The existing reservoir drainage gates cannot achieve immediate water pressure control and require manual operation, resulting in high labor intensity and inability to relieve pressure in time, thereby reducing the service life of the dam.
A reservoir drainage gate based on water pressure control was designed. By adding water discharge ports, rotating shafts, positioning holes, interceptor plates, positioning components and reset components, the reservoir's water pressure automatically opens and closes the gate to achieve independent pressure relief.
It realizes automatic control of reservoir water pressure without manual operation, reduces the labor intensity of staff, improves the convenience of reservoir water pressure control, and extends the service life of the dam.
Smart Images

Figure CN119162966B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of reservoir drainage gates, and in particular to a reservoir drainage gate based on water pressure control. Background Art
[0002] During the rainy season, heavy rains may fall from time to time, increasing the rainfall in various regions and thus raising the water level in the reservoir. If the water in the reservoir is not drained in time, the dam will be subjected to excessive water pressure, thereby reducing the service life of the dam. When the gate needs to be opened to drain the water from the reservoir, the staff needs to start the drive assembly to lift the gate of the reservoir to open the gate of the reservoir for drainage. However, this method cannot achieve instant control of the water pressure in the reservoir and requires manual drainage of the water pressure in the reservoir, which reduces the labor intensity of the staff. If the staff does not observe the water level of the reservoir in time and cannot release the pressure in time, the dam will be subjected to excessive water pressure, thereby reducing the service life of the dam. The existing gate water pressure control cannot achieve autonomous pressure relief, which reduces the convenience of use. Summary of the invention
[0003] The object of the present invention is to provide a reservoir drainage gate capable of automatically releasing pressure and controlling water pressure according to the water level of the reservoir, so as to solve the problems raised in the above-mentioned background technology.
[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a reservoir drainage gate based on water pressure control, comprising a base, a gate, a cutoff plate, a positioning assembly, a reset assembly, an auxiliary salvage assembly and a drive assembly, gate piers are fixedly provided on both sides of the base, notches are provided on one side of the gate piers, shaft grooves are provided on one side of the gate piers, arc rails are fixedly provided on one side of the gate piers, the gate is installed between the gate piers, a rotating shaft rotatably connected to the shaft groove is fixedly provided on both sides of the gate, a positioning hole is provided on one side of the rotating shaft, a drain port is provided on the gate, guide columns slidably connected to the arc rails are fixedly provided on both sides of the gate, the cutoff plate is provided downstream of one side of the gate, and the cutoff plate is slidably provided on a guide rod, one end of the guide rod is fixedly connected to one side of the gate pier, the positioning assembly is installed on one side of the gate pier to position the shaft; both sides of the cutoff plate are connected to the positioning assembly , a reset component is installed on one side of the intercepting plate, and the positioning component is pushed to reset so that the positioning component limits the rotating shaft. The auxiliary salvage component is installed on one side of the gate to salvage and clean up the debris floating on the water surface on the upstream side of the gate. The driving component is installed on the downstream side of the gate to drive the auxiliary salvage component; by adding a water discharge port, a rotating shaft, a positioning hole, a intercepting plate, a positioning component and a reset component, the gate is opened and closed by the water pressure of the reservoir, and the water pressure of the reservoir is automatically controlled. There is no need for the staff to open the gate to release the pressure, which effectively reduces the labor intensity of the staff. The device can automatically open the gate when drainage is required, and automatically close the gate after pressure relief, so as to realize the convenience of reservoir water pressure control, and can timely release the pressure of the reservoir to avoid the problem that the dam is subjected to excessive water pressure and the service life of the dam is shortened, so as to realize the autonomous pressure relief of reservoir water pressure control and improve the convenience of use.
[0005] Preferably, the positioning assembly includes a transverse column fixedly arranged on one side of the gate pier and connected to the positioning hole, the transverse column is a hollow column, and limiting grooves are provided on both sides of the transverse column, and a positioning rod is slidably provided inside the transverse column, and the positioning rod matches the positioning hole, and limit blocks are fixedly provided on both sides of the positioning rod and are slidably connected to the limiting groove, one end of the positioning rod extends to the outside of the transverse column and is fixedly connected to one end of the pull rod, and the pull rod is fixedly provided with a column rod at one end away from the positioning rod, and a fixing block is fixedly provided at one end of the pull rod and located at one end of the intercepting plate, a strip groove is provided on the fixing block, and an opening connected to the strip groove is provided on the side wall of the fixing block, one end of the pull rod passes through the opening and extends to the inside thereof and is fixedly connected to the column rod, and both ends of the column rod are slidably arranged inside the strip groove; the positioning assembly can fix the rotating shaft when the gate is closed, and unlock the rotating shaft after the water level reaches the drain outlet and overflows.
