Feces curing device for sewage interception pretreatment

By designing a device for sewage interception, storage, water separation and flow control well trough and parallel septic tank in rural manure treatment, the interception and dehydration of debris in manure is solved, and the synchronous maturation process of manure is optimized, and the realization of the Efficient pretreatment and anaerobic stabilization treatment of manure improve the utilization rate of manure.

CN119191657AInactive Publication Date: 2024-12-27南阳四相环保科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310765362.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-27
Publication Date
2024-12-27
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In rural dispersed manure treatment, existing solid-liquid separators are not suitable for on-site use, and the debris in the manure carry a large amount of manure, which makes the grille easy to be blocked. It is necessary to intercept the debris in the manure and carry out the debris in the manure and carry out the Dehydration device for near-premises and subsequent maturation.

Method used

Design a feces synchronous maturation device composed of a sewage interceptor storage, water-distribution and flow-controlled well trough combined with at least two septic tanks in parallel. By providing feces in the water-distribution and flow-controlled well trough, it introduces a sewage interceptor and debris into the sewage interceptor and debris. Store the dehydration container, use the flow control device to control the flow direction of manure and dehydration of debris, and realize the pretreatment and anaerobic stabilization of manure.

Benefits of technology

Effectively intercept and dehydrate debris in manure, optimize the synchronous maturation process of manure, reduce the complexity and cost of subsequent treatment, and improve the utilization rate of maturation sludge of manure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119191657A_ABST
    Figure CN119191657A_ABST
Patent Text Reader

Abstract

The invention provides an excrement curing device for sewage interception pretreatment, which is mainly characterized in that the excrement curing device is a sludge stabilizing treatment device consisting of a sewage interception, storage, water distribution and flow control well slot and at least two parallel septic tanks, and an excrement leading-in sewage interception slot, an impurity storage and dehydration container and at least two flow control devices are arranged in the sewage interception, storage, water distribution and flow control well slot; each flow control device is communicated with one septic tank and is used for controlling the input-output of at least two septic tanks and carrying out synchronous anaerobic stabilization treatment, the flow control device in front of one septic tank is started to carry out excrement input, storage and accumulation, and the flow control devices in front of other septic tanks are closed to carry out excrement fermentation and curing. The manure pretreatment technology and the manure synchronous anaerobic stabilization treatment technology are integrated, meanwhile, the functions of reducing manure sundries, storing and dehydrating the sundries, seeping water and refluxing and fermenting and curing the manure are achieved, and treatment of dispersive manure is optimized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a sludge treatment device. Background Art

[0002] The feces and sewage removed from the septic tank need to be fermented and matured, and then converted into organic fertilizer before they can be used. Because debris will enter the septic tank, solid-liquid separation is required before the feces and sewage are fermented to intercept the debris in the feces and sewage, which is conducive to the subsequent feces and sewage fermentation and organic fertilizer utilization. The main methods of feces and sewage fermentation are aerobic fermentation and anaerobic fermentation. Aerobic fermentation uses composting technology, but the water content of feces and sewage is high and needs to be dehydrated and dried first. Composting is suitable for centralized treatment of a certain scale and is not convenient for the treatment of dispersed feces and sewage. Rural areas have land conditions, and the nearby maturation and utilization of feces and sewage is an ideal treatment and disposal method. Based on the existing technical conditions, the synchronous anaerobic stabilization treatment technology is suitable for the nearby treatment and disposal of dispersed feces and sewage in rural areas. To achieve the nearby treatment and disposal of feces and sewage, it is also necessary to intercept the debris in the feces and sewage on site to facilitate subsequent maturation and utilization. The general solid-liquid separator is not suitable for decentralized on-site application in rural areas. The use of coarse screens can intercept sewage on site, but it is also necessary to overcome the problem of a large amount of fecal water carried in the debris, and it is necessary to clean the debris in the screen in a timely manner to avoid accumulation and blockage. Therefore, it is necessary to adopt a device that has the function of intercepting debris in feces and sewage and collecting, dehydrating and infiltrating debris, which is convenient for nearby operation. In terms of feces and sewage fermentation, according to the characteristics of synchronous anaerobic stabilization treatment technology, a water diversion and flow control well is generally provided before at least two parallel septic tanks, and the flow control device is installed in the water diversion and flow control well. The parallel spacing between the water inlet pipes of two adjacent septic tanks can reach more than three meters, while the width of the water diversion and flow control well is generally only 1-1.5 meters. The part that is less than the spacing between two septic tanks needs to be buried with pipes. If the debris retention and dehydration device is installed outside the water diversion and flow control well, additional land will be occupied, increasing costs and workload. Therefore, by utilizing the distance between the water inlet pipes of two parallel septic tanks, the debris retention and collection dehydration device can be combined with the water diversion and flow control well. This can combine the debris retention and collection dehydration of manure and sewage pretreatment with the synchronous anaerobic stabilization treatment technology of manure and sewage maturation, solve the problems of debris retention, collection dehydration, seepage backflow, etc. in manure and sewage pretreatment, optimize the pretreatment of synchronous maturation of manure and sewage, and facilitate subsequent manure and sewage treatment and disposal. Summary of the invention

