Reinforcing structure and reinforcing method for pavement around inspection well
By adopting a combined structure of refurbished well seats, reinforcement casing and reinforcement components on the road surface around the inspection well, the problem of road surface sinking is solved, the service life is improved and the stability and crack resistance of the road surface are enhanced.
Patent Information
- Application Number
- CN202411520120.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-29
- Publication Date
- 2024-12-27
AI Technical Summary
The road surface around the inspection well is prone to sink when it is subjected to large loads, resulting in a short service life, and the existing renovation process is simple and the effect is not good.
Using a combined structure of refurbished well seats, reinforcement casings and reinforcement components, increase the contact area between the well seats and soil layer, and support and reinforcement surfaces through reinforcement components, add guide holes and reinforcement rods to improve stability, and use them when necessary. Metal rib mesh to enhance tensile shear strength.
It effectively reduces the possibility of road collapse, improves the service life of the road after renovation, and reduces the risk of cracking and rutting deformation.
Smart Images

Figure CN119194950A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of inspection well construction, and in particular to a road surface reinforcement structure and reinforcement method around an inspection well. Background Art
[0002] The well chamber structure in the underground pipeline is also called the inspection well, which is set up for the maintenance of urban underground infrastructure such as power supply, water supply, drainage, sewage, communication, cable TV, gas pipes, street light lines, etc. It is generally set up at the intersection of pipelines, bends, places where the pipe diameter or slope changes, and at regular intervals on the straight pipe section.
[0003] An inspection well generally includes a well chamber body cast underground, a well seat is installed on the upper end surface of the well chamber body, a manhole cover ring seat is fixed on the well seat, and a flap is hinged on the manhole cover ring seat. At present, when the road surface around the inspection well has a large traffic load, the road surface around the inspection well often suffers from subsidence, so it is often necessary to renovate the road surface around the inspection well. In the renovation construction of the road surface around the inspection well, the ground around the manhole cover is first excavated to form a renovation foundation pit. After the well seat and the manhole cover ring seat are replaced and re-elevated, asphalt concrete is re-poured in the renovation foundation pit, and the renovation foundation pit is filled and repaired to form a new road surface. The above renovation process is simple, and the service life of the road surface around the inspection well after renovation is low, and there is room for optimization. Summary of the invention
[0004] In order to increase the service life of the road surface around the refurbished inspection well, one of the purposes of the present application is to provide a road surface reinforcement structure around the inspection well.
[0005] The present application provides a road reinforcement structure around an inspection well using the following technical solutions: A road surface reinforcement structure around an inspection well comprises a refurbished well seat, a refurbished well cover ring seat and a reinforced casing, wherein the refurbished well seat is fixedly mounted on the upper end surface of the well shaft of the well chamber body, the refurbished well cover ring seat is fixedly mounted on the upper end surface of the refurbished well seat, the reinforced casing is embedded in the refurbished foundation pit, the lower end surface of the reinforced casing abuts against the bottom inner wall of the refurbished foundation pit, a reinforcement assembly is arranged between the reinforced casing and the refurbished well seat, concrete is poured in the refurbished foundation pit to form a refurbished road surface, and the upper surface of the refurbished well cover ring seat is flush with the upper surface of the refurbished road surface.
[0006] By adopting the above technical scheme, a reinforced casing is added in the renovated foundation pit, and a reinforcing component is arranged between the reinforced casing and the renovated well seat. On the one hand, the contact area between the renovated well seat and the soil layer is increased, and the anti-subsidence performance of the renovated well seat is improved. On the other hand, the reinforcing component supports and reinforces the road surface around the inspection well, thereby reducing the possibility of collapse of the road surface around the renovated inspection well and improving the service life of the road surface around the renovated inspection well.
