Hybrid load energy storage system suitable for micro-grid of wet smelting plant and control method of hybrid load energy storage system
By designing a hybrid load energy storage system and control method in a wet smelter, using the circuit breaker's split-closing control, priority is given to starting the grid-type energy storage equipment and integrating it into conventional energy storage equipment, which solves the problem of guarantee after power outage of external power grids. The difficulties in factory production have achieved rapid recovery of power supply and reduced risk of production interruption.
Patent Information
- Application Number
- CN202411138659.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-19
AI Technical Summary
The prior art cannot ensure the production and operation of the wet smelter after the power supply of the external power grid of the factory is interrupted, resulting in serious safety and economic losses.
A hybrid load energy storage system is designed, and by dividing the power consumption equipment into the first power consumption equipment and the second power consumption equipment according to the power consumption priority, and configuring off-grid and grid-type energy storage equipment, using circuit breaking The switch control of the device is given priority to starting the grid-type energy storage equipment to provide voltage and frequency support, and then incorporate it into conventional energy storage equipment to supply power to ensure the power supply of important power equipment.
After the external power grid is powered off, the grid-type energy storage equipment will be quickly started to provide voltage and frequency support, giving priority to ensuring important power equipment, ensuring the continuous operation of factory production, and reducing the risk of production interruption and economic losses.
Smart Images

Figure CN119093424A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of microgrids, and in particular to a hybrid load energy storage system suitable for a microgrid of a hydrometallurgical plant and a control method thereof. Background Art
[0002] During factory operation, there may be power outages due to power shortages in the external power grid, resulting in isolated grid operation. It takes a long time to restart large factory equipment after shutdown. For example, after the shutdown of a large industrial asynchronous machine in a hydrometallurgical plant, there is still a certain amount of material inside the equipment such as ball mills and crushers towed by the rear end. Restarting after shutdown requires complex technical processes such as turning the machine, frequency conversion motor input, speed increase, and load production.
[0003] In the prior art, energy storage systems can be configured for factories with unstable power supply. Conventional on-grid and off-grid energy storage systems have certain power supply risks in the actual production process: when the power supply of the external power grid is reduced but not completely lost, the voltage and frequency support provided by the external power grid can be used to participate in the energy supply and distribution of the factory microgrid. However, when the external power grid completely loses its power supply capacity, it takes a certain amount of time for the factory's self-provided generator sets to start and connect to the grid. During this period of time, high-energy-consuming machinery will be shut down directly, resulting in serious safety hazards or serious economic and property losses. In other words, the energy storage system configuration in the prior art cannot ensure the production and operation of the factory after the power supply of the factory's external power grid is interrupted. Summary of the invention
[0004] The present invention provides a hybrid load energy storage system and a control method thereof suitable for a microgrid of a hydrometallurgical plant, so as to solve the defect in the prior art that it is impossible to ensure factory production after the power supply terminal of the power grid outside the factory is connected, and to ensure factory production after the power supply of the power grid outside the factory is interrupted.
[0005] The present invention provides a hybrid load energy storage system suitable for a hydrometallurgical plant microgrid, comprising: a plurality of first power-consuming devices, a plurality of second power-consuming devices, a first energy storage device and a second energy storage device, wherein the power consumption priority of the first power-consuming devices is lower than the power consumption priority of the second power-consuming devices, the first energy storage device is an off-grid energy storage device, and the second energy storage device is a grid-connected energy storage device; Each of the first electrical devices is connected to the first energy storage device through a branch with a first circuit breaker, each of the second electrical devices is connected to the second energy storage device through a branch with a second circuit breaker, the first energy storage device is connected to the AC bus through a branch with a third circuit breaker, the second energy storage device is connected to the AC bus through a branch with a fourth circuit breaker, the AC bus is connected to an external power grid, the first electrical device is connected to the AC bus through a branch with a fifth circuit breaker, and the second electrical device is connected to the AC bus through a branch with a sixth circuit breaker.
