The invention provides a kerb short-distance transportation and installation integration device. The kerb short-distance transportation and installation integration device comprises a pallet fork frame, front traveling wheels, a crane carriage handrail, a crane boom, a crane boom support, a rotary platform, driving wheels, a rack body, an operating device and an engine. The rack body is fixedly arranged on a rear axle above a rotary shaft of the driving wheels. The front end of the pallet fork frame is fixedly mounted on a rotary shaft of the front traveling wheels. A lifting cylinder is mounted on the rack body and connected with the pallet fork frame. The rotary platform is mounted at the top end of the rack body. The crane boom support hinged to the crane boom is mounted and fixed to the rotary platform. A supporting cylinder is mounted between the crane boom support and the crane boom. A hoisting manipulator is connected with a hoisting chain. The operating device is arranged on the top of the rear end of the rack body. Through the kerb short-distance transportation and installation integration device, the problems that labor and time are wasted during manual transportation andpavement of kerbs and the efficiency is low are effectively solved. The kerb short-distance transportation and installation integration device is high in construction automation level and working efficiency, and achieves the synchronous, accurate and integral transfer, installation and pavement effects of kerbs.