Device and method for automatically binding reinforcing steel bars and pouring concrete in vertical shaft
By designing automatic steel bar binding devices in the construction of the shaft, and using ring tracks and moving trolleys to achieve automatic steel bar binding, the problem of long and unsafe manual binding time is solved, the construction efficiency and automation are improved, and the concrete pouring is not affected.
Patent Information
- Application Number
- CN202411043922.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-12-13
AI Technical Summary
In the construction of vertical shafts, steel bar binding usually relies on manual operations, resulting in long and unsafe binding time and lack of automation, which affects construction efficiency and accuracy.
A device including steel formwork assembly, stable boot assembly and working platform was designed, and the revolving track and moving cart were used to achieve automatic binding of steel bars. Through the automatic binding of steel bars, the structure is automatically positioned, combed straight and fixed, and manual participation is reduced.
Automatic binding of steel bars is realized, construction efficiency and safety is improved, and the degree of automation of vertical shaft construction is enhanced, without affecting the concrete pouring process.
Smart Images

Figure CN119122535A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of shaft construction, and in particular relates to a device and method for automatic steel bar binding and concrete pouring in a shaft. Background Art
[0002] Before pouring the shaft, scattered steel bars need to be tied into a steel cage in the shaft. Currently, the tying is usually done manually, which not only costs manpower but also requires workers to move back and forth, making the tying time long. Summary of the invention
[0003] The present invention proposes a device for automatic steel bar binding and concrete pouring in a shaft, which can reduce manual participation in the entire binding process, improve safety, facilitate improving construction efficiency, improve steel bar binding accuracy and the degree of automation of shaft construction, and at the same time do not affect pouring.
[0004] To this end, the technical solution adopted by the present invention is: a device for automatic steel bar binding and concrete pouring in a shaft, including a steel formwork assembly for realizing concrete pouring, the steel formwork assembly is arranged on a load-bearing frame, and a spacing is arranged on the outer side of the lower end of the load-bearing frame for supporting a stabilizing shoe assembly on the shaft wall, and a working platform for realizing pouring and steel bar binding operations is arranged above the steel formwork assembly, and an automatic steel bar binding structure for realizing steel bar binding is arranged on the working platform.
[0005] As a preferred embodiment of the above scheme, the automatic steel bar binding structure includes at least two annular rails spaced apart from each other, each annular rail is provided with a mobile trolley which can move in a circular manner on the corresponding annular rail, all the mobile trolleys are provided with a vertical steel bar positioning component for positioning the vertical steel bars, an automatic steel bar binding component for binding the vertical steel bars and the annular steel bars, and annular steel bar straightening component for maintaining the spacing between the annular steel bars, and the annular steel bar straightening component is located in front of the moving direction of the vertical steel bar positioning component and the automatic steel bar binding component, all the annular rails are supported by a plurality of columns which are arranged in a circumferential direction and whose lower ends are fixed to the working platform, and at least one of the columns is provided with an annular steel bar fixing component for fixing the annular steel bars.
[0006] Further preferably, the annular steel bar fixing assembly includes an annular steel bar fixing plate, and a plurality of fixing openings for fixing the annular steel bars are arranged at upper and lower intervals on the side of the annular steel bar fixing plate facing the shaft wall, and the annular steel bar fixing plate is arranged on the corresponding column through at least two annular steel bar fixing telescopic cylinders arranged at upper and lower intervals, and the annular steel bar fixing telescopic cylinders are staggered with the annular track.
[0007] Further preferably, the vertical steel bar positioning assembly includes a vertical steel bar positioning plate, on which a plurality of vertical steel bar clamps are arranged at upper and lower intervals, the vertical steel bar positioning plate is arranged on a corresponding mobile trolley through a vertical steel bar telescopic bracket, and a vertical steel bar positioning telescopic cylinder located on both sides of the vertical steel bar telescopic bracket is also arranged between each mobile trolley and the vertical steel bar positioning plate.
