Method for orderly charging regulation and control of charging pile area and computing device
The method for orderly charging control in a charging pile area addresses the grid overload issue by using real-time data to adjust power strategies, ensuring stable and efficient charging operations.
Patent Information
- Application Number
- CN202411333747.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-12-31
AI Technical Summary
The large-scale charging demand of electric vehicles poses a significant load pressure on the power grid, potentially leading to grid failures due to random and volatile charging demands.
A method for orderly charging control in a charging pile area, utilizing an intelligent fusion terminal to acquire real-time charging and transformer data, adjusting power strategies based on load rates, and implementing power reduction or recovery strategies to maintain grid stability.
Ensures stable operation of the power grid by dynamically adjusting charging power, preventing overload and fluctuations, optimizing resource utilization, and enhancing user experience.
Smart Images

Figure CN119231504A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of electric power technology, and in particular to a method and computing equipment for orderly charging control in a charging pile area. Background Art
[0002] As the world pays more attention to environmental protection and sustainable development, electric vehicles, as a clean energy means of transportation, are becoming more and more popular. However, the large-scale charging demand of electric vehicles has put forward new requirements for the stability and reliability of the power grid. The charging demand of electric vehicles is random and volatile. If a large number of electric vehicles are charged at the same time, it will cause huge load pressure on the power grid and even cause power grid failure.
[0003] Therefore, it is necessary to maintain the stable operation of the power system by managing and regulating the charging piles of electric vehicles, ensuring the charging needs of users while avoiding unnecessary pressure on the power grid and promoting the harmonious coexistence of electric vehicles and the power grid. Summary of the invention
[0004] The present invention aims to provide a method and computing device for orderly charging control of a charging pile area, coordinate all charging piles being charged in the area, and effectively solve the problem of overload in the area by adjusting the real-time output power.
[0005] According to one aspect of the present invention, a method for real-time orderly charging control of a charging pile area includes: providing real-time acquisition of charging data and transformer gateway data of charging piles connected to the area through an intelligent fusion terminal in the area, wherein the transformer gateway data includes a distribution transformer load rate;
[0006] Obtain charging pile parameters and overall parameters, wherein the charging pile parameters include the number of charging pile control gears and the minimum charging pile control cycle, and the overall parameters include a load rate over-limit drop threshold and a load rate over-limit recovery threshold;
[0007] The load rate of the distribution transformer is monitored and judged, and a corresponding power strategy is executed in real time according to the results of the monitoring and judgment.
[0008] According to some embodiments, executing a corresponding power strategy according to the monitoring and distinguishing results includes executing a power reduction strategy:
[0009] If the load factor of the distribution transformer is greater than the load factor over-limit reduction threshold, it indicates that the transformer is in a load factor over-limit state, and a power reduction strategy is executed.
[0010] According to some embodiments, a corresponding power strategy is executed in real time according to the monitoring and discrimination results, including executing a power recovery strategy:
[0011] If the distribution transformer load factor is less than the load factor over-limit recovery threshold, it indicates that the transformer is in a load factor safety state, and a power recovery strategy is executed.
[0012] According to some embodiments, executing a corresponding power strategy in real time according to the monitoring and discrimination results also includes:
[0013] If the load factor of the distribution transformer is between the load factor over-limit decreasing threshold and the load factor over-limit recovering threshold, the transformer is in an intermediate load factor state, and no strategy is executed.
[0014] According to some embodiments, the charging data of the charging pile includes:
[0015] Charging status, minimum output power, real-time power, rated power, set power, remaining battery capacity and maximum battery capacity;
[0016] The charging data of the charging piles are the data of each charging pile.
[0017] According to some embodiments, the number of charging pile control gears is used to determine the power of each charging pile control;
[0018] The minimum control cycle of the charging pile is used to determine the interval time between two distribution transformer load rates within the charging pile area.
[0019] According to some embodiments, executing the power reduction strategy includes:
[0020] Filter charging piles that meet the power reduction conditions. The charging piles are currently in charging state, and the set power is greater than the minimum output power;
[0021] Calculating a priority standard value for charging piles that meet the power reduction condition;
[0022] Determine the priority number of the charging pile according to the priority standard value, and sort the charging piles in descending priority order;
[0023] The number of charging piles to be regulated and the predicted load rate of the regulated descent are calculated by combining the descent priority order, the distribution transformer load rate and the charging pile regulation step length;
[0024] Execute power reduction for the specified charging pile according to the preset control step length;
[0025] If there is no charging pile that meets the power reduction conditions, the power reduction strategy is terminated and the minimum control cycle T waiting time is entered.
