Sand mine drilling and sampling device
By designing a sand ore drilling and sampling device, and using hydraulic drive components and mechanical linkage to achieve automated sampling, the problems of complex operation, low efficiency and sample deviation in traditional drilling and drilling and sand ore sampling methods are solved, and the sampling efficiency and sample quality are improved.
Patent Information
- Application Number
- CN202411359817.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2024-12-20
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The traditional drilling ore sampling method relies on manual operations, resulting in complex operations, high labor intensity, low efficiency, large sample deviations, easy equipment failures, and lack of automation, limiting its effectiveness in complex environments and large-scale applications.
A sand ore drilling sampling device is designed, including a working cylinder, a magnetic suction seat, a bore stabilization mechanism, a sand extraction mechanism and an impurity crushing mechanism. It can achieve rapid positioning, automated sampling and sample processing through hydraulic drive components and mechanical linkage. Ensure efficient sampling under complex geological conditions.
Improve sampling efficiency and safety, realize automation and mechanization, reduce manual operation, and ensure sample purity and quality, adaptability and versatility.
Smart Images

Figure CN119164700A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ore sand drilling equipment, in particular to a sand ore drilling sampling device. Background Art
[0002] In the field of sand mining sampling, it is common practice to use specialized sampling equipment and techniques to extract representative samples from sand mines. These samples will be used to analyze the composition and quality of the ore sand. The sampling process needs to take into account accuracy and representativeness to ensure that the samples taken can truly reflect the characteristics of the entire ore body. Deep drilling is carried out using a drill rig to obtain ore sand samples from different depths. This method can provide continuous samples from the surface to the deep inside of the ore body, which helps to evaluate the vertical distribution of the ore body in detail.
[0003] Traditional drilling sand sampling methods often rely on more manual operations, such as manual drilling, sampling and sample processing. This not only increases the complexity of the operation, but also increases the labor intensity of the staff. At the same time, it faces the problem of inefficiency in the sampling process, especially in the environment of hard rock or complex geological structure, the sampling speed will be greatly reduced, and manual sampling is difficult to ensure that homogeneous and representative samples are obtained from each sampling point, which leads to deviations in sample data and affects the accuracy of the final analysis results. It usually lacks advanced stable control systems, which causes equipment failure or operational risks in complex or unstable terrain. Traditional sand sampling methods usually do not contain highly automated and intelligent elements, which limits their application in large-scale or continuous sampling operations. When sampling, the processing of large-particle samples is usually insufficient, which can easily cause equipment blockage, interrupt the sampling process, and require frequent maintenance and manual intervention. Summary of the invention
[0004] In view of the shortcomings of the prior art, the present invention provides a sand mine drilling sampling device, which solves the problems that the traditional sand mine drilling sampling method relies on manual operation, is complicated to operate, has high labor intensity, is inefficient, has large sample deviation, is prone to equipment failure and lacks automation, thus limiting its effectiveness in complex environments and large-scale applications.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: a sand ore drilling sampling device, comprising The working cylinder is used for installing and fixing the drilling sampling structure, and the side wall is provided with relative through grooves; The external sleeve is located on the outer surface of the working tube and is used to fit over and assist in fixing the drilling structure; The magnetic suspension seat is located on the working barrel and is used for magnetic suspension and recovery of the drilling sampling structure; The excavation stabilization mechanism is located in the working tube and is used for the stable lowering and attachment and fixation of the drilling sampling structure; The sand extraction mechanism is used for the main sampling operation of drilling and sampling structures; The impurity crushing mechanism is located below the working cylinder and is used to separate the impurities during sampling; The excavation operation mechanism is located on the working barrel and is used to drill the area to be sampled.
[0006] Preferably, the external sleeve is sleeved on the outer surface of the working cylinder, the sand extraction mechanism is arranged on the upper part of the working cylinder, the excavation stabilization mechanism is distributed and fixedly connected to the side of the working cylinder, the impurity crushing mechanism is arranged on the lower part of the working cylinder, the magnetic suspension seat is arranged on the top of the inner wall of the working cylinder, and the excavation operation mechanism is arranged on the working part of the working cylinder.
[0007] Preferably, the excavation stabilization mechanism includes a fixed ring, a traction ring 1, a connecting hinge and a traction ring 2, the fixed ring is fixedly connected to the upper part of the side wall of the working cylinder, the side wall of the fixed ring is rotatably connected to a rotating rod 1 evenly distributed in a ring, the end of the rotating rod 1 away from the fixed ring is rotatably connected to a rubber pulley, the middle part of one side wall of the rotating rod is rotatably connected to a linkage rod 1, the traction ring 1 is slidably connected to the middle and upper part of the side wall of the working cylinder and is located below the fixed ring, and the end of the linkage rod 1 away from the rotating rod 1 is rotatably connected to one side wall of the traction ring.