[0008] Further preferably, the automatic steel bar binding assembly includes a steel bar binding robot, which is slidably arranged on a vertical walking track, and the vertical walking track is arranged on a corresponding mobile trolley through a binding telescopic bracket, and a steel bar binding telescopic cylinder located on both sides of the binding telescopic bracket is also arranged between each mobile trolley and the binding telescopic bracket.
[0009] Further preferably, the annular steel bar straightening assembly includes an annular steel bar straightening plate, on which a plurality of positioning openings for the annular steel bars to be inserted and a plurality of anti-slip rods for preventing the steel bars from slipping out of the annular steel bar fixing assembly are arranged at upper and lower intervals, and the annular steel bar straightening plate is arranged on a corresponding mobile trolley through a straightening telescopic bracket, and a straightening telescopic cylinder located on both sides of the straightening telescopic bracket is also arranged between each mobile trolley and the straightening telescopic bracket.
[0010] Further preferably, an auxiliary platform is provided on the column to assist in fixing the annular reinforcement on the annular reinforcement fixing assembly, and an inclined support is provided between the auxiliary platform and the column.
[0011] Further preferably, the steel formwork assembly includes at least two steel formworks, each having a pouring window thereon for facilitating concrete pouring, two adjacent steel formworks being connected by a steel formwork telescopic bracket, and a demolding cylinder located on the inner side of the steel formwork telescopic bracket for achieving demolding is also provided between the two adjacent steel formworks. When the demolding cylinder is retracted, the distance between the two adjacent steel formworks is shortened, thereby achieving demolding.
[0012] Further preferably, the stabilizing shoe assembly includes a support plate that can be supported on the wall of the shaft, the support plate is arranged on the bearing frame body through corresponding supporting telescopic brackets, the support plate and the bearing frame body are provided with stabilizing shoes, the stabilizing shoe includes a vertically arranged shoe cylinder, the upper and lower ends of the shoe cylinder are hinged to the support plate or the bearing frame body through correspondingly arranged shoe rods, and the shoe rod and the shoe cylinder are connected in an articulated manner.
[0013] Also disclosed is a method for automatic steel bar binding and concrete pouring in a shaft, based on the above steel bar binding and concrete pouring device, further comprising the following steps:
[0014] S1: The whole device moves into position; the stabilizing shoe assembly shrinks, and then the whole device is driven downward by the hoist until the automatic steel bar binding structure is just below the cast part, and then stops moving. At this time, the stabilizing shoe assembly unfolds to support the whole device in the corresponding position;
[0015] S2: Steel bar binding, the circumferential steel bars and vertical steel bars are placed down in sequence from the top, and the steel cage is automatically bound by the steel bar automatic binding structure during the process of the vertical steel bars being placed down;
[0016] S3: Casting and demoulding. After the steel cage is tied, the stabilizing shoe assembly is retracted first, and then the entire device is moved upward by the hoist. At this time, the tied steel cage does not move. When the steel formwork and the tied steel cage are at the same height, the stabilizing shoe assembly is unfolded to support the entire device, and then casting is carried out. After casting, the steel formwork assembly is demoulded. After demoulding, wait for the next work.
[0017] Beneficial effects of the present invention:
[0018] 1) An automatic steel bar tying structure is provided to realize automatic tying of steel bars, and the automatic steel bar tying structure is located above the working platform. During pouring, the automatic steel bar tying structure will not affect the pouring.
[0019] 2) The positions of multiple annular steel bars are fixed by annular steel bar fixing components, and the vertical steel bars are positioned by vertical steel bar positioning components that can move on the annular track. In addition, there is an automatic steel bar binding component that can move with the vertical steel bars and can bind the vertical and annular steel bars, so that the entire steel cage can be automatically bound, and no manual binding is required during the binding process, which can effectively reduce the manual participation in the entire binding process, thereby improving safety, facilitating the improvement of construction efficiency, and improving the steel bar binding accuracy and the degree of automation of shaft construction, while not affecting the pouring.