[0026] According to some embodiments, executing the power recovery strategy in real time includes:
[0027] Filter charging piles that meet the recovery conditions. The charging piles are currently in charging state, and the set power is less than the rated power.
[0028] Calculate the priority standard value of each charging pile for all the screened charging piles;
[0029] Determine the priority number of the charging pile according to the priority standard value, and sort the priority of the charging pile;
[0030] The number of charging piles to be regulated and the predicted load rate of regulation recovery are calculated by combining the regulation priority order, the distribution transformer load rate and the charging pile regulation step length;
[0031] Perform power recovery for the specified charging pile according to the preset control step;
[0032] If there is no charging pile that meets the power recovery conditions, the power recovery strategy is terminated and the minimum control cycle waiting time is entered.
[0033] According to some embodiments, the priority standard value is used as a basis for charging pile regulation, and the calculation formula of the priority standard value is:
[0034]
[0035] Among them, Y is the priority standard value, S rem is the remaining battery capacity, S max is the maximum capacity of the battery, P real The real-time output power of the charging pile, P max The maximum power of the charging pile.
[0036] According to another aspect of the present invention, there is provided a computing device, comprising:
[0037] Processor; and
[0038] A memory stores a computer program, and when the computer program is executed by the processor, the processor executes any of the aforementioned methods.
[0039] According to an exemplary embodiment of the present invention, by acquiring the charging data of the charging pile and the transformer gateway data in real time through the intelligent fusion terminal of the substation, the timeliness and accuracy of the data can be ensured, and comprehensive data support can be provided. Subsequently, the charging power of the charging pile can be dynamically adjusted according to the real-time data to ensure the stable operation of the power grid. By reasonably setting the parameters of the charging pile and the overall parameters, the overload and frequent fluctuations of the power grid can be effectively avoided, and the stable operation of the system can be maintained. The setting of multi-gear adjustment and the minimum control cycle can optimize the utilization of power resources, improve the efficiency of the use of charging piles, and reduce energy waste. The setting of the load rate over-limit drop threshold and the recovery threshold can effectively prevent and respond to overload risks and ensure the safe operation of the power grid; by monitoring and judging the load rate of the distribution transformer, real-time monitoring and dynamic adjustment can effectively reduce the load fluctuation of the power grid and improve the overall stability of the system.
[0040] Through the method of the present invention, when the load rate of the distribution transformer exceeds the load rate over-limit reduction threshold, it indicates that the transformer is in a load rate over-limit state, and a power reduction strategy is executed to orderly reduce the output power of the charging pile to reduce the load rate of the transformer in the substation area, prevent transformer overload, and avoid power grid failure. When the load rate of the distribution transformer is lower than the load rate over-limit recovery threshold, a power recovery strategy is executed to orderly restore the output power of the charging pile. Executing the corresponding power strategy based on the results can significantly improve the safety and stability of the power grid, optimize the utilization of power resources, enhance user experience, and support system maintenance and fault diagnosis.
[0041] It is to be understood that the foregoing general description and the following detailed description are exemplary only and are not restrictive of the invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for describing the embodiments are briefly introduced below.
[0043] Figure 1 A flow chart of a method for orderly charging regulation in a charging station area according to an example embodiment is shown.
[0044] Figure 2 A flow chart showing the execution of different power strategies in a method for orderly charging regulation of a charging station area according to an example embodiment.
[0045] Figure 3 A flow chart for executing a power reduction strategy according to an example embodiment is shown.
[0046] Figure 4 A flow chart for executing a power recovery strategy according to an example embodiment is shown.
[0047] Figure 5 A block diagram of a computing device according to an example embodiment of the invention is shown. DETAILED DESCRIPTION
[0048] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in many forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that the present invention will be comprehensive and complete and fully convey the concepts of the example embodiments to those skilled in the art. The same reference numerals in the figures represent the same or similar parts, and thus their repeated description will be omitted.
[0049] In addition, the described features, structures or characteristics may be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present invention. However, those skilled in the art will appreciate that the technical solution of the present invention can be practiced without one or more of the specific details, or other methods, components, devices, steps, etc. may be adopted. In other cases, known methods, devices, implementations or operations are not shown or described in detail to avoid blurring various aspects of the present invention.
