Shear wall vertical seam splicing structure and construction method

By adopting the cross-anchoring connection method of embedded components and steel strands in the shear wall structure, the problem of low construction efficiency of shear wall structure in the existing technology is solved, and more efficient construction and lower cost solutions are achieved The solution enhances the overall performance of the structure and installation error tolerance.

CN119145536APending Publication Date: 2024-12-17CHINA CONSTR FOURTH ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411580708.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-07
Publication Date
2024-12-17

AI Technical Summary

Technical Problem

The existing assembled integral shear wall structure is complex in installation and low efficiency during construction, and cannot fully utilize the advantages of prefabricated buildings. Moreover, the rear casting band width of the integral shear wall structure is difficult to guarantee, which hinders the industrialization of the construction and Development of green construction.

Method used

A shear wall vertical joint splicing structure and construction method are adopted, including pre-embedding the first, second and third embedded components and steel strands, connecting two shear wall panels through cross anchoring, and utilizing the flexibility of the steel strands and the compressed performance of concrete improves the overall performance of the structure, and simplifies the installation process through the design of embedded components and anchor fixtures.

Benefits of technology

The construction efficiency of vertical joint splicing of shear walls is improved, the cost is reduced, the structure's lateral stiffness and installation fault tolerance are enhanced, the problem of inefficient connections in the existing technology is solved, and more efficient construction is achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119145536A_ABST
    Figure CN119145536A_ABST
Patent Text Reader

Abstract

The invention provides a shear wall vertical seam splicing structure and a construction method. The shear wall vertical seam splicing structure comprises a plurality of first pre-buried assemblies, a plurality of second pre-buried assemblies, a plurality of third pre-buried assemblies, a plurality of anchoring clamps and a plurality of steel strands, wherein the first pre-buried assemblies, the second pre-buried assemblies, the third pre-buried assemblies, the anchoring clamps and the steel strands are pre-buried on a first shear wall to be spliced and a second shear wall to be spliced; the two ends of the steel strand are connected with the first embedded assembly of the first shear wall and the third embedded assembly of the second shear wall correspondingly. And the two ends of the steel strand are connected with the first pre-embedded assembly of the second shear wall and the third pre-embedded assembly of the first shear wall correspondingly, positioning is achieved through the second pre-embedded assembly, the steel strand is fixed through an anchoring clamp, and rapid splicing of the first shear wall and the second shear wall is achieved through cross anchoring of the steel strand. The problem that in the prior art, an assembly type shear wall connecting structure is low in installation efficiency can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shear wall vertical seam splicing, and in particular to a shear wall vertical seam splicing structure and a construction method. Background Art

[0002] The commonly used prefabricated integral shear wall structure buildings have some shortcomings in design and construction, such as complex installation and slow construction efficiency, which cannot give full play to the characteristics and advantages of prefabricated buildings. The integral shear wall structure still has a wide post-casting strip, its quality is difficult to guarantee, the formwork is large and the construction efficiency is low, which hinders the development of industrialized construction and green construction. Summary of the invention

[0003] In order to overcome the above technical defects, the present invention provides a shear wall vertical seam splicing structure and a construction method, which can improve the construction efficiency of the shear wall vertical seam splicing.

[0004] In order to solve the above problems, the present invention is implemented according to the following technical solutions:

[0005] A shear wall vertical seam splicing structure, comprising: a plurality of first embedded components, a plurality of second embedded components, a plurality of third embedded components, a plurality of anchoring clamps and a plurality of steel strands;

[0006] The first embedded component and the third embedded component are respectively embedded in the upper part and the lower part of the first shear wall to be spliced, and the first embedded component, the second embedded component and the third embedded component are respectively embedded in the upper part, the middle part and the lower part of the second shear wall to be spliced;

[0007] Two ends of the steel strand are respectively connected to the first embedded component of the first shear wall and the third embedded component of the second shear wall;

[0008] and two ends of the steel strand are respectively connected to the first embedded component of the second shear wall and the third embedded component of the first shear wall;

[0009] The second embedded component is provided with a receiving groove for arranging the steel strand;

[0010] The anchoring clamp is clamped with the steel strand.

[0011] As a further improvement of the present invention, the first embedded component comprises: a main body, a reinforcing fixing part, and an adjusting part;

[0012] The first end of the main body is fixedly connected to the reinforcing fixing portion;

[0013] After the steel strand passes through the reinforcing fixing part and the main body in sequence, it passes through the second end of the main body and is connected to the third embedded component;

[0014] The adjusting portion passes through a side wall of the main body and abuts against the steel strand.