[0006] Preferably, the reset assembly includes a triangular plate, a rotating rod is fixedly provided on one side of the triangular plate, an end of the rotating rod away from the triangular plate is fixedly connected to one side of the gate pier, a pressing groove is fixedly provided at an edge of the triangular plate away from the rotating rod, a pressing plate is fixedly provided at a top corner of one side of the triangular plate, a movable rod is rotatably provided on one side of the upper side of the rotating rod and located on one side of the triangular plate, an L-shaped rod is rotatably provided on the end of the movable rod away from the triangular plate, a push plate is fixedly provided on one end of the L-shaped rod away from the movable rod, a slider is fixedly provided on one side of the push plate, the slider is slidably provided inside a slide rail, and the slide rail is fixedly provided at one end of the arc rail;
[0007] The reset assembly also includes a reset push rod, which is slidably arranged inside the sleeve, one side of the sleeve is fixedly connected to one side of the gate, both ends of the reset push rod are fixedly arranged on the first wedge block and the second wedge block, a stop block matching the first wedge block is fixedly arranged on the lower side of the arc rail, one side of the stop block and one side of the first wedge block are both provided with inclined surfaces, the first wedge block matches the pressing groove, a cross bar is fixedly arranged between the two slide rails, a trapezoidal block is fixedly arranged on one side of the cross bar, the trapezoidal block is an isosceles trapezoidal block, and one side of the second wedge block contacts the hypotenuse of the trapezoidal block; by adding a reset assembly, the positioning assembly can be pushed to position the rotating shaft when the gate is reset and closed.
[0008] Preferably, the auxiliary salvage component includes a crawler provided on one side of the gate, crawler wheels are meshed on the inner sides of both ends of the crawler, and a stop plate is fixedly provided on one side of the crawler at an equal distance, wherein first transmission teeth are fixedly provided on both sides of the crawler wheel located on the side above the gate, and the first transmission teeth are connected to the drive component. By adding an auxiliary salvage component, floating objects floating on the water surface on one side of the gate can be salvaged.
[0009] Preferably, the driving assembly includes an impeller arranged on one side of the lower end of the gate, a first gear is fixedly provided at both ends of the impeller, a second gear is provided on the upper side of the gate, the first gear and the second gear are meshingly connected via a toothed chain, and a second transmission tooth meshingly connected to the first transmission tooth is fixedly provided on one side of the second gear; the driving assembly can convert the kinetic energy of the water flow into mechanical energy to drive the auxiliary salvage assembly, which can effectively reduce the use of the driving equipment and make reasonable use of the kinetic energy of the water flow.
[0010] Preferably, the track wheel, the impeller and the second gear are all connected to the gate via a bearing frame, which increases the safety of the installation and placement of the track wheel, the impeller and the second gear and avoids them being suspended in the air.
[0011] Preferably, protection boxes are fixedly provided on both sides of the gate, and the first transmission tooth and the second transmission tooth are both arranged inside the protection box, which can protect the first and second transmission teeth.
[0012] Preferably, a material guide plate is fixedly provided between the protection boxes, and a material sliding trough is fixedly provided at one end of the material guide plate to guide the salvaged floating objects and slide them to the shore of the reservoir.
[0013] Preferably, baffles are fixedly provided on both sides of the gate located on the upstream side, and an inclined plate is fixedly provided on one side of the baffle, which can reduce the floating objects from passing through between the gate and the gate pier and entering the downstream.
[0014] Preferably, a baffle is fixedly provided on one end of the guide rod away from the gate pier, which can increase the safety of the intercepting plate sliding on the guide rod.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] The present invention optimizes the existing water pressure-controlled reservoir drainage gate, adds a water discharge port, a rotating shaft, a positioning hole, a intercepting plate, a positioning component and a reset component, and opens and closes the gate by the water pressure of the reservoir, thereby realizing automatic water pressure control of the reservoir. There is no need for staff to open the gate to release pressure, which effectively reduces the labor intensity of staff. The device can automatically open the gate when drainage is required and automatically close the gate after pressure relief, thereby realizing the convenience of reservoir water pressure control, being able to relieve pressure on the reservoir in time, avoiding the problem of shortening the service life of the dam due to excessive water pressure on the dam, realizing autonomous pressure relief of reservoir water pressure control, and improving convenience of use. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the structure of the gate closing of the present invention;
[0018] Figure 2 This is a schematic diagram of the structure of the gate opening in the present invention;
[0019] Figure 3 for Figure 2 The enlarged view of point A in the middle;
[0020] Figure 4 It is a side sectional view of the gate pier in the present invention;
[0021] Figure 5 It is a structural schematic diagram of the installation of the reset assembly and the gate pier in the present invention;
[0022] Figure 6 It is a structural schematic diagram of the gate opening pushing the reset component in the present invention;
[0023] Figure 7 for Figure 6 The enlarged view of point B in the middle;
[0024] Figure 8 It is a structural schematic diagram of the first wedge block pushing the pressing groove in the present invention;
[0025] Fig. 9 It is a structural schematic diagram of the first wedge block being separated from the pressing groove in the present invention;
[0026] Fig.10 It is a structural schematic diagram of the connection between the triangular plate and the movable rod in the present invention;
[0027] Fig.11 For the present invention Fig.10 Exploded diagram of
[0028] Fig.12 It is a structural schematic diagram of the triangular plate in the present invention;
[0029] Fig.13 It is a structural schematic diagram of the auxiliary salvage assembly in the present invention;
[0030] Fig.14 It is a schematic diagram of the structure of the driving component in the present invention;
[0031] Fig.15 It is a schematic diagram of the structure of the connection between the auxiliary component and the driving component in the present invention.