[0008] Preferably, the sand extraction mechanism comprises a motor box and an extension box, the motor box is fixedly connected to the bottom of the magnetic suspension seat, the bottom of the motor box is fixedly connected with a guide cylinder, the top of the inner side wall of the guide cylinder is rotatably connected to a spiral conveying rod, and the top of the spiral conveying rod is fixedly connected to the bottom output end of the motor inside the motor box, the middle and lower part of the side wall of the guide cylinder is fixedly connected with a top fixing ring 2, the side walls of the top fixing ring 2 are fixedly connected to nut auxiliary blocks arranged front and back, the nut auxiliary blocks are slidably connected in the through groove of the working cylinder and extend to the outside of the working cylinder through the through groove, the extension box is relatively fixedly connected to the side wall of the working cylinder, the inner side wall of the extension box is rotatably connected with a driving screw, and the driving screw is threadedly connected to the inside of the nut auxiliary block, and the upper part of the side wall of the guide cylinder is provided with contact grooves evenly distributed in annular distribution, and the side wall of the guide cylinder is also fixedly connected with a gathering pool at the height of the contact groove, and the top of the gathering pool is a bucket-shaped structure, and there is a gap between the bucket-shaped structure and the working cylinder.
[0009] Preferably, the impurity crushing mechanism includes an assembly barrel, the top of the assembly barrel is rotatably connected to a crushing impeller 1, the bottom of the assembly barrel is rotatably connected to a crushing impeller 2, the top of the inner wall of the assembly barrel is rotatably connected to a main bevel gear, the bottom end of the rotating shaft of the crushing impeller 1 is fixedly connected to the top end of the rotating shaft of the main bevel gear, the bottom of the inner wall of the assembly barrel is rotatably connected to a secondary bevel gear, the bottom end of the rotating shaft of the crushing impeller 2 is fixedly connected to the top end of the rotating shaft of the secondary bevel gear, the inner wall of the assembly barrel is rotatably connected to an auxiliary bevel gear, and the secondary bevel gear and the main bevel gear are both meshed and connected to the relative tooth keys of the auxiliary bevel gear.
[0010] Preferably, the excavation operation mechanism includes a drill sleeve, which is mounted on one end of the working tube close to the impurity crushing mechanism, and the drill sleeve is provided with an excavation drill bit at a working part away from the working tube, and the outer surface of the excavation groove is provided with an excavation groove communicated with the drill sleeve.
[0011] Preferably, the link hinge seat is annularly and evenly distributed and fixedly connected to the middle and lower part of the side wall of the working cylinder, the traction drag ring 2 is slidably connected to the lower part of the side wall of the working cylinder and is also located below the link hinge seat, the link hinge seat is rotatably connected to a rotating rod 2, the middle and lower part of the rotating rod 2 is rotatably connected to a linkage rod 2, the side end of the linkage rod 2 away from the rotating rod 2 is rotatably connected to the side wall of the traction drag ring 2, the end of the rotating rod 2 away from the link hinge seat is rotatably connected to a contact arc panel, the bottom of the fixed ring is fixedly connected to two groups of front-and-rear symmetrical hydraulic drive components 1, and the bottom telescopic end of the hydraulic drive component 1 is fixedly connected to the traction drag ring 1.
[0012] Preferably, the side wall of the working cylinder is fixedly connected with a hydraulic drive component 2, and the bottom telescopic end of the hydraulic drive component 2 is fixedly connected to the second traction and drag ring.
[0013] Preferably, a top fixing ring is fixedly connected to the upper middle portion of the guide cylinder side wall, the top fixing ring is slidably connected to the inner wall of the working cylinder, a lifting motor is fixedly connected to the bottom of the extension box, and the bottom end of the driving screw is fixedly connected to the motor shaft of the lifting motor.
[0014] Preferably, a bottom fixing ring 1 is fixedly connected to the middle part of the side wall of the component cylinder, and the bottom fixing ring 1 is fixedly connected to the middle and lower part of the side wall of the working cylinder. A bottom fixing ring 2 is fixedly connected to the bottom of the motor box 2, and the bottom fixing ring 2 is fixedly connected to the lower part of the side wall of the working cylinder. The bottom rotating shaft of the secondary bevel gear is fixedly connected to the top output end of the motor box 2.