[0015] As a further improvement of the present invention, the main body is a hollow steel tube;

[0016] The first end of the hollow steel pipe is provided with a thread, and the hollow steel pipe is connected to the reinforcing fixing part through the thread;

[0017] The steel strand passes through the inner cavity of the hollow steel pipe;

[0018] The adjusting portion is provided on one side wall of the hollow steel pipe.

[0019] As a further improvement of the present invention, the reinforcing fixing portion is a solid steel pipe;

[0020] The solid steel pipe is provided with a through hole for connecting the hollow steel pipe and allowing the steel strand to pass through.

[0021] As a further improvement of the present invention, the second embedded component comprises: an embedded part body;

[0022] The embedded part body is bent to form the receiving groove;

[0023] The side wall of the accommodating groove is bent inwardly to form an auxiliary positioning portion.

[0024] As a further improvement of the present invention, the third embedded component comprises: an embedded part and a fixed part;

[0025] The embedded part is embedded in the first shear wall and the second shear wall, and the fixed part is fixedly connected to the embedded part and to the steel strand.

[0026] As a further improvement of the present invention, at least one group of the third embedded components is embedded in the middle of the first shear wall and the second shear wall;

[0027] The third embedded components are evenly distributed from top to bottom;

[0028] The first end of the steel strand is connected to the first embedded component of the first shear wall, and the second end of the steel strand passes through the third embedded component of the second shear wall in sequence... and is connected to the third embedded component of the first shear wall or the third embedded component of the second shear wall to form a cross anchorage;

[0029] and the first end of the steel strand is connected to the first embedded component of the second shear wall, and the second end of the steel strand sequentially passes through the third embedded component of the first shear wall ... and is connected to the third embedded component of the second shear wall or the third embedded component of the first shear wall to form a cross anchorage;

[0030] The anchoring clamp is clamped with the second end of the steel strand.

[0031] As a further improvement of the present invention, the fixing portion is configured as a circular ring for the steel strand to pass through and be fixed.

[0032] As a further improvement of the present invention, the anchoring clamp is configured to be U-shaped, and threads are provided at both ends thereof;

[0033] The steel strand is arranged in the U-shaped anchoring fixture.

[0034] Compared with the prior art, the beneficial effects of the shear wall vertical seam splicing structure provided by the present invention are as follows: the first embedded component, the third embedded component, and the steel strand directly connect the two shear wall panels, and the operation is convenient and simple; the second embedded component in the middle can be used for auxiliary positioning and installation, and can also improve the lateral stiffness; the third embedded component is arranged at the lower part, which is convenient for fixing the steel strand construction and increasing the connection speed, and the steel strand can greatly improve the installation fault tolerance rate, and compared with the traditional steel plate bolt connection, it can greatly reduce the cost and improve the economic benefit.

[0035] In addition, the present invention also provides a construction method for shear wall vertical seam splicing, which is applied to the above-mentioned shear wall vertical seam splicing structure, comprising the steps of:

[0036] When prefabricating the first shear wall, the first embedded component is embedded in the upper part of the first shear wall; the third embedded component is embedded in the lower part of the first shear wall or in the middle and lower part of the first shear wall; the first end of the steel strand is connected to the first embedded component of the first shear wall;

[0037] When prefabricating the second shear wall, the first embedded component is embedded in the upper part of the second shear wall; the second embedded component is embedded in the middle part of the second shear wall; the third embedded component is embedded in the lower part of the second shear wall or in the middle and lower part of the second shear wall; the first end of the steel strand is connected to the first embedded component of the second shear wall;

[0038] During splicing, the second embedded component is used for positioning;

[0039] Passing the second end of the steel strand through the third embedded component of the second shear wall in sequence... and connecting the third embedded component of the first shear wall or the third embedded component of the second shear wall to form a cross anchorage;

[0040] and sequentially passing the second end of the steel strand through the third embedded component of the first shear wall ... and connecting the third embedded component of the second shear wall or the third embedded component of the first shear wall to form a cross anchorage;

[0041] The steel strand is fixed by using the anchoring fixture;

[0042] Pour concrete at the joints of the first shear wall and the second shear wall.

