SPMT combined type transportation lifting beam and transportation method
By designing SPMT combined transport lifting beams, using the clamping structure and bolt fixing method of footwear and lifting beams, the function of withdrawing land by itself during shipment is realized, and the long occupation period and construction cost of transport lifting beams in traditional technology is solved. High problems improve transportation efficiency and efficiency.
Patent Information
- Application Number
- CN202411466980.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-21
- Publication Date
- 2025-01-07
AI Technical Summary
In traditional marine engineering, large steel structures need to be arranged in advance in the early stages of construction, resulting in a long occupation period and high construction cost.
Design a SPMT combined transport lifting beam, including footwear and two lifting beams, with openings and bolt plates on the lifting beam, which can be lifted and fixed through lifting lugs and hooks, and can be withdrawn back to the land by itself during loading. Avoid laying up the lifting beams in advance.
It improves the efficiency of transportation lifting beams, reduces the cost of repeated construction, and simplifies the transportation process.
Smart Images

Figure CN119262234A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of marine engineering, and in particular relates to an SPMT combined transport lifting beam and a transport method. Background Art
[0002] In the early stages of construction of large steel structures in traditional marine engineering, transport beams need to be arranged at the bottom of the steel structures. When the construction is completed and loaded onto the ship, the SPMT self-propelled modular transport vehicle enters the bottom of the transport beams, loads the transport beams and steel structures onto the barge, and the transport beams go out to sea with the steel structures. After the offshore installation is completed, the transport beams return to land with the barge, resulting in a long period of transport beam occupation. A large number of transport beams need to be produced to meet the construction needs of the steel structures on site, which increases the construction cost of the transport beams.
[0003] Therefore, it is urgent to design a SPMT combined transport beam lifting and transportation method to solve the above-mentioned problems. Summary of the invention
[0004] The object of the present invention is to provide a SPMT combined transport lifting beam and a transport method, which has the advantages of not needing to be arranged in advance at the initial stage of construction and can be withdrawn to land with the SPMT after loading, thereby solving the problems mentioned in the background technology.
[0005] To achieve the above purpose, the specific technical scheme of a SPMT combined transport beam and transport method of the present invention is as follows: A SPMT combined transport lifting beam comprises a foot shoe and two lifting beams, wherein the foot shoe is provided with a transport area for carrying a steel structure, and the lifting beam is provided with an opening, and the two lifting beams can be buckled together. When the two lifting beams are buckled together, the two openings form a clamping hole, and the clamping hole clamps and fixes the foot shoe.
[0006] Furthermore, the lifting beam includes a beam top plate, a beam bottom plate and a beam web plate, the beam web plate is located between the beam top plate and the beam bottom plate, the beam top plate and the beam bottom plate are fixedly connected by the beam web plate, and when the two lifting beams are buckled, the beam web plates of the two lifting beams are in contact.
[0007] Furthermore, a bolt plate is fixedly connected to the top plate, and bolt holes are provided on the bolt plate for bolts to pass through. When the two lifting beams are buckled, the bolt plates on the two lifting beams are in contact, and the two bolt holes overlap. Bolts are passed through the corresponding two bolt holes to fix the two lifting beams.
[0008] Furthermore, a beam reinforcement plate is fixedly connected between the beam top plate and the beam bottom plate, the beam reinforcement plate is fixedly connected to the beam web plate, and the arrangement directions of the beam reinforcement plate and the beam web plate are perpendicular.
[0009] Furthermore, a lifting lug is fixedly connected to the beam top plate, and the lifting lug can be hooked with a lifting hook of a crane.
[0010] Furthermore, the foot shoes include a shoe top plate, a shoe bottom plate and a middle tube, the middle tube is fixedly connected to the shoe top plate and the shoe bottom plate, the transport area is arranged on the shoe top plate, when the two lifting beams are buckled, the clamping holes clamp and fix the middle tube, and the shoe bottom plate contacts the top surface of the lifting beam.
[0011] Furthermore, a shoe cross rib plate is fixedly connected inside the middle tube.
[0012] Furthermore, a rib plate is fixedly connected between the shoe top plate and the shoe bottom plate, and the rib plate is fixedly connected to the middle tube.
[0013] Furthermore, a column reinforcement plate is provided on the transport area, and the column reinforcement plate is connected to the shoe top plate and the steel structure.