[0050] The block diagrams shown in the accompanying drawings are merely functional entities and do not necessarily correspond to physically independent entities. That is, these functional entities may be implemented in software form, or in one or more hardware modules or integrated circuits, or in different networks and / or processor devices and / or microcontroller devices.
[0051] The flowcharts shown in the accompanying drawings are only exemplary and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps can be decomposed, and some operations / steps can be combined or partially combined, so the actual execution order may change according to actual conditions.
[0052] It should be understood that although the terms first, second, third, etc. may be used herein to describe various components, these components should not be limited by these terms. These terms are used to distinguish one component from another component. Therefore, the first component discussed below can be referred to as the second component without departing from the teachings of the present inventive concept. As used herein, the term "and / or" includes any one of the associated listed items and all combinations of one or more.
[0053] The user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in the present invention are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with the relevant laws, regulations and standards of relevant countries and regions, and provide corresponding operation entrances for users to choose to authorize or refuse.
[0054] Those skilled in the art will appreciate that the drawings are merely schematic diagrams of example embodiments, and the modules or processes in the drawings are not necessarily necessary for implementing the present invention, and therefore cannot be used to limit the protection scope of the present invention.
[0055] In view of the large-scale charging demand of electric vehicles for the stability of the power grid, a charging pile area orderly charging control method is proposed. It can detect the real-time load rate of the area in real time, coordinate all charging piles in the area, and reduce the area load at the minimum cost by adjusting the real-time output power, effectively solving the problem of overload in the area.
[0056] Exemplary embodiments of the present invention are described below with reference to the accompanying drawings.
[0057] Figure 1 A flow chart of a method for orderly charging regulation of a charging station area according to an example embodiment is shown.
[0058] This method can effectively utilize the historical data of surrounding stations and provide reliable historical irradiance prediction for newly built photovoltaic power stations.
[0059] In S101, the charging data of the charging piles connected to the substation and the transformer gateway data are acquired in real time through the substation intelligent fusion terminal, wherein the transformer gateway data includes the distribution transformer load rate.
[0060] According to the exemplary embodiment, the charging state of the charging pile area is controlled by the area intelligent fusion terminal, and the charging data and transformer gateway data of the charging piles connected to the area are obtained in real time through the area intelligent fusion terminal. The transformer gateway data includes the distribution transformer load rate L rate The charging data of the charging pile is the data of each charging pile, and the charging data of the charging pile includes charging state, minimum output power, real-time power, rated power, set power, remaining battery capacity and maximum battery capacity; charging state St, minimum output power P min , real-time power P real , Rated power P n , set power P set 、Battery remaining capacity S rem With the maximum battery capacity S max , the set power P set Supports setting and reading by the intelligent fusion terminal of the substation area; the charging state St, if the charging pile is currently charging, St is 1; if it is not currently charging, St is 0. The transformer gateway data also includes the transformer capacity S n And the real-time power factor PF of the substation.
[0061] The intelligent fusion terminal of the substation area can effectively obtain the charging data of the charging pile and the gateway data of the transformer in real time, providing reliable data support for subsequent load evaluation, intelligent scheduling and dynamic adjustment.
[0062] In S103, charging pile parameters and overall parameters are obtained.
[0063] According to an exemplary embodiment, the charging pile parameters include the number of charging pile control gears n d , the minimum control cycle T of the charging pile, the overall parameters include the load rate over-limit drop threshold Sr down , Load rate over-limit recovery threshold Sr up .
[0064] The number of gears controlled by the charging pile n d , which is used to determine the power of each charging pile regulation, that is, the charging pile regulation step length P sgset , P sgset The calculation method is:
[0065]
[0066] The minimum control cycle T of the charging pile is the load rate L of the two distribution transformers in the substation area. rate The interval time of judgment is based on the load factor L of the distribution transformer after judgment. rate The execution strategy of the interval.
[0067] By setting reasonable charging pile parameters and overall parameters, the load of the charging pile area can be effectively managed to ensure the stability and reliability of the power grid. The reasonable configuration of the charging pile parameters and overall parameters is the key to achieving orderly charging regulation.
