Intelligent power failure ticket generation method and device, electronic equipment and storage medium
Through dynamic topological analysis and automated processes, the power outage ticket generation problems are solved, and the safety and accuracy of power system scheduling are improved.
Patent Information
- Application Number
- CN202411213664.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-12-24
AI Technical Summary
In the prior art, the generation efficiency of power outage operation tickets is inefficient and difficult to manage, making it difficult to ensure the safety of power system scheduling.
By receiving and responding to power outage instructions, an initial power outage ticket is created, a list of power outage equipment is configured based on preset power outage requirements, and a dynamic topological analysis of the target power system is carried out, a device group within the target power outage range is determined, a target power outage ticket is generated, and a manual intervention is reduced. Optimize operation management.
Improve the accuracy and safety of generating operation tickets, reduce operation complexity, and ensure the standardization and safety of power outage operations.
Smart Images

Figure CN119180635A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of intelligent distribution network of power system, and in particular to a method and device for intelligently generating power outage tickets, electronic equipment and storage medium. Background Art
[0002] In the operation and maintenance of the power system, the generation and management of operation tickets are important links to ensure the safe operation and maintenance of power equipment. Operation tickets are mainly used to record and manage the power outage operations of various equipment in the power system to ensure that the safety and reliability of the system can be effectively guaranteed when the power outage operation is carried out. Usually, the generation of operation tickets involves the dispatcher's selection of equipment in the power outage area, the formulation of operation steps, and the final execution.
[0003] At present, the process of generating operation tickets mainly relies on the manual operation of dispatchers. Dispatchers need to manually select relevant equipment and gradually generate operation steps according to specific power outage requirements. This process usually includes the following steps: First, the dispatcher needs to identify the area that needs power outage, and then select the lines and switchgear involved from the power system. Next, the dispatcher will generate the corresponding operation steps based on the selected equipment and record them in the operation ticket. This process is not only complicated, but also prone to errors, especially when faced with the situation where multiple power outage ranges need to be operated at the same time.
[0004] When multiple power outage areas are in progress at the same time, the dispatcher must select the line switch equipment multiple times to ensure that all relevant equipment is correctly selected. The workload is large, and the dispatcher needs to frequently select equipment and generate operation steps, which increases the complexity of the operation and the workload. In addition, errors or omissions that may occur during manual operation will directly affect the operational safety of the power system. When performing these operations, the dispatcher must be highly concentrated to prevent safety hazards caused by operational errors.
[0005] In modern power systems, with the increase of power equipment and the complexity of operation requirements, traditional manual operation methods are becoming less and less suitable. Manual operation is not only inefficient, but also easily affected by human factors, making it difficult to ensure safety during the operation.
[0006] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0007] The embodiments of the present invention provide a method and device, an electronic device, and a storage medium for intelligently generating power outage tickets, so as to at least solve the technical problems in the related art that the generation efficiency of power outage operation tickets is low, the management is difficult, and it is difficult to ensure the dispatch safety of the power system.
[0008] According to one aspect of an embodiment of the present invention, there is provided a method for intelligently generating a power outage ticket, comprising: receiving and responding to a power outage instruction to create an initial power outage ticket, wherein the power outage instruction carries at least a preset power outage requirement and a preset power outage rule; configuring a power outage equipment list in the initial power outage ticket based on the preset power outage requirement, and performing a dynamic topology analysis on a target power system based on the power outage equipment list to obtain a target power outage range; determining R equipment groups within the target power outage range, and obtaining equipment group information of each equipment group, wherein R is a positive integer; and generating a target power outage ticket based on the initial power outage ticket, the preset power outage rule, the target power outage range, and the equipment group information.
[0009] Furthermore, the step of creating an initial power outage ticket includes: determining an invoicing type based on the preset power outage requirement carried by the power outage instruction, wherein the invoicing type is used to indicate the ticket type of S operation tickets required for the current power outage operation and the automatic generation method of all the operation tickets, S being a positive integer; generating S operation tickets based on the S ticket types, wherein the generated S operation tickets include at least the initial power outage ticket.
[0010] Furthermore, the step of configuring the power outage device list in the initial power outage ticket based on the preset power outage requirement includes: parsing the preset power outage requirement to obtain N boundary devices involved in the current power outage operation, wherein the boundary device is used to define the boundary of the target power outage range, and N is a positive integer; for the N boundary devices, obtaining the device identification of each boundary device, and entering the device identification into the power outage device list of the initial power outage ticket.
[0011] Furthermore, the step of performing dynamic topological analysis on the target power system based on the power outage equipment list to obtain a target power outage range includes: obtaining a system topology diagram and system operation information of the target power system, and determining whether the energized state of the target power system is that the line topology is energized based on the system operation information; when the line topology of the target power system is energized, parsing the preset power outage demand to obtain M sub-devices involved in the current power outage operation, wherein the sub-devices are arranged at branch points of power lines for switching loads, and M is a positive integer; in the system topology diagram, the M sub-devices are regarded as being in a temporary closing state to obtain the power system in which the energized state is that the entire line is energized; performing line analysis on the power system with the entire line energized based on the N boundary devices in the power outage equipment list to obtain the target power outage range.
[0012] Furthermore, the step of performing line analysis on the power system with all lines energized based on the N boundary devices in the power outage equipment list to obtain the target power outage range includes: performing line analysis on the target power system with all lines energized in combination with the system topology diagram to obtain a line information set, wherein the line information set contains line information of T power lines in the target power system, and the line information includes: equipment information and upstream and downstream relationships of all power equipment in the power line, where T is a positive integer; for the N boundary devices in the power outage equipment list, determining the power outage sub-range corresponding to each boundary device based on the line information set to obtain N power outage sub-ranges, wherein the power outage sub-range refers to the boundary device and the downstream equipment of the boundary device; integrating the N power outage sub-ranges based on the system topology diagram, and performing equipment deduplication processing to obtain the target power outage range.
