Large-volume concrete pouring equipment for deep foundation pit and use method of large-volume concrete pouring equipment
By using symmetrical crown beams and adjustment mechanisms in deep foundation pits, combined with the combined design of bolts, sliders, sliders, pulleys and flexible slip pipes, the flexibility of the pouring method for large-volume concrete in deep foundation pits in the prior art is solved and Efficiency issues have achieved precise casting and efficient construction that adapts to different foundation pit sizes.
Patent Information
- Application Number
- CN202411553487.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-02
- Publication Date
- 2024-12-17
AI Technical Summary
The existing large-volume concrete pouring methods for deep foundation pits have problems such as inability to cover the pouring range, high construction costs, long time and poor flexibility. In particular, automobile pumps and chute setting methods are limited by the foundation pit depth and pouring range.
A large-volume concrete pouring equipment for deep foundation pits including two symmetrical crown beams and adjustment mechanisms was designed. The horizontal and vertical pipes of the pipes were realized through the combination of bolts, slide rails, sliders, pulleys, wire ropes and flexible pipes. Movement improves the flexibility and efficiency of construction.
The equipment realizes precise pouring in deep foundation pits through the adjustment mechanism, adapts to the needs of foundation pits of different widths and depths, improves the flexibility and efficiency of construction, and ensures the stability and flexibility of the pouring process.
Smart Images

Figure CN119145414A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of deep foundation pit pouring, and in particular to a deep foundation pit mass concrete pouring device and a use method thereof. Background Art
[0002] In modern construction projects, with the development of urban construction, there are more and more underground structures such as high-rise buildings, large underground shopping malls, underground parking lots and subway stations. These underground structures often require deep foundation pits as the foundation space. Concrete pouring in deep foundation pits, especially large-volume concrete pouring, has become a key link. For example, on the raft foundation of a super-high-rise building, in order to meet the huge load transfer requirements of the superstructure, the raft foundation thickness may reach several meters and the area may reach thousands of square meters. The quality of this large-volume concrete pouring is directly related to the stability of the entire building.
[0003] At present, the methods for pouring large-volume concrete in deep foundation pits include tower crane hoisting, ground pump pouring, automobile pump pouring and chute pouring. Among them, automobile pump and chute pouring are common construction methods, but both methods are subject to certain limitations or have certain disadvantages. Automobile cranes are affected by the site and pouring position and may not be able to cover the pouring range. When setting up a chute, due to the deep foundation pit, it is necessary to set up pouring support lattice columns, which has high cost and long erection time. At the same time, due to the limitation of the chute, the pouring range is not flexible, and it is necessary to pour a section of concrete and dismantle a section of the chute, which makes the construction cumbersome. Summary of the invention
[0004] The purpose of the present invention is to provide a deep foundation pit mass concrete pouring equipment and a use method thereof to solve the problems raised in the above background technology.
[0005] To solve the above technical problems, the present invention is achieved through the following technical solutions: The present invention is a deep foundation pit mass concrete pouring device and a method for using the device, comprising two crown beams, the two crown beams are symmetrically fixed and poured on the inner wall of the deep foundation pit. An adjustment mechanism is provided on the crown beam, and the adjustment mechanism includes a plurality of bolts 1 fixedly connected to the two crown beams, and the plurality of bolts 1 are symmetrically arranged on the side of the two crown beams close to each other, and the outer walls of the plurality of bolts 1 are slidably connected with slide rails, and there are two slide rails, and the two slide rails are symmetrically arranged on the side of the two crown beams close to each other, and the outer walls of the plurality of bolts 1 are threadedly connected with nuts 1, and the plurality of nuts 1 are in contact with the outer walls of the slide rails.
[0006] Furthermore, the outer walls of the two slide rails are slidably connected with sliders, the inner walls of the sliders are fixedly connected with a plurality of fixing rods, the outer walls of the plurality of fixing rods are fixedly connected with bearings, and the plurality of bearings are in contact with the outer walls of the slide rails.
[0007] Furthermore, grooves are provided on the sides of the two sliding blocks that are close to each other, and the inner walls of a plurality of the grooves are rotatably connected to two pulleys.
[0008] Furthermore, a steel wire rope is wound around the outer wall of the pulley, and there are two steel wire ropes, which are symmetrically arranged between two sliding blocks.