[0006] The present invention provides a control method for a hybrid load energy storage system applicable to a hydrometallurgical plant microgrid, comprising: when the external power grid is powered off, controlling the third circuit breaker and the sixth circuit breaker to be opened, and the second circuit breaker and the third circuit breaker to be closed; Controlling the opening and closing of the fifth circuit breaker corresponding to the first electrical equipment based on the power failure priority of the first electrical equipment, wherein the power failure priority reflects the degree of influence of the power failure of the first electrical equipment on factory production; After the second energy storage device provides stable voltage and frequency support, the third circuit breaker is controlled to close.
[0007] According to a hybrid load energy storage system control method suitable for a hydrometallurgical plant microgrid provided by the present invention, when the external power grid is not powered off, the third circuit breaker, the fourth circuit breaker, the fifth circuit breaker and the sixth circuit breaker are kept closed, and the first circuit breaker and the second circuit breaker are kept open.
[0008] According to a hybrid load energy storage system control method applicable to a hydrometallurgical plant microgrid provided by the present invention, the method of controlling the opening and closing of the fifth circuit breaker corresponding to the first power consumer based on the power-off priority of the first power consumer comprises: When the power-off priority of the first power-consuming device is the first power-off priority, controlling the fifth circuit breaker corresponding to the first power-consuming device to close, and controlling the first power-consuming device to reduce the load within the process requirement range; When the power-off priority of the first power-consuming device is the second power-off priority, controlling the fifth circuit breaker corresponding to the first power-consuming device to close, and controlling the first power-consuming device to partially shut down; When the power-off priority of the first electrical device is the third power-off priority, controlling the fifth circuit breaker corresponding to the first electrical device to open; The impact of power outage of electrical equipment corresponding to the first power outage priority on production is greater than that of the second power outage priority, and the impact of power outage of electrical equipment corresponding to the second power outage priority on production is greater than that of the third power outage priority.
[0009] According to a hybrid load energy storage system control method applicable to a hydrometallurgical plant microgrid provided by the present invention, after controlling the third circuit breaker to close, the method comprises: After the voltage and frequency of the first energy storage device are synchronized with those of the second energy storage device, the first circuit breaker of the first electrical equipment corresponding to the fifth circuit breaker that is closed is controlled to be closed, and the fifth circuit breaker that is closed is opened.
[0010] According to a hybrid load energy storage system control method applicable to a hydrometallurgical plant microgrid provided by the present invention, after controlling the third circuit breaker to close, the method comprises: The power supply of the second energy storage device is reduced to match the energy consumption of the second power consuming device.
[0011] The present invention also provides a control device for a hybrid load energy storage system suitable for a hydrometallurgical plant microgrid, comprising: A power-off instant control module, used for controlling the third circuit breaker and the sixth circuit breaker to be opened, and the second circuit breaker and the third circuit breaker to be closed when the external power grid is powered off; A first power-consuming equipment control module, configured to control the opening and closing of the fifth circuit breaker corresponding to the first power-consuming equipment based on the power-off priority of the first power-consuming equipment, wherein the power-off priority reflects the degree of influence of the power-off of the first power-consuming equipment on the factory production; The energy storage coordination module is used to control the closing of the third circuit breaker after the second energy storage device provides stable voltage and frequency support.
[0012] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, it implements a hybrid load energy storage system control method applicable to a microgrid of a hydrometallurgical plant as described in any one of the above.
[0013] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the control method for a hybrid load energy storage system applicable to a microgrid of a hydrometallurgical plant as described in any one of the above is implemented.
[0014] The present invention also provides a computer program product, comprising a computer program, which, when executed by a processor, implements any of the above-described hybrid load energy storage system control methods applicable to a hydrometallurgical plant microgrid.
