Fabricated electromechanical equipment anti-seismic suspension system and construction method thereof
By combining the embedded plate and the suspension bracket assembly in the concrete beam slab, the structural damage caused by rear anchoring is solved, the seismic performance and reliability are improved, and it is convenient for later maintenance and disassembly.
Patent Information
- Application Number
- CN202411331905.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-12-31
AI Technical Summary
The anchoring form of existing mechanical and electrical equipment is easily caused by cracks and repeated holes in concrete structures, affecting structural safety and weather resistance.
Adoptable plate and suspension bracket assembly, including alloy clip anchor head, fixed suspension rod, pull rod and seismic damping ring. The suspension bracket assembly is installed at the bottom of the embedded plate, and the fixed suspension rod is connected to the electromechanical equipment. The seismic damping ring is located adjacent. Between the booms, the alloy clip anchor head and the fixing sheet are fixed to avoid damage to the structure by rear anchoring.
It realizes the pre-buried stressed parts in concrete beams and slabs to avoid damage to the structure by rear anchoring, improves seismic performance and reliability, and facilitates post-maintenance and disassembly.
Smart Images

Figure CN119222470A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of motor installation and processing, and specifically relates to an anti-seismic suspension system for assembled electromechanical equipment and a construction method thereof. Background Art
[0002] The seismic suspension system for assembled electromechanical equipment is a technology used in the building electromechanical installation industry. It has been optimized and improved in design, warehousing, prefabrication, assembly, etc. The main advantages of this system are its safety, environmental protection, economy and efficiency. It can improve the seismic performance of building electromechanical facilities and improve the stability of equipment installation.
[0003] The existing mechanical and electrical equipment is generally installed by planting reinforcement or post-anchoring hanger bars on the building structure beams and slabs. When there are earthquake-resistant requirements, earthquake-resistant supports and hangers are set. The earthquake-resistant supports and hangers are also post-anchored at the bottom of the structural beams and slabs. This post-anchoring form drills holes at the bottom of the beams and slabs, especially in the bottom area of the concrete beams and slabs, which can easily cause cracks in the concrete structure. It is also common to repeat the drilling of the main reinforcement position after post-anchoring, which is not conducive to the safety and weather resistance of the beam and slab structure. Summary of the invention
[0004] The object of the present invention is to provide a seismic suspension system for assembled electromechanical equipment and a construction method thereof, so as to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above object, the present invention adopts the following technical solutions: A seismic suspension system for assembled electromechanical equipment includes an embedded plate and a suspension bracket assembly, wherein the embedded plate is installed at the bottom of a concrete plate, and the suspension bracket assembly is installed at the bottom of the embedded plate. The suspension bracket assembly includes an alloy clip anchor head, a shaped hanger, a pull rod and a seismic damping ring. The tops of several shaped hangers are connected to the embedded plate through alloy clip anchor heads, and the bottoms of the shaped hangers are connected to external electromechanical equipment. A fixing plate is provided at the bottom of the shaped hanger, and the seismic damping ring is located between two adjacent shaped hangers. One end of the pull rod is connected to the seismic damping ring, and the other end of the pull rod is connected to the shaped hanger through the alloy clip anchor head or the fixing plate.
[0006] Preferably, the anti-seismic damping ring comprises a damping metal ring and a glass fiber nylon ball, the glass fiber nylon ball is located in the middle of the damping metal ring, and one end of the pull rod passes through the damping metal ring and presses against the glass fiber nylon ball.
[0007] Preferably, the damping metal ring is provided with a plurality of damping clamps in an annular direction, and the damping clamps are sleeved on the outside of the pull rod.
[0008] Preferably, a suspension rod slot is provided in the middle of the embedded plate, and the opening shape of the suspension rod slot is T-shaped; Preferably, the suspension rod slide groove is provided with a plurality of installation openings along its length direction, and fasteners are installed inside the installation openings.
[0009] Preferably, the lengthwise interval between every two adjacent mounting openings is 600-1200 mm.