[0007] Preferably, guide holes are radially penetrated through the circumferential wall of the reinforced casing, and a plurality of guide holes are provided and distributed along the circumference of the reinforced casing. Reinforcement holes corresponding to the positions of the guide holes are provided on the inner circumferential wall of the renovation foundation pit. The reinforcement assembly includes a reinforcement tube arranged on the renovation well seat and a reinforcement rod slidably connected to the reinforcement tube, and the ends of the reinforcement rod are successively passed through the guide hole and the reinforcement hole.
[0008] By adopting the above technical solution, after the renovation well seat and the reinforced casing are installed, the reinforcement rod is slid so that the ends of the reinforcement rod are successively passed through the guide hole and the reinforcement hole, and the reinforcement rod is inserted into the old concrete layer, so that the renovation well seat and the surrounding pavement structure layer form a solid and stable body, reducing the possibility of displacement of the renovation well seat due to mechanical rolling load, and further reducing the possibility of sinking displacement of the inspection well and subsidence of the road surface around the inspection well.
[0009] Preferably, a protective ring groove is opened on the upper part of the renovation foundation pit, and the protective ring groove is located above the reinforcement hole. The upper part of the reinforcement casing is protrudingly provided with a protective ring plate embedded in the protective ring groove.
[0010] By adopting the above technical solution, a protective ring plate is added, and after the reinforced casing is placed in the renovation pit, the outer peripheral wall of the reinforced casing abuts against the inner peripheral wall of the renovation pit, and the protective ring plate of the reinforced casing abuts against the bottom inner wall of the protective ring groove. The staff uses a handheld drilling equipment to drill the peripheral wall of the renovation pit through the guide hole to form a reinforced hole. The protective ring plate presses the soil above the reinforced hole to reduce the possibility of collapse of the soil around the renovation pit due to the drilling operation.
[0011] Preferably, a sliding ring cavity is axially opened on the lower end face of the reinforced casing, a supporting ring plate is arranged below the reinforced casing, the upper end face of the supporting ring plate is fixedly connected with a sliding ring plate slidably inserted in the sliding ring cavity, the lower end face of the supporting ring plate abuts against the bottom inner wall of the renovation foundation pit, and the reinforced casing is provided with an adjusting part for adjusting the sliding position of the sliding ring plate.
[0012] By adopting the above technical solution, the position of the sliding ring plate in the sliding ring cavity is adjusted by the adjusting member, thereby adjusting the height position of the reinforcing casing, thereby adjusting the height position of the guide hole, so that the guide hole and the reinforcing rod are at the same height position, thereby improving the convenience of the reinforcing rod threading operation.
[0013] Preferably, the lower end surface of the reinforcing rod is provided with a slot for clamping the bottom inner wall of the guide hole, and a casting gap is provided between the protective ring plate and the inner peripheral wall of the protective ring groove. When the bottom inner wall of the guide hole is clamped in the slot, a casting gap is provided between the protective ring plate and the bottom inner wall of the protective ring groove.
[0014] By adopting the above technical scheme, after the renovation of the well seat and the reinforcement casing are installed, the sliding reinforcement rod is made so that the ends of the reinforcement rod are successively inserted into the guide hole and the reinforcement hole, and the reinforcement casing is driven to move up relative to the sliding ring plate through the adjusting member. On the one hand, the bottom inner wall of the guide hole is embedded in the card groove, which effectively reduces the possibility of the reinforcement rod sliding back and out of the reinforcement hole. On the other hand, there is a casting gap between the bottom inner wall of the protective ring plate and the protective ring groove. The staff fills the bonding liquid through the casting gap between the protective ring plate and the inner peripheral wall of the protective ring groove. The bonding liquid flows into and fills the casting gap between the protective ring plate and the bottom inner wall of the protective ring groove, thereby repairing / reinforcing the soil around the renovation foundation pit and fixing the reinforcement casing.
[0015] Preferably, the reinforced casing has an installation cavity located above the guide hole and connected to the guide hole, the reinforced casing is provided with a blocking block which is connected to the installation cavity by sliding along the axial direction of the reinforced casing, the reinforced casing is provided with an elastic member built into the installation cavity to force the blocking block to normally slide and retract into the installation cavity, a linkage member is provided between the blocking block and the sliding ring plate, and when the reinforced casing moves up relative to the support ring plate, the blocking block is driven to move downward relative to the reinforced casing through the linkage member.