[0015] The hybrid load energy storage system and control method for a microgrid in a hydrometallurgical plant provided by the present invention divides the power-consuming equipment in the factory into first power-consuming equipment and second power-consuming equipment according to power-consuming priorities, directly configures a second grid-forming type energy storage device for the second power-consuming equipment with higher power-consuming priorities, and directly configures a conventional grid-connected and off-grid type first energy storage device for the first power-consuming equipment with lower power-consuming priorities, each first power-consuming equipment is respectively connected to the first energy storage device through a branch provided with a first circuit breaker, each second power-consuming equipment is respectively connected to the second energy storage device through a branch provided with a second circuit breaker, the first energy storage device is connected to the AC busbar through a branch provided with a third circuit breaker, and the second energy storage device is connected to the AC busbar through a branch provided with a fourth circuit breaker. The first power-consuming equipment is connected to the AC busbar, and the AC busbar is connected to the external power grid. The first power-consuming equipment is connected to the AC busbar through a branch of the fifth circuit breaker, and the second power-consuming equipment is connected to the AC busbar through a branch of the sixth circuit breaker. When the external power grid in the factory is disconnected from the power supply, the grid-forming energy storage equipment can be started quickly and preferentially after the power outage through the opening and closing of each circuit breaker, so as to provide voltage and frequency support for the factory power grid in a shorter time, and at the same time, power supply is provided to more important power-consuming equipment in priority. After the grid-forming energy storage equipment provides stable power and frequency, the off-grid energy storage equipment is connected to the grid through the opening and closing of the circuit breaker to provide power support, thereby ensuring the production of the factory after the power supply of the external power grid in the factory is interrupted. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 The wiring principle of the hybrid load energy storage system for the microgrid of a hydrometallurgical plant provided by the present invention is Figure 1 .
[0018] Figure 2 The wiring principle of the hybrid load energy storage system for the microgrid of a hydrometallurgical plant provided by the present invention is Figure 2 .
[0019] Figure 3 It is a flow chart of a control method of a hybrid load energy storage system applicable to a microgrid of a hydrometallurgical plant provided by the present invention.
[0020] Figure 4 It is a structural schematic diagram of a hybrid load energy storage system control device suitable for a hydrometallurgical plant microgrid provided by the present invention.
[0021] Figure 5 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] Combine the following Figure 1 The hybrid load energy storage system provided by the present invention is applicable to a microgrid of a hydrometallurgical plant, such as Figure 1 As shown, the hybrid load energy storage system for a hydrometallurgical plant microgrid provided by the present invention includes a plurality of first power-consuming devices, a plurality of second power-consuming devices, a first energy storage device ( Figure 1 Conventional off-grid energy storage equipment and the second energy storage equipment ( Figure 1 The grid-forming energy storage device in the microgrid). Among them, the first power-consuming device and the second power-consuming device are divided based on power consumption priority, and the power consumption priority of the first power-consuming device is lower than that of the second power-consuming device. Specifically, according to the factory production process, the power-consuming devices included in the factory microgrid can be divided into the first power-consuming device and the second power-consuming device according to the power consumption priority. The second power-consuming device is the production equipment that should be protected first in the factory process, and the first power-consuming device is the non-key protection equipment in production. In other words, the loss caused by the power failure of the first power-consuming device will be greater than the loss caused by the power failure of the second power-consuming device. Figure 2 As shown, in a hydrometallurgical smelter, the second electrical equipment can be large asynchronous motors, park control halls and control systems, electric arc furnaces and other equipment with strict requirements on temperature changes, transportation pipelines for key production materials and their associated pumps or fans, security systems and emergency shutdown systems in the production process within the park, etc. The first electrical equipment can be low-temperature electrolytic cells that have no strict requirements on temperature changes and have a certain system inertia, auxiliary lighting equipment within the plant, air conditioning and ventilation pipelines that have no direct impact on actual production and their associated fans / water coolers or heating equipment, and material transportation pipelines and their associated pumps or fans that have no serious impact on the factory production process after starting, stopping or reducing load.
[0024] In the system provided by the present invention, the first power-consuming device can be connected to the first circuit breaker ( Figure 1 S16-S20 in the first energy storage device) can be directly connected to the first energy storage device, and the second power consumption device can be connected through the second circuit breaker ( Figure 1S4-S9 in the above description directly connects to the second energy storage device, that is, for the second power-consuming device, a grid-type energy storage is configured for it, and for the first power-consuming device, a conventional grid-connected and off-grid energy storage is configured for it. Since the cost of grid-type energy storage is relatively high, the system provided by the present invention can reduce the initial investment and construction cost of the energy storage system in the factory.