[0020] 3) A circumferential steel bar straightening assembly is provided in the automatic steel bar binding structure, and the circumferential steel bar straightening assembly can move together with the vertical steel bar positioning assembly, so as to prevent the circumferential steel bars at the position where there is no circumferential steel bar fixing plate from falling downward under the action of gravity, thereby ensuring the spacing of the circumferential steel bars. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the present invention.
[0022] Figure 2 It is a top view of the automatic steel bar binding structure in the present invention.
[0023] Figure 3 It is a schematic diagram of the annular steel bar fixing assembly in the present invention.
[0024] Figure 4 It is a schematic diagram of the annular steel bar straightening assembly in the present invention.
[0025] Figure 5 It is a schematic diagram of the vertical steel bar positioning assembly in the present invention.
[0026] Figure 6 It is a schematic diagram of the automatic steel bar binding assembly in the present invention.
[0027] Figure 7 It is a top view of the steel formwork assembly in the present invention when it is in a supporting state.
[0028] Figure 8 It is a top view of the steel formwork assembly in the present invention when it is in a demoulding state.
[0029] Figure numerals: Annular track-1, column-2, Annular steel bar fixing plate-3, fixing opening-3a, Annular steel bar fixing telescopic cylinder-4, moving trolley-5, vertical steel bar positioning plate-6, vertical steel bar clamp-6a, vertical steel bar telescopic bracket-7, vertical steel bar positioning telescopic cylinder-8, steel bar tying manipulator-9, vertical walking track-10, tying telescopic bracket-11, steel bar tying telescopic cylinder-12, Annular steel bar straightening plate-13, positioning opening-13a, anti-slip rod-13b, straightening telescopic bracket-14, straightening telescopic cylinder-15, auxiliary platform-16, working platform-17, steel formwork-18, casting window-18a, bearing frame-19, support plate-20, supporting telescopic bracket-21, stabilizing support shoe-22, support shoe cylinder-22a, support shoe rod-22b, steel formwork telescopic bracket-23, demoulding cylinder-24. DETAILED DESCRIPTION
[0030] The present invention will be further described below by way of embodiments and in conjunction with the accompanying drawings:
[0031] like Figure 1-8 As shown, a device for automatic steel bar tying and concrete pouring in a shaft is mainly composed of a steel formwork assembly, a bearing frame 19, a stabilizing shoe assembly, a working platform 17 and a steel bar automatic tying structure, wherein the steel formwork assembly is used for concrete pouring, and the steel formwork assembly is arranged on the bearing frame 19, and a stabilizing shoe assembly is arranged at intervals on the outer side of the lower end of the bearing frame 19 for supporting on the shaft wall. Preferably, at least three groups of stabilizing shoe assemblies are evenly spaced circumferentially, and a working platform 17 for pouring and steel bar tying operations is arranged above the steel formwork assembly, and an automatic steel bar tying structure for steel bar tying is arranged on the working platform 17.
[0032] The automatic steel bar binding structure mainly consists of a circular track 1, columns 2, a vertical steel bar positioning assembly, a steel bar automatic binding assembly, a circular steel bar straightening assembly and a circular steel bar fixing assembly. Among them, at least two circular tracks 1 are arranged at intervals above and below, and all circular tracks 1 are supported by multiple columns 2 arranged in a circular manner and fixed at the lower end, and at least one column 2 is provided with a circular steel bar fixing assembly for fixing the circular steel bars.