[0032] In the figure: 1, base; 2, gate pier; 3, notch; 4, shaft groove; 5, arc rail; 6, gate; 7, rotating shaft; 8, positioning hole; 9, drain port; 10, guide column; 11, interceptor plate; 12, guide rod; 13, cross column; 14, limit groove; 15, positioning rod; 16, limit block; 17, pull rod; 18, column rod; 19, fixed block; 20, strip groove; 21, opening; 22, triangle plate; 23, rotating rod; 24, pressing groove; 25, pressing plate; 26, movable rod; 27, L-shaped rod; 28, push plate; 2 9. Slider; 30. Reset push rod; 31. Sleeve; 32. First wedge block; 33. Second wedge block; 34. Block; 35. Inclined surface; 36. Cross bar; 37. Trapezoidal block; 38. Track; 39. Track wheel; 40. Stop plate; 41. First transmission tooth; 42. Impeller; 43. First gear; 44. Second gear; 45. Tooth chain; 46. Second transmission tooth; 47. Bearing frame; 48. Protection box; 49. Guide plate; 50. Slide trough; 51. Baffle plate; 52. Inclined plate; 53. Baffle plate; 54. Slide rail. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] Example 1, please refer to Figure 1-Figure 15 A reservoir drainage gate based on water pressure control shown in the figure includes a base 1, a gate 6, a cutoff plate 11, a positioning component, a reset component, an auxiliary salvage component and a drive component. Gate piers 2 are fixed on both sides of the base 1, a notch 3 is opened on one side of the gate pier 2, an axis groove 4 is opened on one side of the gate pier 2, an arc rail 5 is fixed on one side of the gate pier 2, the gate 6 is installed between the gate piers 2, a rotating shaft 7 rotatably connected to the axis groove 4 is fixed on both sides of the gate 6, a positioning hole 8 is opened on one side of the rotating shaft 7, a drain port 9 is opened on the gate 6, a guide column 10 slidably connected to the arc rail 5 is fixed on both sides of the gate 6, and the cutoff plate 11 is set. At the downstream of one side of the gate 6, the intercepting plate 11 is slidably arranged on the guide rod 12, one end of the guide rod 12 is fixedly connected to one side of the gate pier 2, and a baffle 53 is fixedly arranged on the end of the guide rod 12 away from the gate pier 2. The positioning component is installed on one side of the gate pier 2 to position the rotating shaft 7; both sides of the intercepting plate 11 are connected to the positioning component, and the reset component is installed on one side of the intercepting plate 11. The positioning component is pushed to reset so that the positioning component limits the rotating shaft 7. The auxiliary salvage component is installed on one side of the gate 6 to salvage and clean up the debris floating on the water surface on the upstream side of the gate 6. The driving component is installed on the downstream side of the gate 6 to drive the auxiliary salvage component.
[0035] See also Figure 1 , Figure 4-Figure 11 The positioning assembly shown in the figure includes a transverse column 13 fixedly arranged on one side of the gate pier 2 and connected to the positioning hole 8. The transverse column 13 is a hollow column. Both sides of the transverse column 13 are provided with limiting grooves 14. A positioning rod 15 is slidably arranged inside the transverse column 13. The positioning rod 15 matches the positioning hole 8. Both sides of the positioning rod 15 are fixedly provided with limiting blocks 16 slidably connected to the limiting grooves 14. One end of the positioning rod 15 extends to the outside of the transverse column 13 and is fixedly connected to one end of a pull rod 17. The pull rod 17 is fixedly provided with a column 18 at one end away from the positioning rod 15. A fixing block 19 is fixedly provided at one end of the pull rod 17 and at one end of the intercepting plate 11. A strip groove 20 is opened on the fixing block 19. An opening 21 connected to the strip groove 20 is opened on the side wall of the fixing block 19. One end of the pull rod 17 passes through the opening 21 and extends to the inside thereof and is fixedly connected to the column 18. Both ends of the column 18 are slidably arranged inside the strip groove 20.
[0036] See also Figure 1-Figure 12The reset assembly shown in the figure includes a triangular plate 22, a rotating rod 23 is fixedly provided on one side of the triangular plate 22, and one end of the rotating rod 23 away from the triangular plate 22 is fixedly connected to one side of the gate pier 2, a pressing groove 24 is fixedly provided at the edge of the side of the triangular plate 22 away from the rotating rod 23, a pressing plate 25 is fixedly provided at the top corner of one side of the triangular plate 22, a movable rod 26 is rotatably provided on one side of the triangular plate 22 on the upper side of the rotating rod 23, an L-shaped rod 27 is rotatably provided on the end of the movable rod 26 away from the triangular plate 22, a push plate 28 is fixedly provided on one end of the L-shaped rod 27 away from the movable rod 26, a slider 29 is fixedly provided on one side of the push plate 28, the slider 29 is slidably provided inside the slide rail 54, and the slide rail 54 is fixedly provided at one end of the arc rail 5;
[0037] See also Figure 1-Figure 12 The reset assembly shown in the figure also includes a reset push rod 30, which is slidably arranged inside the sleeve 31, and one side of the sleeve 31 is fixedly connected to one side of the gate 6. Both ends of the reset push rod 30 are fixedly arranged on the first wedge block 32 and the second wedge block 33. A stopper 34 matching the first wedge block 32 is fixedly arranged on one side of the lower side of the arc rail 5. One side of the stopper 34 and one side of the first wedge block 32 are both provided with an inclined surface 35. The first wedge block 32 matches the pressing groove 24. A cross bar 36 is fixedly arranged between the two slide rails 54, and a trapezoidal block 37 is fixedly arranged on one side of the cross bar 36. The trapezoidal block 37 is an isosceles trapezoidal block, and one side of the second wedge block 33 contacts the hypotenuse of the trapezoidal block 37.