[0068] The number of charging pile control gears described in this embodiment can improve the flexibility of charging pile power regulation, and can adjust the charging power more finely according to actual needs. Through multi-gear regulation, it is possible to minimize unnecessary high-power charging while ensuring charging needs, thereby saving energy. Setting the minimum regulation cycle can avoid frequent power adjustments, reduce the impact on the power grid, and maintain the stability of the system. A reasonable load rate over-limit drop threshold can take timely measures when the transformer load rate approaches the critical value to prevent overload and ensure the safe operation of the power grid; a reasonable load rate over-limit recovery threshold setting can restore the charging power in time when the transformer load rate drops to a safe range, ensuring that the utilization rate of the charging pile and the charging needs of users are met.
[0069] In S105, the load factor of the distribution transformer is monitored and determined, and a corresponding power strategy is executed in real time according to the results of the monitoring and determination.
[0070] In the orderly charging control method of charging pile area, monitoring and judging the load rate of distribution transformer is a key step to ensure the stability of the power grid. According to the different states of the load rate of distribution transformer, the system will implement different power strategies. For the specific judgment process, see Figure 2 .
[0071] According to an exemplary embodiment, the load rate of the distribution transformer is monitored and determined. If the load rate of the distribution transformer L rateGreater than the load rate over-limit drop threshold Sr down , indicating that the transformer is in a load rate over-limit state, and the power reduction strategy is executed; if the distribution transformer load rate L rate Less than the load rate over-limit recovery threshold Sr up , the load rate over-limit recovery threshold Sr up Less than Sr down 10% indicates that the transformer is in a safe load rate state and a power recovery strategy needs to be implemented;
[0072] If the distribution transformer load factor L rate When the load rate exceeds the limit drop threshold Sr down and load rate over-limit recovery threshold Sr up During this period, the transformer is in an intermediate load rate state and does not execute any strategy, waiting for the minimum control cycle of the charging pile.
[0073] Through this example embodiment, the system can monitor the load rate of the distribution transformer in real time, and execute the corresponding power strategy in real time according to different load states to ensure the stability and reliability of the power grid. This method of orderly charging control in the charging pile area can not only effectively manage the load of the charging pile area, but also improve the utilization efficiency of power resources.
[0074] Figure 3 A flow chart for executing a power reduction strategy according to an example embodiment is shown.
[0075] The power reduction strategy is to reduce the output power of the connected charging pile to reduce the transformer load rate.
[0076] In S201, it is determined whether there is a charging pile that meets the power reduction condition.
[0077] According to an exemplary embodiment, all charging piles that meet the power reduction condition are screened, wherein the power reduction condition includes that the charging pile charging state St=1 and the current P of the charging pile set >P min If there is no charging pile that meets the reduction conditions, enter S217, the power reduction strategy is terminated, and return to the minimum control cycle T waiting time.
[0078] In S203, a priority standard value is calculated for the charging piles that meet the power reduction condition.
[0079] According to an exemplary embodiment, a priority standard value is calculated for a charging pile that meets the power reduction condition, and the priority standard value is used as a basis for regulating the charging pile. The priority standard value Y is calculated as follows:
[0080]
[0081] Among them, S rem is the remaining battery capacity, Smax is the maximum capacity of the battery, P real is the real-time power, P max is the maximum power.
[0082] In S205, the priority numbers of the charging piles are determined according to the priority standard values, and the charging piles are sorted in descending priority order.
[0083] The priority number i is a serial number value sorted from large to small according to Y in the power reduction strategy, and is numbered from 1. The larger the Y, the smaller the corresponding i value of the charging pile, and the smaller the i value, the higher the reduction priority of the charging pile.
[0084] In S207, a temporary variable p is defined.
[0085] After the priority ranking is completed, define a temporary variable p, and set p = 1. Go to S209 to determine whether p is equal to i max , if p is equal to i max , then S210 is performed to reduce the power of all charging piles that meet the conditions according to the preset control step, such as reducing the power by 1 step.
[0086] If p is not equal to i max , proceed to S211.
[0087] In S211, the predicted load factor is calculated.
[0088] Calculate the predicted load factor L pre_down_tem (p) is the transformer load rate of the first p piles in priority after a power reduction of one step, which is calculated as:
[0089]
[0090] Among them, L rate is the load factor of the distribution transformer, PF is the real-time power factor of the distribution transformer, S n is the transformer capacity, P sgset_i is the control step length P corresponding to the pile with priority number i sgset 、i max The priority number i corresponds to the pile with the lowest priority.
