the power distribution cabinet, configure RFID tags, scan them with the RFID reader, store them in the warehouse, and obtain material information data; Based on the material information data, the environment around the warehouse is acquired to obtain environmental data, and the impact of the environment on production materials is analyzed to obtain material depreciation data; According to the environmental data, the quantity of materials in the surrounding distribution stations is obtained, and the types and quantities of damaged materials in the surrounding distribution stations are analyzed to obtain material demand data; Based on the environmental data, multiple RFID readers are set up on the production line and transportation line to track the real-time location of production materials, predict transportation time, and obtain material supply data; Based on the material demand data and the material supply data, it is determined whether the existing inventory in the warehouse is sufficient, and purchase is performed if insufficient.
2. A method for managing materials for power distribution cabinet production according to claim 1, characterized in that: The step of obtaining relevant parameter information of the materials for producing the power distribution cabinet, configuring the RFID tag, scanning the material through the RFID reader, storing the material in the warehouse, and obtaining the material information data specifically includes the following steps: Obtain the purchase list of production materials, obtain material standard data, and obtain the size, electromagnetic wave signal, and ultrasonic signal of production materials under standard materials; Based on the material standard data, the name and size of the production materials are scanned before the production materials are put into storage, matched with the purchase list, and the material information is preliminarily confirmed to obtain preliminary information data; According to the purchase list, if the production materials to be stored are not matched with the purchase list after the initial scan, they will enter the waiting area; According to the preliminary information data, the electromagnetic wave signals and ultrasonic signals of the production materials are detected to confirm whether the production materials match the list. If they do not match, they enter the waiting area; If there is a match, an RFID tag is configured, material-related information is stored, and after being read and written scanned by an RFID reader, the material is stored in a warehouse and the quantity is recorded to obtain the material information data.
3. A method for managing materials for power distribution cabinet production according to claim 2, characterized in that: The step of obtaining a purchase list of production materials, obtaining material standard data, and obtaining the size, electromagnetic wave signal, and ultrasonic signal of the production materials under the standard materials also includes the following steps: Obtain the weather environment at the time of entry, obtain the warehouse environment at the time of entry, obtain the temperature data, and obtain the electromagnetic wave impact data based on the inverse coefficient between temperature and electromagnetic wave signal; Based on the temperature data, an inverse coefficient between the temperature and the ultrasonic signal is obtained, the degree of influence of the ultrasonic wave on the production material is analyzed, and ultrasonic wave influence data is obtained; Based on the electromagnetic wave impact data, a relationship curve between the electromagnetic wave signal and the ultrasonic signal is obtained, and the impact of the ultrasonic signal caused by the electromagnetic wave signal is obtained according to the positive and negative relationship within the frequency band, so as to obtain the impact data; The electromagnetic wave impact data, the ultrasonic wave impact data and the impact data are combined, and actual parameter conditions of production materials are calculated and superimposed on the material standard data to update the real-time material standard data.
4. A method for managing materials for power distribution cabinet production according to claim 2, characterized in that: If the material matches, the step of configuring an RFID tag, storing the material-related information, scanning the material with an RFID reader, storing the material in a warehouse and recording the quantity to obtain the material information data also includes the following steps: According to the purchase list, the purchase quantity is obtained, and according to the storage quantity of the production materials, the purchase quantity is automatically reduced and adjusted to obtain the purchase quantity data; Based on the purchase quantity data, when the number of production materials in the purchase list is 0, the relevant information of the production materials automatically disappears from the purchase list, and the purchase list is adjusted; For the production materials in the waiting area, scan the name parameters of the production materials, sort them out, and obtain an unidentified list; Based on the unidentified list and the purchase list, if the purchase list has not been cleared, the production materials are divided into a secondary analysis area; if the purchase list has been cleared, the production materials are placed in a pending area and wait for return processing.