[0014] A SPMT transportation method, using the above-mentioned SPMT combined transportation beam lifting device, comprises the following steps: S1. Place the foot shoe on top of the cement pad, weld a reinforcement plate around the middle pipe between the foot shoe and the cement pad, place a steel structure in the transportation area of the foot shoe, and weld a column reinforcement plate between the steel structure and the foot shoe; S2. When loading, remove the construction ribs, connect the hook and the lifting lug by crane, and sequentially hoist the two lifting beams on both sides of the middle tube of the foot shoe. Place insulating rubber between the foot shoe and the transport lifting beam, then use bolts to pass through the two bolt holes and tighten the bolts to fix the two lifting beams and clamp the middle tube; S3, the SPMT self-propelled modular transporter enters the vehicle to the bottom of the transport beam, places insulating rubber between the transport beam and the SPMT self-propelled modular transporter, and the SPMT self-propelled modular transporter rises and contacts the transport beam to transport the steel structure to the barge; S4. After the steel structure falls onto the sea transport pier, lift the transport beam back onto the SPMT self-propelled modular transport vehicle and withdraw it to land with the SPMT self-propelled modular transport vehicle.
[0015] The present invention has the following advantages: it solves the problem that the traditional SPMT roll-on / roll-off loading needs to transport the lifting beams with the steel structure to the sea, and the lifting beams need to be placed under the structure at the initial stage of the steel structure construction, which leads to a long period of transportation of the lifting beams. It greatly improves the utilization efficiency of the transport lifting beams and reduces the repeated construction cost of the transport lifting beams. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the SPMT combined transport beam of the present invention; Figure 2 It is a structural schematic diagram of the lifting beam of the present invention; Figure 3 It is a schematic diagram of the structure of the footwear of the present invention; Figure 4This is a structural schematic diagram of the welding of the rib plate of the footwear of the present invention; Figure 5 This is a schematic diagram of the structure of the lifting beam clamping the foot shoes after the stiffener plate is removed in the present invention; Figure 6 This is a schematic diagram of the overall arrangement of the present invention when loading on a ship; Explanation of the markings in the figure: 1. Lifting beam; 11. Beam top plate; 12. Beam bottom plate; 13. Beam web plate; 14. Bolt plate; 15. Lifting lug; 16. Beam reinforcement plate; 17. Opening; 2. Shoe; 21. Shoe top plate; 22. Shoe bottom plate; 23. Middle pipe; 24. Shoe reinforcement plate; 25. Shoe cross reinforcement plate; 3. Steel structure; 31. Column reinforcement plate; 4. Cement pad; 5. Construction reinforcement plate; 6. SPMT self-propelled modular transport vehicle. DETAILED DESCRIPTION
[0017] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0018] Those skilled in the art will appreciate that, although some embodiments herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present invention and form different embodiments. For example, in the claims, any one of the claimed embodiments may be used in any combination.
[0019] Please refer to the attached Figure 1 To Attachment Figure 6 The present invention describes an SPMT combined transport lifting beam and a transport method.
[0020] At present, in the early stage of construction of large steel structures in traditional marine engineering, it is necessary to arrange the transport beams at the bottom of the steel structures. When the construction is completed and loaded on the ship, the SPMT self-propelled modular transport vehicle enters the bottom of the transport beams, loads the transport beams and steel structures onto the barge, and the transport beams go out to sea with the steel structures. After the offshore installation is completed, the transport beams return to land with the barge, resulting in a long period of transport beam occupation. A large number of transport beams need to be produced to meet the construction needs of the steel structures on site, which increases the construction cost of the transport beams.
[0021] Therefore, the SPMT combined transport lifting beam includes a foot shoe 2 and two lifting beams 1. The foot shoe 2 is provided with a transport area for carrying the steel structure 3. The lifting beam 1 is provided with an opening 17. The two lifting beams 1 can be buckled together. When the two lifting beams 1 are buckled together, the two openings 17 form a clamping hole, and the clamping hole clamps and fixes the foot shoe 2.
[0022] The SPMT combined transport beam solves the problem that the traditional SPMT roll-on / roll-off loading requires the transport beam 1 to go out to sea with the steel structure 3, and the beam 1 needs to be placed under the structure at the initial stage of construction of the steel structure 3, which leads to a long occupancy period of the transport beam 1. It greatly improves the utilization efficiency of the transport beam 1 and reduces the repeated construction cost of the transport beam 1.
[0023] Furthermore, the lifting beam 1 includes a beam top plate 11, a beam bottom plate 12 and a beam web 13. The beam web 13 is located between the beam top plate 11 and the beam bottom plate 12. The beam top plate 11 and the beam bottom plate 12 are fixedly connected by the beam web 13. When the two lifting beams 1 are buckled, the beam webs 13 of the two lifting beams 1 are in contact with each other, and the foot shoes 2 are in contact with the two beam top plates 11.
