House building ceiling structure and construction method thereof

Through the coordinated cooperation of lifting components and fixed components, the splicing and installation of suspended ceiling structures are completed on the ground, which solves the problems of high labor intensity and low efficiency of staff in the mid-air in the prior art, and realizes more efficient installation of suspended ceiling structures. Reinforcements and limiting components improve installation stability.

CN119266444APending Publication Date: 2025-01-07WENZHOU CHENG BO CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411465519.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-21
Publication Date
2025-01-07

AI Technical Summary

Technical Problem

During the construction of the existing ceiling structure, staff need to hold the main keel and auxiliary keel in mid-air for a long time, resulting in high labor intensity and low installation efficiency.

Method used

Using the coordinated cooperation of lifting components and fixing components, the staff completes most of the splicing installation on the ground, lifts the keel to a designated position through the lifting components, and uses the fixing components to complete the connection between the keel and the boom on the ground, reducing half-empty workload.

Benefits of technology

The labor intensity of staff is reduced, the installation efficiency of the ceiling structure is improved, and the installation errors of reinforcement and limiting components are adapted to enhance the stability of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119266444A_ABST
    Figure CN119266444A_ABST
Patent Text Reader

Abstract

The invention relates to a house building suspended ceiling structure and a construction method thereof. The suspended ceiling structure is fixedly arranged at the bottom of a floor; the suspended ceiling structure comprises a suspender assembly, a keel frame, a panel layer, a hoisting assembly and a fixing assembly. The suspender assembly comprises a plurality of suspenders which are fixedly arranged at the bottom of a floor. The hoisting assembly is detachably connected with the keel frame, the hoisting assembly is used for being connected with a hoisting device, and the hoisting device is used for hoisting the keel frame to the suspender assembly; the fixing assembly is used for connecting the keel and the suspender; the panel layer is laid on the keel frame, and the panel layer is fixedly connected with the secondary keel. According to the ceiling structure splicing and mounting device, a worker can complete most splicing and mounting work of the ceiling structure on the ground through cooperation of the hoisting assembly and the fixing assembly, the workload of the worker in the air is reduced, and therefore the labor intensity of the worker is reduced, and the mounting efficiency of the ceiling structure is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of building technology, and in particular to a building ceiling structure and a construction method thereof. Background Art

[0002] The suspended ceiling structure is a structure used to cover the ceiling in interior decoration. It not only shields the pipes, wires and other facilities above, but also improves the aesthetics and functionality of the interior.

[0003] In the prior art, workers need to first install hangers, which are fixed to the bottom of the floor slab by expansion bolts; then, the workers fix the keel frame to the hangers, that is, fix the main keel of the keel frame to the hangers, and fix the secondary keel of the keel frame to the main keel; finally, the workers lay and fix the panel on the keel frame.

[0004] During the above construction process, workers need to complete the installation and fixation of the main keel and the hanger, and the installation and fixation of the secondary keel and the main keel in mid-air, and the workers need to hold the main keel and the secondary keel for a long time, which affects the installation efficiency of the ceiling structure and has high labor intensity. Summary of the invention

[0005] In order to reduce the workload of staff and improve the installation efficiency of the suspended ceiling structure, the present application provides a suspended ceiling structure for building construction and a construction method thereof.