[0003] The purpose of the present invention is to design a synchronous maturation device for manure and sewage, which is composed of a sewage interception, collection, water distribution and flow control well trough and at least two parallel septic tanks.

[0004] The technical solution of the sewage interception and pretreatment feces and sewage maturation device of the present invention is composed of a sewage interception, collection, water diversion and flow control well trough connected to two groups of parallel septic tanks, each group of septic tanks has at least one septic tank; the sewage interception, collection, water diversion and flow control well trough described below is referred to as the well trough, and at least two water outlets are arranged at the lower part of the well trough, and the water outlets are arranged at the two ends of the well trough, and the flow cross section in front of the water outlet has a flow control device, and the bottom of the well trough is a sewage flow channel, and at least one sewage inlet interception trough and at least one debris storage and dehydration container are arranged in the upper middle part of the well trough between the flow control devices at the two ends, or at least one sewage inlet interception trough and at least one debris storage and dehydration container are arranged in the well trough. At least one sewage inlet and interception trough is provided in the middle and upper part, at least one debris collection and dehydration container is bypassed outside the trough, pipes are led out from the outlet where the flow control device is installed and are respectively connected to a septic tank, the water outlet of the septic tank is provided with a septic tank drainage pipe, or the water outlet of the septic tank is connected to a water diversion flow control well, or the water outlet of the septic tank is connected to a flow control well equipped with a flow control device by a septic tank drainage pipe; when the synchronous maturation device for sewage and feces is started, a group of flow control devices at the input end of the septic tank or at both ends of the septic tank are opened, and the flow control devices at the input ends of other septic tanks or at both ends of the septic tank are closed.

[0005] The working process and method of the sewage maturation device for sewage interception pretreatment are as follows: one group of septic tanks has accumulated sewage stored in it, and another group of septic tanks has space for receiving sewage, the flow control device before the group of septic tanks with space for receiving sewage is opened, and the flow control device before the other group of septic tanks that have accumulated sewage is closed, and the sewage is discharged into the sewage interception trough by a sewage suction truck, and the sewage interception grille of the sewage interception trough intercepts debris, and the sewage flows downward to the bottom of the sewage interception trough, and the sewage flows into the connected septic tank through the opened flow control device. When there are many debris in the sewage, it affects the drainage speed of the sewage interception grille, and the sewage exceeds the top of the sewage interception trough, and the excess sewage overflows and is discharged into the well. After the sewage transfer input is completed, the debris intercepted by the grille is cleaned and placed in the debris storage and dehydration container. The debris storage and dehydration container has holes at the bottom. During the period when the debris stays in the storage and dehydration container, sewage seeps out and flows back into the well. After the debris storage and dehydration container has accumulated debris for a certain period of time, the debris that has been dehydrated to a certain extent is cleared out and the container is reused to store the debris; feces and sewage are accumulated and stored in the septic tank with the flow control device turned on, and the other group of septic tanks with the flow control device turned off contains the accumulated feces and sewage, which are subjected to anaerobic stabilization treatment. When the fermentation time reaches the feces and sewage maturation time, a batch of feces and sewage anaerobic stabilization treatment is completed and becomes mature sludge; the mature sludge is cleared out to free up the volume space of the septic tank, and the other group of septic tanks has completed feces and sewage accumulation. The flow control devices of the two groups of septic tanks are switched, and the flow control device before the septic tank with the freed space is turned on to start collecting accumulated feces and sewage, and the flow control device before the septic tank that has collected accumulated feces and sewage is turned off to restart the anaerobic stabilization treatment of a new batch of feces and sewage; they are operated in rotation in sequence.