[0033] Each annular track 1 is provided with a mobile trolley 5 that moves in annular direction on the corresponding annular track, and all the mobile trolleys 5 are provided with a vertical steel bar positioning assembly for positioning the vertical steel bars, a steel bar automatic binding assembly for binding the vertical steel bars with the annular steel bars, and an annular steel bar straightening assembly for maintaining the spacing of the annular steel bars, and the annular steel bar straightening assembly is located in front of the moving direction of the vertical steel bar positioning assembly and the steel bar automatic binding assembly, that is, the mobile trolleys of the vertical steel bar positioning assembly, the steel bar automatic binding assembly, and the annular steel bar straightening assembly are shared, that is, the vertical steel bar positioning assembly, the steel bar automatic binding assembly, and the annular steel bar straightening assembly are all synchronously moved in annular direction under the action of multiple mobile trolleys arranged at intervals above and below. Of course, a separate mobile trolley can also be provided for the vertical steel bar positioning assembly, the steel bar automatic binding assembly, and the annular steel bar straightening assembly on each annular track, that is, the mobile trolleys of the vertical steel bar positioning assembly, the steel bar automatic binding assembly, and the annular steel bar straightening assembly are separately arranged. To further improve efficiency, at least two moving trolleys can be arranged on each circular track, and all moving trolleys located on the same vertical plane are provided with vertical steel bar positioning components, steel bar automatic binding components and circular steel bar straightening components, that is, at least two groups of vertical steel bar positioning components, steel bar automatic binding components and circular steel bar straightening components are arranged in the circular direction. The moving trolley adopts a structure that can automatically move on the circular track according to the existing technology.
[0034] The annular steel bar fixing assembly specifically includes an annular steel bar fixing plate 3, on which a plurality of fixing openings 3a for fixing the annular steel bars are arranged at upper and lower intervals on one side of the annular steel bar fixing plate 3 facing the shaft wall. To achieve the fixation of the annular steel bars, at least two annular steel bar fixing telescopic cylinders 4 are arranged at upper and lower intervals on the annular steel bar fixing plate 3 and are arranged on corresponding columns 2, so that the position of the annular steel bar fixing plate can be adjusted so that the tied steel bar cage can better match the shaft, and the annular steel bar fixing telescopic cylinders 3 and the annular rail 1 are staggered so that the automatic binding assembly will not interfere with the annular steel bar fixing assembly.
[0035] The vertical steel bar positioning assembly includes a vertical steel bar positioning plate 6. To facilitate the positioning of the vertical steel bars after they are placed, a plurality of vertical steel bar clamps 6a are arranged at intervals up and down on the vertical steel bar positioning plate 6. Preferably, the vertical steel bar clamps are arranged staggered up and down with the annular track, and a strip groove or an open groove for the vertical steel bars to pass through is arranged on the vertical steel bar clamps. To achieve the fixation of the vertical steel bar positioning plate, the vertical steel bar positioning plate 6 is arranged on the corresponding mobile trolley 5 through the vertical steel bar telescopic bracket 7, and a vertical steel bar positioning telescopic cylinder 8 located on both sides of the vertical steel bar telescopic bracket is also arranged between each mobile trolley 5 and the vertical steel bar positioning plate 6, so that it can adjust the position of the vertical steel bar positioning plate, thereby facilitating the contact between the annular steel bars and the vertical steel bars.
[0036] The steel bar automatic binding assembly includes a steel bar binding manipulator 9. To achieve the binding of multiple annular steel bars and vertical steel bars, the steel bar binding manipulator 9 is slidably arranged on a vertical travel track 10. A driving assembly for realizing the up and down movement of the steel bar binding manipulator is also arranged between the steel bar binding manipulator and the vertical travel track, and the driving assembly can adopt a screw nut mechanism or a gear rack mechanism, among which the steel bar binding manipulator is a prior art. To achieve the fixation of the vertical travel track, the vertical travel track 10 is arranged on the corresponding mobile trolley 5 through a binding telescopic bracket 11, and a steel bar binding telescopic cylinder 12 located on both sides of the binding telescopic bracket is also arranged between each mobile trolley 5 and the binding telescopic bracket 11, so as to facilitate the overall device to be moved out of the shaft after completion.