[0013] Furthermore, after performing a dynamic topology analysis on the target power system based on the power outage equipment list to obtain the target power outage range, it also includes: searching for power points in the target power outage range based on the power point tracking strategy to obtain a search result; when the search result indicates that the target power outage range contains at least one of the power points, determining that the target power outage range is in an unclosed state, and reconfiguring the power outage equipment list until the target power outage range in a closed state is obtained; when the search result indicates that the target power outage range does not contain any of the power points, determining that the target power outage range is in the closed state, and executing the step of determining R equipment groups within the target power outage range.
[0014] Furthermore, the step of generating a target power outage ticket based on the initial power outage ticket, the preset power outage rules, the target power outage range and the device group information includes: for each of the device groups in the target power outage range, extracting the device group type information and the device group status information in the device group information; generating a power outage operation statement based on the preset power outage rules, the device group type information and the device group status information, wherein the power outage operation statement is used to perform a power outage operation on the device group according to the preset power outage rules; and writing R power outage operation statements corresponding to R device groups into the initial power outage ticket to obtain the target power outage ticket.
[0015] According to another aspect of an embodiment of the present invention, there is also provided an intelligent device for generating a power outage ticket, comprising: a receiving unit, configured to receive and respond to a power outage instruction, and create an initial power outage ticket, wherein the power outage instruction carries at least a preset power outage requirement and a preset power outage rule; a configuration unit, configured to configure a power outage equipment list in the initial power outage ticket based on the preset power outage requirement, and perform a dynamic topology analysis on a target power system based on the power outage equipment list to obtain a target power outage range; a determination unit, configured to determine R equipment groups within the target power outage range, and obtain equipment group information of each equipment group, wherein R is a positive integer; and a generation unit, configured to generate a target power outage ticket based on the initial power outage ticket, the preset power outage rule, the target power outage range, and the equipment group information.
[0016] Furthermore, the receiving unit includes: a first determination module, used to determine the invoicing type based on the preset power outage requirement carried by the power outage instruction, wherein the invoicing type is used to indicate the ticket type of S operation tickets required for the current power outage operation and the automatic generation method of all the operation tickets, S is a positive integer; a first generation module, used to generate S operation tickets based on the S ticket types, wherein the generated S operation tickets include at least the initial power outage ticket.
[0017] Furthermore, the configuration unit includes: a first parsing module, used to parse the preset power outage requirement to obtain N boundary devices involved in the current power outage operation, wherein the boundary device is used to define the boundary of the target power outage range, and N is a positive integer; a first acquisition module, used to obtain the device identification of each of the N boundary devices, and enter the device identification into the power outage device list of the initial power outage ticket.
[0018] Furthermore, the configuration unit includes: a second acquisition module, used to acquire the system topology map and system operation information of the target power system, and determine whether the energized state of the target power system is that the line topology is energized based on the system operation information; a second analysis module, used to analyze the preset power outage demand to obtain M branch devices involved in the current power outage operation when the line topology of the target power system is energized, wherein the branch devices are arranged at the branch points of the power lines for switching loads, and M is a positive integer; a second generation module, used to regard the M branch devices in the system topology map as being in a temporary closing state, and obtain the power system in which the energized state is that the entire line is energized; an analysis module, used to perform line analysis on the power system with the entire line energized based on the N boundary devices in the power outage equipment list, and obtain the target power outage range.
[0019] Furthermore, the analysis module includes: an analysis submodule, which is used to perform line analysis on the target power system with all lines energized in combination with the system topology diagram, and obtain a line information set, wherein the line information set contains line information of T power lines in the target power system, and the line information includes: equipment information and upstream and downstream relationships of all power equipment in the power line, and T is a positive integer; a determination submodule, which is used to determine the power outage subrange corresponding to each of the N boundary devices in the power outage equipment list based on the line information set, and obtain N power outage subranges, wherein the power outage subrange refers to the boundary device and the downstream device of the boundary device; an integration submodule, which is used to integrate the N power outage subranges based on the system topology diagram, and perform equipment deduplication processing to obtain the target power outage range.
[0020] Furthermore, the intelligent generation device of power outage tickets also includes: a search module, which is used to search for power points in the target power outage range based on the power point tracking strategy to obtain a search result; a second determination module, which is used to determine that the target power outage range is in an unclosed state when the search result indicates that the target power outage range contains at least one of the power points, and reconfigure the power outage equipment list until the target power outage range in a closed state is obtained; a third determination module, which is used to determine that the target power outage range is in the closed state when the search result indicates that the target power outage range does not contain any of the power points, and execute the step of determining R equipment groups within the target power outage range.
[0021] Furthermore, the generation unit includes: an extraction module, used to extract the device group type information and the device group status information in the device group information for each of the device groups in the target power outage range; a third generation module, used to generate a power outage operation statement based on the preset power outage rule, the device group type information and the device group status information, wherein the power outage operation statement is used to perform a power outage operation on the device group according to the preset power outage rule; a writing module, used to write the R power outage operation statements corresponding to the R device groups into the initial power outage ticket to obtain the target power outage ticket.
[0022] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is also provided, wherein the computer-readable storage medium includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute any of the above-mentioned intelligent generation methods for power outage tickets.
[0023] According to another aspect of an embodiment of the present invention, there is also provided an electronic device, comprising one or more processors and a memory, wherein the memory is used to store one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement any one of the above-mentioned methods for intelligently generating power outage tickets.
[0024] In the present invention, a method for intelligently generating a power outage ticket is proposed. The method first receives and responds to a power outage instruction to create an initial power outage ticket, wherein the power outage instruction carries at least a preset power outage demand and a preset power outage rule. Then, a power outage equipment list in the initial power outage ticket is configured based on the preset power outage demand, and a dynamic topology analysis is performed on a target power system based on the power outage equipment list to obtain a target power outage range. Then, R equipment groups within the target power outage range are determined, and equipment group information of each equipment group is obtained, wherein R is a positive integer. Finally, a target power outage ticket is generated based on the initial power outage ticket, the preset power outage rule, the target power outage range, and the equipment group information.