[0010] Preferably, the embedded plate is connected to the concrete plate via embedded plate anchor bars. A construction method of an assembled electromechanical equipment seismic suspension system comprises the following steps: S1. Determine the installation location and space, and determine the spatial location of each electromechanical equipment and the distribution information of the hangers in combination with the electromechanical installation drawings and BIM modeling; S2. Install the embedded plate. During the construction stage of the plate-beam structure, place the embedded plate on the bottom formwork and anchor it in the structural plate-beam through the upper embedded plate anchor bars. Use a film to stick the lower lifting chute of the embedded plate to prevent the concrete slurry from entering. S3. Install the shaped hanger. After the concrete age of the structural slab beam is met, tear off the film at the hanger slideway of the embedded slab bottom plate, insert the alloy clip anchor head and the shaped hanger at the installation opening, and fix the alloy clip anchor head and the shaped hanger with bolts in advance. After adjusting the spacing, use fasteners to extend into the hanger slideway to fix on both sides of the alloy clip anchor head. At the same time, use fasteners to tighten and close the installation opening. Use rubber strips to embed the gaps in the hanger slideway to fill the slots; S4. Install the damping metal ring, use the alloy clip anchor head and the preset bolts on the fixed hanger fixing plate to preliminarily fix the elastic-plastic pull rod, and store the pull rod in the damping metal ring; S5. After the system is tightened and the assembly is completed, the electromechanical equipment is suspended on the seismic support system, the posture of the tie rod is adjusted so that each tie rod is evenly stressed and the central glass fiber nylon ball is tightened, and the clip anchor head and the fixing plate bolts are tightened to complete the assembly. Technical effects and advantages of the present invention: In this assembled electromechanical equipment seismic suspension system and construction method, the load-bearing parts of the suspension are all pre-buried in the concrete beam-slab structure, avoiding damage and adverse effects on the structure caused by post-anchorage, facilitating later maintenance and disassembly and modification, and this structure has the advantages of good seismic performance, high reliability, and easy disassembly and assembly. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the connection structure between the alloy clip anchor head and the shaped suspension rod in the present invention; Figure 3It is a schematic structural diagram of the anti-seismic damping ring in the present invention; Figure 4 It is a structural schematic diagram of the embedded plate in the present invention; Figure 5 It is a schematic diagram of the internal structure of the installation port in the present invention; Figure 6 It is a flow chart of the construction method of the seismic suspension system of assembled electromechanical equipment in the present invention; In the figure: 1. embedded plate; 11. hanger rod slide groove; 12. installation port; 13. fastener; 14. embedded plate anchor bar; 2. suspension bracket assembly; 21. alloy clip anchor head; 22. shaped hanger rod; 23. pull rod; 24. seismic damping ring; 241. damping metal ring; 242. glass fiber nylon ball; 243. damping clamp; 25. fixing plate. DETAILED DESCRIPTION
[0012] The following will be combined with the attached embodiment of the present invention Figure 1-Figure 6 , the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. The specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention. Example
[0013] like Figure 1 and Figure 2As shown, an assembled electromechanical equipment seismic suspension system includes an embedded plate 1 and a suspension bracket assembly 2. The embedded plate 1 is installed at the bottom of the concrete plate. The suspension bracket assembly 2 is installed at the bottom of the embedded plate 1. The suspension bracket assembly 2 includes an alloy clip anchor head 21, a shaped hanger 22, a pull rod 23 and an anti-seismic damping ring 24. The tops of several shaped hangers 22 are connected to the embedded plate 1 through the alloy clip anchor heads 21. In order to further improve the stability of the connection, a T-shaped connector is provided at the top of the shaped hanger 22. The bottom of the shaped hanger 22 is connected to the external electromechanical equipment. The bottom of the shaped hanger 22 is provided with a fixing plate 25. The anti-seismic damping ring 24 is located adjacent to the embedded plate 1. Between the two shaped hangers 22, one end of the pull rod 23 is connected to the seismic damping ring 24, and the other end of the pull rod 23 is connected to the shaped hanger 22 through the alloy clip anchor head 21 or the fixing plate 25. The embedded plate 1 is convenient for installing the suspension system into the interior of the concrete slab, and installing the electromechanical equipment to the bottom of the concrete slab through the shaped hanger 22. The top of the shaped hanger 22 is reinforced by the alloy clip anchor head 21. Multiple shaped hangers 22 are connected by the pull rod 23 and the seismic damping ring 24, which not only improves the stability of the connection, but also has a better seismic effect. In addition, the structure is easy to disassemble and assemble, which can greatly avoid damage caused by post-anchoring.