[0006] The present application provides a building ceiling structure and a construction method thereof, which adopts the following technical solutions: A building ceiling structure and a construction method thereof, wherein the ceiling structure is fixedly arranged at the bottom of a floor slab; the ceiling structure comprises a hanger assembly, a keel frame, a panel layer, a hanging assembly and a fixing assembly; the hanger assembly comprises a plurality of hangers, the plurality of hangers are arranged at intervals, and the hangers are fixedly arranged at the bottom of the floor slab; the keel frame comprises a main keel and a secondary keel, the main keel is provided in a plurality, and the plurality of the main keels are arranged horizontally at intervals; the secondary keels are provided in a plurality, the plurality of the secondary keels are arranged horizontally at intervals, and the secondary keels are arranged vertically to the main keels, and the secondary keels are fixedly arranged at a side of the main keel away from the hanger; the hanging assembly comprises a plurality of hangers, the plurality of the hangers are detachably connected to the main keel at intervals, and the hanging assembly is used to be connected to a lifting device The lifting device is used to lift the keel frame to the suspension rod assembly; the number of the fixing assemblies is consistent with the number of the suspension rods, and the fixing assemblies are used to connect the keel frame and the suspension rods; the fixing assembly includes a first fixing member and a second fixing member, and the first fixing member is fixedly connected to the main keel; the second fixing member includes a first connecting plate and a second connecting plate arranged horizontally, the first connecting plate is provided with a first fixing hole for the suspension rod to pass through, the first connecting plate and the suspension rod are fixedly connected by fastening nuts on both sides, the second connecting plate is provided with a second fixing hole for the bolts to pass through, and the second connecting plate is bolted to the first fixing member; the panel layer is laid on the keel frame, and the panel layer is fixedly connected to the secondary keel.

[0007] By adopting the above technical solution, the staff first installs the hanger at the bottom of the floor slab and bolts the hanger to the second fixing member of the fixing assembly. Then, the staff installs the keel frame on the ground and fixes the first fixing member of the fixing assembly to the main keel; then, the staff hoists the installed keel frame as a whole to the designated installation position through the hoisting assembly, and bolts the first fixing member of the fixing assembly to the second fixing member, thereby completing the connection between the keel frame and the hanger. Finally, the staff fixes the panel layer to the keel frame to complete the installation of the ceiling structure.

[0008] That is, through the coordinated cooperation of lifting components and fixing components, the workers can complete most of the splicing and installation work of the ceiling structure on the ground, and then lift the keel frame to the installation position and fix the keel frame to the suspension rod; thereby reducing the workload of the workers in mid-air, thereby reducing the labor intensity of the workers and improving the installation efficiency of the ceiling structure.

[0009] Optionally, the first fixing hole and the second fixing hole are located on the same vertical line.

[0010] By adopting the above technical solution, the first fixing hole and the second fixing hole are located on the same vertical line, so that the force of the second connecting member is facilitated to improve the stability of the keel frame installation.

[0011] Optionally, the second fixing member also includes a third connecting plate, the first connecting plate and the second connecting plate are arranged at both ends of the third connecting plate, and the first connecting plate, the second connecting plate and the third connecting plate are integrally formed; the first connecting plate and the second connecting plate are arranged on both sides of the plane where the third connecting plate is located.

[0012] By adopting the above technical solution, the first connecting plate and the second connecting plate are arranged on both sides of the third connecting plate, that is, the first fixing hole and the second fixing hole are located on both sides of the third connecting plate, so that it is convenient for the staff to install the second fixing piece and to connect the suspension rod and the second fixing piece.

[0013] Optionally, the suspended ceiling structure also includes a reinforcement member, which includes a third reinforcement plate, and a first reinforcement plate and a second reinforcement plate arranged on both sides of the third reinforcement plate in sequence; the first reinforcement plate is hingedly connected to the third reinforcement plate, the first reinforcement plate is fixedly connected to the suspension rod, the second reinforcement plate is hingedly connected to the third reinforcement plate, and the second reinforcement plate is used for bolt connection to the first fixing member.

[0014] By adopting the above technical solution, since the first reinforcement plate and the third reinforcement plate, as well as the second reinforcement plate and the third reinforcement plate are hingedly connected, the horizontal distance and the vertical distance between the first reinforcement plate and the second reinforcement plate are both adjustable; the reinforcement member can adapt to the installation error between the hanger and the first fixing member, so that the hanger and the second fixing member are connected through the reinforcement member, so as to further reduce the workload of the staff for reinstallation, improve the installation efficiency of the suspended ceiling, and improve the installation stability of the suspended ceiling structure.