[0025] In the present invention, an initial power outage ticket is automatically created by automatically receiving and responding to power outage instructions, the system automatically configures a power outage equipment list, configures the equipment list based on preset power outage requirements and performs dynamic topology analysis on the power system to ensure accurate identification of the target power outage range, divide it into multiple equipment groups, and process the equipment group information separately in groups. Finally, the initial power outage ticket, preset power outage rules, target power outage range and equipment group information are combined to generate a target power outage ticket. Compared with the prior art, the above steps use an automated process to reduce errors that may be caused by manual intervention, optimize the organization and management of power outage operations by dividing equipment groups, reduce the operation process and management complexity, and comprehensively consider the application of power outage operation rules, reduce the impact of misoperation on the dispatching safety of the power system, improve the accuracy of generated operation tickets, ensure the standardization and safety of power outage operations, and thus solve the technical problems of low efficiency in generating power outage operation tickets, difficult management, and difficulty in ensuring the dispatching safety of the power system in the related art. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0027] Figure 1 is a flow chart of an optional intelligent generation method of a power outage ticket according to an embodiment of the present invention;
[0028] Figure 2 is a flow chart of an optional method for intelligently generating power outage tickets based on dynamic topology according to an embodiment of the present invention;
[0029] Figure 3is a schematic diagram of an optional intelligent generation device for power outage tickets according to an embodiment of the present invention;
[0030] Figure 4 It is a hardware structure block diagram of an electronic device (or mobile device) for an intelligent method for generating power outage tickets according to an embodiment of the present invention. DETAILED DESCRIPTION
[0031] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0032] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0033] The following embodiments of the present invention can be applied to various systems / applications / devices that require intelligent dispatching of power systems and intelligent issuance of power outage tickets, and can reduce the impact of human factors on the invoicing process based on automated and intelligent power grid topology analysis, and realize the intelligent and efficient dispatching requirements in modern power systems. The present invention automatically receives and responds to power outage instructions, configures a list of power outage equipment based on power outage requirements to perform topological analysis on the power system, accurately identifies the power outage range and divides it into multiple power outage groups to obtain power outage equipment information in groups, and then accurately generates a power outage operation ticket.
[0034] The present invention is described in detail below in conjunction with various embodiments.
[0035] Embodiment 1
[0036] According to an embodiment of the present invention, an embodiment of a method for intelligently generating power outage tickets is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0037] Figure 1 is a flow chart of an optional intelligent generation method of a power outage ticket according to an embodiment of the present invention, such as Figure 1 As shown, the method comprises the following steps:
[0038] Step S101, receiving and responding to a power outage instruction, and creating an initial power outage ticket, wherein the power outage instruction carries at least a preset power outage requirement and a preset power outage rule.
[0039] Step S102: configuring a power outage equipment list in an initial power outage ticket based on a preset power outage demand, and performing a dynamic topology analysis on a target power system based on the power outage equipment list to obtain a target power outage range.
[0040] Step S103, determining R device groups within the target power outage range, and obtaining device group information of each device group, where R is a positive integer.
[0041] Step S104, generating a target power outage ticket based on the initial power outage ticket, preset power outage rules, target power outage range and equipment group information.
[0042] Through the above steps, a power outage instruction can be received and responded to first, and an initial power outage ticket can be created, wherein the power outage instruction carries at least a preset power outage demand and a preset power outage rule, and then the power outage equipment list in the initial power outage ticket is configured based on the preset power outage demand, and a dynamic topology analysis is performed on the target power system based on the power outage equipment list to obtain the target power outage range, and then R equipment groups within the target power outage range are determined, and the equipment group information of each equipment group is obtained, wherein R is a positive integer, and finally a target power outage ticket is generated based on the initial power outage ticket, the preset power outage rule, the target power outage range and the equipment group information.
[0043] In an embodiment of the present invention, an initial power outage ticket is automatically created by automatically receiving and responding to a power outage instruction, the system automatically configures a power outage equipment list, configures the equipment list based on a preset power outage demand, and performs a dynamic topology analysis on the power system to ensure accurate identification of a target power outage range, divide it into multiple equipment groups, and process equipment group information separately in groups. Finally, a target power outage ticket is generated by combining the initial power outage ticket, preset power outage rules, target power outage range, and equipment group information. Compared with the prior art, the above steps use an automated process to reduce errors that may be caused by manual intervention, optimize the organization and management of power outage operations by dividing equipment groups, reduce the operation process and management complexity, and comprehensively consider the application of power outage operation rules, reduce the impact of misoperation on the dispatching safety of the power system, improve the accuracy of generated operation tickets, ensure the standardization and safety of power outage operations, and thus solve the technical problems of low efficiency in generating power outage operation tickets, difficult management, and difficulty in ensuring the dispatching safety of the power system in the related art.
[0044] The embodiment of the present invention is described in detail below in combination with the above steps.
[0045] The implementing entity of the embodiment of the present invention may be a dispatching center of a smart grid system or a power system, which improves the intelligence level of operation ticket generation by automatically receiving power outage instructions, automatically configuring equipment lists, dynamically analyzing power systems, dividing equipment groups, and other steps.
[0046] Step S101, receiving and responding to a power outage instruction, and creating an initial power outage ticket, wherein the power outage instruction carries at least a preset power outage requirement and a preset power outage rule.