[0006] The manure and sewage introduction and interception trough is arranged in the upper middle part of the sewage interception, storage, water diversion and flow control well trough between the two flow control devices. The manure and sewage introduction and interception trough is an upper opening device composed of a sewage interception grille at the bottom and vertical partitions or grilles on the four walls and the well trough wall. The top of the vertical partition or grille is lower than the wellhead of the sewage interception, storage, water diversion and flow control well trough, which is the overflow outlet of the manure and sewage.

[0007] The debris storage and dehydration container is a garbage trough or garbage can with holes in the bottom, which is suspended or supported and installed in the middle and upper part of the sewage interception, storage, water diversion and flow control well. The garbage trough is an upper open container surrounded by an open bottom plate and vertical partitions or grilles and well walls, and the garbage can is a garbage can with holes in the bottom plate.

[0008] The flow control device is a diagonal pressure gate or a vertical gate, or a valve or a baffle; the diagonal pressure gate is composed of a diagonal pressure support plate and a diagonal pressure gate plate, or is composed of a diagonal pressure flow passage and a diagonal pressure gate plate.

[0009] The oblique pressure support plate is a panel obliquely arranged at the flow section in front of the pipe opening of the well wall. There is a flow hole on the oblique pressure support plate. There are docking devices on the oblique pressure support plate on both sides of the flow hole, or there are hinges on the oblique pressure support plate above the flow channel, which are connected to the oblique pressure gate plate.

[0010] The oblique pressure flow channel is a flow channel with a right-angled triangle or right-angled trapezoidal side elevation, the front of the channel is an oblique oblique pressure support plate, the two sides of the channel are vertical channel side wall plates in the shape of a right-angled triangle or a right-angled trapezoid, the back of the channel is directly connected to the well wall hole, or the back of the channel has a channel rear wall plate with a flow hole, the front oblique pressure support plate has a flow hole, the oblique pressure support plates on both sides of the flow hole have docking devices, or there are hinges on the oblique pressure support plate above the flow channel, and the hinges are connected to the oblique pressure gate plate.

[0011] The inclined pressure gate plate is a gate plate of a gate plate panel, one side of the gate plate is connected to a hinge, and there is a handle or a lifting chain on the gate plate, or the inclined pressure gate plate is a T-type inclined pressure gate plate, which has a horizontal gate plate cross arm on the top of the gate plate panel, the gate plate cross arm and the panel are T-shaped, and the gate plate cross arm is connected to the lifting chain; or the inclined pressure gate plate is an inclined pressure gate plate with a parking stopper in the middle of both sides of the gate plate panel, and the lifting chain is connected from the upper part of the gate plate panel or from the parking stops on both sides, and the parking stopper is a baffle or tube or column protruding outward from the gate plate panel; there is a hanging device on the well slot wall above the inclined pressure gate for hanging the inclined pressure gate plate.

[0012] When the gate is closed, the oblique pressure gate plate rests on the oblique pressure supporting plate, and the plate surface covers the flow opening, or the oblique pressure gate plate connected by the hinge is lowered and covers the flow opening. When the gate is opened, the oblique pressure gate plate is lifted or raised from the flow opening.

[0013] The flow control well is a flow well with a quadrilateral or circular shape when viewed from above. The bottom of the flow well has at least one water inlet and at least one water outlet, and a flow control device is provided in the flow section in front of one of the pipe openings.

[0014] The water-dividing flow control well is a flow well equipped with at least two flow control devices, which are installed in the flow section in front of the pipe outlet at the bottom of the flow well; or the water-dividing flow control well is a water-dividing flow control device formed by connecting at least two parallel flow control wells with a connecting pipe, and a flow control device is installed in each flow control well, which is installed in the flow section in front of the pipe outlet at the bottom of the flow well.