[0015] Working principle: First, use the excavation mechanism to excavate a hole in the area where the excavation mechanism is needed to test the sand mine, then place the equipment in the hole, and lower the equipment by loosening the cable fixed on the magnetic suspension seat. The drill sleeve included in the excavation mechanism is inserted between the working barrel and the external sleeve. When the drill sleeve is driven to rotate, the excavation drill installed on the drill sleeve starts to rotate and break the soil and rock formation in the area to be tested. The excavated mineral material to be tested will penetrate into the working barrel along the excavation groove set by the excavation drill bit and the drill sleeve, and the excavation stabilization mechanism is activated. After the hydraulic drive assembly fixed at the bottom of the fixed ring is started, the traction ring fixed at its output end is pulled to slide upward along the side wall of the working barrel. At the same time, the traction ring slides and moves When the hydraulic drive component 1 is started, the hydraulic drive component 2 is also started, and the traction and drag ring 2 fixed at its output end is pulled upward along the side wall of the working cylinder. When the traction and drag ring 2 slides and moves, the three groups of linkage rods 2 installed on it are driven to move upward, and the other side end of the linkage rod 2 is rotatably installed in the middle part of the rotating rod 2, so that the three groups of linkage rods 2 are lifted up and rotated outward along the end of the fixed ring at the same time. The rubber pulleys installed at the outer ends of the three groups of rotating rods 1 contact the inner wall of the predetermined sampling slot at the same time, so as to stabilize in the drilling and excavation hole slot for sampling. When the hydraulic drive component 1 is started, the hydraulic drive component 2 is also started, and pulls the traction and drag ring 2 fixed at its output end to slide upward along the side wall of the working cylinder. When the traction and drag ring 2 slides and moves, it drives the three groups of linkage rods 2 installed on it to move upward, and the other side end of the linkage rod 2 is rotatably installed in the middle part of the rotating rod 2, so that the three groups of linkage rods 2 are lifted up and rotated outward along the end of the fixed ring at the same time. The three sets of rotating rods are lifted up and rotated outward along the ends of the connecting hinge seats at the same time, and the contact arc panels installed at the outer ends of the three sets of rotating rods simultaneously contact the inner wall of the predetermined sampling slot hole, thereby stabilizing the drilling and excavation hole slot for sampling. The sampling device is quickly fixed to the inner wall of the predetermined sampling slot hole in a triangular support manner. When it is necessary to sample slag and stones in a specific area, the motor arranged inside the motor box starts and drives the spiral conveying rod fixed at its output end to rotate inside the guide cylinder. The rotating spiral conveying rod forms an upward guiding suction force, which guides the samples to be taken in the sampling area into the working cylinder and the guide cylinder at the same time and gradually rises until it reaches the contact groove set on the side wall of the guide cylinder, and falls and gathers along the contact groove. In the aggregate pool, while the sand extraction mechanism is guiding the sampling, the impurity crushing mechanism is also activated. After the motor box 2 fixed to the bottom of the working cylinder by the bottom fixing ring 2 is started, it drives the crushing impeller 2 with its output shaft fixed to rotate along the bottom wall of the component cylinder. While the crushing impeller 2 rotates, its rotating shaft located in the component cylinder also drives the secondary bevel gear to rotate, and the secondary bevel gear then drives the auxiliary bevel gear meshing with it to rotate, and the auxiliary bevel gear guides the rotating torque to the main bevel gear meshing at the top again, so that the main bevel gear also rotates and rotates in the opposite direction to the secondary bevel gear, and the main bevel gear also guides a group of crushing impellers 1 with fixed rotating shafts to rotate along the top wall of the component cylinder, and the crushing impeller 1 and the secondary bevel gear form a rotating crushing ability in the opposite direction,The large-particle samples in the sampling are intensively crushed to reduce the possibility of the predetermined sampling slot being blocked by the accumulation of debris, and the sampling is completed smoothly; after the sampling is completed, the sampling equipment is pulled out of the predetermined sampling slot again through the cable on the magnetic suspension seat, and the sand extraction mechanism is activated at the same time. The start-up of the two sets of lifting motors drives a set of driving screws to rotate inside a set of extension boxes respectively, and the nut auxiliary block attached to the thread of the driving screw also drives the rotation of the screw and rises accordingly. The top fixing ring 2 fixed to the nut auxiliary block also drives the guide cylinder and the motor box 1 to rise, so that the motor box 1 slides upward on the inner wall of the working cylinder using the top fixing ring 1, and at the same time, the magnetic suspension seat that blocks the predetermined sampling slot is lifted and separated from the predetermined sampling slot. Through the opened magnetic suspension seat, the aggregate pool can be extended out of the working cylinder for sampling and recovery.