[0043] Compared with the prior art, the construction method and structural stress-bearing beneficial effects of the shear wall vertical seam splicing structure provided by the present invention are as follows: the force exerted on the wall is converted into horizontal and vertical pressure on the wall and tension on the steel strands by utilizing the flexibility of the steel strands, making full use of the compressive properties of the concrete and the excellent tensile properties of the steel strands, thereby improving the overall performance of the structure. When prefabricating the shear wall, the first embedded component, the second embedded component, and the third embedded component are first embedded in the shear wall. During the installation process, the shear wall is spliced ​​by using cross-anchored steel strands, which can solve the problem of low installation efficiency of the assembled shear wall connection structure in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 It is a structural schematic diagram of the axonometric diagram of the vertical joint splicing structure of the shear wall described in Example 1;

[0045] Figure 2 It is a front view of the connection between the first shear wall and the second shear wall in Example 1;

[0046] Figure 3 A top view of the connection between the first shear wall and the second shear wall in Example 1;

[0047] Figure 4 This is a schematic structural diagram of the first embedded component in Example 1;

[0048] Figure 5 This is a schematic diagram of the first embedded component embedded in the shear wall in Example 1;

[0049] Figure 6 This is a schematic structural diagram of the second embedded component in Example 1;

[0050] Figure 7 This is a schematic structural diagram of the third embedded component described in Example 1;

[0051] Figure 8 This is a schematic diagram of the third embedded component in Example 1 being embedded in the shear wall;

[0052] Fig. 9 This is a schematic diagram of the structure of the anchoring clamp described in Example 1;

[0053] Fig.10 It is a front view of the connection between the first shear wall and the second shear wall in Example 2;

[0054] Fig.11 This is a top view of the connection between the first shear wall and the second shear wall in Example 1.

[0055] Explanation of the reference numerals: 1. first embedded component; 11. main body; 12. reinforced fixing portion; 13. adjustment portion; 2. second embedded component; 21. receiving groove; 22. auxiliary positioning portion; 3. third embedded component; 31. embedded portion; 32. fixing portion; 4. anchoring clamp; 5. steel strand; 100. first shear wall; 200. second shear wall. DETAILED DESCRIPTION

[0056] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0057] Example 1

[0058] This embodiment provides a shear wall vertical joint splicing structure, such as Figures 1 to 3 As shown, it includes: a plurality of first embedded components 1, a plurality of second embedded components 2, a plurality of third embedded components 3, a plurality of anchoring clamps 4 and a plurality of steel strands 5; the first embedded components 1 and the third embedded components 3 are respectively embedded in the upper part and the lower part of the first shear wall 100 to be spliced, and the first embedded components 1, the second embedded components 2, and the third embedded components 3 are respectively embedded in the upper part, the middle part and the lower part of the second shear wall 200 to be spliced; the two ends of the steel strand 5 are respectively connected to the first embedded component 1 of the first shear wall 100 and the third embedded component 3 of the second shear wall 200; and the two ends of the steel strand 5 are respectively connected to the first embedded component 1 of the second shear wall 200 and the third embedded component 3 of the first shear wall 100; the second embedded component 2 is provided with a receiving groove 21 for arranging the steel strand 5; the anchoring clamp 4 is clamped with the steel strand 5.

[0059] Specifically, when prefabricating the shear wall, the first embedded component 1, the second embedded component 2, and the third embedded component 3 are embedded in advance, wherein two first embedded components 1 are embedded in the upper part of the first shear wall 100 and the second shear wall 200, respectively, the heights of the two first embedded components 1 are consistent and they are located on different sides of the shear wall, the first embedded component 1 on the first shear wall 100 is arranged correspondingly to the first embedded component 1 on the second shear wall 200, and two third embedded components 3 are embedded in the upper part of the first shear wall 100 and the second shear wall 200, respectively, the heights of the two third embedded components 3 are consistent and they are located on different sides of the shear wall, the third embedded component 3 on the first shear wall 100 is arranged correspondingly to the third embedded component 3 on the second shear wall 200. At least one second embedded component 2 is embedded in the second shear wall 200, and the specific number of embedded components can be flexibly adjusted based on the size of the shear wall.

[0060] The first embedded component 1 on the first shear wall 100 is connected to the third embedded component 3 on the same side of the second shear wall 200 through the steel strand 5 to form a cross anchoring on the same side.