[0015] The septic tank is a sedimentation digestion tank with at least two compartments, the internal space of the septic tank is divided into a sedimentation tank with at least two compartments by a partition wall or a partition board or a curved partition board, or the septic tank is a combined treatment tank with at least two single prefabricated sedimentation tanks connected in series by a flow connection pipe, and a flow hole or a flow pipe is provided on the partition board or the partition wall or the curved partition board below the liquid level in the septic tank, or a flow hole or a flow pipe is provided on the partition board or the partition wall or the curved partition board below the liquid level in the septic tank, and a vent is provided on the partition board or the partition wall or the curved partition board above the liquid level; the septic tank is a brick-built septic tank, or The septic tank is constructed of reinforced concrete, or is an integral septic tank made of fiberglass, or is an integral septic tank made of cement, or is a septic tank composed of at least two prefabricated concrete monomer sedimentation tanks; one end of the septic tank is provided with a septic tank inlet pipe, and the other end is provided with a water outlet or a drainage device, the water outlet device is a septic tank drainage pipe, or is a water outlet tee, or is a water outlet tee for slowing down and flowing, the water outlet tee is connected to the septic tank drainage pipe, each grid space of the septic tank is provided with an inspection port and a cover plate, and an exhaust pipe leading to the outside upward is provided on the upper part of the side wall of the septic tank, the top plate of the septic tank, the septic tank inspection port, or the septic tank inlet pipe.

[0016] The decelerating and slow-flowing water outlet tee is a water outlet tee with a small-diameter flow hole, the small-diameter flow hole is arranged at the lower part of the vertical channel of the water outlet tee, and the horizontal pipe of the water outlet tee is connected to the septic tank drainage pipe.

[0017] The septic tank inlet pipe is a straight pipe introduced into the septic tank through the tank wall above the liquid level, or the septic tank inlet pipe enters the septic tank and is introduced into the septic tank below the liquid level through a tee, or the septic tank inlet pipe enters the septic tank and turns into an inverted L shape to enter below the liquid level of the septic tank, or the septic tank inlet pipe is introduced into the septic tank from the middle of the tank wall below the liquid level of the septic tank.

[0018] The concrete prefabricated monomer sedimentation tank is a hollow container with a circular or polygonal shape in a top view. The hollow container is composed of a combination of reinforced concrete prefabricated components. The container has a bottom plate, side walls, and a top plate. The side walls have water inlet and outlet holes, and the top plate has an inspection port and a cover plate.

[0019] The present invention is used for anaerobic stabilization treatment of manure and sewage emptied and transferred from septic tanks, and converts manure and sewage into mature sludge that is convenient for land use through sewage interception pretreatment and sludge synchronous anaerobic stabilization treatment technology. The benefit lies in that the transferred manure and sewage are pre-intercepted with debris, and the moisture in the debris is collected and removed to a certain extent. The manure and sewage after the debris is intercepted is subjected to synchronous anaerobic stabilization treatment, and the produced mature sludge does not have large pieces of matter, which is convenient for the subsequent land use of the mature sludge. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The structure of the present invention is further described below with reference to the accompanying drawings and examples.

[0021] Figure 1 It is a top plan schematic diagram of implementation scheme 1 of the present invention.

[0022] Figure 2 It is a cross-sectional view of the sewage interception, storage, water diversion and flow control well trough of the present invention.

[0023] Figure 3 It is a top plan schematic diagram of implementation scheme 2 of the present invention.

[0024] Figure 4 It is a top plan schematic diagram of implementation scheme 3 of the present invention.

[0025] Figure 5 It is a top plan schematic diagram of implementation scheme 4 of the present invention.

[0026] Figure 6 It is a top plan schematic diagram of implementation scheme 5 of the present invention.

[0027] Figure 7 It is a side view of the oblique pressure flow passage of the oblique pressure gate of the present invention.

[0028] Figure 8 It is a front view of the oblique pressure supporting plate of the oblique pressure gate of the present invention.

[0029] Fig. 9 It is a plan view of a T-shaped oblique pressure gate of the oblique pressure gate of the present invention.