[0016] By adopting the above technical scheme, under normal conditions, the elastic member forces the blocking block to slide and retract into the installation cavity, thereby improving the convenience of the reinforcing rod insertion operation and the convenience of the drilling operation on the renovation of the foundation pit wall. After the ends of the reinforcing rod are successively inserted into the guide hole and the reinforcing hole, the reinforcing casing is driven to move up relative to the sliding ring plate through the adjusting member, so that the bottom inner wall of the guide hole is embedded in the groove, and in the process of the reinforcing casing moving up relative to the sliding ring plate, the sliding ring plate drives the blocking block to move down relative to the reinforcing casing through the linkage member, so that the lower end face of the blocking block abuts against the upper end face of the reinforcing rod, so that the blocking block blocks the gap between the reinforcing rod and the top inner wall of the guide hole, effectively reducing the possibility of waste caused by the bonding liquid flowing out through the gap between the outer peripheral wall of the reinforcing casing and the inner peripheral wall of the renovation foundation pit and the guide hole in turn, facilitating the bonding liquid to flow into the reinforcing hole, so that the reinforcing rod and the old soil are fixed as one.
[0017] Preferably, a slide groove is provided on the inner wall of the installation cavity, and the slide groove is connected to the inner wall of the guide hole. The blocking block is provided with a first slider slidably connected to the slide groove. A rope threading hole connected to the protective ring groove is provided on the inner wall at the bottom of the slide groove. The linkage part is a linkage rope passed through the rope threading hole, one end of the linkage rope is fixedly connected to the first slider, and the other end of the linkage rope is fixedly connected to the sliding ring plate.
[0018] By adopting the above technical solution, when the reinforcing casing moves up relative to the sliding ring plate, the sliding ring plate pulls the blocking block downward relative to the reinforcing casing through the linkage rope, so that the lower end surface of the blocking block abuts against the upper end surface of the reinforcing rod.
[0019] Preferably, the reinforcement assembly further comprises a metal rib mesh arranged on the reinforcement tube and the reinforcement rod.
[0020] By adopting the above technical solution and adding metal mesh, on the one hand, the metal mesh can effectively absorb the tensile stress inside the asphalt concrete, delay the occurrence of cracks such as reflection, temperature and differential settlement, thereby reducing the risk of cracking in the renovated road surface; on the other hand, it can improve the tensile and shear strength of the asphalt concrete layer structure, making the road surface structure more stable; on the other hand, the metal mesh can limit the displacement of asphalt concrete aggregates and reduce the rutting deformation of the asphalt concrete surface layer, thereby extending the service life of the road surface.
[0021] Preferably, the upper end surfaces of the reinforcing tube and the reinforcing rod are penetrated with mounting holes, the metal mesh is protrudingly fixed with mounting screws inserted in the mounting holes, and the ends of the mounting screws are threadedly connected with anti-slip nuts.
[0022] By adopting the above technical solution, after the renovation of the well seat and the reinforced casing are installed, the reinforcing rod is slid so that the ends of the reinforcing rod are successively inserted into the guide hole and the reinforcement hole, and the installation screws on the metal mesh are respectively inserted into the installation holes on the reinforcing pipe and the reinforcing rod, and locked with anti-slip nuts to achieve the fixation of the metal mesh.
[0023] In order to increase the service life of the road surface around the refurbished inspection well, the second purpose of the present application is to provide a method for reinforcing the road surface reinforcement structure around the inspection well.