[0024] Preferably, the beam top plate 11 includes a straight top plate and an inclined top plate, the straight top plate is located between the two inclined top plates, and when the two lifting beams 1 are buckled, the straight top plate contacts the foot shoes 2, and the straight top plate supports the foot shoes 2. By setting the inclined top plate, the amount of steel in the lifting beam 1 is reduced.
[0025] Furthermore, a bolt plate 14 is fixedly connected to the top plate, and bolt holes for bolts to pass through are opened on the bolt plate 14. When the two lifting beams 1 are buckled, the bolt plates 14 on the two lifting beams 1 are in contact, and the two bolt holes overlap. Bolts are passed through the corresponding two bolt holes and then tightened to fix the two lifting beams 1.
[0026] Preferably, the specific number of bolt plates 14 is twelve, and every two bolt plates 14 located on different lifting beams 1 correspond to each other. In other embodiments of the present invention, the specific number of bolt plates 14 is multiple, as long as it can be guaranteed that the lifting beam 1 is fixed when the bolts are tightened.
[0027] Specifically, a beam stiffener plate 16 is fixedly connected between the beam top plate 11 and the beam bottom plate 12 , the beam stiffener plate 16 is fixedly connected to the beam web plate 13 , and the beam stiffener plate 16 is disposed in a direction perpendicular to the beam web plate 13 .
[0028] Furthermore, a lifting lug 15 is fixedly connected to the beam top plate 11, and the lifting lug 15 can be hooked with the hook of the crane. Preferably, the specific number of the lifting lug 15 is four, and each lifting beam 1 is fixedly connected to a lifting lug 15, and the lifting lug 15 is located at both ends of the lifting beam 1.
[0029] Furthermore, the foot shoe 2 includes a shoe top plate 21, a shoe bottom plate 22 and a middle tube 23. The middle tube 23 is fixedly connected to the shoe top plate 21 and the shoe bottom plate 22. The transport area is arranged on the shoe top plate 21. When the two lifting beams 1 are buckled, the clamping hole clamps and fixes the middle tube 23, and the shoe bottom plate 22 contacts the straight top surface, and the shoe bottom plate 22 is supported by the straight top plate.
[0030] Preferably, the diameter of the main column of the steel structure 3 is larger than the diameter of the middle circular hole of the shoe top plate 21 .
[0031] Preferably, the diameter of the intermediate tube 23 is smaller than or equal to the diameter of the clamping hole.
[0032] Preferably, a shoe cross rib plate 25 is fixedly connected inside the middle tube 23 . In other embodiments of the present invention, rib plates of other shapes may also be used as long as the rigid supporting force of the middle tube 23 can be guaranteed.
[0033] Furthermore, a rib plate 24 is fixedly connected between the shoe top plate 21 and the shoe bottom plate 22, and the rib plate 24 is fixedly connected to the middle tube 23. Preferably, the specific number of the rib plates 24 is multiple, and they are equidistantly arranged around the center tube. In other embodiments of the present invention, other numbers of rib plates 24 may be provided, or no rib plates 24 may be provided, as long as the rigid supporting force of the shoe top plate 21 and the shoe bottom plate 22 can be guaranteed.
[0034] Furthermore, a column rib plate 31 is provided on the transport area, and the column rib plate 31 is connected to the shoe top plate 21 and the steel structure 3. By providing the column rib plate 31, the steel structure 3 and the shoe top plate 21 are fixed.
[0035] A SPMT transportation method, using the above-mentioned SPMT combined transportation lifting beam 1, comprises the following steps: S1, place the foot shoe 2 on top of the cement pad 4, weld the rib plate 5 around the middle pipe 23 between the foot shoe 2 and the cement pad 4, place the steel structure 3 in the transportation area of the foot shoe 2, and weld the column rib plate 31 between the steel structure 3 and the foot shoe 2; S2. When loading, the construction rib plate 5 is removed, the hook is connected to the lifting lug 15 by a crane, and the two lifting beams 1 are hoisted on both sides of the middle pipe 23 of the foot shoe 2 in sequence, and insulating rubber is placed between the foot shoe 2 and the transport lifting beam 1. Then, bolts are passed through the two bolt holes and tightened to fix the two lifting beams 1 and clamp and fix the middle pipe 23; S3, the SPMT self-propelled module transporter 6 enters the bottom of the transport beam 1, and places insulating rubber between the transport beam 1 and the SPMT self-propelled module transporter 6. The SPMT self-propelled module transporter 6 rises and contacts the transport beam 1 to transport the steel structure 3 to the barge; S4, after the steel structure 3 falls onto the sea transport pier, the transport lifting beam 1 is hoisted back onto the SPMT self-propelled modular transport vehicle 6, and the transport lifting beam 1 is withdrawn to land along with the SPMT self-propelled modular transport vehicle 6.