[0047] Specifically, the initial outage ticket is a preliminary document or record generated based on the received outage instruction, which contains basic information and related configurations of the outage operation. It is the starting point for generating the final target outage ticket. The recorded content includes the purpose of the outage (equipment maintenance, system upgrade, etc.), basic information (outage time, duration, and areas and equipment involved), and a list of outage equipment (a preliminary list of equipment expected to be affected by the outage). It should be noted that some of the above content can be directly generated based on the outage instruction, and some content (at least including the list of outage equipment) needs to be analyzed and configured in subsequent processes.
[0048] The initial power outage ticket in the embodiment of the present invention provides basic data for subsequent processing and provides a basic framework for subsequent analysis and generation of target power outage tickets.
[0049] It should be noted that the preset power outage requirements refer to the specific requirements and demands specified in the power outage instructions, which are pre-set during the system setting or configuration stage. The preset power outage rules are the operating specifications and standards set in the system configuration to ensure that the power outage operation is carried out in accordance with the established procedures and rules.
[0050] Optionally, the step of creating an initial power outage ticket in step S101 includes: determining the invoicing type based on the preset power outage requirement carried by the power outage instruction, wherein the invoicing type is used to indicate the ticket types of S operation tickets required for the current power outage operation and the automatic generation method of all operation tickets, S being a positive integer; generating S operation tickets based on the S ticket types, wherein the generated S operation tickets include at least the initial power outage ticket.
[0051] It should be noted that determining the invoice type means that the system identifies the invoice type through the rule engine or configuration file. For example, the system determines whether to generate a maintenance ticket, upgrade ticket, initial power outage ticket, etc., or determines whether to generate a power outage ticket alone, or to automatically generate a power transfer ticket, power restoration ticket, power transfer recovery ticket, etc. while generating a power outage ticket. The invoice type also specifies the automatic generation method of the operation ticket, including template generation, rule-driven generation, or automatic creation of tickets by filling templates with data.
[0052] In the embodiment of the present invention, by determining the invoicing type and automatically generating an operation ticket, the risk of manual input errors is reduced, the accuracy and consistency of the ticket content are ensured, and while flexibly adapting to the complexity of various power outage operations, the entire process can efficiently and accurately handle power outage requirements, ensuring the smooth progress of power outage operations and meeting relevant standards.
[0053] Step S102: configuring a power outage equipment list in an initial power outage ticket based on a preset power outage demand, and performing a dynamic topology analysis on a target power system based on the power outage equipment list to obtain a target power outage range.
[0054] In order to ensure the accuracy and effectiveness of the power outage operation, optionally, the step of configuring the power outage equipment list in the initial power outage ticket based on the preset power outage demand in step S102 includes: parsing the preset power outage demand to obtain N boundary devices involved in the current power outage operation, wherein the boundary device is used to define the boundary of the target power outage range, and N is a positive integer; for the N boundary devices, obtaining the device identification of each boundary device, and entering the device identification into the power outage equipment list of the initial power outage ticket.
[0055] Specifically, boundary devices refer to devices that require special attention during power outage operations, including but not limited to: switches, transformers, circuit breakers, etc. in the power grid. Power outage operations performed through boundary devices can isolate specific power system areas. After identifying and marking boundary devices, the system can more accurately analyze the impact of power outages on the entire power network and which areas will be affected by the power outage.
[0056] Optionally, in step S102, a step of performing a dynamic topological analysis on the target power system based on the power outage equipment list to obtain a target power outage range includes: obtaining a system topology diagram and system operation information of the target power system, and determining whether the energized state of the target power system is that the line topology is energized based on the system operation information; when the line topology of the target power system is energized, parsing a preset power outage demand to obtain M sub-devices involved in the current power outage operation, wherein the sub-devices are arranged at branch points of the power lines for switching loads, and M is a positive integer; in the system topology diagram, the M sub-devices are regarded as being in a temporary closing state to obtain a power system in which the energized state is that the entire line is energized; performing a line analysis on the power system with the entire line energized based on the N boundary devices in the power outage equipment list to obtain a target power outage range.
[0057] It should be noted that the line topology is energized means that the entire power line or power network of the target power system is energized as a whole, that is, the current flow in the line is continuous rather than interrupted.
[0058] Another thing that needs to be explained is that the system topology diagram is a graphical model of the target power system, in which the nodes represent power equipment and the edges represent the connections between the equipment. The implementation subject in the embodiment of the present invention can use graph theory algorithms (such as depth-first search, breadth-first search) or power system analysis tools (such as load flow analysis, fault analysis) to calculate the impact range of the power outage equipment on the system.
[0059] In addition, the branch device in the embodiment of the present invention refers to a branch point device used for switching the power line where the boundary device is located, usually a circuit breaker or an isolating switch.
[0060] In the embodiment of the present invention, by parsing preset requirements and dynamic topology analysis, the system can accurately define the scope of power outage to ensure the effectiveness of the operation. The identification and entry of boundary devices make the power outage operation have clear boundaries, thereby reducing the impact on non-power outage areas and improving the operating efficiency of the system.
[0061] In order to determine the detailed information of each power line in the system and determine the power outage scope affected by each boundary device, and then determine the complete power outage scope, optionally, based on the N boundary devices in the power outage device list, a line analysis is performed on the power system with all lines energized to obtain the target power outage scope, including: performing a line analysis on the target power system with all lines energized in combination with the system topology diagram to obtain a line information set, wherein the line information set contains line information of T power lines in the target power system, and the line information includes: equipment information and upstream and downstream relationships of all power equipment in the power line, and T is a positive integer; for the N boundary devices in the power outage device list, the power outage sub-range corresponding to each boundary device is determined based on the line information set to obtain N power outage sub-ranges, wherein the power outage sub-range refers to the boundary device and the downstream equipment of the boundary device; integrating the N power outage sub-ranges based on the system topology diagram, and performing equipment deduplication processing to obtain the target power outage range.