[0024] A method for reinforcing a road surface reinforcement structure around an inspection well, comprising the following steps: Step S01, renovation of foundation pit excavation; Step S02, dismantle the old manhole cover ring and the old manhole seat, clean the upper end surface of the well shaft and the gravel in the renovation pit, and level the bottom wall of the renovation pit; Step S03, placing the renovation well seat and the reinforced casing; the renovation well seat is installed on the upper end surface of the wellbore, the reinforced casing is embedded in the renovation foundation pit, the outer peripheral wall of the reinforced casing abuts against the inner peripheral wall of the renovation foundation pit, and the lower end surface of the reinforced casing abuts against the bottom inner wall of the renovation foundation pit; Step S04, installing a reinforcement component between the reinforced casing and the refurbished well seat; Step S05, installing the renovated manhole cover ring seat and pouring concrete. The renovated manhole seat is fixedly installed on the upper end surface of the shaft of the well chamber body, and concrete is poured in the renovated foundation pit to form a renovated road surface, and the upper surface of the renovated manhole cover ring seat is flush with the upper surface of the renovated road surface.
[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. A reinforced casing is added in the renovation foundation pit, and a reinforcement component is set between the reinforced casing and the renovation well seat. On the one hand, the contact area between the renovation well seat and the soil layer is increased to improve the anti-settling performance of the renovation well seat. On the other hand, the reinforcement component plays a supporting and reinforcing role for the road surface around the inspection well, thereby reducing the possibility of collapse of the road surface around the renovation inspection well and improving the service life of the road surface around the renovation inspection well; 2. After the renovation well seat and the reinforcement casing are installed, slide the reinforcement rod so that the ends of the reinforcement rod are successively inserted into the guide hole and the reinforcement hole, and then drive the reinforcement casing to move up relative to the sliding ring plate through the adjustment piece. On the one hand, the bottom inner wall of the guide hole is embedded in the card groove, which effectively reduces the possibility of the reinforcement rod sliding back and out of the reinforcement hole. On the other hand, there is a casting gap between the bottom inner wall of the protection ring plate and the protection ring groove. The staff fills the bonding liquid through the casting gap between the protection ring plate and the inner peripheral wall of the protection ring groove. The bonding liquid flows into and fills the casting gap between the protection ring plate and the bottom inner wall of the protection ring groove, repairs / reinforces the soil around the renovation foundation pit, and fixes the reinforcement casing; 3. Add metal mesh. On the one hand, the metal mesh can effectively absorb the tensile stress inside the asphalt concrete, delay the occurrence of cracks such as reflection, temperature and differential settlement, thereby reducing the risk of cracking in the renovated road surface. On the other hand, it can improve the tensile and shear strength of the asphalt concrete layer structure to make the road surface structure more stable. On the other hand, the metal mesh can limit the displacement of asphalt concrete aggregates and reduce the rutting deformation of the asphalt concrete surface layer, thereby extending the service life of the road surface. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the overall structure of the road surface reinforcement structure around the inspection well.
[0027] Figure 2 It is a cross-sectional view of a pavement reinforcement structure around an inspection well.
[0028] Figure 3 yes Figure 2 A local enlarged schematic diagram at point A.
[0029] Figure 4 Schematic diagram of the internal structure of the installation cavity.
[0030] Figure 5 It is a structural diagram of the metal reinforcement mesh.
[0031] Explanation of the accompanying drawings: 1. Refurbishing the well seat; 11. Slideway; 2. Refurbishing the well cover ring seat; 3. Reinforced casing; 31. Protective ring plate; 32. Sliding ring cavity; 33. Support ring plate; 331. Sliding ring plate; 332. Mounting block; 34. Guide hole; 341. Mounting cavity; 342. Slide groove; 35. Blocking block; 351. First slider; 36. Spring; 37. Linkage rope; 4. Adjusting air bag; 41. Adjusting air pipe; 5. Reinforcement assembly; 51. Reinforcement tube; 511. Second slider; 52. Reinforcement rod; 521. Slot; 53. Metal rib mesh; 531. Mounting screw; 532. Anti-slip nut; 10. Wellbore; 20. Refurbishing foundation pit; 30. Protective ring groove; 40. Reinforcement hole; 50. Adhesive liquid. DETAILED DESCRIPTION
[0032] The following is combined with Figure 1-5 This application is described in further detail.