[0014] like Figure 3 As shown, the seismic damping ring 24 includes a damping metal ring 241 and a glass fiber nylon ball 242. The glass fiber nylon ball 242 is located in the middle of the damping metal ring 241. One end of the pull rod 23 passes through the damping metal ring 241 and presses against the glass fiber nylon ball 242. The damping metal ring 241 is circumferentially provided with a plurality of damping clamps 243. The damping clamps 243 are sleeved on the outside of the pull rod 23. The damping metal ring 241 not only has efficient vibration control, but also has high stability, high temperature resistance and corrosion resistance. The damping clamps 243 on the surface can further improve the stability of the pull rod 23. The internal glass fiber nylon ball 242 has excellent mechanical properties, heat resistance, stability and chemical resistance.
[0015] like Figure 4 and Figure 5 As shown, a hanger slot 11 is opened in the middle of the embedded plate 1, and the opening shape of the hanger slot 11 is T-shaped. The hanger slot 11 is opened along its length direction with a plurality of installation openings 12. Fasteners 13 are installed inside the installation openings 12. The length direction interval between every two adjacent installation openings 12 is 600-1200mm. The embedded plate 1 is connected to the concrete plate through the embedded plate anchor 14. The embedded plate anchor 14 can improve the connection stability between the embedded plate 1 and the concrete plate. The T-shaped hanger slot 11 can prevent the fixed hanger 22 from falling out. The installation opening 12 is reinforced by the fastener 13 to further improve the stability of the equipment connection.
[0016] like Figure 6As shown, a construction method of an assembled electromechanical equipment seismic suspension system comprises the following steps: S1. Determine the installation location and space, and determine the spatial location of each electromechanical equipment and the distribution information of the hangers in combination with the electromechanical installation drawings and BIM modeling; S2, installing the embedded plate 1. During the construction stage of the plate-beam structure, the embedded plate 1 is placed on the bottom formwork and anchored in the structural plate beam through the upper embedded plate anchor 14. A film is pasted on the lower lifting chute of the embedded plate 1 to prevent the concrete slurry from entering. S3, install the shaped hanger 22. After the concrete age of the structural slab beam is met, tear off the film at the hanger slideway 11 of the bottom plate of the embedded plate 1, insert the alloy clip anchor head 21 and the shaped hanger 22 at the installation opening 12, the alloy clip anchor head 21 and the shaped hanger 22 are fixed and installed in advance by bolts, and after adjusting the spacing, use the fastener 13 to extend into the hanger slideway 11 to fix on both sides of the alloy clip anchor head 21, and at the same time use the fastener 13 to tighten and close the installation opening 12, and use the rubber strip to embed the gap in the hanger slideway 11 to fill the slot; S4, install the damping metal ring 241, use the alloy clip anchor head 21 and the preset bolts on the fixing plate 25 of the fixed suspension rod 22 to preliminarily fix the elastic-plastic pull rod 23, and store and install the pull rod 23 in the damping metal ring 241; S5. After the system is tightened and the assembly is completed, the electromechanical equipment is suspended on the seismic support system, the posture of the tie rod 23 is adjusted so that each tie rod 23 is evenly stressed and presses against the central glass fiber nylon ball 242, and the bolts of the clip anchor head and the fixing plate 25 are tightened to tighten the tie rod 23 and complete the assembly.
[0017] In summary, the construction method of the present invention is simple and efficient, has a high earthquake resistance effect and high connection stability.