[0038] See also Figure 1 , Figure 2 , Figure 4 , Figure 6 , Fig.13 and Fig.14 In the figure, baffles 51 are fixedly provided on both sides of the gate 6 located at the upstream side, and an inclined plate 52 is fixedly provided on one side of the baffle 51.
[0039] When using the reservoir drainage gate based on water pressure control: first, the gate 6 is in a closed state. When the water level upstream of the reservoir rises, the water pressure upstream of the reservoir becomes larger. When the water level upstream of the reservoir reaches the point where pressure relief is required, the water in the reservoir needs to be discharged in time. In the device, a drain port 9 is provided above the gate 6. When the water level upstream reaches the drain port 9, if the water level in the reservoir is still rising, the rising water will flow into the downstream of the other side of the gate 6 through the drain port 9 provided on the gate 6, and flow into The water on the other side of the gate 6 will be blocked and intercepted by the intercepting plate 11 installed downstream, so that the water overflowing from the drain port 9 can be collected. During installation, the downstream side of the base 1 is set as an inclined surface, and the intercepting plate 11 is set on the inclined surface. When the intercepting plate 11 continuously intercepts and blocks the overflowing water, the collected and intercepted water will push the intercepting plate 11, so that the intercepting plate 11 slides on the guide rod 12 along the inclined surface. While sliding, the intercepting plate 11 will pull the positioning component to release the positioning of the rotating shaft 7.
[0040] When the intercepting plate 11 slides in the downstream direction, the fixed block 19 on the intercepting plate 11 moves synchronously. The movement of the fixed block 19 will pull the column 18 at one end of the pull rod 17, and the column 18 will slide inside the strip groove 20 during the pulling process. Since the intercepting plate 11 slides obliquely and the pull rod 17 slides horizontally, the column 18 will be displaced inside the strip groove 20 and in the vertical direction of the strip groove 20. The fixed block 19 can drive the pull rod 17 to move while pulling the column 18. A positioning rod 15 is fixed at one end of the pull rod 17, which can drive the positioning rod 15 to move synchronously in the downstream direction, so that the positioning rod 15 slides inside the cross column 13, and one end of the positioning rod 15 is separated from the positioning hole 8 on one side of the rotating shaft 7, and is pulled out from the inside of the shaft groove 4. At this time, the positioning rod 15 and the positioning hole 8 can be realized. Separation, at this time, the positioning rod 15 no longer causes positioning constraints on the rotating shaft 7. When the positioning rod 15 slides in the cross column 13, the limit blocks 16 on both sides of the positioning rod 15 will slide in the limit grooves 14, which can increase the stability of the sliding of the positioning rod 15. By preventing the positioning rod 15 from being pulled out of the cross column 13, the sliding safety of the positioning rod 15 is increased; when the fixed block 19 moves to the downstream side, at this time, the fixed block 19 can push the push plate 28 on one side, so that the slider 29 on one side of the push plate 28 slides inside the slide rail 54, and the movement of the push plate 28 can pull the movable rod 26 to move through the L-shaped rod 27. The movable rod 26 is rotatably connected to one side of the triangular plate 22, so that the triangular plate 22 can be pulled. At the same time, one side of the triangular plate 22 is rotatably connected to one side of the gate pier 2 through the rotating rod 23, so that the triangular plate 22 rotates around the rotating rod 23.
[0041] After the positioning rod 15 is pulled out from the positioning hole 8, the rotating shaft 7 is no longer constrained by the positioning rod 15. At this time, the gate 6 will rotate inversely with the rotating shaft as the center. Since the water level of the reservoir is high and pressure relief is required, the water pressure above the rotating shaft 7 and located on the upstream side of the gate 6 is greater than the water pressure on the side of the gate 6 below the rotating shaft 7. At this time, the water pressure on the side above the rotating shaft 7 pushes the gate 6 to rotate toward the downstream side with the rotating shaft 7 as the center, so that the gate 6 can be opened. When the gate 6 is opened, the baffles 51 on both sides of the gate 6 can block the gap between the side of the gate 6 and the gate pier 2, reducing the flow of floating objects from the gap between the two to the downstream. At the same time, when the gate 6 rotates, it rotates at the gap 3. At this time, the inclined plate 52 on one side of the baffle 51 can block the gate 6 between the gap 3 and reduce the flow of floating objects from the gap between the two to the downstream.
[0042] After the gate 6 is pushed open by the water pressure above the rotating shaft 7, the guide columns 10 on both sides of the gate 6 slide inside the arc track 5, which can increase the stability of the gate 6 opening. When the guide columns 10 slide inside the arc track 5, one end of the guide columns 10 extending from the arc track 5 can squeeze and push the pressure plate 25 at one end of the tilted triangular plate 22, so that the triangular plate 22 rotates again with the rotating rod 23 as the center. When the triangular plate 22 rotates, it can continuously push the L-shaped rod 27 through the movable rod 26, so that the push plate 28 continues to slide on one side of the slide rail 54. When the guide column 10 slides to the other end of the arc track 5, the guide column 10 can press the pressure plate 25, and the triangular plate 22 stops rotating, and the push plate 28 stops sliding on one side of the slide rail 54.