[0025] Furthermore, the first energy storage device is provided with a third circuit breaker ( Figure 1 The branch of S2 in the circuit is connected to the AC busbar, and the second energy storage device is connected to the AC busbar by setting the fourth circuit breaker ( Figure 1 The branch of S3 in the circuit is connected to the AC busbar, and the first power-consuming equipment is connected to the AC busbar by setting the fifth circuit breaker ( Figure 1 The branch of S21-S25 in the second power-consuming equipment is connected to the AC busbar by setting the sixth circuit breaker ( Figure 1 The branches S10-S15 in the circuit are connected to the AC bus.
[0026] When a power outage occurs in the external power grid in a factory, the grid-connected energy storage device can be quickly started up first by opening and closing each circuit breaker, and dominate the power supply of the factory microgrid, providing voltage and frequency support for the factory power grid in a shorter period of time, while giving priority to providing power supply to more important electrical equipment. After the grid-connected energy storage device provides stable power and frequency, the grid-connected and off-grid energy storage device can be connected to the grid through the opening and closing of the circuit breaker to provide power support. The grid-connected energy storage device assists the startup and commissioning of conventional grid-connected and off-grid energy storage devices. The two work together to effectively maintain the operation of important electrical equipment and other auxiliary machines in the factory, and ensure factory production after the external power grid is cut off.
[0027] Combine the following Figure 3 The control method of the hybrid load energy storage system applicable to the microgrid of a hydrometallurgical plant provided by the present invention is described as follows: Figure 3 As shown, the control method of the hybrid load energy storage system applicable to the microgrid of a hydrometallurgical plant provided by the present invention comprises the following steps: S310, when the external power grid is powered off, controlling the third circuit breaker and the sixth circuit breaker to be opened, and the second circuit breaker and the third circuit breaker to be closed; S320, controlling the opening and closing of a fifth circuit breaker corresponding to the first electrical equipment based on the power failure priority of the first electrical equipment, wherein the power failure priority reflects the degree of influence of the power failure of the first electrical equipment on factory production; S330: After the second energy storage device provides stable voltage and frequency support, control the third circuit breaker to close.
[0028] like Figure 1As shown, a circuit breaker is provided between the AC bus and the external power grid. When the external power grid is not powered off, the circuit breaker is closed, and the remaining circuit breakers are controlled to be opened and closed, so that various electrical equipment in the factory microgrid are directly powered by the external power grid through the AC bus. That is, when the external power grid is not powered off, the third circuit breaker, the fourth circuit breaker, the fifth circuit breaker and the sixth circuit breaker are kept closed, and the first circuit breaker and the second circuit breaker are kept open. When the external power grid is not powered off, the first energy storage device and the second energy storage device are charged for energy storage.
[0029] When the external power grid is powered off, the circuit breaker between the AC busbar and the external power grid is immediately disconnected, and the third and sixth circuit breakers are immediately controlled to be open, while the second and third circuit breakers are kept closed. In this way, the second energy storage device can be quickly put into power supply to ensure the operation of the second power-consuming device. As for the first power-consuming device, it can be powered off, partially shut down, or continue to operate according to the actual situation.
[0030] Specifically, controlling the opening and closing of the fifth circuit breaker corresponding to the first electrical equipment based on the power-off priority of the first electrical equipment includes: When the power-off priority of the first electrical equipment is the first power-off priority, controlling the fifth circuit breaker corresponding to the first electrical equipment to close, and controlling the first electrical equipment to reduce the load within the process requirement range; When the power-off priority of the first electrical equipment is the second power-off priority, controlling the fifth circuit breaker corresponding to the first electrical equipment to close, and controlling the first electrical equipment to partially shut down; When the power-off priority of the first electrical equipment is the third power-off priority, controlling the fifth circuit breaker corresponding to the first electrical equipment to open; The impact of power outage of electrical equipment corresponding to the first power outage priority on production is greater than that of the second power outage priority, and the impact of power outage of electrical equipment corresponding to the second power outage priority on production is greater than that of the third power outage priority.