[0016] The present invention provides a sand mine drilling sampling device, which has the following beneficial effects: 1. The present invention has an efficient sampling and fixing mechanism: through the design of hydraulic drive components and multiple groups of linkage rods and rotating rods, the sampling device can be quickly positioned and fixed in the hole slot. This triangular support method not only improves the stability of the equipment, but also allows efficient sampling under complex or loose geological conditions. The entire sampling process has a high degree of automation, from drilling into the formation, fixing equipment, sampling to extracting samples, and then to sample processing and collection. The entire process does not require human intervention, which significantly improves work efficiency and safety. By using hydraulic drive components and mechanical linkage mechanisms, the entire sampling process is automated and mechanized, reducing the need for manual operation and potential errors, and improving work efficiency and safety.
[0017] 2. Impurity treatment and sample purification effects of the present invention: Utilizing the internal crushing mechanism, large particle impurities in the collected samples can be processed in real time, reducing the risk of blockage and equipment damage, while improving the purity and quality of the samples. The modular design of the system allows for rapid adjustment or replacement of the device in different sampling environments, improving the adaptability and versatility of the equipment.
[0018] 3. Stability and precise positioning effect of the present invention: Rubber pulleys, contact arc panels and other components are used to accurately position and stabilize the inside of the hole groove, ensuring that the sampling equipment can work stably in complex geological environments, thereby improving the accuracy and reliability of sampling. The design of the entire sampling equipment allows continuous operation, from excavation, sampling to sample processing and impurity separation, forming a complete operation chain, reducing the possibility of operation interruption and improving operation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 The main structure of the present invention is shown in three dimensions. Figure 1 ; Figure 2The main structure of the present invention is shown in three dimensions. Figure 2 ; Figure 3 The main structure of the present invention is shown in three dimensions. Figure 3 ; Figure 4 The main structure of the present invention is shown in three dimensions. Figure 4 ; Figure 5 It is a three-dimensional schematic diagram of the internal structure of the main body of the present invention; Figure 6 It is a schematic diagram of the outer structure of the working cylinder of the present invention; Figure 7 It is a schematic diagram of the internal structure of the working cylinder of the present invention; Figure 8 It is a structural schematic diagram of the sand extraction mechanism of the present invention; Fig. 9 The structure of the impurity crushing mechanism of the present invention is shown in FIG. Figure 1 ; Fig.10 The structure of the impurity crushing mechanism of the present invention is shown in FIG. Figure 2 ; Fig.11 It is a schematic diagram of the structure of the excavation operation mechanism of the present invention.
[0020] Among them, 1. working cylinder; 2. external sleeve; 3. excavation stabilization mechanism; 4. sand extraction mechanism; 5. impurity crushing mechanism; 6. excavation operation mechanism; 7. magnetic suspension seat; 31. fixing ring; 32. rotating rod 1; 33. hydraulic drive component 1; 34. rubber pulley; 35. linkage rod 1; 36. traction drag ring 1; 37. connecting hinge seat; 38. traction drag ring 2; 39. rotating rod 2; 310. hydraulic drive component 2; 311. linkage rod 2; 312. contact arc panel; 41. motor box 1; 42. traction Guide cylinder; 43, spiral conveying rod; 44, top fixing ring 1; 45, top fixing ring 2; 46, nut sub-block; 47, extension box; 48, lifting motor; 49, driving screw; 410, contact groove; 411, aggregate tank; 51, assembly cylinder; 52, bottom fixing ring 1; 53, bottom fixing ring 2; 54, crushing impeller 1; 55, crushing impeller 2; 56, main bevel gear; 57, sub-bevel gear; 58, auxiliary bevel gear; 59, motor box 2; 61, drill sleeve; 62, excavation drill bit; 63, excavation groove. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings of the specification of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] Please refer to the attached Figure 1 -Attached Figure 4 The embodiment of the present invention provides a sand mining drilling sampling device, including a working barrel 1 for installing and fixing the drilling sampling structure, and the side wall is provided with relative through grooves, the sand extraction mechanism 4 is arranged at the upper part of the working barrel 1, the external sleeve 2 is located on the outer surface of the working barrel 1, and is used to cover and assist in fixing the drilling structure, the excavation stabilization mechanism 3 is distributed and fixedly connected to the side of the working barrel 1, the impurity crushing mechanism 5 is arranged at the lower part of the working barrel 1, and the magnetic suspension seat 7 is arranged at the top of the inner wall of the working barrel 1; the magnetic suspension seat 7 is located at the top of the working barrel 1, and is used for magnetic suspension and recovery of the drilling sampling structure; Please refer to the attached Figure 1 -Attached Figure 6The excavation stabilization mechanism 3 is used for the stable lowering and attachment and fixing of the drilling sampling structure. The excavation stabilization mechanism 3 includes a fixing ring 31, a traction drag ring 1 36, a link hinge seat 37 and a traction drag ring 2 38. The fixing ring 31 is fixedly connected to the upper part of the side wall of the working cylinder 1. The side wall of the fixing ring 31 is rotatably connected to a rotating rod 1 32 evenly distributed in an annular shape. The end of the rotating rod 1 32 away from the fixing ring 31 is rotatably connected to a rubber pulley 34. The middle part of the side wall of the rotating rod 1 32 is rotatably connected to a linkage rod 1 35. The traction drag ring 1 36 is slidably connected to the middle and upper part of the side wall of the working cylinder 1 and is located below the fixing ring 31. The end of the linkage rod 1 35 away from the rotating rod 1 32 is rotatably connected to the side wall of the traction drag ring 1 36. The link hinge seats 37 are evenly distributed in an annular shape and fixedly connected to the side of the working cylinder 1 At the middle and lower part of the wall, the traction and drag ring 2 38 is slidably connected to the lower part of the side wall of the working cylinder 1 and is also located below the link hinge seat 37. The link hinge seat 37 is rotatably connected to the rotating rod 2 39. The middle and lower part of the rotating rod 2 39 is rotatably connected to the linkage rod 2 311. The side end of the linkage rod 2 311 away from the rotating rod 2 39 is rotatably connected to the side wall of the traction and drag ring 2 38. The end of the rotating rod 2 39 away from the link hinge seat 37 is rotatably connected to the contact arc panel 312. The bottom of the fixed ring 31 is fixedly connected to two groups of front and rear symmetrical hydraulic drive components 1 33. The bottom telescopic end of the hydraulic drive component 1 33 is fixedly connected to the traction and drag ring 1 36. The side wall of the working cylinder 1 is fixedly connected to the hydraulic drive component 2 310. The bottom telescopic end of the hydraulic drive component 2 310 is fixedly connected to the traction and drag ring 2 linkage 38, firstly, use (6) to dig a hole in the area where the excavation operation mechanism is required to dig a hole, then place the equipment in the hole, and lower the equipment by loosening the cable fixed on the magnetic suspension seat 7, and activate the excavation stabilization mechanism 3. After the hydraulic drive component 33 fixed at the bottom of the fixed ring 31 is started, pull the traction ring 36 fixed at its output end to slide upward along the side wall of the working tube 1. While the traction ring 36 slides and moves, it drives the three sets of linkage rods 35 installed on it to move upward. Because the other side end of the linkage rod 35 is installed in the middle of the rotating rod 32, the three sets of linkage rods 35 lift up the three sets of rotating rods 32 and rotate them outward at the same time along the end of the fixed ring 31. The outer ends of the three sets of rotating rods 32 are increased. The rubber pulley 34 installed at the same time contacts the inner wall of the predetermined sampling slot hole, thereby being stabilized in the drilling and excavation hole slot for sampling. When the hydraulic drive component 1 33 is started, the hydraulic drive component 2 410 is also started, and pulls the traction and drag ring 2 38 fixed at its output end to slide upward along the side wall of the working tube 1. When the traction and drag ring 2 38 slides and moves, it drives the three sets of linkage rods 2 311 installed on it to move upward. Because the other side end of the linkage rod 2 311 is rotatably installed in the middle of the rotating rod 2 39, the three sets of linkage rods 2 311 lift the three sets of rotating rods 2 39 and rotate them outward at the same time along the end of the connecting hinge seat 37. The contact arc panel 312 installed at the outer end of the three sets of rotating rods 2 39 simultaneously contacts the inner wall of the predetermined sampling slot hole.Thus, the sampling device can be stabilized in the drilling hole and the sampling device can be quickly fixed on the inner wall of the predetermined sampling slot by using a triangular support method.