[0091] In S213, it is determined whether the predicted load factor is less than a load factor over-limit decrease threshold.
[0092] If the predicted load rate is less than the load rate over-limit drop threshold, the power of the first p charging piles in the priority ranking is reduced by 1 step;
[0093] If the predicted load rate is greater than the load rate over-limit drop threshold, then p = p + 1, and continue to determine whether p is equal to i max .
[0094] According to some embodiments, according to the power reduction strategy, the number k of charging piles to be regulated is determined as follows:
[0095] If L pre_down_tem (i max )>Sr down , then k=i max ;
[0096] If L pre_down_tem (p)≥Sr down And L pre_down_tem (p+1) <Sr down , p max , then k=p+1.
[0097] The control reduces the predicted load factor L pre_down is the expected load rate after this regulation, and its value is L pre_down_tem (k).
[0098] After the k value is determined, the intelligent fusion terminal in the substation area issues a control reduction command to reduce the power of the charging piles with a priority of 1 to k by one control step, and sets the power of the pile to (P set -P sgset ), after the setting is completed, enter the minimum cycle T waiting time, and after the waiting is completed, the next round of strategy execution will be carried out.
[0099] Figure 4 A flow chart for executing a power recovery strategy according to an example embodiment is shown.
[0100] The power recovery strategy is to orderly restore the output power of charging piles that have been reduced due to regulation.
[0101] In S301, it is determined whether there is a charging pile that meets the power recovery condition.
[0102] According to an exemplary embodiment, all charging piles that meet the power reduction condition are screened, wherein the power reduction condition includes the charging pile charging state St=1, the current P of the charging pile set <P n If there is no charging pile that meets the descending conditions, the process goes to S317, the power recovery strategy is terminated, and the system returns to the minimum control cycle T waiting time.
[0103] In S303, a priority standard value is calculated for the charging piles that meet the power reduction condition.
[0104] According to an exemplary embodiment, a priority standard value is calculated for a charging pile that meets the power reduction condition, and the priority standard value is used as a basis for regulating the charging pile. The priority standard value Y is calculated as follows:
[0105]
[0106] Among them, S rem is the remaining battery capacity, S max is the maximum capacity of the battery, P real is the real-time power, P max is the maximum power.
[0107] In S305, the priority number of the charging pile is determined according to the priority standard value, and the charging piles are prioritized.
[0108] The priority number i is a serial number value sorted from small to large according to Y in the power recovery strategy, starting from 1. The smaller the Y, the smaller the corresponding i value of the pile, and the smaller the i value, the higher the recovery priority of the pile.
[0109] In S307, a temporary variable p is defined.
[0110] After the priority ranking is completed, define a temporary variable p, and set p = 1. Go to S309 to determine whether p is equal to i max , if p is equal to i max , then S310 is performed to perform power recovery for all charging piles that meet the conditions according to a preset control step, such as 1 step of power recovery.
[0111] If p is not equal to i max , proceed to S311.
[0112] In S311, the predicted load factor is calculated.
[0113] Calculate the predicted load factor L pre_up_tem (p), calculated as:
[0114]
[0115] Among them, L rate is the load factor of the distribution transformer, PF is the real-time power factor of the distribution transformer, S n is the transformer capacity, P sgset_i is the control step length P corresponding to the pile with priority number i sgset 、i max The priority number i corresponds to the pile with the lowest priority.
[0116] In S313, it is determined whether the predicted load rate is greater than a load rate over-limit recovery threshold.
[0117] If the predicted load rate is greater than the load rate over-limit recovery threshold, the power of the charging pile ranked before (p-1) in priority order is restored by one step;
[0118] If the predicted load rate is less than or equal to the load rate over-limit recovery threshold, p=p+1 is set and the process returns to step S309 for determination.
[0119] According to some embodiments, according to the power recovery strategy, the number k of charging piles to be regulated is determined as follows:
[0120] If L pre_up_tem (i max ) <Sr up , then k=i max ;
[0121] If L pre_up_tem (p)≤Sr up And L pre_down_tem (p+1)>Sr up , p max , then k=p.
[0122] The control restores the predicted load factor L pre_up is the expected load rate after this regulation, and its value is L pre_up_tem (k).