[0033] The present application embodiment discloses a road surface reinforcement structure around an inspection well, referring to Figure 1 , Figure 2 , including a renovated well seat 1, a renovated well cover ring seat 2 and a reinforced casing 3. The renovated well seat 1 is coaxially fixedly installed on the upper end surface of the well shaft 10 of the well chamber body, the renovated well cover ring seat 2 is coaxially fixedly installed on the upper end surface of the renovated well seat 1, the reinforced casing 3 is placed in the renovated foundation pit 20, and the reinforced casing 3 and the renovated well seat 1 are coaxially arranged.
[0034] Reference Figure 2 , Figure 3 A protective ring groove 30 is provided around the upper peripheral wall of the renovation foundation pit 20, and a reinforcement hole 40 is provided in the middle of the inner peripheral wall of the renovation foundation pit 20, so that the protective ring groove 30 is located above the reinforcement hole 40, and a plurality of reinforcement holes 40 are provided and distributed around the axis of the renovation well seat 1. A protective ring plate 31 embedded in the protective ring groove 30 is protruding and fixed on the upper peripheral wall of the reinforcement casing 3, and a casting gap is provided between the outer peripheral wall of the protective ring plate 31 and the inner peripheral wall of the protective ring groove 30. A sliding ring cavity 32 is provided around the lower end surface of the reinforcement casing 3 in the axial direction, and a support ring plate 33 is provided below the reinforcement casing 3. The upper end surface of the support ring plate 33 is fixedly connected with a sliding ring plate 331 slidably inserted in the sliding ring cavity 32, and the lower end surface of the support ring plate 33 abuts against the bottom inner wall of the renovation foundation pit 20.
[0035] The reinforcement sleeve 3 is provided with an adjustment member for adjusting the sliding position of the sliding ring plate 331. In this embodiment, the adjustment member is an adjustment air bag 4 built into the sliding ring cavity 32 and located above the sliding ring plate 331. The inner peripheral wall of the reinforcement sleeve 3 is fixedly penetrated with an adjustment air pipe 41 connected to the inner cavity of the adjustment air bag 4. A one-way air valve (not shown in the figure) is provided in the adjustment air pipe 41 to reduce the possibility of air leakage of the adjustment air bag 4. In other embodiments, the adjustment member can also adopt a screw structure to achieve relative movement between the reinforcement sleeve 3 and the sliding ring plate 331.
[0036] Reference Figure 3 , Figure 4 The inner circumferential wall of the reinforcing casing 3 is provided with a guide hole 34 in the radial direction. There are a plurality of guide holes 34 and they are distributed along the circumference of the reinforcing casing 3. The number of guide holes 34 corresponds to that of reinforcing holes 40. The reinforcing casing 3 has an installation cavity 341 located above the guide hole 34 and connected to the guide hole 34. A slide groove 342 is provided on the inner wall of the installation cavity 341. The slide groove 342 is connected to the inner wall of the guide hole 34. A rope threading hole connected to the protective ring groove 30 is provided on the inner wall of the bottom of the slide groove 342. The reinforcing casing 3 is provided with a blocking block 35. The blocking block 35 protrudes and is fixed with a first slider 351 that is slidably connected to the slide groove 342. The reinforced casing 3 is provided with an elastic member built into the installation cavity 341 to force the blocking block 35 to normally slide and retract into the installation cavity 341. Specifically, the elastic member is a spring 36, the upper end of the spring 36 is fixedly connected to the top inner wall of the installation cavity 341, and the lower end of the spring 36 is fixedly connected to the upper end surface of the blocking block 35.