[0009] Furthermore, outer walls of the two steel wire ropes are fixedly connected with fixed blocks, and a fixed frame is fixedly connected between the two fixed blocks.
[0010] Furthermore, two connecting plates are fixedly connected to the inner wall of the fixing frame, and a sliding plate is slidably connected between the two connecting plates and the inner wall of the fixing frame.
[0011] Furthermore, two connecting blocks are fixedly connected to the side of the sliding plate away from the wire rope, and the outer walls of the two connecting blocks are fixedly connected with arc-shaped spring pieces. Bolt 2 slides through the two arc-shaped spring pieces, and nut 2 is threadedly connected to the outer wall of bolt 2. Nut 2 is in contact with the arc-shaped spring piece. A flexible slide pipe is arranged between the two connecting blocks, and the flexible slide pipe is in contact with the inner walls of the two arc-shaped spring pieces.
[0012] Furthermore, the top and bottom surfaces of the sliding plate are fixedly connected with baffles, the two baffles are respectively in contact with the top and bottom surfaces of the fixed frame, the top surface of the sliding plate is fixedly connected with a hook, and the outer wall of the hook is wrapped with a pull rope.
[0013] The present invention has the following beneficial effects: (1) The present invention is provided with an adjustment mechanism. Before pouring the deep foundation pit, multiple bolts can be inverted and embedded in the inner side of the two crown beams, and a section of the bolt can be left outside the crown beam. At the same time, the slide rail is made of a 24kg hanging rail with a height of 107mm, a bottom width of 90mm, a head width of 51mm, and a waist thickness of 10.9mm. One end is drilled and expanded for passing the bolt to fix it. At the same time, the slide rail is fixed on the inner side of the two crown beams with multiple nuts. It is easy to disassemble and assemble, and can also provide a stable support system for subsequent construction.
[0014] (2) The present invention is provided with a slider, which is made of channel steel plus multiple bearings and multiple pulleys. The channel steel is welded with steel plates. The thickness of the steel plates is not less than 1.5 cm. The inner dimension of the steel plates is the same as the width of the slide rail head. The outer diameter of the bearings is 1 cm. When in use, the wire rope is passed through the multiple pulleys between the two sliders so that the wire rope can slide on the inner wall of the pulley. The fixed block and the fixed frame on the wire rope can move with the wire rope, so that the flexible slide pipe can move horizontally in the horizontal plane, which is convenient for the internal pouring of the deep foundation pit. This design greatly improves the flexibility and efficiency of construction. The construction personnel can easily adjust the position of the slide pipe to adapt to the needs of foundation pits of different widths, thereby ensuring precise control during the internal pouring of the deep foundation pit.
[0015] (3) The present invention is provided with a fixing frame, and the fixing frame and the connecting plate cooperate with each other so that the sliding plate can only move vertically up and down, which can realize the vertical longitudinal movement of the flexible chute, can adapt to the pouring of foundation pits of different depths, and further improve the flexibility and efficiency of construction. The flexible chute is made of a steel wire reinforced polyurethane hose with a diameter of 200mm. The hose can be made into standard sections of 5m and 10m for different sites, and the standard sections are connected by joints. After the flexible chute is placed between the two arc-shaped spring sheets, the flexible chute can be fixed between the two arc-shaped spring sheets by twisting nut two and bolt two. The two arc-shaped spring sheets fix different positions of the flexible chute, which can improve the fixing effect and prevent the flexible chute from detaching during the construction process. After the various components are installed together, one end of the pull rope is tied to the outer wall of the hook, and the flexible chute is driven by pulling the pull rope to freely change the horizontal and vertical directions in the horizontal plane, which greatly improves the flexibility and efficiency of construction.