[0123] After the k value is determined, the intelligent fusion terminal in the substation area issues a control recovery command to restore the power of the charging piles with a priority of 1 to k by one control step, and sets the power of the pile to (P set +P sgset ), after the setting is completed, enter the minimum cycle T waiting time, and after the waiting is completed, the next round of strategy execution will be carried out.
[0124] The present invention utilizes the orderly charging control method of the charging pile area, combined with the data parameters obtained in real time by the intelligent fusion terminal of the area, during the peak period of power grid load, by setting a reasonable load rate over-limit reduction threshold and the number of charging pile control gears, the power of the charging pile can be reduced in time to prevent overload and avoid power grid failure; during the low load period of the power grid, by setting a reasonable load rate over-limit recovery threshold, the power of the charging pile can be restored in time, and idle power resources can be fully utilized, thereby realizing efficient, reliable and safe charging management.
[0125] Figure 5 A block diagram of a computing device according to an example embodiment of the invention is shown.
[0126] like Figure 5 As shown, computing device 30 includes processor 12 and memory 14. Computing device 30 may also include bus 22, network interface 16, and I / O interface 18. Processor 12, memory 14, network interface 16, and I / O interface 18 may communicate with each other via bus 22.
[0127] The processor 12 may include one or more general-purpose CPUs (Central Processing Units, processors), microprocessors, or application-specific integrated circuits, etc., for executing relevant program instructions.
[0128] The memory 14 may include a machine system readable medium in the form of a volatile memory, such as a random access memory (RAM), a read-only memory (ROM) and / or a cache memory. The memory 14 is used to store one or more programs including instructions and data. The processor 12 can read the instructions stored in the memory 14 to execute the above-mentioned method according to the embodiment of the present invention.
[0129] The computing device 30 may also communicate with one or more networks via the network interface 16. The network interface 16 may be a wireless network interface.
[0130] The bus 22 may include an address bus, a data bus, a control bus, etc. The bus 22 provides a path for exchanging information between components.
[0131] It should be noted that, in the specific implementation process, the computing device 30 may also include other components necessary for normal operation. In addition, those skilled in the art may understand that the above device may only include components necessary for implementing the embodiments of this specification, and need not include all components shown in the figure.
[0132] The present invention also provides a computer-readable storage medium having a computer program stored thereon, which implements the steps of the above method when executed by a processor. The computer-readable storage medium may include, but is not limited to, any type of disk, including a floppy disk, an optical disk, a DVD, a CD-ROM, a microdrive, and a magneto-optical disk, a ROM, a RAM, an EPROM, an EEPROM, a DRAM, a VRAM, a flash memory device, a magnetic card or an optical card, a nanosystem (including a molecular memory IC), a network storage device, a cloud storage device, or any type of medium or device suitable for storing instructions and / or data.
[0133] An embodiment of the present invention also provides a computer program product, which includes a non-transitory computer-readable storage medium storing a computer program, and the computer program is operable to cause a computer to execute part or all of the steps of any method recorded in the above method embodiments.
[0134] Those skilled in the art can clearly understand that the technical solution of the present invention can be implemented with the help of software and / or hardware. "Unit" and "module" in this specification refer to software and / or hardware that can independently complete or cooperate with other components to complete specific functions, where the hardware can be, for example, a field programmable gate array, an integrated circuit, etc.
[0135] It should be noted that, for the above-mentioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should know that the present invention is not limited by the described action sequence, because according to the present invention, certain steps can be performed in other sequences or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present invention.
[0136] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0137] In the several embodiments provided by the present invention, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.
[0138] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0139] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0140] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or the whole or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the methods of various embodiments of the present invention.
[0141] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0142] The exemplary embodiments of the present invention are specifically shown and described above. It should be understood that the present invention is not limited to the detailed structure, configuration or implementation method described herein; on the contrary, the present invention is intended to cover various modifications and equivalent configurations included in the spirit and scope of the attached clauses.
[0143] Those skilled in the art can clearly understand that the technical solution of the present invention can be implemented with the help of software and / or hardware. "Unit" and "module" in this specification refer to software and / or hardware that can independently complete or cooperate with other components to complete specific functions, where the hardware can be, for example, a field programmable gate array, an integrated circuit, etc.
[0144] It should be noted that, for the above-mentioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should know that the present invention is not limited by the described action sequence, because according to the present invention, certain steps can be performed in other sequences or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present invention.
[0145] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0146] In the several embodiments provided by the present invention, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.