[0023] Please refer to the attached Figure 1 -Attached Figure 8 The sand extraction mechanism 4 is used for the main sampling operation of the drilling sampling structure. The sand extraction mechanism 4 includes a motor box 41 and an extension box 47. The motor box 41 is fixedly connected to the bottom of the magnetic suspension seat 7. The bottom of the motor box 41 is fixedly connected with a guide cylinder 42. The top of the inner wall of the guide cylinder 42 is rotatably connected to a spiral conveying rod 43. The top of the spiral conveying rod 43 is fixedly connected to the bottom output end of the motor inside the motor box 41. The middle and lower part of the side wall of the guide cylinder 42 is fixedly connected with a top fixing ring 45. The side wall of the top fixing ring 45 is fixedly connected to nut sub-blocks 46 arranged front and back. The nut sub-block 46 is slidably connected in the through groove of the working cylinder 1 and extends to the outside of the working cylinder 1 through the through groove. The extension box 47 is relatively fixedly connected to the side wall of the working cylinder 1, and the inner wall of the extension box 47 is rotatably connected to the driving screw 49, and the driving screw 49 is threadedly connected to the inside of the nut auxiliary block 46. The upper part of the side wall of the guide cylinder 42 is provided with a uniformly annularly distributed contact groove 410, and the side wall of the guide cylinder 42 is fixedly connected with a collection pool 411 at the height of the contact groove 410. The top of the collection pool 411 is a bucket-shaped structure, and there is a gap between the bucket-shaped structure and the working cylinder 1. The upper and middle part of the side wall of the guide cylinder 42 is fixedly connected with a top fixing ring 44, and the top fixing ring 44 is slidably connected to the inner wall of the working cylinder 1. The bottom of the extension box 47 is fixedly connected with a lifting motor 48, and the driving screw 49 The bottom end is fixedly connected to the motor shaft of the lifting motor 48. When it is necessary to sample the slag and stones in a specific area, after the sampling is completed, the sampling device is pulled out of the predetermined sampling slot again by the cable on the magnetic suspension seat 7, and the sand extraction mechanism 4 is activated at the same time. The start-up of the two sets of lifting motors 48 respectively drives a set of driving screws 49 to rotate inside a set of extension boxes 47, and the nut auxiliary block 46 threadedly mounted on the driving screw 49 also drives the screw 49 to rotate and rise accordingly. The top fixing ring 2 45 fixed to the nut auxiliary block 46 also drives the guide cylinder 42 and the motor box 1 41 to rise, so that the motor box 1 41 uses the top fixing ring 1 44 to move in the working cylinder. 1 slides upward on the inner wall, and at the same time lifts up the magnetic hanger 4 that blocks the predetermined sampling slot and detaches from the predetermined sampling slot. Through the opened magnetic hanger 7, the collection pool 411 can be extended out of the working cylinder 1 for sampling and recovery. The motor arranged inside the motor box 41 starts and drives the spiral conveying rod 43 fixed at its output end to rotate inside the guide cylinder 42. The rotating spiral conveying rod 43 forms an upward guiding suction force, which guides the samples to be taken in the sampling area to enter the working cylinder 1 and the guide cylinder 42 at the same time and gradually rise until they reach the contact groove 410 set on the side wall of the guide cylinder 42, and fall along the contact groove 410 and gather in the collection pool 411.
[0024] Please refer to the attached Figure 1 -Attached Fig.10 The impurity crushing mechanism 5 is located below the working cylinder 1 and is used for separating impurities during sampling. The impurity crushing mechanism 5 includes an assembly cylinder 51. The top of the assembly cylinder 51 is rotatably connected to a crushing impeller 1 54. The bottom of the assembly cylinder 51 is rotatably connected to a crushing impeller 2 55. The top of the inner wall of the assembly cylinder 51 is rotatably connected to a main bevel gear 56. The bottom end of the rotating shaft of the crushing impeller 1 54 is fixedly connected to the top end of the rotating shaft of the main bevel gear 56. The bottom of the inner wall of the assembly cylinder 51 is rotatably connected to a secondary bevel gear 57. The bottom end of the rotating shaft of the crushing impeller 2 55 is fixedly connected to the top end of the rotating shaft of the main bevel gear 56. The top of the rotating shaft of the auxiliary bevel gear 57 is fixedly connected, and the inner wall of the component cylinder 51 is rotatably connected with the auxiliary bevel gear 58. The auxiliary bevel gear 57 and the main bevel gear 56 are meshed and connected with the relative tooth keys of the auxiliary bevel gear 58. The middle part of the side wall of the component cylinder 51 is fixedly connected with the bottom fixing ring 1 52, and the bottom fixing ring 1 52 is fixedly connected to the middle and lower part of the side wall of the working cylinder 1. The bottom of the motor box 2 59 is fixedly connected with the bottom fixing ring 2 53, and the bottom fixing ring 2 53 is fixedly connected to the lower part of the side wall of the working cylinder 1. The bottom rotating shaft of the auxiliary bevel gear 57 is fixedly connected The impurity crushing mechanism 5 is also activated when the top output end of the motor box 59 is connected to the sand pumping mechanism 4 for guided sampling. After the motor box 59 fixed to the lower part of the working cylinder 1 by the bottom fixing ring 53 is started, the crushing impeller 55 fixed to its output shaft rotates along the bottom wall of the component cylinder 51. When the crushing impeller 55 rotates, its rotating shaft located in the component cylinder 51 also drives the auxiliary bevel gear 57 to rotate, and the auxiliary bevel gear 57 then drives the auxiliary bevel gear 58 meshing with it to rotate, and the auxiliary bevel gear 58 is rotated. The bevel gear 58 then guides the rotational torque to the main bevel gear 56 meshing at the top again, causing the main bevel gear 56 to rotate accordingly and rotate in the opposite direction to the sub-bevel gear 57. The main bevel gear 56 also guides a group of crushing impellers 54 with fixed rotating shafts to rotate along the top wall of the component barrel 51. The crushing impellers 54 and the sub-bevel gear 57 form a rotating crushing ability in opposite directions, intensively crushing large particle samples in the sampling, reducing the possibility of debris accumulation causing blockage of the predetermined sampling slot, and ensuring the smooth completion of sampling.