[0036] Therefore, there is no need to place the lifting beam 1 in advance at the initial stage of construction of the steel structure 3 of the present invention. The lifting beam 1 is only used when loading. After loading, the transportation lifting beam 1 is dismantled and withdrawn to land with the SPMT self-propelled modular transport vehicle 6, thereby improving the use efficiency of the lifting beam 1 and reducing the repeated construction cost of the lifting beam 1.
[0037] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. A SPMT combined transport beam lift, characterized in that: It includes a foot shoe and two lifting beams. The foot shoe is provided with a transport area for carrying steel structures. The lifting beam is provided with an opening. The two lifting beams can be buckled. When the two lifting beams are buckled, the two openings form a clamping hole, and the clamping hole clamps and fixes the foot shoe.
2. The SPMT combined transport beam lift according to claim 1 is characterized in that: The lifting beam includes a beam top plate, a beam bottom plate and a beam web plate. The beam web plate is located between the beam top plate and the beam bottom plate. The beam top plate and the beam bottom plate are fixedly connected by the beam web plate. When two lifting beams are buckled, the beam web plates of the two lifting beams are in contact.
3. The SPMT combined transport beam lift according to claim 2 is characterized in that: A bolt plate is fixedly connected to the top plate, and bolt holes are opened on the bolt plate for bolts to pass through. When the two lifting beams are buckled, the bolt plates on the two lifting beams are in contact, and the two bolt holes overlap. The bolts pass through the corresponding two bolt holes to fix the two lifting beams.
4. The SPMT combined transport beam lift according to claim 2 is characterized in that: A beam reinforcement plate is fixedly connected between the beam top plate and the beam bottom plate, the beam reinforcement plate is fixedly connected to the beam web plate, and the setting directions of the beam reinforcement plate and the beam web plate are perpendicular.
5. The SPMT combined transport beam lift according to claim 2 is characterized in that: A lifting lug is fixedly connected to the top plate of the beam, and the lifting lug can be hooked with the hook of the crane.
6. The SPMT combined transport beam lift according to claim 1 is characterized in that: The foot shoes include a shoe top plate, a shoe bottom plate and a middle tube, the middle tube is fixedly connected to the shoe top plate and the shoe bottom plate, the transport area is arranged on the shoe top plate, when the two lifting beams are buckled, the clamping holes clamp and fix the middle tube, and the shoe bottom plate contacts the top surface of the lifting beam.
7. The SPMT combined transport beam lift according to claim 6 is characterized in that: A shoe cross rib plate is fixedly connected inside the middle tube.
8. The SPMT combined transport beam lift according to claim 6 is characterized in that: A shoe rib plate is fixedly connected between the shoe top plate and the shoe bottom plate, and the shoe rib plate is fixedly connected to the middle tube.
9. The SPMT combined transport beam lift according to claim 6, characterized in that: The transport area is provided with column ribs, which are connected to the shoe top plate and the steel structure.
10. A method for transporting SPMT, characterized in that: Using the SPMT combined transport beam lift as described in any one of claims 1 to 9 comprises the following steps: S1. Place the foot shoe on top of the cement pad, weld a reinforcement plate around the middle pipe between the foot shoe and the cement pad, place a steel structure in the transportation area of the foot shoe, and weld a column reinforcement plate between the steel structure and the foot shoe; S2. When loading, remove the construction ribs, connect the hook and the lifting lug by crane, and sequentially hoist the two lifting beams on both sides of the middle tube of the foot shoe. Place insulating rubber between the foot shoe and the transport lifting beam, then use bolts to pass through the two bolt holes and tighten the bolts to fix the two lifting beams and clamp the middle tube; S3, the SPMT self-propelled modular transporter enters the vehicle to the bottom of the transport beam, places insulating rubber between the transport beam and the SPMT self-propelled modular transporter, and the SPMT self-propelled modular transporter rises and contacts the transport beam to transport the steel structure to the barge; S4. After the steel structure falls onto the sea transport pier, lift the transport beam back onto the SPMT self-propelled modular transport vehicle and withdraw it to land with the SPMT self-propelled modular transport vehicle.