5. A method for managing materials for power distribution cabinet production according to claim 1, characterized in that: The step of acquiring the warehouse environment based on the material information data, obtaining environmental data, analyzing the impact of the environment on production materials, and obtaining material depreciation data specifically includes the following steps: Based on the material information data, the storage time of the production materials is obtained, and the depreciation degree of the production materials is analyzed according to the storage scan to obtain the initial depreciation data; Based on the initial loss data, meteorological data is obtained, and according to the impact of the weather on the production materials, the daily loss degree of the production materials is calculated to obtain meteorological loss data; According to the initial damage data, temperature and humidity data are obtained, and according to the negative correlation between temperature and humidity and production materials, the damage degree caused by daily temperature and humidity is analyzed to obtain temperature and humidity damage data; The weather damage data and the temperature and humidity damage data are combined, and the damage degree of the production materials is analyzed according to the time accumulation to obtain the material damage data.
6. A method for managing materials for power distribution cabinet production according to claim 1, characterized in that: The step of obtaining the quantity of materials in the surrounding distribution stations according to the environmental data, analyzing the types and quantities of damaged materials in the surrounding distribution stations, and obtaining material demand data specifically includes the following steps: Obtain the number of surrounding distribution cabinets, calculate the total types and quantities of production materials for the distribution cabinets based on the number of distribution cabinets, and obtain material quantity data; Based on the material quantity data, the service life of the materials is obtained, and according to the general use time of the production materials in the historical records, the replacement time of the production materials is analyzed to obtain the replacement time data; Based on the replacement time data and the material depreciation data, the depreciation degree of the production materials is analyzed after superposition calculation, the damage time and quantity are obtained, and the material demand data is obtained.
7. A method for managing materials for power distribution cabinet production according to claim 5, characterized in that: The step of setting a plurality of RFID readers and writers on the production line and the transportation line based on the environmental data, tracking the real-time location of the production materials, predicting the transportation time, and obtaining the material supply data also includes the following steps: Set RFID tags on transport vehicles to obtain the cargo transportation time. According to the RFID readers on the production line and transportation line, obtain the real-time distance and transportation time of the cargo and obtain the transportation data. Based on the environmental data and the transportation data, the actual transportation time is analyzed according to the proportional coefficient between the severity of the weather and the transportation time to obtain the transportation time data; The actual data of daily production materials is calculated and predicted based on the material information data and the transportation time data in combination with the daily warehouse in and out information to obtain the material supply data.
8. A method for managing materials for power distribution cabinet production according to claim 7, characterized in that: The step of calculating and predicting actual data of daily production materials based on the material information data and the transportation time data in combination with daily inbound and outbound information to obtain the material supply data further includes the following steps: For the production materials in the secondary analysis area, the purchase list is compared to obtain similarity, and a similarity threshold is set. Those exceeding the similarity threshold are preliminarily screened out to obtain preliminary screening data; Based on the transportation data and the initial screening data, according to the degree of damage of the production materials caused by transportation, it is confirmed whether the production materials are damaged. If damage occurs, it can be matched with the purchase list. If not, it enters the waiting area; After matching, the similarity is used as the depreciation degree for analysis to generate the initial depreciation data of the material, and the purchase list and the material supply data are updated.
9. A method for managing materials for power distribution cabinet production according to claim 5, characterized in that: The step of judging whether the existing inventory in the warehouse is sufficient based on the material demand data and the material supply data, and purchasing if insufficient, further comprises the following steps: Based on the material supply data and the material depreciation data, obtaining an available threshold value of the depreciation degree of production materials to obtain depreciation threshold data; Based on the depreciation threshold data and the material information data, unavailable production materials in the material library are screened out, and the material supply data is updated; According to the material demand data and the material supply data, a difference value is set in which the supply is greater than the demand, and difference data is obtained to determine whether the daily supply and demand reach the difference value; If the requirement is met, there is no need to purchase production materials. If the requirement is not met, the purchase list is generated based on the difference.
10. A material management system for power distribution cabinet production, characterized in that: A method for managing production materials of a power distribution cabinet is applied by applying any one of claims 1 to 9, including a scanning module, a detection module, an analysis module and a storage module, wherein the scanning module is used to scan production materials and output material information data after identifying information; the detection module is used to detect the surrounding environment of the warehouse and output environmental data; the analysis module is signal-connected to the scanning module and the detection module, and is used to receive the material information data and the environmental data, analyze the supply and demand of production materials, and then compile and output a purchase list; the storage module is signal-connected to the scanning module, the detection module and the analysis module, and is used to receive and store the material information data, the environmental data and the purchase list.