[0062] It should be noted that through detailed analysis of the system topology diagram, it can be ensured that the identified power outage scope accurately reflects the actual impact of the power outage equipment. Integration and deduplication processing ensure the integrity and consistency of the target power outage scope, automate the processing of complex power system analysis, improve the efficiency and accuracy of power outage scope determination, and help optimize the operation and maintenance of the power system.
[0063] In order to provide an accurate basis for the management and maintenance of the power system, it is necessary to ensure the correct configuration and closure of the target power outage range. Optionally, after executing step S102, it also includes: searching for power points in the target power outage range based on the power point tracking strategy to obtain a search result; when the search result indicates that the target power outage range contains at least one power point, determining that the target power outage range is in an unclosed state, and reconfiguring the power outage equipment list until a closed target power outage range is obtained; when the search result indicates that the target power outage range does not contain any power point, determining that the target power outage range is in a closed state, and executing the step of determining R equipment groups within the target power outage range.
[0064] It should be noted that power point tracking refers to finding power points within the target power outage range based on the power system topology and power point tracking strategies (such as current direction tracking, node analysis, etc.). Power points are usually the source of power in the system, such as generators, substations, etc.
[0065] In an embodiment of the present invention, by searching for power points and confirming whether the target power outage range is closed, it is ensured that no power source continues to supply power within the power outage range, thereby avoiding unexpected impacts on system operations. When it is found that the target power outage range includes power points, the power outage equipment list is reconfigured to ensure that the selected power outage range does not include power points, so that they remain in an effectively closed state. Through automated power point tracking and closed state adjustment, the efficiency and accuracy of determining the power outage range are improved, which helps to reduce manual intervention and potential errors, determine the equipment group within the closed power outage range, provide a clear operation plan for subsequent maintenance and overhaul, and ensure the normal operation and reliability of the power system.
[0066] Step S103, determining R device groups within the target power outage range, and obtaining device group information of each device group, where R is a positive integer.
[0067] Specifically, the equipment group information includes but is not limited to: equipment group type information and equipment group status information, wherein the equipment group type information includes: single switch, switch with single knife switch, switch with double knife switches, single knife switch; the equipment group status information includes: operation, hot standby, and cold standby.
[0068] After obtaining the device group information in step S103, the device information of each power device in each device group may be obtained to generate a target operation ticket. The device information includes but is not limited to: device type and device operation status.
[0069] Step S104, generating a target power outage ticket based on the initial power outage ticket, preset power outage rules, target power outage range and equipment group information.
[0070] Optionally, step S104 includes: for each device group in the target power outage range, extracting the device group type information and the device group status information in the device group information; generating a power outage operation statement based on preset power outage rules, the device group type information and the device group status information, wherein the power outage operation statement is used to perform a power outage operation on the device group according to the preset power outage rules; writing R power outage operation statements corresponding to the R device groups into an initial power outage ticket to obtain a target power outage ticket.
[0071] It should be noted that the preset power outage rules include various power outage conditions, such as the priority of the equipment group, the power load limit during the power outage, the system safety requirements, etc. According to these rules, it can be determined how to perform the power outage operation on the equipment group, such as the sequence, the power outage mode (such as sequential power outage, simultaneous power outage), etc. The target power outage ticket finally generated includes all the necessary power outage operation details, including: operation tasks, operation steps, sequence number, order receiving unit, and operation content.
[0072] The power outage operation statements generated in the embodiment of the present invention are based on the specific status of the equipment group and preset rules to ensure that the power outage operation of each equipment group is accurate and in line with expectations. By writing the power outage operation statements into the target power outage ticket, a systematic operation document is formed to facilitate subsequent execution and management.
[0073] The preset power outage rules in the embodiment of the present invention ensure the safety and rationality of the operation process, reduce the potential risks of power outage operations to system stability and safety, and improve the efficiency of power outage operations by automatically extracting information and generating operation statements, thereby reducing errors and omissions in manual operations.
[0074] The present invention is described below in conjunction with another specific implementation manner.
[0075] In the implementation mode of the present invention, a method for intelligently generating power outage tickets based on dynamic topology is proposed. After receiving the ticket type selected by the dispatcher, all the boundary switches of the power outage range that need to be shut down are determined, and the dynamic topology analysis is automatically called to intelligently identify the power outage range, and determine whether the power outage area is a closed area; the device group to which the device belongs is identified according to the connection relationship of the device nodes, and the type of the device group and the operating status of the device group are determined, and finally the power outage ticket is intelligently generated through dynamic topology identification.
[0076] Figure 2 is a flow chart of an optional method for intelligently generating power outage tickets based on dynamic topology according to an embodiment of the present invention, such as Figure 2 As shown, the method comprises the following steps:
[0077] S1 Invoicing type selection;
[0078] S2 power outage equipment selection;
[0079] S3 topology analysis and verification;
[0080] S4 device group status identification;
[0081] S5 generates a power outage ticket.
[0082] Regarding the invoicing type selection step in S1, it mainly refers to supporting the dispatching end to select the invoicing type and the automatic generation method of the operation ticket, for example, generating a power outage ticket separately, generating a power transfer ticket, a power restoration ticket, and a power transfer recovery ticket while generating a power outage ticket, etc.
[0083] The power outage equipment selection step in S2 mainly refers to supporting the dispatching end to add boundary switches of multiple power outage ranges (ie, the boundary equipment in the above-mentioned first embodiment) to the power outage equipment list of the power outage ticket at the same time.
[0084] Regarding the topology analysis and verification steps in S3, according to the boundary devices of all power outage ranges selected by the power outage equipment in S2, call dynamic topology analysis to obtain the upstream and downstream relationship of each boundary device in the power line, so as to obtain the entire power outage range, and use the power point tracking technology to determine whether the selection of boundary switches / boundary devices in the power outage range is complete according to the number of power points in all power outage ranges, so as to determine whether the power outage range is closed.