[0061] like Figure 4 and Figure 5 As shown, the first embedded component 1 includes: a main body 11, a reinforcing fixing part 3212, and an adjusting part 13; the first end of the main body 11 is fixedly connected to the reinforcing fixing part 3212; the steel strand 5 passes through the reinforcing fixing part 3212 and the main body 11 in sequence, and then passes through the second end of the main body 11 to connect with the third embedded component 3; the adjusting part 13 passes through a side wall of the main body 11 and abuts against the steel strand 5. The reinforcing fixing part 3212 can make the entire first embedded component 1 more firmly embedded in the shear wall and will not be easily unanchored. Each first embedded component 1 is used with a steel strand 5, and when the shear wall is prefabricated, the first embedded component 1 is first fixed to the steel strand.

[0062] Preferably, the main body 11 is a hollow steel pipe; the first end of the hollow steel pipe is provided with a thread, and the hollow steel pipe is connected to the reinforcing fixing part 3212 by a thread; the steel strand 5 passes through the inner cavity of the hollow steel pipe; and an adjusting part 13 is provided on one side wall of the hollow steel pipe. The adjusting part 13 can be implemented by bolts, and correspondingly, a threaded hole is provided on one side wall of the hollow steel pipe for the bolts to pass through. At the same time, the steel strand 5 can be clamped in the hollow steel pipe by the bolts to prevent the steel strand 5 from being unanchored. The main body 11, the reinforcing fixing part 3212, and the adjusting part 13 are all embedded in the shear wall, so before the shear wall is prefabricated, the steel strand 5 needs to be clamped. After the prefabrication is completed, one end of the steel strand 5 is embedded in the shear wall, and the other end is reserved to be connected with the third embedded component 3 when the shear wall is spliced.

[0063] The reinforcing fixing portion 3212 is a solid steel pipe; the solid steel pipe is provided with a through hole with a thread for connecting the hollow steel pipe and allowing the steel strand 5 to pass through.

[0064] like Figure 6As shown, the second embedded component 2 includes: an embedded component body; the embedded component body is bent to form a receiving groove 21, and the receiving groove 21 is used to limit the displacement of the steel strand 5; the side wall of the receiving groove 21 is bent inward to form an auxiliary positioning portion 22, and half of the receiving groove 21 of the embedded component body is embedded in the shear wall, and the remaining half is exposed to the outside. The receiving groove 21 is as wide as the shear wall and has a height of 20-30cm. That is, the embedded component body is generally shaped like a channel steel, and is bent inward at the flange for a length of 5cm. Its function is to serve as auxiliary positioning. First, the wall with the second embedded component 2 is hoisted, and then when the wall on the other side is hoisted, it can be hoisted in close contact with the second embedded component 2 to achieve the functions of auxiliary positioning and controlling the distance between walls; second, it improves the lateral force stiffness; third, it can be used as a template fixing device. In addition, the second embedded component body can also be implemented with square steel.

[0065] like Figure 7 and Figure 8 As shown, the third embedded component 3 includes: an embedded part 31 and a fixed part 32; the embedded part 31 is embedded in the first shear wall 100 and the second shear wall 200, and the fixed part 32 is fixedly connected to the embedded part 31 and to the steel strand 5.

[0066] The embedded part 31 is provided with an external thread, so as to increase the bonding force between the third embedded part and the shear wall. The fixing part 32 is provided in a circular ring shape for the steel strand 5 to pass through and fix. The fixing part 32 is exposed outside the shear wall.

[0067] like Fig. 9 As shown, the anchoring fixture 4 is set in a U shape, and threads are set at both ends; the steel strand 5 is set in the U-shaped anchoring fixture 4. In the specific use process, the steel strand 5 is first passed through the fixing part 32, and then anchored by the anchoring fixture 4.

[0068] This embodiment directly connects two shear wall panels through the first embedded component, the third embedded component, and the steel strand, which is convenient and simple to operate; the second embedded component in the middle can be used to assist in positioning and installation, and can also improve the lateral stiffness; the third embedded component is arranged at the lower part, which is convenient for fixing the steel strand construction and increasing the connection speed. The steel strand can greatly improve the installation fault tolerance rate and the force transmission is clear. Compared with the traditional steel plate bolt connection, it can greatly reduce costs and improve economic benefits.

[0069] Example 2

[0070] This embodiment provides another type of shear wall vertical seam splicing structure. According to the actual stress conditions, the number of third embedded components is increased and the connection form is changed. That is, the difference between this embodiment and Embodiment 1 is that at least one group of third embedded components 3 is embedded in the middle of the first shear wall 100 and the second shear wall 200.