[0037] A linkage member is provided between the blocking block 35 and the sliding ring plate 331. A mounting block 332 is fixedly protruded from the side wall of the sliding ring plate 331. The linkage member is a linkage rope 37 passed through the rope threading hole. One end of the linkage rope 37 is fixedly connected to the lower end surface of the first slider 351, and the other end of the linkage rope 37 is fixedly connected to the upper end surface of the mounting block 332. When the reinforcing casing 3 moves upward relative to the supporting ring plate 33, the blocking block 35 is pulled downward relative to the reinforcing casing 3 by the linkage rope 37, so that the lower end surface of the blocking block 35 abuts against the upper end surface of the reinforcing rod 52, thereby blocking the guide hole 34.
[0038] Reference Figure 3 , Figure 4 , Figure 5A reinforcement assembly 5 is provided between the reinforcement casing 3 and the renovation well seat 1. The reinforcement assembly 5 includes a reinforcement tube 51 provided on the renovation well seat 1, a reinforcement rod 52 slidably connected to the reinforcement tube 51, and a metal rib mesh 53 provided on the reinforcement tube 51 and the reinforcement rod 52. A slideway 11 is coaxially provided around the upper part of the outer peripheral wall of the renovation well seat 1. The reinforcement tube 51 is a square tube. The axial direction of the reinforcement tube 51 is parallel to the radial direction of the renovation well seat 1. One end of the reinforcement tube 51 is fixedly connected to a second slider 511 slidably connected to the slideway 11. The reinforcing rod 52 is a square rod, the ends of which are sequentially inserted into the guide hole 34 and the reinforcing hole 40, the lower end surface of the reinforcing rod 52 is provided with a slot 521 for the inner wall of the bottom of the guide hole 34 to be clamped, the upper end surfaces of the reinforcing tube 51 and the reinforcing rod 52 are penetrated with mounting holes, the metal rib mesh 53 is protruding and fixed with a mounting screw 531 inserted in the mounting hole, and the end of the mounting screw 531 is threadedly connected with an anti-slip nut 532. Concrete is poured in the renovation pit 20 to form a renovation road surface, and the upper surface of the renovation manhole cover ring seat 2 is flush with the upper surface of the renovation road surface.
[0039] The present application also discloses a method for reinforcing a road surface reinforcement structure around an inspection well, comprising the following steps: Step S01, excavating the renovation foundation pit 20, cutting and excavating the road surface around the old manhole cover ring seat by a cutting tool to form a renovation foundation pit 20; Step S02, dismantle the old manhole cover ring and the old manhole seat, clean the upper end surface of the well shaft 10 and the gravel in the renovation pit 20, and level the bottom wall of the renovation pit 20; Step S03, placing the renovation well seat 1 and the reinforced casing 3; the renovation well seat 1 is installed on the upper end surface of the wellbore 10, the reinforced casing 3 is placed on the renovation foundation pit 20, the outer peripheral wall of the reinforced casing 3 abuts against the inner peripheral wall of the renovation foundation pit 20, the protective ring plate 31 abuts against the inner wall of the protective ring groove 30, and the lower end surface of the support ring plate 33 abuts against the bottom inner wall of the renovation foundation pit 20; the peripheral wall of the renovation foundation pit 20 is drilled by means of drilling equipment, specifically, the drill rod of the drilling equipment drills the peripheral wall of the renovation foundation pit 20 through the guide hole 34 to form a reinforced hole 40, and during the drilling process, the protective ring plate 31 presses the soil above the reinforced hole 40 to reduce the possibility of collapse of the soil around the renovation foundation pit 20 due to the drilling operation.