[0037] The annular steel bar straightening assembly includes an annular steel bar straightening plate 13, on which a plurality of positioning openings 13a for the annular steel bars to be inserted and a plurality of anti-dropping rods 13b for preventing the steel bars from falling out of the annular steel bar fixing assembly are arranged at intervals up and down. The annular steel bar straightening plate 13 is arranged on the corresponding moving trolley 5 through a straightening telescopic bracket 14, and a straightening telescopic cylinder 15 located on both sides of the straightening telescopic bracket is also arranged between each moving trolley 5 and the straightening telescopic bracket 14.
[0038] Preferably, an auxiliary platform 16 is provided on the column 2 to assist in fixing the annular reinforcement on the annular reinforcement fixing assembly, and a staircase with handrails is provided between the auxiliary platform and the bottom to facilitate access to the auxiliary platform, and an inclined support is provided between the auxiliary platform 16 and the column 2, and preferably handrails are also provided on the outside of the working platform and the auxiliary platform.
[0039] To facilitate demoulding of the steel formwork assembly, the steel formwork assembly includes at least two steel formworks, a pouring window 18a is left on the steel formwork 18 for pouring concrete, two adjacent steel formworks 18 are connected by a steel formwork telescopic bracket 23, and a demoulding oil cylinder 24 is arranged inside the steel formwork telescopic bracket 23 between the two adjacent steel formworks 18 for demoulding. When the demoulding oil cylinder is retracted, the distance between the two adjacent steel formworks is shortened, thereby achieving demoulding. To facilitate the hoisting of the steel formwork assembly, a number of template hoisting points are also provided.
[0040] The stabilizing shoe assembly includes a support plate 20 that can be supported on the wall of the shaft. The support plate 20 is arranged on the bearing frame 19 through a corresponding supporting telescopic bracket 21. Stabilizing shoes 22 are arranged on the support plate 20 and the bearing frame 19. The stabilizing shoe 22 includes a vertically arranged shoe cylinder 22a. The upper and lower ends of the shoe cylinder 22a are hinged to the support plate 20 or the bearing frame 19 through corresponding shoe rods 22b, and the shoe rod 22b is connected to the shoe cylinder 22a in an articulated manner. When the shoe cylinder 22a is extended, the support plate can be brought close to the bearing frame, thereby facilitating the up and down movement of the bearing frame. When the shoe cylinder 22a is contracted, the support plate can be moved away from the bearing frame, so that the support plate is against the wall of the shaft and the bearing frame does not move.
[0041] To reduce the moving distance, it is best that the depth of the steel formwork assembly matches the depth of the column, that is, the tied steel cage matches the corresponding casting depth of the steel formwork assembly.
[0042] Based on the above device, a method for automatic steel bar binding and concrete pouring in a shaft is provided, which is also equipped with a hoist located outside the shaft, and the cable of the hoist is fixed on the bearing frame, and before each contraction of the stabilizing shoe assembly (i.e., before the shoe cylinder is extended), it is best to ensure that the hoist cable is in a taut state, including the following steps:
[0043] The first step is to move the entire device into place. First, retract the stabilizing shoe assembly, and then use the hoist to drive the entire device downward until the automatic steel bar binding structure is just below the poured part, then stop moving. At this time, the stabilizing shoe assembly unfolds to support the entire device in the corresponding position.
[0044] Step 2: Steel bar tying. Place the circumferential steel bars and vertical steel bars in order from the top. After all the circumferential steel bars are placed, place the vertical steel bars. At the same time, the steel bar automatic tying structure is used to automatically tie the steel cage during the process of placing the vertical steel bars. The specific operation process is as follows:
[0045] 1. Fixing of multiple annular steel bars. First, insert the annular steel bars into the fixed openings at the same height. When inserting, the insertion is achieved through the joint action of manual labor and the annular steel bar straightening assembly. Specifically, the straightening telescopic cylinder is extended to extend the annular steel bar straightening plate outward for a certain distance, and then the annular steel bars are lowered to the corresponding position. Even if the annular steel bars fall into the positioning opening and are located on the inner side of the anti-drop rod, the straightening telescopic cylinder is retracted to allow the annular steel bars to have the force to be inserted into the fixed opening. When the straightening telescopic cylinder is retracted, the workers work together to insert the annular steel bars into all the fixed openings. Repeat the above work to complete the fixation of multiple annular steel bars.