[0030] In the attached drawings, 1. sewage is introduced into the sewage interception trough; 2. flow control device; 3. septic tank input pipe; 4. septic tank drainage pipe; 5. outlet flow control well; 6. storage and dehydration container; 7. connecting pipe; 8. sewage flow passage; 9. outlet pipe; 10. partition wall or partition; 11. flow hole or flow pipe; 12. inspection port and cover plate; 13. curved partition; 14. sewage interception grille; 15. partition or grille; 16. overflow port; 17. well cover; 18. bypass drain pipe; 19. water diversion flow control well; 20. oblique pressure support plate; 21. flow hole; 22. docking device; 23. gate panel; 24. gate crossbeam; 25. lifting rope chain; 26. hanging ring; 27. channel side wall plate; 28. channel bottom plate; 29. ​​channel rear wall plate; 30. perforated plate or grille. Implementation

[0031] like Figure 1 , 2, 7, 8, and 9 show implementation scheme 1, which is a sludge treatment device composed of a sewage interception, collection, water diversion, and flow control well trough, two parallel septic tanks, and a flow control well 5 at the outlet end of the septic tank; the sewage interception, collection, water diversion, and flow control well trough is a strip trough body with a quadrilateral shape in a top view, which is built with bricks, and a septic tank input pipe 3 is led out from the well wall on both sides of the well trough, and a flow control device 2 is installed in front of the pipe mouth, and the flow control device 2 is an oblique pressure gate. There is a sewage introduction sewage interception trough 1 and a debris storage and dehydration container 6 in the area between the two flow control devices 2. The sewage introduction sewage interception trough 1 and the storage and dehydration container 6 are installed in the middle and upper part of the well trough, and the sewage flow passage 8 is below. The sewage introduction sewage interception trough 1 and the storage and dehydration container 6 are separated by a vertical passage. The channel is a discharge channel, the sewage introduction interception trough 1 is a top-opening container with a quadrilateral shape in a top view, the bottom plate is a sewage interception grille 14, and the four side walls are respectively the well walls of two sewage interception storage water diversion flow control wells and two vertical partitions or grilles 15, the partitions or grilles 15 are lower than the wellhead height of the well, and the top of the partitions or grilles 15 is an overflow port 16; the storage and dehydration container 6 is a top-opening container with a quadrilateral shape in a top view, the bottom plate is a perforated plate or grille 30, the four side walls are respectively the well walls of two sewage interception storage water diversion flow control wells and two vertical partitions or grilles, and the wellhead of the sewage interception storage water diversion flow control well has a well cover 17; the septic tank input pipe 3 led from the flow control device 2 is connected to a two-grid septic tank, and the septic tank is made of bricks. The septic tank is constructed such that a partition wall or partition 10 is provided in the middle of the septic tank to divide the septic tank into two spaces. A flow hole 11 is provided in the middle of the partition wall or partition 10, and a vent is provided on the upper part. An exhaust pipe leading upward is provided on the top plate of the septic tank. An inspection port and a cover plate 12 are provided on the top plate above each septic tank space. A septic tank drain pipe 4 is provided at the outlet of the septic tank. The septic tank drain pipe 4 is connected to an outlet flow control well 5. A flow control device 2 is provided in front of the outlet of the septic tank drain pipe 4 in the outlet flow control well 5. A connecting pipe 7 is provided between the two outlet flow control wells 5. One of the outlet flow control wells 5 has an outlet pipe 9 leading to the outside. The sewage interception, storage and water distribution control well trough and the flow control device 2 in the outlet flow control well 5 are oblique pressure gates. The oblique pressure gates are provided by oblique pressure. The flow channel is composed of a T-shaped oblique pressure gate plate. The side view of the oblique pressure flow channel is in the shape of a right triangle. The front is an oblique pressure support plate 20, on which there is a flow hole 21. Two plate-shaped docking devices 22 are erected upward from both sides of the oblique pressure support plate 20. The two sides of the channel are right-angled triangle channel side wall plates 27, and the bottom of the channel is provided with a channel bottom plate 29. The back of the oblique pressure support plate 20 corresponds to the channel rear wall plate 28, on which there is a flow hole connected to the well wall pipe opening; the T-shaped oblique pressure gate plate is composed of a gate panel 23 and a gate cross arm 24, which is in a T shape. A humanoid lifting cable chain 25 is connected to the gate cross arm 24, and a hanging ring 26 is provided at the terminal of the lifting cable chain 25, and the hanging ring 26 is connected to the suspension device above;When the device is in synchronous maturation operation, the flow control device 2 at both ends of one septic tank is opened, and the flow control device 2 at both ends of the other septic tank is closed. When the flow control device 2 is opened, the T-shaped oblique pressure gate is parked on the docking device, the plate panel 23 covers the flow hole, and the gate is closed. When the flow control device 2 is opened, the T-shaped oblique pressure gate is moved away from the flow hole; the septic tank with the flow control device 2 opened is used for receiving, storing and accumulating feces and sewage, and the septic tank with the flow control device 2 closed is used for anaerobic stabilization treatment of feces and sewage, and mature sludge is produced in batches. ;