[0040] Step S04, install the reinforcement assembly 5, slide the second slider 511 to adjust the position of the reinforcement rod 52, so that the end of the reinforcement rod 52 is aligned with the guide hole 34, pull the reinforcement rod 52 to make the reinforcement rod 52 slide away from the renovation well seat 1, and after the end of the reinforcement rod 52 is successively inserted into the guide hole 34 and the reinforcement hole 40, the air pipe 41 is connected to an external air pump to inflate the adjustment airbag 4, and the adjustment airbag 4 expands to drive the reinforcement casing 3 to move up relative to the sliding ring plate 331, so that the guide hole 3 4 is embedded in the card groove 521, and in the process of the reinforcement casing 3 moving up relative to the sliding ring plate 331, the sliding ring plate 331 pulls the blocking block 35 to move down relative to the reinforcement casing 3 through the linkage rope 37, so that the lower end surface of the blocking block 35 abuts against the upper end surface of the reinforcement rod 52, so that the blocking block 35 blocks the gap between the reinforcement rod 52 and the top inner wall of the guide hole 34, and the protection ring plate 31 rises so that there is a casting gap between the protection ring plate 31 and the bottom inner wall of the protection ring groove 30. The staff fills the bonding liquid 50 through the casting gap between the protective ring plate 31 and the inner wall of the protective ring groove 30. The bonding liquid 50 flows into and fills the casting gap between the protective ring plate 31 and the bottom inner wall of the protective ring groove 30 to repair / reinforce the soil around the renovated foundation pit 20. The bonding liquid 50 flows into the reinforcement hole 40 through the gap between the outer wall of the reinforced casing 3 and the inner wall of the renovated foundation pit 20, so that the reinforcement rod 52 and the old soil are fixed as one.
[0041] Step S05, install the renovated manhole cover ring seat 2 and pour concrete. After the adhesive liquid 50 solidifies, fix the renovated manhole seat 1 on the upper end surface of the shaft 10 of the well chamber body, and insert the mounting screws 531 of the metal mesh 53 into the mounting holes on the reinforcing pipe 51 and the reinforcing rod 52 accordingly. After locking the anti-drop nut 532, pour asphalt concrete in the renovation foundation pit 20 to form a renovated road surface. Stir and compact the asphalt concrete so that the upper surface of the renovated manhole cover ring seat 2 is flush with the upper surface of the renovated road surface.
[0042] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A road reinforcement structure around an inspection well, characterized in that: The invention comprises a renovation well seat (1), a renovation well cover ring seat (2) and a reinforcement casing (3), wherein the renovation well seat (1) is fixedly mounted on the upper end surface of a well shaft (10) of a well chamber body, the renovation well cover ring seat (2) is fixedly mounted on the upper end surface of the renovation well seat (1), the reinforcement casing (3) is embedded in the renovation foundation pit (20), the lower end surface of the reinforcement casing (3) abuts against the bottom inner wall of the renovation foundation pit (20), a reinforcement component (5) is arranged between the reinforcement casing (3) and the renovation well seat (1), concrete is poured in the renovation foundation pit (20) to form a renovation road surface, and the upper surface of the renovation well cover ring seat (2) is flush with the upper surface of the renovation road surface.
2. The road surface reinforcement structure around the inspection well according to claim 1 is characterized in that: The peripheral wall of the reinforcement casing (3) is provided with a guide hole (34) penetrating in the radial direction, a plurality of guide holes (34) are provided and distributed along the circumference of the reinforcement casing (3), the inner peripheral wall of the renovation foundation pit (20) is provided with a reinforcement hole (40) corresponding to the position of the guide hole (34), the reinforcement assembly (5) comprises a reinforcement pipe (51) arranged on the renovation well seat (1) and a reinforcement rod (52) slidably connected to the reinforcement pipe (51), and the end of the reinforcement rod (52) is sequentially penetrated through the guide hole (34) and the reinforcement hole (40).
3. A road surface reinforcement structure around an inspection well according to claim 2, characterized in that: A protective ring groove (30) is provided on the upper portion of the renovation foundation pit (20), the protective ring groove (30) being located above the reinforcement hole (40), and a protective ring plate (31) embedded in the protective ring groove (30) is protruding from the upper portion of the reinforcement casing (3).
4. The road surface reinforcement structure around the inspection well according to claim 3 is characterized in that: The lower end surface of the reinforcement casing (3) is provided with a sliding ring cavity (32) along the axial direction, a support ring plate (33) is provided below the reinforcement casing (3), the upper end surface of the support ring plate (33) is fixedly connected with a sliding ring plate (331) that is slidably inserted in the sliding ring cavity (32), the lower end surface of the support ring plate (33) abuts against the bottom inner wall of the renovation foundation pit (20), and the reinforcement casing (3) is provided with an adjustment member for adjusting the sliding position of the sliding ring plate (331).