[0016] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0018] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a rear view structural schematic diagram of the adjustment mechanism of the present invention; Figure 3 It is a front structural schematic diagram of the adjustment mechanism of the present invention; Figure 4 It is a structural schematic diagram of the slider of the present invention; Figure 5 for Figure 1 A schematic diagram of the enlarged structure at A in the middle; Figure 6 for Figure 2 A schematic diagram of the enlarged structure at B in the middle; Figure 7 for Figure 3 Schematic diagram of the enlarged structure at C in the middle; Figure 8 for Figure 3 Schematic diagram of the enlarged structure at D in the middle; In the accompanying drawings, the components represented by the reference numerals are listed as follows: In the figure: 1. crown beam; 2. adjustment mechanism; 4. hook; 5. pull rope; 6. flexible slide; 21. slide rail; 22. bolt one; 23. nut one; 24. slider; 241. fixing rod; 242. bearing; 243. groove; 244. pulley; 25. wire rope; 26. fixing block; 27. fixing frame; 28. connecting plate; 29. sliding plate; 291. connecting block; 292. arc-shaped spring piece; 293. bolt two; 294. nut two; 295. baffle. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] See also Figure 1-Figure 8 As shown, the present invention is a deep foundation pit mass concrete pouring device and a method of using the same, comprising two crown beams 1, the two crown beams 1 are symmetrically fixed and poured on the inner wall of the deep foundation pit, An adjusting mechanism 2 is provided on the crown beam 1, and the adjusting mechanism 2 includes a plurality of bolts 22 fixedly connected to the two crown beams 1, and the plurality of bolts 22 are symmetrically arranged on the side where the two crown beams 1 are close to each other, and the outer walls of the plurality of bolts 22 are slidably connected with a slide rail 21, and there are two slide rails 21, and the two slide rails 21 are symmetrically arranged on the side where the two crown beams 1 are close to each other, and the outer walls of the plurality of bolts 22 are threadedly connected with nuts 23, and the plurality of nuts 23 are in contact with the outer walls of the slide rails 21, and the outer walls of the two slide rails 21 are slidably connected with sliders 24, and the inner walls of the sliders 24 are fixedly connected with a plurality of fixing rods 241, and the outer walls of the plurality of fixing rods 241 are fixedly connected with bearings 242, and the plurality of bearings 242 are in contact with the outer walls of the slide rails 21, and the two sliders 24 are provided with grooves 243 on the side where the two sliders 24 are close to each other, and the inner walls of the plurality of grooves 243 are rotatably connected with two pulleys 244, and the outer walls of the pulleys 244 are wrapped with steel wire ropes 25.
[0021] There are two steel wire ropes 25, and the two steel wire ropes 25 are symmetrically arranged between the two sliders 24. The outer walls of the two steel wire ropes 25 are fixedly connected with fixed blocks 26, and a fixed frame 27 is fixedly connected between the two fixed blocks 26. The inner wall of the fixed frame 27 is fixedly connected with two connecting plates 28, and a sliding plate 29 is slidably connected between the two connecting plates 28 and the inner wall of the fixed frame 27. Two connecting blocks 291 are fixedly connected to the side of the sliding plate 29 away from the steel wire rope 25. The outer walls of the two connecting blocks 291 are fixedly connected with arc-shaped spring pieces 292, and bolts 293 are slidably penetrated through the two arc-shaped spring pieces 292. The outer wall of the bolts 293 is threadedly connected with nuts 294, and the nuts 294 are in contact with the arc-shaped spring pieces 292. A flexible slide pipe 6 is arranged between the two connecting blocks 291.
[0022] The flexible slide pipe 6 is in contact with the inner walls of the two arc-shaped spring pieces 292. The top and bottom surfaces of the sliding plate 29 are fixedly connected with baffles 295. The two baffles 295 are respectively in contact with the top and bottom surfaces of the fixed frame 27. The top surface of the sliding plate 29 is fixedly connected with a hook 4. The outer wall of the hook 4 is wrapped with a pull rope 5. The fixed frame 27 and the connecting plate 28 cooperate with each other so that the sliding plate 29 can only move vertically up and down, which can realize the vertical longitudinal movement of the flexible slide pipe 6, can adapt to the pouring of foundation pits of different depths, and further improve the flexibility and efficiency of construction.
[0023] The flexible slide pipe 6 is made of a steel wire reinforced polyurethane hose with a diameter of 200 mm. The hose can be made into standard sections of 5 m and 10 m for different sites, and the standard sections are connected by joints. After the flexible slide pipe 6 is placed between the two arc-shaped spring pieces 292, the flexible slide pipe 6 can be fixed between the two arc-shaped spring pieces 292 by twisting the nut 294 and the bolt 293. The two arc-shaped spring pieces 292 fix different positions of the flexible slide pipe 6, which can improve the fixing effect and prevent the flexible slide pipe 6 from detaching during construction. After the various components are installed together, one end of the pull rope 5 is tied to the outer wall of the hook 4, and the pull rope 5 is pulled to drive the flexible slide pipe 6 to change horizontally and vertically at will in the horizontal plane, which greatly improves the flexibility and efficiency of construction.