[0025] Please refer to the attached Figure 1 -Attached Fig.11The excavation operation mechanism 6 includes a drill sleeve 61, which is mounted on one end of the working barrel 1 close to the impurity crushing mechanism 5. The working part of the drill sleeve 61 away from the working barrel 1 is provided with an excavation drill bit 62, and the outer surface of the excavation groove 63 is provided with an excavation groove 63 communicated with the drill sleeve 61. The excavation operation mechanism 6 is used to excavate a hole groove in the area where the excavation operation mechanism is required to perform sand mine testing, and then the equipment is placed in the hole groove, and the equipment is lowered by loosening the cable fixed on the magnetic suspension seat. The drill sleeve 61 included in the excavation operation mechanism 6 is mounted between the working barrel 1 and the external sleeve 2. When the drill sleeve 61 is driven to rotate, the excavation drill bit 62 installed on the drill sleeve 61 starts to rotate and operates to crush and excavate the soil and rock formation in the area to be tested. The excavated mineral material to be tested will penetrate into the working barrel 1 along the excavation drill bit 62 and the excavation groove 63 set by the drill sleeve 61.
[0026] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A sand mine drilling sampling device, Features: include The working cylinder (1) is used for installing and fixing the drilling sampling structure, and the side wall is provided with relative through grooves; The external sleeve (2) is located on the outer surface of the working tube (1) and is used to fit over and assist in fixing the drilling structure; The magnetic suspension seat (7) is located on the working cylinder (1) and is used for magnetic suspension and recovery of the drilling sampling structure; The excavation stabilization mechanism (3) is located in the working cylinder (1) and is used to stabilize the lowering and attachment and fixation of the drilling sampling structure; The sand extraction mechanism (4) is used for the main sampling operation of the drilling sampling structure; The impurity crushing mechanism (5) is located below the working cylinder (1) and is used to separate impurities during sampling; The excavation operation mechanism (6) is located on the operation barrel (1) and is used to drill the area to be sampled.
2. A sand ore drilling sampling device according to claim 1, Features: The external sleeve (2) is sleeved on the outer surface of the working cylinder (1), the sand extraction mechanism (4) is arranged at the upper part of the working cylinder (1), the excavation stabilization mechanism (3) is distributed and fixedly connected to the side of the working cylinder (1), the impurity crushing mechanism (5) is arranged at the lower part of the working cylinder (1), the magnetic suspension seat (7) is arranged at the top of the inner wall of the working cylinder (1), and the excavation operation mechanism (6) is arranged at the working part of the working cylinder (1).
3. A sand ore drilling sampling device according to claim 1, Features: The excavation stabilization mechanism (3) comprises a fixed ring (31), a traction drag ring (36), a connecting hinge seat (37) and a traction drag ring (38), wherein the fixed ring (31) is fixedly connected to the upper part of the side wall of the working cylinder (1), the side wall of the fixed ring (31) is rotatably connected to a rotating rod (32) evenly distributed in an annular shape, the end of the rotating rod (32) away from the fixed ring (31) is rotatably connected to a rubber pulley (34), the middle part of the side wall of the rotating rod (32) is rotatably connected to a linkage rod (35), the traction drag ring (36) is slidably connected to the middle and upper part of the side wall of the working cylinder (1) and is located below the fixed ring (31), and the end of the linkage rod (35) away from the rotating rod (32) is rotatably connected to the side wall of the traction drag ring (36).