[0032] like Figure 3 The embodiment 2 shown does not have an outlet flow control well 5 at the outlet of the septic tank, and there is no flow control device at the outlet of the septic tank. The septic tank drainage pipe is the outlet pipe 9, and the outlet pipe 9 is connected to the external pipe network. The elevation is higher than the external pipe network. When one septic tank is drained, it can avoid sewage backflow into another septic tank. The design of other aspects of this embodiment is the same as that of embodiment 1.

[0033] like Figure 4 The embodiment 3 shown is a sludge treatment device composed of a sewage interception, collection, water diversion and flow control well trough, two parallel integral glass fiber reinforced plastic septic tanks, and a water diversion and flow control well 19 at the outlet of the septic tank. The sewage interception, collection, water diversion and flow control well trough has two storage and dehydration containers 6, a sewage introduction sewage interception trough 1, and two flow control devices 2. The two storage and dehydration containers 6 are respectively arranged on both sides of the sewage introduction sewage interception trough 1, and the storage and dehydration containers 6 are spaced from the sewage introduction sewage interception trough 1. The vertical channel is a discharge channel; the fiberglass septic tank is in the shape of a horizontal cylinder with caps at both ends. There is a curved partition 12 inside the septic tank that divides the septic tank into two spaces. There is a flow hole 11 on the curved partition 12 and an air vent on the top. The two septic tank drainage pipes 4 are respectively connected to a water diversion and flow control well 19. There are two flow control devices 2 in the water diversion and flow control well 19, and an outlet pipe 9 is led out from the water diversion and flow control well 19. The other aspects of the design of this implementation plan are the same as those of implementation plan 1.

[0034] like Figure 5 The illustrated implementation scheme 4 has three parallel integral reinforced concrete septic tanks, the integral concrete septic tanks are in the shape of a horizontal cylinder, with caps at both ends, a partition 10 inside, and a flow hole 11 on the partition 10. A sewage interception, collection, water diversion and flow control well trough is provided at the input end of the three parallel septic tanks. There are three flow control devices 2, a sewage introduction sewage interception trough 1, and a debris collection and dehydration container 6 in the well trough. The three flow control devices 2 are respectively connected to a septic tank, and each septic tank has a septic tank drainage pipe 4 connected to an outlet control well 5 at the outlet end, and two adjacent outlet control wells 5 are connected by a connecting pipe 7, and the middle outlet control well 5 has an outlet pipe 9 leading to the outside. The other aspects of the implementation scheme are designed the same as implementation scheme 1.

[0035] like Figure 6The embodiment 5 shown is a sewage intercepting, storing, water dividing and flow controlling well trough, which has two flow controlling devices 2 at both ends of a well trough having a rectangular shape when viewed from above, and a sewage introducing sewage intercepting trough 1 is provided in the upper middle part of the well trough between the two flow controlling devices 2, and a debris storing and dehydrating container 6 is bypassed outside the rectangular well trough, and a perforated plate or a grille 30 with holes is provided at the bottom of the storing and dehydrating container 6, and a bypass drain pipe 18 is provided at the bottom of the storing and dehydrating container 6 and is connected to the rectangular well trough; the outlet pipes 9 leading out of the two outlet end flow controlling wells 5 intersect and are jointly led to the outside, and the other aspects of the design of this embodiment are the same as those of embodiment 1.