[0043] When the guide column 10 slides to the other end of the arc rail 5, the second wedge block 33 at the end of the reset push rod 30 on one side of the gate 6 contacts the hypotenuse of the trapezoidal block 37 respectively. At this time, the hypotenuse of the trapezoidal block 37 can push the second wedge block 33, so that the reset push rod 30 slides inside the sleeve 31, and the first wedge block 32 at the other end of the reset push rod 30 penetrates into the bottom of the arc rail 5 and aligns with the pressing groove 24, waiting for the gate 6 to rotate in the opposite direction to push the pressing groove 24.
[0044] After the gate 6 is pushed open by the water pressure above the rotating shaft 7, the lower end of the gate 6 is separated between the base 1 to produce a pressure relief channel. At this time, the upstream water will flow into the downstream through the pressure relief channel there, realizing the effect of upstream downward pressure. At the same time, when the gate 6 is rotated to open with the rotating shaft 7, the pressure relief channel is located on the side of the base 1 and the lower end of the gate 6 and is located in the water. Floating objects floating above the water surface will be intercepted by the gate 6 and located above the water surface of the inclined surface of the gate 6. Then, they will be salvaged by the auxiliary salvaging component, so as to avoid the pressure relief channel being located above the water surface, causing the floating objects to follow the water flow through the gate and accumulate at the gate, thereby affecting the blockage of the gate, thereby improving the smoothness of drainage through the pressure relief channel.
[0045] The water from the upstream of the reservoir is discharged into the downstream through the pressure relief channel. Continuous drainage and pressure relief will cause the water level of the upstream reservoir to drop. The drop in water level will cause the water pressure on the upstream side of the gate 6 at the end above the rotating shaft 7 to gradually decrease. The gate 6 is pushed by the water pressure below the rotating shaft 7, so that the gate 6 will rotate in the opposite direction around the rotating shaft 7, so that the gate 6 is gradually closed. When the water pressure on the side of one end of the gate 6 below the rotating shaft 7 is greater than the water pressure on the side of one end of the gate 6 above the rotating shaft 7, the gate 6 is pushed to reverse by the water pressure at the lower end, and the gate 6 contacts one side of the gate pier 2, so that the gate 6 can be closed.
[0046] When the gate 6 is gradually closed in the reverse direction, the guide posts 10 on both sides of the gate 6 slide inside the arc track 5 as the gate 6 reverses, and at the same time, the gate 6 drives the first wedge block 32 extending to the bottom of the arc track 5 to move synchronously. After the gate 6 drives the first wedge block 32 to fit into the pressing groove 24 on one side of the triangular plate 22, the gate 6 continues to rotate in the reverse direction, driving the reset push rod 30 and the first wedge block 32 to move synchronously. At this time, the first wedge block 32 can push the triangular plate 22 in the reverse direction, so that the triangular plate 22 rotates in the reverse direction with the rotating rod 23 as the center of the circle. At the same time, the L-shaped rod 27 is pulled in the reverse direction by the movable rod 26, so that the L-shaped rod 27 pulls the push plate 28 to slide to the upstream side. When the push plate 28 moves to one side of the fixed block 19, it can push the fixed block 19, so that the fixed block 19 moves to the side close to the gate 6. The movement of the fixed block 19 can drive the intercepting plate 11 to move synchronously, so that the intercepting plate 11 When the gate 6 is closed, the positioning rod 15 is pushed into the shaft groove 4 and inserted into the positioning hole 8 on one side of the shaft 7, so that the shaft 7 can be re-positioned, waiting for the next pressure relief unlocking. When the gate 6 is closed, the first wedge block 32 slides out of the pressing groove 24, so that the first wedge block 32 is separated from the pressing groove 24, and the first wedge block 32 contacts with the stopper 34, which will cause the first wedge block 32 to slide on the inclined surface 35 of the stopper 34, so that the first wedge block 32 is pushed to one side of the gate 6, and the reset push rod 30 is reset, waiting for the next extension use. This action can realize the positioning of the shaft 7, increase the positioning of the gate 6 by the shaft 7, and realize the stability of the gate 6 closing when the reservoir does not need pressure relief.
[0047] The device has a simple structure. By adding a drain port 9, a rotating shaft 7, a positioning hole 8, a diverter plate 11, and a positioning component and a reset component, the gate 6 can be opened and closed by the water pressure of the reservoir, thereby realizing automatic water pressure control of the reservoir, avoiding the staff from opening the gate 6 to release pressure after observing the water level of the reservoir, and effectively reducing the labor intensity of the staff. The device can automatically open the gate 6 when drainage is required, and automatically close the gate 6 after pressure relief, thereby realizing the convenience of reservoir water pressure control, and can timely relieve pressure on the reservoir, thereby avoiding the problem of shortening the service life of the dam due to excessive water pressure on the dam, realizing autonomous pressure relief of reservoir water pressure control, and improving convenience of use.