[0031] like Figure 2As shown, for equipment that does not require high sensitivity to power changes and has a certain inertia, such as low-temperature electrolyzers, it can be considered as the first power-off priority, and it can be reduced to the minimum load within the scope of process requirements, and keep its corresponding fifth circuit breaker closed so that it can draw power through the second energy storage device. For equipment that can be partially shut down, such as auxiliary lighting equipment, it can be considered as the second power-off priority, keep its corresponding fifth circuit breaker closed, and shut down the equipment according to the minimum baseline standard, so that although it can draw power through the second energy storage device, the amount of power drawn is limited. For example, for auxiliary lighting equipment, a part of the basic lighting that maintains the normal operation of personnel in the factory can be reserved, and the rest of the lighting is shut down. For equipment that has no effect on production when shutting down, such as building air conditioners, it can be considered as the third power-off priority, and the fifth circuit breaker corresponding to the controller is opened so that it cannot draw power through the second energy storage device. By further dividing the first power-consuming equipment, the protection of factory production can be effectively improved when power is supplied through the second energy storage device during a power outage.
[0032] The second energy storage device can quickly provide power supply to the factory microgrid. After establishing stable voltage and frequency support in the second energy storage device, that is, after the voltage and frequency output fluctuation degree of the second energy storage device is lower than the preset set value, the third circuit breaker is closed, so that the first energy storage device can obtain the basic voltage and frequency reference, so as to make corresponding voltage and frequency output.
[0033] After controlling the third circuit breaker to close, the control method provided by the present invention further includes: After the voltage and frequency of the first energy storage device are synchronized with the second energy storage device, the first circuit breaker of the first electrical equipment corresponding to the fifth circuit breaker that is closed is controlled to be closed, and the fifth circuit breaker that is closed is opened.
[0034] When the first energy storage device synchronizes to produce the same voltage and frequency as the second energy storage device, the fifth circuit breaker corresponding to the first power consuming device drawing power from the second energy storage device through the AC bus is opened, and the first circuit breaker directly connected to the first energy storage device is closed.
[0035] Furthermore, when the first energy storage device synchronizes a voltage and frequency consistent with the second energy storage device, since the first energy storage device can participate in power supply, the power supply power of the second energy storage device can be reduced so that the power supply frequency domain of the second energy storage device matches the energy consumption of the second power-consuming device, thereby preferentially ensuring that the power of the second energy storage device is supplied to the second power-consuming device.
[0036] After the first energy storage device runs stably, the power consumption state of the first power-consuming device can be adjusted. Specifically, the power consumption state of the first power-consuming device with the first power-off priority is adjusted first, and the first priority device is controlled to increase the load and operate normally. Then, depending on the power reserve of the first energy storage device, the shut-down first power-consuming device with the second power-off priority is restored. Finally, if there is still power surplus in the first energy storage device, the first circuit breaker of all or part of the first power-consuming devices with the third power-off priority is closed.
[0037] The method provided by the present invention starts the grid-connected energy storage device, partially shuts down the first power-consuming device or reduces its operating power, and waits for the grid-connected energy storage device to establish voltage and frequency support according to the frequency coordination waiting mechanism of the grid-connected and off-grid energy storage devices led by the grid-connected energy storage device. After the grid-connected energy storage device establishes its voltage and frequency support, conventional grid-connected and off-grid energy storage devices are put into use, and the power of the first power-consuming device is gradually restored as required. In this process, the power of the first power-consuming device is gradually adjusted according to the power reduction mechanism and the synchronous power increase mechanism of the grid-connected and off-grid energy storage devices. Finally, under the basic conditions such as the power and capacity of the configured overall energy storage device, the factory is operated with maximum efficiency, and the external grid is waited for power to be restored.