[0046] 2. Tie the vertical steel bars at the bottom. Align the vertical steel bars with the vertical steel bar clamp and lower them vertically so that the vertical steel bars are located in the vertical steel bar clamp. Then the steel bar tying manipulator works to realize the automatic tying of a vertical steel bar and multiple circular steel bars. After completion, the mobile trolley drives the circular steel bar straightening assembly, the vertical steel bar positioning assembly and the steel bar automatic tying assembly to the next position.
[0047] 3. Form a steel cage. Repeat step 2 until the automatic binding of the steel cage is completed.
[0048] The third step is pouring and demoulding. After the automatic binding of the steel cage is completed, the steel bar fixing telescopic cylinder, the vertical steel bar positioning telescopic cylinder, the steel bar binding telescopic cylinder and the combing telescopic cylinder are retracted to facilitate subsequent operations. The stabilizing shoe assembly is retracted, and the entire device is driven upward by the hoist. At this time, the bound steel cage does not move. When the steel formwork and the bound steel cage are at the same height, the stabilizing shoe assembly is unfolded to support the entire device, and then pouring is carried out through the pouring window. After pouring, the steel formwork assembly is demoulded. After demoulding, wait for the next work.
Claims
1. A device for automatic steel bar tying and concrete pouring in a shaft, characterized by: The invention comprises a steel formwork assembly for realizing concrete pouring, wherein the steel formwork assembly is arranged on a bearing frame (19), a stabilizing shoe assembly is arranged at a spacing on the outer side of the lower end of the bearing frame (19) for supporting on the wall of a shaft, an operating platform (17) for realizing pouring and steel bar tying operations is arranged above the steel formwork assembly, and an automatic steel bar tying structure for realizing steel bar tying is arranged on the operating platform (17).
2. The device for automatic steel bar tying and concrete pouring in a shaft according to claim 1, characterized in that: The steel bar automatic binding structure comprises at least two annular tracks (1) arranged at intervals in the upper and lower parts, each annular track (1) is provided with a movable trolley (5) which moves in annular direction on the corresponding annular track, all movable trolleys (5) are provided with a vertical steel bar positioning component for positioning vertical steel bars, an automatic steel bar binding component for binding vertical steel bars with annular steel bars, and an annular steel bar straightening component for maintaining the spacing between the annular steel bars, and the annular steel bar straightening component is located in front of the moving direction of the vertical steel bar positioning component and the automatic steel bar binding component, all the annular tracks (1) are supported by a plurality of columns (2) which are arranged in annular direction and fixed at the lower ends, and at least one column (2) is provided with an annular steel bar fixing component for fixing the annular steel bars.
3. The device for automatic steel bar tying and concrete pouring in a shaft according to claim 2, characterized in that: The annular steel bar fixing assembly comprises an annular steel bar fixing plate (3), a side of the annular steel bar fixing plate (3) facing the shaft wall is provided with a plurality of fixing openings (3a) for fixing the annular steel bars at intervals in the upper and lower directions, the annular steel bar fixing plate (3) is provided on a corresponding column (2) via at least two annular steel bar fixing telescopic cylinders (4) provided at intervals in the upper and lower directions, and the annular steel bar fixing telescopic cylinders (3) are provided in a staggered manner with the annular track (1).
4. The device for automatic steel bar tying and concrete pouring in a shaft according to claim 2, characterized in that: The vertical steel bar positioning assembly comprises a vertical steel bar positioning plate (6), on which a plurality of vertical steel bar clamps (6a) are arranged at intervals above and below, and the vertical steel bar positioning plate (6) is arranged on a corresponding moving trolley (5) via a vertical steel bar telescopic bracket (7), and a vertical steel bar positioning telescopic cylinder (8) located on both sides of the vertical steel bar telescopic bracket is further arranged between each moving trolley (5) and the vertical steel bar positioning plate (6).