[0048] Example 2, please refer to Figure 1-Figure 15 , this embodiment further explains Example 1, the base 1, gate 6, intercepting plate 11, positioning assembly, reset assembly, auxiliary salvage assembly and driving assembly shown in the figure, gate piers 2 are fixedly provided on both sides of the base 1, notches 3 are provided on one side of the gate piers 2, shaft grooves 4 are provided on one side of the gate piers 2, arc rails 5 are fixedly provided on one side of the gate piers 2, gate 6 is installed between the gate piers 2, rotating shafts 7 rotatably connected to the shaft grooves 4 are fixedly provided on both sides of the gate 6, positioning holes 8 are provided on one side of the rotating shaft 7, drain ports 9 are provided on the gate 6, guide rails slidably connected to the arc rails 5 are fixedly provided on both sides of the gate 6 The column 10 and the intercepting plate 11 are arranged at the downstream of one side of the gate 6, and the intercepting plate 11 is slidably arranged on the guide rod 12, one end of the guide rod 12 is fixedly connected to one side of the gate pier 2, and the positioning component is installed on one side of the gate pier 2 to position the rotating shaft 7; both sides of the intercepting plate 11 are connected to the positioning component, and the reset component is installed on one side of the intercepting plate 11, and the positioning component is pushed to reset so that the positioning component limits the rotating shaft 7, and the auxiliary salvage component is installed on one side of the gate 6 to salvage and clean up the debris floating on the water surface on the upstream side of the gate 6, and the driving component is installed on the downstream side of the gate 6 to drive the auxiliary salvage component;
[0049] See also Figure 1 , Figure 2 and Figure 13-Figure 15 The auxiliary salvage assembly shown in the figure includes a crawler 38 provided on one side of the gate 6, crawler wheels 39 are meshed on the inner sides of both ends of the crawler 38, and a stop plate 40 is fixedly provided at an equal distance on one side of the crawler 38, wherein first transmission teeth 41 are fixedly provided on both sides of the crawler wheel 39 located on the upper side of the gate 6, and the first transmission teeth 41 are connected to the driving assembly;
[0050] See also Figure 4 , Fig.13 and Fig.15The driving assembly shown in the figure includes an impeller 42 arranged on the lower end side of the gate 6, and a first gear 43 is fixedly provided at both ends of the impeller 42. A second gear 44 is provided on the upper side of the gate 6. The first gear 43 and the second gear 44 are meshed and connected by a toothed chain 45. A second transmission tooth 46 meshed and connected to the first transmission tooth 41 is fixedly provided on one side of the second gear 44.
[0051] In the present embodiment, an auxiliary salvage component is installed on the upstream side of the gate 6 to salvage floating objects floating on the water surface on the upstream side of the reservoir, thereby reducing congestion and accumulation of floating objects at the gate and achieving smooth drainage of the gate. At the same time, a driving component is provided on the downstream side of the gate 6, which can convert the kinetic energy of the water flow into mechanical energy to drive the auxiliary salvage component when the gate 6 is opened to release pressure, and can reasonably utilize the kinetic energy of the water, reducing the use of driving equipment. At the same time, the auxiliary salvage component can be automatically driven when the gate 6 is opened, thereby increasing the convenience of use.
[0052] In specific use, after the water pressure on the upstream side of the gate 6 reaches the drain port 9, the water in the upstream reservoir will flow into the downstream through the drain port 9, and the intercepting plate 11 at the downstream can intercept the flowing water. When the intercepting plate 11 intercepts the water and can push it, the intercepting plate 11 will slide along the guide rod 12. When the intercepting plate 11 is displaced, the positioning assembly is separated from the positioning hole 8 on the side of the rotating shaft 7 to unlock the rotating shaft 7. Since the upstream water pressure is large and the water pressure on the side above the rotating shaft 7 is greater than the water pressure on the side below the rotating shaft 7, the water pressure upstream and above the rotating shaft 7 can push the gate 6, so that the gate 6 rotates along the rotating shaft 7 to open the gate 6. At this time, one end of the bottom of the gate 6 is separated from the base 1, and the upstream water will flow downstream through this place.
[0053] The water in the upstream can push the impeller 42 at the downstream end of the gate 6 during the flow, so that the impeller 42 rotates, and the flowing water energy can be reasonably utilized. The rotation of the impeller 42 can drive the first gears 43 on both sides to rotate. The first gear 43 and the second gear 44 on the upper side of the gate 6 are meshed and transmitted through the tooth chain 45, that is, the second gear 44 is driven to rotate through the meshing of the tooth chain 45 while the first gear 43 rotates. The rotation of the second gear 44 can drive the second transmission gear 46 on one side to rotate. Since the second transmission gear 46 is meshed and connected with the first transmission gear 41, the second transmission gear 46 is meshed and connected with the first transmission gear 41. When the first transmission gear 41 rotates, the first transmission gear 41 can be driven to rotate, and the first transmission gear 41 is fixedly installed on both sides of one of the track wheels 39, and a track 38 is provided between the track wheels 39 at both ends of the gate 6, which can drive the track 38 to move on the upstream side of the gate 6. When the track moves on one side of the gate 6, it can salvage floating objects floating on the upstream water surface, avoid clogging the gate by floating objects, increase the cleaning of floating objects at the gate when the reservoir is opened, avoid manual salvage using salvage tools, effectively reduce the labor intensity of the staff, and improve the convenience of salvaging floating objects on the water surface at the gate.
[0054] After the gate 6 is opened and the reservoir is pressed down, the water level upstream of the reservoir drops, which will change the pressure on the gates 6 on both sides of the rotating shaft 7. While the water pressure above the rotating shaft 7 gradually decreases, the gate 6 gradually rotates in the opposite direction. At this time, the inclination angle of the gate 6 can be changed. Similarly, the water level on the upstream side of the gate 6 drops, and the floating objects intercepted on the side of the gate 6 also drop. At this time, the auxiliary salvage component on one side of the gate 6 can adapt its height to salvage floating objects at different water levels, which increases the convenience of salvaging floating objects and can make reasonable use of the water energy flowing upstream of the reservoir.