[0038] The hybrid load energy storage system control device applicable to the hydrometallurgical plant microgrid provided by the present invention is described below. The hybrid load energy storage system control device applicable to the hydrometallurgical plant microgrid described below and the hybrid load energy storage system control method applicable to the hydrometallurgical plant microgrid described above can be referred to each other. Figure 4 As shown, the hybrid load energy storage system control device applicable to the microgrid of a hydrometallurgical plant provided by the present invention includes the following modules: The power failure instant control module 410 is used to control the third circuit breaker and the sixth circuit breaker to be opened, and the second circuit breaker and the third circuit breaker to be closed when the external power grid fails; A first power-consuming equipment control module 420, configured to control the opening and closing of a fifth circuit breaker corresponding to the first power-consuming equipment based on a power-off priority of the first power-consuming equipment, wherein the power-off priority reflects the degree of influence of the power-off of the first power-consuming equipment on factory production; The energy storage coordination module 430 is used to control the closing of the third circuit breaker after the second energy storage device provides stable voltage and frequency support.
[0039] Figure 5 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 5As shown, the electronic device may include: a processor 510, a communication interface 520, a memory 530 and a communication bus 540, wherein the processor 510, the communication interface 520 and the memory 530 communicate with each other through the communication bus 540. The processor 510 may call the logic instructions in the memory 530 to execute a hybrid load energy storage system control method applicable to a hydrometallurgical plant microgrid, the method comprising: when the external power grid is powered off, controlling the third circuit breaker and the sixth circuit breaker to be opened, and the second circuit breaker and the third circuit breaker to be closed; based on the power-off priority of the first power-consuming device, controlling the opening and closing of the fifth circuit breaker corresponding to the first power-consuming device, the power-off priority reflects the degree of influence of the power-off of the first power-consuming device on the factory production; when the second energy storage device provides stable voltage and frequency support, controlling the third circuit breaker to be closed.
[0040] In addition, the logic instructions in the above-mentioned memory 530 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.
[0041] On the other hand, the present invention also provides a computer program product, which includes a computer program, which can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the hybrid load energy storage system control method suitable for a wet smelter microgrid provided by the above methods, the method including: when the external power grid is powered off, controlling the third circuit breaker and the sixth circuit breaker to be opened, and the second circuit breaker and the third circuit breaker to be closed; based on the power off priority of the first power user, controlling the opening and closing of the fifth circuit breaker corresponding to the first power user, the power off priority reflects the degree of impact of the power off of the first power user on the factory production; when the second energy storage device provides stable voltage and frequency support, controlling the third circuit breaker to be closed.
[0042] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the hybrid load energy storage system control method suitable for a wet smelter microgrid provided by the above-mentioned methods, the method comprising: when the external power grid is powered off, controlling the third circuit breaker and the sixth circuit breaker to be opened, and the second circuit breaker and the third circuit breaker to be closed; based on the power off priority of the first power user, controlling the opening and closing of the fifth circuit breaker corresponding to the first power user, the power off priority reflects the degree of impact of the power off of the first power user on the factory production; when the second energy storage device provides stable voltage and frequency support, controlling the third circuit breaker to be closed.
[0043] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0044] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0045] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A hybrid load energy storage system suitable for a hydrometallurgical plant microgrid, characterized in that: The hybrid load energy storage system comprises: a plurality of first power-consuming devices, a plurality of second power-consuming devices, a first energy storage device and a second energy storage device, wherein the power consumption priority of the first power-consuming device is lower than the power consumption priority of the second power-consuming device, the first energy storage device is an on-grid and off-grid energy storage device, and the second energy storage device is a grid-connected energy storage device; Each of the first electrical devices is connected to the first energy storage device through a branch with a first circuit breaker, each of the second electrical devices is connected to the second energy storage device through a branch with a second circuit breaker, the first energy storage device is connected to the AC bus through a branch with a third circuit breaker, the second energy storage device is connected to the AC bus through a branch with a fourth circuit breaker, the AC bus is connected to an external power grid, the first electrical device is connected to the AC bus through a branch with a fifth circuit breaker, and the second electrical device is connected to the AC bus through a branch with a sixth circuit breaker.