[0024] When in use, by setting up the adjustment mechanism 2, before pouring the deep foundation pit, multiple bolts 22 can be inverted and embedded in the inner side of the two crown beams 1 in sequence, and a section of the bolt 22 can be left outside the crown beam 1. At the same time, the slide rail 21 is made of a 24kg hanging rail with a height of 107mm, a bottom width of 90mm, a head width of 51mm, and a waist thickness of 10.9mm. One end is drilled and expanded for passing the bolt 22 for fixing. At the same time, the slide rail 21 is fixed on the inner side of the two crown beams 1 with multiple nuts 23, which is convenient for disassembly and assembly, and can also provide a stable support system for subsequent construction. The slider 24 is made of channel steel plus multiple bearings 242 and multiple pulleys 244. The channel steel is welded with steel plates. The thickness of the steel plates is not less than 1.5 cm. The inner dimension of the steel plates is the same as the width of the head of the slide rail 21. The outer diameter of the bearing 242 is 1 cm. When in use, the wire rope 25 passes through the multiple pulleys 244 between the two sliders 24, so that the wire rope 25 can slide on the inner wall of the pulley 244. The fixed block 26 and the fixed frame 27 on the wire rope 25 can move with the wire rope 25, so that the flexible slide pipe 6 can be moved horizontally in the horizontal plane, which is convenient for the internal pouring of the deep foundation pit. This design greatly improves the flexibility and efficiency of the construction. The construction personnel can easily adjust the position of the slide pipe to meet the needs of foundation pits of different widths, thereby ensuring that precise control can be achieved during the internal pouring process of the deep foundation pit. The fixing frame 27 and the connecting plate 28 cooperate with each other so that the sliding plate 29 can only move vertically up and down, so that the flexible slide pipe 6 can be moved vertically and longitudinally, and can adapt to the pouring of foundation pits of different depths, further improving the flexibility and efficiency of construction. The flexible slide pipe 6 is made of a steel wire reinforced polyurethane hose with a diameter of 200mm. The hose can be made into standard sections of 5m and 10m for different sites, and the standard sections are connected by joints. After the flexible slide pipe 6 is placed between the two arc-shaped spring pieces 292, the flexible slide pipe 6 can be fixed between the two arc-shaped spring pieces 292 by twisting the nut 294 and the bolt 293. The two arc-shaped spring pieces 292 fix different positions of the flexible slide pipe 6, which can improve the fixing effect and prevent the flexible slide pipe 6 from detaching during the construction process. After the various components are installed together, one end of the pull rope 5 is tied to the outer wall of the hook 4, and the flexible slide pipe 6 is driven to change horizontally and longitudinally in the horizontal plane at will by pulling the pull rope 5, which greatly improves the flexibility and efficiency of construction.
[0025] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A deep foundation pit mass concrete pouring device, comprising two crown beams (1), wherein the two crown beams (1) are symmetrically fixed and poured on the inner wall of the deep foundation pit, characterized in that: The crown beam (1) is provided with an adjustment mechanism (2), the adjustment mechanism (2) comprising a plurality of bolts (22) fixedly connected to the two crown beams (1), the plurality of bolts (22) being symmetrically arranged on a side of the two crown beams (1) close to each other, the outer walls of the plurality of bolts (22) being slidably connected to a slide rail (21), there being two slide rails (21), the two slide rails (21) being symmetrically arranged on a side of the two crown beams (1) close to each other, the outer walls of the plurality of bolts (22) being threadedly connected to a nut (23), the plurality of nuts (23) being in contact with the outer wall of the slide rail (21).
2. The deep foundation pit mass concrete pouring equipment according to claim 1 is characterized by: The outer walls of the two slide rails (21) are slidably connected to a slider (24), the inner walls of the slider (24) are fixedly connected to a plurality of fixing rods (241), the outer walls of the plurality of fixing rods (241) are fixedly connected to bearings (242), and the plurality of bearings (242) are in contact with the outer walls of the slide rails (21).