[0055] When the water pressure on the gate 6 below the shaft 7 is greater than the water pressure on the gate 6 above it, the gate 6 closes automatically. At this time, the reset assembly can push the positioning assembly to allow the positioning assembly to position and restrain the shaft 7 again to prevent the shaft 7 from rotating again. When the next upstream water level passes the drain port 9, the positioning assembly can be dragged again to unlock the shaft 7, release the pressure again, and salvage floating objects on the upstream water surface again, thereby achieving convenience of use.
[0056] Example 3, please refer to Figure 1-Figure 15, this embodiment further illustrates other embodiments, the base 1, gate 6, intercepting plate 11, positioning assembly, reset assembly, auxiliary salvage assembly and driving assembly shown in the figure, both sides of the base 1 are fixed with gate piers 2, one side of the gate piers 2 is provided with a notch 3, one side of the gate piers 2 is provided with an axis groove 4, one side of the gate piers 2 is fixed with an arc rail 5, the gate 6 is installed between the gate piers 2, both sides of the gate 6 are fixed with a rotating shaft 7 rotatably connected to the axis groove 4, one side of the rotating shaft 7 is provided with a positioning hole 8, the gate 6 is provided with a drain port 9, and both sides of the gate 6 are fixed with a guide slidably connected to the arc rail 5 The intercepting plate 11 is arranged at the downstream of one side of the gate 6, and the intercepting plate 11 is slidably arranged on the guide rod 12, one end of the guide rod 12 is fixedly connected to one side of the gate pier 2, and the positioning component is installed on one side of the gate pier 2 to position the rotating shaft 7; both sides of the intercepting plate 11 are connected to the positioning component, and the reset component is installed on one side of the intercepting plate 11, and the positioning component is pushed to reset so that the positioning component limits the rotating shaft 7, and the auxiliary salvage component is installed on one side of the gate 6 to salvage and clean up the debris floating on the water surface on the upstream side of the gate 6, and the driving component is installed on the downstream side of the gate 6 to drive the auxiliary salvage component.
[0057] See also Figure 13-Figure 15 , the track wheel 39, the impeller 42 and the second gear 44 shown in the figure are all connected to the gate 6 through the bearing frame 47;
[0058] See also Figure 1 , Figure 2 , Figure 4 and Fig.13 As shown in the figure, a protection box 48 is fixedly provided on both sides of the gate 6 , and the first transmission gear 41 and the second transmission gear 46 are both arranged inside the protection box 48 .
[0059] See also Figure 1 , Figure 2 , Figure 4 and Fig.13 A material guide plate 49 is fixedly provided between the protective boxes 48 shown in the figure, and a sliding groove 50 is fixedly provided at one end of the material guide plate 49.
[0060] In this embodiment, the track wheel 39, the impeller 42 and the second gear 44 are all connected to the gate 6 through the bearing frame 47, which can increase the installation stability between the track wheel 39, the impeller 42 and the second gear 44 and the gate 6, avoid the track wheel 39, the impeller 42 and the second gear 44 being placed in the air, and increase the safety of the placement and use of the track wheel 39, the impeller 42 and the second gear 44; both sides of the gate 6 are fixed with protective boxes 48, in which the first and second transmission teeth can be installed, which can protect the first and second transmission teeth and increase the safety of the use of the first and second transmission teeth; between the protective boxes 48, a guide plate 49 is provided, which can guide the floating objects on the water surface salvaged by the auxiliary salvage component, and at the same time, a sliding groove 50 is fixed on one side of the guide plate 49, which can discharge the floating objects on the water surface sliding off the guide plate 49 to the shore side of the reservoir, avoid the floating objects on the water surface falling into the downstream of the reservoir, and realize the treatment of the floating objects on the water surface after salvage.