[0147] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0148] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0149] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or the whole or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the methods of various embodiments of the present invention.
[0150] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0151] The exemplary embodiments of the present invention are specifically shown and described above. It should be understood that the present invention is not limited to the detailed structure, configuration or implementation method described herein; on the contrary, the present invention is intended to cover various modifications and equivalent configurations included in the spirit and scope of the attached clauses.
Claims
1. A method for real-time orderly charging control of charging pile areas, characterized in that: include: The charging data of the charging piles connected to the area and the transformer gateway data are obtained in real time through the area intelligent fusion terminal, and the transformer gateway data includes the distribution transformer load rate; Obtain charging pile parameters and overall parameters, wherein the charging pile parameters include the number of charging pile control gears and the minimum charging pile control cycle, and the overall parameters include a load rate over-limit drop threshold and a load rate over-limit recovery threshold; The load rate of the distribution transformer is monitored and judged, and a corresponding power strategy is executed in real time according to the results of the monitoring and judgment.
2. The method according to claim 1, characterized in that Execute the corresponding power strategy in real time according to the monitoring and identification results, including executing the power reduction strategy: If the load factor of the distribution transformer is greater than the load factor over-limit reduction threshold, it indicates that the transformer is in a load factor over-limit state, and a power reduction strategy is executed.
3. The method according to claim 2, characterized in that Execute the corresponding power strategy in real time according to the monitoring and identification results, including executing the power recovery strategy: If the distribution transformer load factor is less than the load factor over-limit recovery threshold, it indicates that the transformer is in a load factor safety state, and a power recovery strategy is executed.
4. The method according to claim 2, characterized in that: Executing the corresponding power strategy in real time according to the monitoring and identification results also includes: If the load factor of the distribution transformer is between the load factor over-limit decreasing threshold and the load factor over-limit recovering threshold, the transformer is in an intermediate load factor state, and no strategy is executed.
5. The method according to claim 1, characterized in that: The charging data of the charging pile includes: Charging status, minimum output power, real-time power, rated power, set power, remaining battery capacity and maximum battery capacity; The charging data of the charging piles are the data of each charging pile.
6. The method according to claim 1, characterized in that The number of charging pile control gears is used to determine the power of each charging pile control; The minimum control cycle of the charging pile is used to determine the interval time between two distribution transformer load rates within the charging pile area.
7. The method according to claim 2, characterized in that: Executing the power reduction strategy includes: Filter charging piles that meet the power reduction conditions. The charging piles are currently in charging state, and the set power is greater than the minimum output power; Calculating a priority standard value for charging piles that meet the power reduction condition; Determine the priority number of the charging pile according to the priority standard value, and sort the charging piles in descending priority order; The number of charging piles to be regulated and the predicted load rate of the regulated descent are calculated by combining the descent priority order, the distribution transformer load rate and the charging pile regulation step length; Execute power reduction for the specified charging pile according to the preset control step length; If there is no charging pile that meets the power reduction conditions, the power reduction strategy is terminated and the minimum control cycle waiting time is entered.
8. The method according to claim 3, characterized in that Executing the power recovery strategy includes: Filter charging piles that meet the recovery conditions. The charging piles are currently in charging state, and the set power is less than the rated power. Calculate the priority standard value of each charging pile for all the screened charging piles; Determine the priority number of the charging pile according to the priority standard value, and sort the priority of the charging pile; The number of charging piles to be regulated and the predicted load rate of regulation recovery are calculated by combining the regulation priority order, the distribution transformer load rate and the charging pile regulation step length; Perform power recovery for the specified charging pile according to the preset control step; If there is no charging pile that meets the power recovery conditions, the power recovery strategy is terminated and the minimum control cycle waiting time is entered.
9. The method according to claim 6, characterized in that The priority standard value is used as the basis for charging pile regulation, and the calculation formula of the priority standard value is: Among them, Y is the priority standard value, S rem is the remaining battery capacity, S max is the maximum capacity of the battery, P real The real-time output power of the charging pile, P max The maximum power of the charging pile.
10. A computing device, characterized in that include: processor; as well as A memory storing a computer program, which, when executed by the processor, enables the processor to perform the method according to any one of claims 1 to 9.
Citation Information
Cited By
Ordered charging control method and charging pile
CN119928647A
Charging pile power adjusting method and system based on court load rate
CN120955673A