[0071] Next, an explanation is given by taking the case where two sets of third embedded components 3 are embedded in the middle of the first shear wall 100 and the second shear wall 200 as an example:

[0072] like Fig.10 and Fig.11 As shown, the third embedded component 3 is evenly distributed from top to bottom in the middle of the shear wall; the first end of the steel strand 5 is connected to the first embedded component 1 of the first shear wall 100, and the second end of the steel strand 5 passes through the third embedded component 3 of the second shear wall 200 and the first embedded component 1 of the first shear wall 100 in sequence, and finally connects to the third embedded component 3 of the second shear wall 200; and the first end of the steel strand 5 is connected to the first embedded component 1 of the second shear wall 200, and the second end of the steel strand 5 passes through the third embedded component 3 of the first shear wall 100 and the third embedded group of the second shear wall 200 in sequence, and finally connects to the third embedded component 3 of the first shear wall 100; the anchor clamp 4 is clamped with the second end of the steel strand 5, so that the two steel strands 5 form a same-side cross anchoring.

[0073] For other implementation processes of this embodiment, please refer to Embodiment 1, which will not be described in detail here.

[0074] Example 3

[0075] This embodiment provides a construction method for splicing vertical seams of a shear wall, which is applied to the vertical seam splicing structure of the shear wall in Embodiment 1 or Embodiment 2, and includes the following steps:

[0076] When prefabricating the first shear wall 100, the first embedded component 1 and the third embedded component 3 are respectively embedded in the upper part and the lower part of the first shear wall 100 to be spliced; the first end of the steel strand 5 is connected to the first embedded component 1 of the first shear wall 100;

[0077] When prefabricating the second shear wall 200, the first embedded component 1, the second embedded component 2, and the third embedded component 3 are respectively embedded in the upper part, the middle part, and the lower part of the second shear wall 200 to be spliced; the first end of the steel strand 5 is connected to the first embedded component 1 of the second shear wall 200;

[0078] When splicing, use the second embedded component 2 for positioning;

[0079] Connect the second end of the steel strand 5 to the third embedded component 3 on the same side of the second shear wall 200, and connect the second end of another steel strand 5 to the third embedded component 3 on the same side of the first shear wall 100;

[0080] The two steel strands 5 are fixed by an anchoring fixture 4 so that the two steel strands 5 are cross-anchored on the same side;

[0081] Concrete is poured at the joints of the first shear wall 100 and the second shear wall 200 .

[0082] For other contents of this embodiment, please refer to Embodiment 1, which will not be described in detail here.

[0083] Example 4

[0084] The present embodiment provides a construction method for splicing vertical seams of a shear wall, which is applied to the vertical seam splicing structure of the shear wall in Embodiment 2, and comprises the following steps:

[0085] When prefabricating the first shear wall 100, the first embedded component 1 is embedded in the upper part of the first shear wall 100; the third embedded component 3 is embedded in the middle and lower part of the first shear wall 100;

[0086] When prefabricating the second shear wall 200, the first embedded component 1 is embedded in the upper part of the second shear wall; the second embedded component 2 is embedded in the middle part of the second shear wall; the third embedded component 3 is embedded in the middle and lower part of the second shear wall;

[0087] During assembly, the second embedded component 2 is used for positioning;

[0088] The second end of the steel strand 5 is passed through the third embedded component 3 on the same side of the second shear wall and the third embedded component 3 on the same side of the first shear wall 100 in sequence, and finally connected to the third embedded component 3 on the same side of the second shear wall;

[0089] Pass the second end of the other steel strand 5 through the third embedded component 3 on the same side of the first shear wall 100 and the third embedded component 3 on the same side of the second shear wall in sequence, and finally connect to the third embedded component 3 on the same side of the first shear wall 100;

[0090] The anchoring fixture 4 is used to clamp the second end of the steel strand 5, so that the two steel strands 5 are cross-anchored;

[0091] Concrete is poured at the joints of the first shear wall 100 and the second shear wall 200 .