[0061] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0062] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A reservoir drainage gate based on water pressure control, characterized in that: include: A base (1), gate piers (2) are fixedly provided on both sides of the base (1), a notch (3) is provided on one side of the gate pier (2), an axis groove (4) is provided on one side of the gate pier (2), and an arc rail (5) is fixedly provided on one side of the gate pier (2); A gate (6), the gate (6) being installed between the gate piers (2), a rotating shaft (7) rotatably connected to the shaft groove (4) being fixed on both sides of the gate (6), a positioning hole (8) being provided on one side of the rotating shaft (7), a drain port (9) being provided on the gate (6), and a guide column (10) being slidably connected to the arc rail (5) being fixed on both sides of the gate (6); A cut-off plate (11), the cut-off plate (11) being arranged downstream of one side of the gate (6), and the cut-off plate (11) being slidably arranged on a guide rod (12), one end of the guide rod (12) being fixedly connected to one side of the gate pier (2); a positioning component, the positioning component being mounted on one side of the gate pier (2) to position the rotating shaft (7); both sides of the intercepting plate (11) are connected to the positioning component; A reset component is mounted on one side of the intercepting plate (11) and pushes the positioning component to reset so that the positioning component limits the rotation shaft (7); The reset assembly comprises a triangular plate (22), a rotating rod (23) is fixedly provided on one side of the triangular plate (22), an end of the rotating rod (23) away from the triangular plate (22) is fixedly connected to one side of the gate pier (2), a pressing groove (24) is fixedly provided at the edge of the side of the triangular plate (22) away from the rotating rod (23), a pressing plate (25) is fixedly provided at the top corner of one side of the triangular plate (22), a movable rod (26) is rotatably provided on the upper side of the rotating rod (23) and located on one side of the triangular plate (22), an L-shaped rod (27) is rotatably provided on the end of the movable rod (26) away from the triangular plate (22), a push plate (28) is fixedly provided on one end of the L-shaped rod (27) away from the movable rod (26), a slider (29) is fixedly provided on one side of the push plate (28), the slider (29) is slidably arranged inside a slide rail (54), and the slide rail (54) is fixedly arranged at one end of the arc rail (5); The reset assembly further comprises a reset push rod (30), the reset push rod (30) being slidably arranged inside a sleeve (31), one side of the sleeve (31) being fixedly connected to one side of the gate (6), a first wedge block (32) and a second wedge block (33) being fixedly arranged at both ends of the reset push rod (30), a stopper (34) matching the first wedge block (32) being fixedly arranged on one side below the arc rail (5), one side of the stopper (34) and one side of the first wedge block (32) both being provided with an inclined surface (35), the first wedge block (32) matching the pressing groove (24), a cross bar (36) being fixedly arranged between the two slide rails (54), one side of the cross bar (36) being fixedly arranged with a trapezoidal block (37), the trapezoidal block (37) being an isosceles trapezoidal block, one side of the second wedge block (33) being in contact with the hypotenuse of the trapezoidal block (37); An auxiliary salvaging component is installed on one side of the gate (6) to salvage and clean up debris floating on the water surface upstream of the gate (6); A drive assembly is installed on the downstream side of the gate (6) to drive the auxiliary salvage assembly.
2. A reservoir drainage gate based on water pressure control according to claim 1, characterized in that: The positioning assembly comprises a transverse column (13) fixedly arranged on one side of the gate pier (2) and connected to the positioning hole (8); the transverse column (13) is a hollow column; both sides of the transverse column (13) are provided with limiting grooves (14); a positioning rod (15) is slidably arranged inside the transverse column (13); the positioning rod (15) matches the positioning hole (8); both sides of the positioning rod (15) are fixedly provided with limiting blocks (16) slidably connected to the limiting grooves (14); one end of the positioning rod (15) extends toward the outside of the transverse column (13) and is fixed to one end of a pull rod (17) A column (18) is fixedly provided at one end of the pull rod (17) away from the positioning rod (15), a fixing block (19) is fixedly provided at one end of the pull rod (17) and located at one end of the intercepting plate (11), a strip groove (20) is provided on the fixing block (19), and an opening (21) connected to the strip groove (20) is provided on the side wall of the fixing block (19), one end of the pull rod (17) passes through the opening (21) and extends into the inside thereof to be fixedly connected to the column (18), and both ends of the column (18) are slidably arranged in the inside of the strip groove (20).
3. A reservoir drainage gate based on water pressure control according to claim 1, characterized in that: The auxiliary salvage assembly comprises a crawler (38) arranged on one side of the gate (6), crawler wheels (39) are meshed on the inner sides of both ends of the crawler (38), and a stop plate (40) is fixedly provided at an equal distance on one side of the crawler (38), wherein first transmission teeth (41) are fixedly provided on both sides of the crawler wheel (39) located on the upper side of the gate (6), and the first transmission teeth (41) are connected to the drive assembly.
4. A reservoir drainage gate based on water pressure control according to claim 3, characterized in that: The driving assembly comprises an impeller (42) arranged at a lower end side of the gate (6), first gears (43) being fixedly provided at both ends of the impeller (42), a second gear (44) being provided at an upper side of the gate (6), the first gear (43) and the second gear (44) being meshingly connected via a toothed chain (45), and a second transmission tooth (46) meshingly connected to the first transmission tooth (41) being fixedly provided at one side of the second gear (44).
5. A reservoir drainage gate based on water pressure control according to claim 4, characterized in that: The track wheel (39), the impeller (42) and the second gear (44) are all connected to the gate (6) via a bearing frame (47).
6. A reservoir drainage gate based on water pressure control according to claim 4, characterized in that: A protection box (48) is fixedly provided on both sides of the gate (6), and the first transmission tooth (41) and the second transmission tooth (46) are both arranged inside the protection box (48).
7. A reservoir drainage gate based on water pressure control according to claim 6, characterized in that: A material guide plate (49) is fixedly provided between the protection boxes (48), and a material sliding groove (50) is fixedly provided at one end of the material guide plate (49).
8. A reservoir drainage gate based on water pressure control according to claim 1, characterized in that: Baffles (51) are fixedly provided on both sides of the gate (6) located on the upstream side, and an inclined plate (52) is fixedly provided on one side of the baffle (51).
9. A reservoir drainage gate based on water pressure control according to claim 1, characterized in that: A blocking piece (53) is fixedly provided at one end of the guide rod (12) away from the gate pier (2).
Citation Information
Patent Citations
Flap rising and lying integrated gate
CN111501691A
Automatic opening and closing drainage device and method
CN118727671A
Automatic opening and closing gate
CN203129106U