[0085] The following describes how to identify the power outage range based on dynamic topology:
[0086] 1. The line topology is required to be in normal operating state, that is, except for the tie switch and the boundary switch of the power outage range selected by the power outage equipment in S2, the opening and closing states of other equipment are closed, and the line topology is energized.
[0087] 2. Temporarily close the split devices in the boundary switches of the power outage range selected by the power outage equipment in S2 in the program cache to ensure that the entire line is energized during topology analysis.
[0088] 3. According to the power supply status of the line, obtain all equipment information and upstream and downstream relationships from the power supply point to the end of the line, so as to obtain the downstream area of all power outage boundary equipment.
[0089] 4. Delete the overlapping parts of the downstream area of all power outage boundary devices to obtain the power outage area defined by the power outage boundary devices.
[0090] 5. Use power point tracking technology to find the power point in the power outage area. If the power point can be found, it means that the power outage range is not closed and there is a lack of equipment at the edge of the power outage range in the direction of the power point. A pop-up window will then prompt the dispatcher, who can re-analyze the power outage range topology after selecting the equipment again.
[0091] Regarding the equipment group status identification step in S4, the topology analysis is called based on the power-off equipment selection in S2 to intelligently identify the equipment group to which the equipment belongs, and the equipment group type and operating status are determined based on the status of the equipment in the equipment group. The equipment group types include but are not limited to: single switch, switch with single knife switch, switch with double knife switches, single knife switch. The equipment group status includes but is not limited to: operation, hot standby, and cold standby.
[0092] Regarding the step of generating a power outage ticket in S5, after topology verification, a power outage ticket is generated according to the power outage scope, equipment information, equipment group information and preset rules. The content of the power outage ticket includes at least: operation task, operation steps, serial number, ordered unit, and operation content.
[0093] An exemplary example is to use the configuration of an operation ticket for a switch with double knife switches from operation to maintenance to illustrate the detailed content and usage of the preset power outage rules:
[0094] [Operation to maintenance-1]
[0095] step_num=5
[0096] step_1=1|2|2|1|device type|rule id|
[0097] step_2=0|2|2|1|device type|rule id|
[0098] step_3=1|2|2|2|device type|rule id|
[0099] step_4=-1|0|4|0|device type|rule id|
[0100] step_5=-1|0|6|0|device type|rule id|
[0101] Among them, "[operation to maintenance-1]" means that the equipment group status is "operation" and the equipment group type is "switch with double knife switch"; "step_num=5" means that this part of the rules contains a total of 5 steps.
[0102] The values of each item after "step_1" from left to right are:
[0103] ①1 means that if the device is a three-remote device, this step is generated, and if it is not a three-remote device, this step is skipped. If it is 0, it means that this step is generated directly without considering the three-remote status of the device;
[0104] ②2 refers to the prohibited inversion combination step number 2. After the power outage ticket is finally generated, if a reversal ticket, i.e. a power restoration ticket, needs to be generated, the step sequence of the same prohibited inversion combination step number will not be reversed;
[0105] ③2 means that the priority of this step is 2. When the power outage ticket is finally generated, the operation steps need to be arranged in order of priority;
[0106] ④1 means that the sub-priority of the step is 1. When generating power outage tickets in order of priority, the steps of the same sub-priority within the same priority are arranged together without interleaving;
[0107] ⑤ Equipment type, which means that the main equipment of this step is a distribution network switch or a distribution network knife switch;
[0108] The operation rule id refers to the rule id format used when the operation steps are finally generated.
[0109] The beneficial effects of the embodiments of the present invention include: fully tapping the topology analysis capabilities and topology service capabilities of the power dispatching system, reducing the dispatching workload while improving the efficiency of operation ticket generation, realizing the identification of power outage range through dynamic topology, and intelligently generating power outage tickets based on the type of equipment group where the switches at the boundary of the power outage range are located and the operating status.
[0110] The present invention is described below in conjunction with another optional embodiment.
[0111] Embodiment 2
[0112] The intelligent power outage ticket generation device provided in this embodiment includes multiple implementation units, each implementation unit corresponds to each implementation step in the above-mentioned embodiment one.
[0113] Figure 3 is a schematic diagram of an optional intelligent generation device for power outage tickets according to an embodiment of the present invention, such as Figure 3 As shown, the device may include: a receiving unit 31, a configuration unit 32, a determination unit 33, and a generation unit 34.
[0114] The receiving unit 31 is used to receive and respond to a power outage instruction and create an initial power outage ticket, wherein the power outage instruction carries at least a preset power outage requirement and a preset power outage rule.
[0115] The configuration unit 32 is used to configure the power outage equipment list in the initial power outage ticket based on the preset power outage demand, and perform dynamic topology analysis on the target power system based on the power outage equipment list to obtain the target power outage range.
[0116] The determination unit 33 is used to determine R device groups within the target power outage range and obtain device group information of each device group, where R is a positive integer.
[0117] The generating unit 34 is used to generate a target power outage ticket based on the initial power outage ticket, the preset power outage rule, the target power outage range and the equipment group information.
[0118] The above-mentioned intelligent power outage ticket generation device can first receive and respond to the power outage instruction through the receiving unit 31 to create an initial power outage ticket, wherein the power outage instruction carries at least a preset power outage demand and a preset power outage rule, and then configure the power outage equipment list in the initial power outage ticket based on the preset power outage demand through the configuration unit 32, and perform dynamic topology analysis on the target power system based on the power outage equipment list to obtain the target power outage range, and then determine the R equipment groups within the target power outage range through the determination unit 33, and obtain the equipment group information of each equipment group, wherein R is a positive integer, and finally generate the target power outage ticket based on the initial power outage ticket, the preset power outage rule, the target power outage range and the equipment group information through the generation unit 34.