[0018] Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An assembled electromechanical equipment seismic suspension system, characterized in that The invention comprises an embedded plate (1) and a suspension bracket assembly (2), wherein the embedded plate (1) is installed at the bottom of a concrete plate, the suspension bracket assembly (2) is installed at the bottom of the embedded plate (1), the suspension bracket assembly (2) comprises an alloy clip anchor head (21), a shaped suspension rod (22), a tension rod (23) and an anti-seismic damping ring (24), the tops of a plurality of the shaped suspension rods (22) are connected to the embedded plate (1) via the alloy clip anchor heads (21), and the The bottom of the shaping hanger (22) is connected to external electromechanical equipment, and a fixing plate (25) is provided at the bottom of the shaping hanger (22). The seismic damping ring (24) is located between two adjacent shaping hangers (22). One end of the pull rod (23) is connected to the seismic damping ring (24), and the other end of the pull rod (23) is connected to the shaping hanger (22) through the alloy clip anchor head (21) or the fixing plate (25).
2. The seismic suspension system for assembled electromechanical equipment according to claim 1, characterized in that: The anti-seismic damping ring (24) comprises a damping metal ring (241) and a glass fiber nylon ball (242), wherein the glass fiber nylon ball (242) is located in the middle of the damping metal ring (241), and one end of the pull rod (23) passes through the damping metal ring (241) and presses against the glass fiber nylon ball (242).
3. The seismic suspension system for assembled electromechanical equipment according to claim 2, characterized in that: The damping metal ring (241) is provided with a plurality of damping clamps (243) in an annular direction, and the damping clamps (243) are sleeved on the outside of the pull rod (23).
4. The seismic suspension system for assembled electromechanical equipment according to claim 1, characterized in that: A suspension rod slide groove (11) is provided in the middle of the embedded plate (1), and the opening shape of the suspension rod slide groove (11) is T-shaped.
5. The seismic suspension system for assembled electromechanical equipment according to claim 4, characterized in that: The suspension rod slide groove (11) is provided with a plurality of installation openings (12) along its length direction, and fasteners (13) are installed inside the installation openings (12).
6. The seismic suspension system for assembled electromechanical equipment according to claim 5, characterized in that: The distance between every two adjacent installation openings (12) in the length direction is 600-1200 mm.
7. The seismic suspension system for assembled electromechanical equipment according to claim 4, characterized in that: The embedded plate (1) is connected to the concrete plate via embedded plate anchor bars (14).
8. A construction method for an assembled electromechanical equipment seismic suspension system, characterized in that: The following steps are involved: S1. Determine the installation location and space, and determine the spatial location of each electromechanical equipment and the distribution information of the hangers in combination with the electromechanical installation drawings and BIM modeling; S2, installing the embedded plate (1), placing the embedded plate (1) on the bottom formwork during the slab beam structure construction phase, anchoring it in the structural slab beam through the upper embedded plate anchor bar (14), and using a film to stick to the lower lifting chute of the embedded plate (1) to prevent concrete slurry from entering; S3, installing the shaping hanger (22), after the concrete age of the structural slab beam is met, tear off the film at the hanger slide groove (11) of the bottom plate of the embedded plate (1), insert the alloy clip anchor head (21) and the shaping hanger (22) at the installation opening (12), the alloy clip anchor head (21) and the shaping hanger (22) are fixed and installed in advance by bolts, and after adjusting the spacing, use the fastener (13) to extend into the hanger slide groove (11) and fix on both sides of the alloy clip anchor head (21), and at the same time use the fastener (13) to tighten and close the installation opening (12), and use the rubber strip embedded in the slide groove to fill the pores of the hanger slide groove (11); S4, installing the damping metal ring (241), using the alloy clip anchor head (21) and the preset bolts on the fixing plate (25) of the fixed suspension rod (22) to preliminarily fix the elastic-plastic pull rod (23), and receiving and installing the pull rod (23) in the damping metal ring (241); S5, the system is tightened and the assembly is completed. After the electromechanical equipment is suspended on the seismic support system, the posture of the tie rod (23) is adjusted so that each tie rod (23) is evenly stressed and presses against the central glass fiber nylon ball (242), and the bolts of the clip anchor head and the fixing plate (25) are tightened to tighten the tie rod (23) and complete the assembly.