5. The device for automatic steel bar tying and concrete pouring in a shaft according to claim 2, characterized in that: The automatic steel bar binding assembly comprises a steel bar binding manipulator (9), the steel bar binding manipulator (9) is slidably arranged on a vertical travel track (10), the vertical travel track (10) is arranged on a corresponding moving trolley (5) through a binding telescopic bracket (11), and a steel bar binding telescopic cylinder (12) is also arranged between each moving trolley (5) and the binding telescopic bracket (11) and located on both sides of the binding telescopic bracket.
6. The device for automatic steel bar tying and concrete pouring in a shaft according to claim 2, characterized in that: The annular steel bar straightening assembly comprises an annular steel bar straightening plate (13), on which a plurality of positioning openings (13a) for the annular steel bars to be inserted and a plurality of anti-falling rods (13b) for preventing the steel bars from falling out of the annular steel bar fixing assembly are arranged at intervals up and down. The annular steel bar straightening plate (13) is arranged on a corresponding moving trolley (5) via a straightening telescopic bracket (14), and a straightening telescopic cylinder (15) located on both sides of the straightening telescopic bracket is further arranged between each moving trolley (5) and the straightening telescopic bracket (14).
7. The device for automatic steel bar tying and concrete pouring in a shaft according to claim 2, characterized in that: The column (2) is provided with an auxiliary platform (16) for assisting in fixing the annular steel bars on the annular steel bar fixing assembly, and an inclined support is provided between the auxiliary platform (16) and the column (2).
8. The device for automatic steel bar tying and concrete pouring in a shaft according to claim 1, characterized in that: The steel formwork assembly comprises at least two steel formworks (18), a pouring window (18a) is left on the steel formworks (18) for facilitating concrete pouring, two adjacent steel formworks (18) are connected via a steel formwork telescopic bracket (23), and a demoulding cylinder (24) is provided between the two adjacent steel formworks (18) and is located inside the steel formwork telescopic bracket (23) for achieving demoulding. When the demoulding cylinder (24) is retracted, the distance between the two adjacent steel formworks (23) is shortened, thereby achieving demoulding.
9. The device for automatic steel bar tying and concrete pouring in a shaft according to claim 1, characterized in that: The stabilizing shoe assembly comprises a support plate (20) capable of being supported on a shaft wall, the support plate (20) being arranged on a bearing frame (19) via a corresponding supporting telescopic bracket (21), the support plate (20) and the bearing frame (19) being provided with stabilizing shoes (22), the stabilizing shoes (22) comprising a vertically arranged shoe cylinder (22a), the upper and lower ends of the shoe cylinder (22a) being hinged to the support plate (20) or the bearing frame (19) via a correspondingly arranged shoe rod (22b), and the shoe rod (22b) and the shoe cylinder (22a) being connected in an articulated manner.
10. A method for automatic steel bar binding and concrete pouring in a shaft, characterized in that: The steel bar binding and concrete pouring device according to any one of claims 1 to 9 further comprises the following steps: S1: The whole device moves into position; the stabilizing shoe assembly shrinks, and then the whole device is driven downward by the hoist until the automatic steel bar binding structure is just below the cast part, and then stops moving. At this time, the stabilizing shoe assembly unfolds to support the whole device in the corresponding position; S2: Steel bar tying, the circumferential steel bars and vertical steel bars are placed down in sequence from the top, and after the circumferential steel bars are placed down, the vertical steel bars are placed down, and the steel cage is automatically tied by the steel bar automatic tying structure during the process of placing the vertical steel bars down; S3: Casting and demoulding. After the steel cage is tied, the stabilizing shoe assembly is retracted first, and then the entire device is moved upward by the hoist. At this time, the tied steel cage does not move. When the steel formwork and the tied steel cage are at the same height, the stabilizing shoe assembly is unfolded to support the entire device, and then casting is carried out. After casting, the steel formwork assembly is demoulded. After demoulding, wait for the next work.