2. A control method for a hybrid load energy storage system suitable for a hydrometallurgical plant microgrid according to claim 1, characterized in that: The method comprises: When the external power grid is powered off, controlling the third circuit breaker and the sixth circuit breaker to be opened, and the second circuit breaker and the third circuit breaker to be closed; Controlling the opening and closing of the fifth circuit breaker corresponding to the first electrical equipment based on the power failure priority of the first electrical equipment, wherein the power failure priority reflects the degree of influence of the power failure of the first electrical equipment on factory production; After the second energy storage device provides stable voltage and frequency support, the third circuit breaker is controlled to close.
3. The hybrid load energy storage system control method applicable to a hydrometallurgical plant microgrid according to claim 2 is characterized in that: When the external power grid is not powered off, the third circuit breaker, the fourth circuit breaker, the fifth circuit breaker and the sixth circuit breaker are kept closed, and the first circuit breaker and the second circuit breaker are kept open.
4. The hybrid load energy storage system control method applicable to a hydrometallurgical plant microgrid according to claim 2 is characterized in that: The controlling the opening and closing of the fifth circuit breaker corresponding to the first electrical equipment based on the power-off priority of the first electrical equipment includes: When the power-off priority of the first power-consuming device is the first power-off priority, controlling the fifth circuit breaker corresponding to the first power-consuming device to close, and controlling the first power-consuming device to reduce the load within the process requirement range; When the power-off priority of the first power-consuming device is the second power-off priority, controlling the fifth circuit breaker corresponding to the first power-consuming device to close, and controlling the first power-consuming device to partially shut down; When the power-off priority of the first electrical device is the third power-off priority, controlling the fifth circuit breaker corresponding to the first electrical device to open; The impact of power outage of electrical equipment corresponding to the first power outage priority on production is greater than that of the second power outage priority, and the impact of power outage of electrical equipment corresponding to the second power outage priority on production is greater than that of the third power outage priority.
5. The hybrid load energy storage system control method applicable to a hydrometallurgical plant microgrid according to claim 2 is characterized in that: After the controlling the third circuit breaker to close, the method further comprises: After the voltage and frequency of the first energy storage device are synchronized with those of the second energy storage device, the first circuit breaker of the first electrical equipment corresponding to the fifth circuit breaker that is closed is controlled to be closed, and the fifth circuit breaker that is closed is opened.
6. The hybrid load energy storage system control method applicable to a hydrometallurgical plant microgrid according to claim 2 is characterized in that: After the controlling the third circuit breaker to close, the method further comprises: The power supply of the second energy storage device is reduced to match the energy consumption of the second power consuming device.
7. A control device for a hybrid load energy storage system suitable for a hydrometallurgical plant microgrid according to claim 1, characterized in that: include: A power-off instant control module, used for controlling the third circuit breaker and the sixth circuit breaker to be opened, and the second circuit breaker and the third circuit breaker to be closed when the external power grid is powered off; A first power-consuming equipment control module, configured to control the opening and closing of the fifth circuit breaker corresponding to the first power-consuming equipment based on the power-off priority of the first power-consuming equipment, wherein the power-off priority reflects the degree of influence of the power-off of the first power-consuming equipment on the factory production; The energy storage coordination module is used to control the closing of the third circuit breaker after the second energy storage device provides stable voltage and frequency support.
8. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the computer program, the hybrid load energy storage system control method applicable to the microgrid of a hydrometallurgical plant as described in any one of claims 2 to 6 is implemented.
9. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by the processor, the hybrid load energy storage system control method applicable to the microgrid of a hydrometallurgical plant as described in any one of claims 2 to 6 is implemented.
10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by the processor, the hybrid load energy storage system control method applicable to the microgrid of a hydrometallurgical plant as described in any one of claims 2 to 6 is implemented.
Citation Information
Patent Citations
Micro-grid-connected multi-level multi-target self-balancing control system and method
CN113824136A
Black-start system and method for small hydropower station micro-grid
CN114094635A
Network construction type energy storage converter pre-synchronization control method based on virtual instantaneous power
CN116111867A
Control method and control device of micro-grid, micro-grid and storage medium
CN118074211A