[0119] In an embodiment of the present invention, an initial power outage ticket is automatically created by automatically receiving and responding to power outage instructions, the system automatically configures a power outage equipment list, configures the equipment list based on preset power outage requirements and performs dynamic topology analysis on the power system to ensure accurate identification of the target power outage range, divides it into multiple equipment groups, and processes the equipment group information separately in groups. Finally, the initial power outage ticket, preset power outage rules, target power outage range and equipment group information are combined to generate a target power outage ticket. Compared with the prior art, the above steps use an automated process to reduce errors that may be caused by manual intervention, optimize the organization and management of power outage operations by dividing equipment groups, reduce the operation process and management complexity, and comprehensively consider the application of power outage operation rules, reduce the impact of misoperation on the dispatching safety of the power system, improve the accuracy of generated operation tickets, ensure the standardization and safety of power outage operations, and thus solve the technical problems of low efficiency in generating power outage operation tickets, difficult management, and difficulty in ensuring the dispatching safety of the power system in the related art.
[0120] Optionally, the receiving unit includes: a first determination module, used to determine the invoicing type based on the preset power outage requirement carried by the power outage instruction, wherein the invoicing type is used to indicate the ticket type of S operation tickets required for the current power outage operation and the automatic generation method of all operation tickets, S is a positive integer; a first generation module, used to generate S operation tickets based on the S ticket types, wherein the generated S operation tickets include at least an initial power outage ticket.
[0121] Optionally, the configuration unit includes: a first parsing module, used to parse the preset power outage requirements to obtain N boundary devices involved in the current power outage operation, wherein the boundary device is used to define the boundary of the target power outage range, and N is a positive integer; a first acquisition module, used to obtain the device identification of each boundary device for the N boundary devices, and enter the device identification into the power outage device list of the initial power outage ticket.
[0122] Optionally, the configuration unit includes: a second acquisition module, used to acquire a system topology map and system operation information of the target power system, and determine whether the energized state of the target power system is that the line topology is energized based on the system operation information; a second analysis module, used to analyze the preset power outage demand to obtain the M sub-devices involved in the current power outage operation when the line topology of the target power system is energized, wherein the sub-devices are arranged at the branch points of the power lines for switching loads, and M is a positive integer; a second generation module, used to regard the M sub-devices as being in a temporary closing state in the system topology map, and obtain a power system in which the energized state is that the entire line is energized; an analysis module, used to perform line analysis on the power system with the entire line energized based on the N boundary devices in the power outage equipment list, and obtain a target power outage range.
[0123] Optionally, the analysis module includes: an analysis submodule, which is used to perform line analysis on the target power system with all lines energized in combination with the system topology diagram, and obtain a line information set, wherein the line information set contains line information of T power lines in the target power system, and the line information includes: equipment information and upstream and downstream relationships of all power equipment in the power line, and T is a positive integer; a determination submodule, which is used to determine the power outage subrange corresponding to each boundary device in the power outage equipment list based on the line information set, and obtain N power outage subranges, wherein the power outage subrange refers to the boundary device and the downstream equipment of the boundary device; an integration submodule, which is used to integrate the N power outage subranges based on the system topology diagram, and perform equipment deduplication processing to obtain the target power outage range.
[0124] Optionally, the intelligent generation device of power outage tickets also includes: a search module, which is used to search for power points in the target power outage range based on the power point tracking strategy to obtain a search result; a second determination module, which is used to determine that the target power outage range is in an unclosed state when the search result indicates that the target power outage range contains at least one power point, and reconfigure the power outage equipment list until a closed target power outage range is obtained; a third determination module, which is used to determine that the target power outage range is in a closed state when the search result indicates that the target power outage range does not contain any power point, and execute the step of determining R equipment groups within the target power outage range.
[0125] Optionally, the generation unit includes: an extraction module, used to extract the device group type information and the device group status information in the device group information for each device group in the target power outage range; a third generation module, used to generate a power outage operation statement based on preset power outage rules, the device group type information and the device group status information, wherein the power outage operation statement is used to perform a power outage operation on the device group according to the preset power outage rules; a writing module, used to write the R power outage operation statements corresponding to the R device groups into the initial power outage ticket to obtain the target power outage ticket.
[0126] The above-mentioned intelligent power outage ticket generation device may also include a processor and a memory. The above-mentioned receiving unit 31, configuration unit 32, determination unit 33, generation unit 34, etc. are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize the corresponding functions.
[0127] The processor includes a kernel, which retrieves the corresponding program unit from the memory. One or more kernels can be set, and R device groups within the target power outage range are determined by adjusting kernel parameters, and device group information of each device group is obtained, and a target power outage ticket is generated based on the initial power outage ticket, the preset power outage rule, the target power outage range and the device group information.
[0128] The above-mentioned memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one storage chip.
[0129] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program that is initialized with the following method steps: receiving and responding to a power outage instruction, creating an initial power outage ticket, wherein the power outage instruction carries at least a preset power outage demand and a preset power outage rule; configuring a power outage equipment list in the initial power outage ticket based on the preset power outage demand, and performing a dynamic topology analysis on the target power system based on the power outage equipment list to obtain a target power outage range; determining R equipment groups within the target power outage range, and obtaining equipment group information for each equipment group, wherein R is a positive integer; generating a target power outage ticket based on the initial power outage ticket, the preset power outage rule, the target power outage range, and the equipment group information.
[0130] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is also provided, the computer-readable storage medium including a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute the intelligent method for generating power outage tickets of any one of the above-mentioned embodiments one.
[0131] According to another aspect of an embodiment of the present invention, there is also provided an electronic device, comprising one or more processors and a memory, the memory being used to store one or more programs, wherein when the one or more programs are executed by one or more processors, the one or more processors implement the intelligent method for generating power outage tickets of any one of the above-mentioned embodiments one.