3. The deep foundation pit mass concrete pouring equipment according to claim 1 is characterized by: A groove (243) is provided on one side of the two sliding blocks (24) close to each other, and the inner walls of a plurality of the grooves (243) are rotatably connected to two pulleys (244).
4. The deep foundation pit mass concrete pouring equipment according to claim 1 is characterized by: A steel wire rope (25) is wound around the outer wall of the pulley (244), and there are two steel wire ropes (25). The two steel wire ropes (25) are symmetrically arranged between the two sliders (24).
5. The deep foundation pit mass concrete pouring equipment according to claim 1, characterized in that: The outer walls of the two steel wire ropes (25) are both fixedly connected with a fixing block (26), and a fixing frame (27) is fixedly connected between the two fixing blocks (26).
6. The deep foundation pit mass concrete pouring equipment according to claim 1, characterized in that: Two connecting plates (28) are fixedly connected to the inner wall of the fixed frame (27), and a sliding plate (29) is slidably connected between the two connecting plates (28) and the inner wall of the fixed frame (27).
7. The deep foundation pit mass concrete pouring equipment according to claim 1, characterized in that: Two connecting blocks (291) are fixedly connected to one side of the sliding plate (29) away from the steel wire rope (25); arc-shaped spring sheets (292) are fixedly connected to the outer walls of the two connecting blocks (291); bolt 2 (293) slides through the two arc-shaped spring sheets (292); nut 2 (294) is threadedly connected to the outer wall of the bolt 2 (293); nut 2 (294) is in contact with the arc-shaped spring sheet (292); a flexible slide pipe (6) is provided between the two connecting blocks (291); the flexible slide pipe (6) is in contact with the inner walls of the two arc-shaped spring sheets (292).
8. The deep foundation pit mass concrete pouring equipment according to claim 1, characterized in that: The top and bottom surfaces of the sliding plate (29) are both fixedly connected to baffles (295), the two baffles (295) are in contact with the top and bottom surfaces of the fixed frame (27), respectively; the top surface of the sliding plate (29) is fixedly connected to a hook (4), and the outer wall of the hook (4) is wrapped with a pull rope (5).
9. A method for using a deep foundation pit mass concrete pouring device, using the deep foundation pit mass concrete pouring device according to claim 8, characterized in that: It includes the following steps: S1: Before pouring the deep foundation pit, a plurality of bolts (22) may be inverted and embedded in the inner side of the two crown beams (1), and a section of the bolt (22) may be left outside the crown beam (1). At the same time, the slide rail (21) is made of a 24kg hanging rail with a height of 107mm, a bottom width of 90mm, a head width of 51mm, and a waist thickness of 10.9mm. One end is drilled and expanded for passing the bolt (22) for fixing. At the same time, the slide rail (21) is fixed to the inner side of the two crown beams (1) with a plurality of nuts (23); S2: The slider (24) is made of a channel steel plus a plurality of bearings (242) and a plurality of pulleys (244). The channel steel is welded with steel plates. The thickness of the steel plates is not less than 1.5 cm. The inner dimension of the steel plates is the same as the width of the head of the slide rail (21). The outer diameter of the bearings (242) is 1 cm. When in use, the wire rope (25) is passed through the plurality of pulleys (244) between the two sliders (24), so that the wire rope (25) can slide on the inner wall of the pulley (244). The fixed block (26) and the fixed frame (27) on the wire rope (25) can move with the wire rope (25), so that the flexible slide pipe (6) can be moved horizontally in the horizontal plane. S3: The fixing frame (27) and the connecting plate (28) cooperate with each other so that the sliding plate (29) can only move vertically up and down, so that the flexible slide pipe (6) can be moved vertically and longitudinally. The flexible slide pipe (6) is made of a steel wire reinforced polyurethane hose with a diameter of 200 mm. The hose can be made into standard sections of 5 m and 10 m for different sites. The standard sections are connected by joints. After the flexible slide pipe (6) is placed between the two arc-shaped spring pieces (292), the flexible slide pipe (6) can be fixed between the two arc-shaped spring pieces (292) by twisting the second nut (294) and the second bolt (293). After the various components are installed together, one end of the pull rope (5) is tied to the outer wall of the hook (4), and the pull rope (5) is pulled to drive the flexible slide pipe (6) to change horizontally and longitudinally at will in the horizontal plane.