4. A sand ore drilling sampling device according to claim 1, Features: The sand extraction mechanism (4) comprises a motor box (41) and an extension box (47). The motor box (41) is fixedly connected to the bottom of the magnetic suspension seat (7). The bottom of the motor box (41) is fixedly connected to a guide cylinder (42). The top of the inner wall of the guide cylinder (42) is rotatably connected to a spiral conveying rod (43). The top of the spiral conveying rod (43) is fixedly connected to the bottom output end of the motor inside the motor box (41). The middle and lower part of the side wall of the guide cylinder (42) is fixedly connected to a top fixing ring (45). The side wall of the top fixing ring (45) is fixedly connected to nut auxiliary blocks (46) arranged in front and back. The nut auxiliary blocks (46) are slidably connected to the guide cylinder (42). The guide tube (42) is rotatably connected in a through groove of the working tube (1) and extends to the outside of the working tube (1) through the through groove. The extension box (47) is relatively fixedly connected to the side wall of the working tube (1). The inner side wall of the extension box (47) is rotatably connected to a driving screw (49). The driving screw (49) is threadedly connected to the inside of the nut auxiliary block (46). The upper part of the side wall of the guide tube (42) is provided with contact grooves (410) uniformly distributed in an annular pattern. The side wall of the guide tube (42) is also fixedly connected to a collection pool (411) at the height of the contact grooves (410). The top of the collection pool (411) is a bucket-shaped structure. At the same time, there is a gap between the bucket-shaped structure and the working tube (1).
5. A sand ore drilling sampling device according to claim 1, Features: The impurity crushing mechanism (5) comprises an assembly barrel (51), the top of the assembly barrel (51) is rotatably connected to a crushing impeller 1 (54), the bottom of the assembly barrel (51) is rotatably connected to a crushing impeller 2 (55), the top of the inner wall of the assembly barrel (51) is rotatably connected to a main bevel gear (56), the bottom end of the rotating shaft of the crushing impeller 1 (54) is fixedly connected to the top end of the rotating shaft of the main bevel gear (56), the bottom of the inner wall of the assembly barrel (51) is rotatably connected to a secondary bevel gear (57), the bottom end of the rotating shaft of the crushing impeller 2 (55) is fixedly connected to the top end of the rotating shaft of the secondary bevel gear (57), the inner wall of the assembly barrel (51) is rotatably connected to an auxiliary bevel gear (58), and the secondary bevel gear (57) and the main bevel gear (56) are both meshed and connected to the relative tooth keys of the auxiliary bevel gear (58).
6. A sand ore drilling sampling device according to claim 3, Features: The excavation operation mechanism (6) comprises a drill sleeve (61), the drill sleeve (61) being sleeved on one end of the working barrel (1) close to the impurity crushing mechanism (5), a working portion of the drill sleeve (61) away from the working barrel (1) being provided with an excavation drill bit (62), and an excavation groove (63) communicating with the drill sleeve (61) being provided on the outer surface of the excavation groove (63).
7. A sand ore drilling sampling device according to claim 3, Features: The link hinge seat (37) is evenly distributed in an annular manner and fixedly connected to the middle and lower part of the side wall of the working cylinder (1); the traction towing ring (38) is slidably connected to the lower part of the side wall of the working cylinder (1) and is located below the link hinge seat (37); the link hinge seat (37) is rotatably connected to the rotation rod (39); the middle and lower part of the rotation rod (39) is rotatably connected to the linkage rod (311); the side end of the linkage rod (311) away from the rotation rod (39) is rotatably connected to the side wall of the traction towing ring (38); the end of the rotation rod (39) away from the link hinge seat (37) is rotatably connected to the contact arc panel (312); the bottom of the fixed ring (31) is fixedly connected to two groups of front-to-rear symmetrical hydraulic drive components (33); the bottom telescopic end of the hydraulic drive component (33) is fixedly connected to the traction towing ring (36).
8. A sand ore drilling sampling device according to claim 3, Features: The side wall of the working cylinder (1) is fixedly connected to a second hydraulic drive assembly (310), and the bottom telescopic end of the second hydraulic drive assembly (310) is fixedly connected to a second traction ring (38).
9. A sand ore drilling sampling device according to claim 4, It is characterized in that A top fixing ring (44) is fixedly connected to the upper middle portion of the side wall of the guide cylinder (42), and the top fixing ring (44) is slidably connected to the inner wall of the working cylinder (1). A lifting motor (48) is fixedly connected to the bottom of the extension box (47), and the bottom end of the driving screw (49) is fixedly connected to the motor shaft of the lifting motor (48).
10. A sand ore drilling sampling device according to claim 5, It is characterized in that A bottom fixing ring (52) is fixedly connected to the middle portion of the side wall of the component cylinder (51), and the bottom fixing ring (52) is fixedly connected to the middle and lower portion of the side wall of the working cylinder (1). A bottom fixing ring (53) is fixedly connected to the bottom of the motor box (59), and the bottom fixing ring (53) is fixedly connected to the lower portion of the side wall of the working cylinder (1). The bottom rotating shaft of the auxiliary bevel gear (57) is fixedly connected to the top output end of the motor box (59).
Citation Information
Cited By
Oil drilling equipment
CN119434982A
Oil drilling equipment
CN119434982B