5. The road surface reinforcement structure around the inspection well according to claim 4 is characterized in that: The lower end surface of the reinforcing rod (52) is provided with a slot (521) for the bottom inner wall of the guide hole (34) to be clamped, and a casting gap is provided between the inner peripheral wall of the protection ring plate (31) and the protection ring groove (30). When the bottom inner wall of the guide hole (34) is clamped in the slot (521), a casting gap is provided between the protection ring plate (31) and the bottom inner wall of the protection ring groove (30).
6. A road surface reinforcement structure around an inspection well according to claim 5, characterized in that: The reinforcing casing (3) has a mounting cavity (341) located above the guide hole (34) and connected to the guide hole (34); the reinforcing casing (3) is provided with a blocking block (35) connected to the mounting cavity (341) by sliding along the axial direction of the reinforcing casing (3); the reinforcing casing (3) is provided with an elastic member built into the mounting cavity (341) to force the blocking block (35) to slide and retract into the mounting cavity (341) in a normal state; a linkage member is provided between the blocking block (35) and the sliding ring plate (331); when the reinforcing casing (3) moves upward relative to the supporting ring plate (33), the blocking block (35) is driven to move downward relative to the reinforcing casing (3) through the linkage member.
7. The road surface reinforcement structure around the inspection well according to claim 6 is characterized in that: The inner wall of the installation cavity (341) is provided with a slide groove (342), the slide groove (342) is connected to the inner wall of the guide hole (34), the blocking block (35) is provided with a first sliding block (351) slidably connected to the slide groove (342), the bottom inner wall of the slide groove (342) is provided with a rope threading hole connected to the protective ring groove (30), the linkage member is a linkage rope (37) threaded through the rope threading hole, one end of the linkage rope (37) is fixedly connected to the first sliding block (351), and the other end of the linkage rope (37) is fixedly connected to the sliding ring plate (331).
8. The road surface reinforcement structure around the inspection well according to claim 2 is characterized in that: The reinforcement assembly (5) further comprises a metal rib mesh (53) arranged on the reinforcement tube (51) and the reinforcement rod (52).
9. The road surface reinforcement structure around the inspection well according to claim 8, characterized in that: The upper end surfaces of the reinforcing tube (51) and the reinforcing rod (52) are penetrated with mounting holes, the metal rib mesh (53) is protrudingly fixed with a mounting screw (531) inserted into the mounting hole, and the end of the mounting screw (531) is threadedly connected with an anti-slip nut (532).
10. A method for reinforcing a road surface reinforcement structure around an inspection well, characterized in that: The following steps are involved: Step S01, excavation of a renovation foundation pit (20); Step S02, dismantling the old manhole cover ring and the old manhole seat, cleaning the upper end surface of the wellbore (10) and the gravel in the renovation pit (20), and leveling the bottom wall of the renovation pit (20); Step S03, placing the renovation well seat (1) and the reinforced casing (3); the renovation well seat (1) is installed on the upper end surface of the wellbore (10), the reinforced casing (3) is embedded in the renovation foundation pit (20), the outer peripheral wall of the reinforced casing (3) abuts against the inner peripheral wall of the renovation foundation pit (20), and the lower end surface of the reinforced casing (3) abuts against the bottom inner wall of the renovation foundation pit (20); Step S04, installing the reinforcement component (5), installing the reinforcement component (5) between the reinforcement casing (3) and the renovation well seat (1); Step S05, installing the renovation manhole cover ring seat (2) and pouring concrete, the renovation manhole seat (1) is fixedly installed on the upper end surface of the shaft (10) of the well chamber body, and concrete is poured into the renovation foundation pit (20) to form a renovation road surface, and the upper surface of the renovation manhole cover ring seat (2) is flush with the upper surface of the renovation road surface.