[0092] The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. A shear wall vertical joint splicing structure, characterized in that: include: A plurality of first embedded components, a plurality of second embedded components, a plurality of third embedded components, a plurality of anchoring fixtures and a plurality of steel strands; The first embedded component and the third embedded component are respectively embedded in the upper part and the lower part of the first shear wall to be spliced, and the first embedded component, the second embedded component and the third embedded component are respectively embedded in the upper part, the middle part and the lower part of the second shear wall to be spliced; Two ends of the steel strand are respectively connected to the first embedded component of the first shear wall and the third embedded component of the second shear wall; and two ends of the steel strand are respectively connected to the first embedded component of the second shear wall and the third embedded component of the first shear wall; The second embedded component is provided with a receiving groove for arranging the steel strand; The anchoring clamp is clamped with the steel strand.

2. The shear wall vertical joint splicing structure according to claim 1 is characterized in that: The first embedded component includes: a main body, a reinforcing fixing part, and an adjusting part; The first end of the main body is fixedly connected to the reinforcing fixing portion; After the steel strand passes through the reinforcing fixing part and the main body in sequence, it passes through the second end of the main body and is connected to the third embedded component; The adjusting portion passes through a side wall of the main body and abuts against the steel strand.

3. The shear wall vertical joint splicing structure according to claim 2 is characterized in that: The main body is a hollow steel pipe; The first end of the hollow steel pipe is provided with a thread, and the hollow steel pipe is connected to the reinforcing fixing part through the thread; The steel strand passes through the inner cavity of the hollow steel pipe; The adjusting portion is provided on one side wall of the hollow steel pipe.

4. The shear wall vertical joint splicing structure according to claim 3 is characterized in that: The reinforcing fixing portion is a solid steel pipe; The solid steel pipe is provided with a through hole for connecting the hollow steel pipe and allowing the steel strand to pass through.

5. The shear wall vertical joint splicing structure according to claim 1 is characterized in that: The second embedded component includes: an embedded part body; The embedded part body is bent to form the receiving groove; The side wall of the accommodating groove is bent inwardly to form an auxiliary positioning portion.

6. The shear wall vertical joint splicing structure according to any one of claims 1 to 5, characterized in that: The third embedded component comprises: an embedded part and a fixing part; The embedded part is embedded in the first shear wall and the second shear wall, and the fixed part is fixedly connected to the embedded part and to the steel strand.

7. The shear wall vertical joint splicing structure according to claim 6 is characterized in that: At least one group of the third embedded components is embedded in the middle of the first shear wall and the second shear wall; The third embedded components are evenly distributed from top to bottom; The first end of the steel strand is connected to the first embedded component of the first shear wall, and the second end of the steel strand passes through the third embedded component of the second shear wall in sequence... and is connected to the third embedded component of the first shear wall or the third embedded component of the second shear wall to form a cross anchorage; and the first end of the steel strand is connected to the first embedded component of the second shear wall, and the second end of the steel strand sequentially passes through the third embedded component of the first shear wall ... and is connected to the third embedded component of the second shear wall or the third embedded component of the first shear wall to form a cross anchorage; The anchoring clamp is clamped with the second end of the steel strand.

8. The shear wall vertical joint splicing structure according to claim 6 is characterized in that: The fixing portion is configured in a circular ring shape for the steel strand to pass through and be fixed.

9. The shear wall vertical joint splicing structure according to claim 1, characterized in that: The anchoring fixture is arranged in a U shape, and threads are arranged at both ends thereof; The steel strand is arranged in the U-shaped anchoring fixture.

10. A construction method for splicing vertical seams of shear walls, characterized in that: The shear wall vertical seam splicing structure as claimed in any one of claims 1 to 9 comprises the following steps: When prefabricating the first shear wall, the first embedded component is embedded in the upper part of the first shear wall; the third embedded component is embedded in the lower part of the first shear wall or in the middle and lower part of the first shear wall; the first end of the steel strand is connected to the first embedded component of the first shear wall; When prefabricating the second shear wall, embedding the first embedded component in the upper part of the second shear wall; Embed the second embedded component in the middle of the second shear wall; embed the third embedded component in the lower part of the second shear wall or in the middle and lower part of the second shear wall; connect the first end of the steel strand to the first embedded component of the second shear wall; During splicing, the second embedded component is used for positioning; Passing the second end of the steel strand through the third embedded component of the second shear wall in sequence... and connecting the third embedded component of the first shear wall or the third embedded component of the second shear wall to form a cross anchorage; and sequentially passing the second end of the steel strand through the third embedded component of the first shear wall ... and connecting the third embedded component of the second shear wall or the third embedded component of the first shear wall to form a cross anchorage; The steel strand is fixed by using the anchoring fixture; Pour concrete at the joints of the first shear wall and the second shear wall.