[0132] Figure 4 1 is a hardware structure block diagram of an electronic device (or mobile device) for an intelligent method for generating power outage tickets according to an embodiment of the present invention. Figure 4 As shown, the electronic device may include one or more ( Figure 4 402a, 402b, ..., 402n are used to illustrate) processor 402 (processor 402 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA), memory 404 for storing data. In addition, it may also include: a display, an input / output interface (I / O interface), a universal serial bus (USB) port (which may be included as one of the ports of the I / O interface), a network interface, a keyboard, a power supply and / or a camera. It can be understood by those skilled in the art that Figure 4 The structure shown is only for illustration and does not limit the structure of the above electronic device. Figure 4More or fewer components as shown, or with Figure 4 Different configurations are shown.
[0133] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0134] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0135] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0136] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0137] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0138] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.
[0139] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for intelligently generating a power outage ticket, characterized in that: include: Receiving and responding to a power outage instruction, and creating an initial power outage ticket, wherein the power outage instruction carries at least a preset power outage requirement and a preset power outage rule; Based on the preset power outage demand, a power outage equipment list in the initial power outage ticket is configured, and based on the power outage equipment list, a dynamic topology analysis is performed on the target power system to obtain a target power outage range; Determine R device groups within the target power outage range, and obtain device group information of each device group, where R is a positive integer; A target power outage ticket is generated based on the initial power outage ticket, the preset power outage rule, the target power outage range, and the device group information.
2. The generation method according to claim 1, characterized in that: Steps to create an initial outage ticket, including: Determine the invoicing type based on the preset power outage requirement carried by the power outage instruction, wherein the invoicing type is used to indicate the ticket types of S operation tickets required for the current power outage operation and the automatic generation method of all the operation tickets, where S is a positive integer; S operation tickets are generated based on the S ticket types, wherein the generated S operation tickets at least include the initial power outage ticket.
3. The generation method according to claim 1, characterized in that: The step of configuring the power outage equipment list in the initial power outage ticket based on the preset power outage requirement comprises: Parsing the preset power outage demand to obtain N boundary devices involved in the current power outage operation, wherein the boundary devices are used to define the boundary of the target power outage range, and N is a positive integer; For the N edge devices, a device identification of each edge device is obtained, and the device identification is entered into the power outage device list of the initial power outage ticket.
4. The generation method according to claim 1, characterized in that: The step of performing dynamic topology analysis on the target power system based on the power outage equipment list to obtain the target power outage range includes: Acquire a system topology diagram and system operation information of the target power system, and determine whether the energized state of the target power system is line topology energized based on the system operation information; When the target power system line topology is energized, the preset power outage demand is parsed to obtain M sub-position devices involved in the current power outage operation, wherein the sub-position devices are arranged at the branch points of the power lines for switching loads, and M is a positive integer; In the system topology diagram, the M sub-position devices are regarded as being in a temporary closed state, and the energized state is obtained as the power system in which the entire line is energized; Based on the N boundary devices in the power outage device list, line analysis is performed on the power system with all lines energized to obtain the target power outage range.
5. The generation method according to claim 4, characterized in that: The step of performing line analysis on the power system with all lines energized based on the N boundary devices in the power outage device list to obtain the target power outage range includes: Performing line analysis on the target power system with all lines energized in combination with the system topology diagram to obtain a line information set, wherein the line information set includes line information of T power lines in the target power system, and the line information includes: equipment information and upstream and downstream relationships of all power equipment in the power line, where T is a positive integer; For the N edge devices in the power-off device list, determine the power-off sub-range corresponding to each edge device based on the line information set to obtain N power-off sub-ranges, wherein the power-off sub-range refers to the edge device and the downstream device of the edge device; The N power outage sub-ranges are integrated based on the system topology diagram, and equipment deduplication processing is performed to obtain the target power outage range.
6. The generation method according to claim 1, characterized in that: After performing dynamic topology analysis on the target power system based on the power outage equipment list to obtain the target power outage range, the method further includes: Searching for power points in the target power outage range based on a power point tracking strategy to obtain a search result; When the search result indicates that at least one of the power supply points is included in the target power outage range, determining that the target power outage range is in an unclosed state, and reconfiguring the power outage device list until the target power outage range in a closed state is obtained; When the search result indicates that the target power outage range does not include any of the power supply points, it is determined that the target power outage range is in the closed state, and the step of determining R device groups within the target power outage range is performed.
7. The generation method according to claim 1, characterized in that: The step of generating a target power outage ticket based on the initial power outage ticket, the preset power outage rule, the target power outage range and the device group information comprises: For each of the device groups in the target power outage range, extracting device group type information and device group status information from the device group information; generating a power outage operation statement based on the preset power outage rule, the device group type information and the device group status information, wherein the power outage operation statement is used to perform a power outage operation on the device group according to the preset power outage rule; Write the R power outage operation statements corresponding to the R device groups into the initial power outage ticket to obtain the target power outage ticket.
8. An intelligent device for generating power outage tickets, characterized in that: include: A receiving unit, configured to receive and respond to a power outage instruction and create an initial power outage ticket, wherein the power outage instruction carries at least a preset power outage requirement and a preset power outage rule; A configuration unit, configured to configure a power outage equipment list in the initial power outage ticket based on the preset power outage demand, and to perform a dynamic topology analysis on a target power system based on the power outage equipment list to obtain a target power outage range; A determination unit, configured to determine R device groups within the target power outage range, and obtain device group information of each device group, wherein R is a positive integer; A generating unit is used to generate a target power outage ticket based on the initial power outage ticket, the preset power outage rule, the target power outage range and the equipment group information.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program, wherein when the computer program is executed, the device where the computer-readable storage medium is located is controlled to execute the intelligent method for generating power outage tickets as described in any one of claims 1 to 7.
10. An electronic device, characterized in that: It includes one or more processors and a memory, wherein the memory is used to store one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement the intelligent power outage ticket generation method described in any one of claims 1 to 7.