Claims

1. A sewage sludge ripening device for sewage interception and pretreatment, characterized in that The utility model is composed of a sewage intercepting, collecting, water diversion and flow control well connected to two groups of parallel septic tanks, each group of septic tanks has at least one septic tank; the lower part of the sewage intercepting, collecting, water diversion and flow control well is provided with at least two water outlets, the flow cross section in front of the water outlet is provided with a flow control device, the bottom of the well is a sewage flow passage, at least one sewage introduction sewage intercepting trough and at least one debris collection and dehydration container are provided in the middle and upper part of the well, or a sewage introduction sewage intercepting trough is provided in the middle and upper part of the well, at least one debris collection and dehydration container is bypassed outside the well, a pipe is led out from each flow control device to connect to a septic tank, and the outlet of the septic tank A separate septic tank drain pipe is provided at the water end, or a septic tank drain pipe is provided at the water outlet of the septic tank to connect to a water diversion flow control well; when starting the work, a group of flow control devices at the septic tank input end or the flow control devices at both ends of the septic tank are opened to input and accumulate feces and sewage, which are then introduced into the sewage interception trough to intercept debris, and the debris is cleared out and transferred into a debris collection and dehydration container, and the other septic tank input end flow control devices or the flow control devices at both ends of the septic tank are closed to ferment and mature the feces and sewage. After the maturation time is reached, the mature sludge is cleared out, and then the flow control devices of the two groups of septic tanks are switched to start processing the next batch of feces and sewage.

2. The sewage sludge maturation device for interception and pretreatment according to claim 1 is characterized in that The manure and sewage introduction and sewage interception trough is arranged in the upper middle part of the sewage interception, storage, water diversion and flow control well trough between two flow control devices. The bottom of the manure and sewage introduction and sewage interception trough is a sewage interception grille. The four walls of the manure and sewage introduction and sewage interception trough are composed of two vertical partitions or grilles and two well trough walls. The top of the vertical partition or grille is lower than the wellhead of the sewage interception, storage, water diversion and flow control well trough.

3. The sewage sludge maturation device for interception and pretreatment according to claim 1 is characterized in that The debris storage and dehydration container is a garbage trough or garbage can with holes at the bottom, which is suspended or supported and installed in the middle and upper part of the sewage interception and storage type water diversion and flow control well.

4. The sewage sludge ripening device for interception and pretreatment according to claim 1 is characterized in that The flow control device is a diagonal pressure gate or a vertical gate, or a valve or a baffle; the diagonal pressure gate is composed of a diagonal pressure support plate and a diagonal pressure gate plate, or is composed of a diagonal pressure flow passage and a diagonal pressure gate plate.

5. The sewage sludge ripening device for interception and pretreatment according to claim 4 is characterized in that The inclined pressure support plate is a panel obliquely arranged on the flow section in front of the well wall pipe opening, and there is a flow hole on the inclined pressure support plate. There are docking devices on the inclined pressure support plates on both sides of the flow hole, or there are hinges on the inclined pressure support plate above the flow channel, and the hinges are connected to the inclined pressure gate plate; the inclined pressure flow channel is a flow channel with a right-angled triangle or a right-angled trapezoid on the side elevation, the front of the channel is an inclined inclined pressure support plate, and the two sides of the channel are vertical channel side wall plates in the shape of right triangles or right trapezoids, the back of the channel is directly connected to the well wall hole, or there is a channel rear wall plate with a flow hole on the back of the channel; the inclined pressure gate plate is a polygonal panel connected to the hinge, or the inclined pressure gate plate has a gate crossbeam on the top of the gate panel, forming a T-shaped T-shaped inclined pressure gate plate, and a lifting rope chain is connected to the gate crossbeam; or the inclined pressure gate plate is a gate plate with docking stops on both sides of the gate panel.

6. The sewage sludge maturation device for interception and pretreatment according to claim 1 is characterized in that The water-dividing flow-control well is a flow well equipped with at least two flow-control devices, and the flow-control devices are installed in the flow section in front of the pipe outlet at the bottom of the flow well; or the water-dividing flow-control well is composed of at least two parallel flow-control wells, and each flow-control well is equipped with a flow-control device in front of a water outlet at the bottom.