[0015] Optionally, the ceiling structure also includes a limiting component, which includes at least relatively arranged limiting bars, the two limiting bars are located on the same horizontal plane, and the limiting bars are used to be fixedly connected to the wall; the limiting bars are in contact with the keel frame, and the limiting bars are used to support the keel frame.

[0016] By adopting the above technical solution, a limit assembly is set to temporarily support the keel frame, thereby improving the stability of the keel frame in mid-air, making it easier for workers to fix the boom and the keel frame, reducing the labor intensity of the workers and improving the installation efficiency of the boom structure.

[0017] Optionally, the ceiling structure also includes a guide assembly, which includes a universal wheel and a guide connector, and the universal wheel is rotatably connected to the guide connector; the guide connector is detachably connected to the keel frame, and the universal wheel is used to abut against the wall.

[0018] By adopting the above technical solution and installing the guide assembly on the side wall of the keel frame, the friction between the keel frame and the wall can be reduced during the hoisting process of the keel frame, thereby facilitating the workers to hoist the keel frame.

[0019] Optionally, the hanging assembly includes a hanging plate, a hanging bolt and a hanging nut; the hanging plate is bent to form an installation groove for accommodating the main keel, the hanging plate is provided with a hanging installation hole for the hanging bolt to pass through, the main keel is provided with a connecting hole for the hanging bolt to pass through, and the ceiling bolt is passed through the hanging installation hole and the connecting hole and then connected to the hanging nut.

[0020] By adopting the above technical solution, connecting holes for lifting bolts to pass through are opened on the main keel frame, so that the lifting assembly and the main keel are fixed together, so as to improve the connection strength between the lifting assembly and the main keel frame, and improve the stability of the keel lifting process.

[0021] Optionally, the first fixing member includes a fixing plate, a first fixing bolt and a first fixing nut; the fixing plate includes a fixing groove body and a connecting ear plate, the fixing groove body and the connecting ear plate are integrally formed, the fixing groove body is used to accommodate the main keel, and the groove side wall of the fixing groove body is provided with a through hole for the first fixing bolt to pass through, the first fixing bolt is connected to the first fixing nut to tighten the fixing groove body and the main keel; the connecting ear plate is horizontally arranged, and the connecting ear plate and the notch of the fixing groove body are arranged opposite to each other, and the connecting ear plate is bolted to the second fixing member.

[0022] By adopting the above technical solution, the main keel is tightened by the fixing plate to ensure the connection strength between the first fixing member and the main keel.

[0023] A building ceiling structure and a construction method thereof, comprising the following steps: Positioning and setting out: Setting out the lines at the bottom of the floor slab to determine the installation position of the hanger; setting out the lines on the walls on both sides of the floor slab to determine the installation position of the keel frame; Install the hanger assembly: a plurality of hangers are fixed to the bottom of the floor slab by expansion bolts, and the first fixing member is fixedly connected to the hanger by fastening nuts; Installing the keel frame: connecting the main keel and the secondary keel on the ground to form a keel frame, and fixing the first fixing member, the hoisting assembly and the guide assembly to the keel frame; Install the lifting device: install the winch on the ground, install the fixed pulley at the bottom of the floor, and wind the traction rope of the winch around the fixed pulley and fix it to the lifting assembly; Lifting the keel frame: Use the lifting device to lift the keel frame to the designed installation position; Install the limit assembly: Install the limit strips on the walls on both sides of the floor slab so that when the keel frame contacts the limit strips, the keel frame is located at the designed installation position; Connecting the boom assembly and the keel frame: connecting the first fixing member and the second fixing member so that the keel frame is fixedly connected to the boom; Install the panel layer: fix the panel layer to the keel frame.

[0024] A building ceiling structure and a construction method thereof, comprising the following steps: Install the supporting structure: after the keel frame is in contact with the limiting assembly, install several elevators, and the supporting surfaces of the elevators are in contact with the keel frame, and the elevators are used to support the keel frame.

[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. Through the coordination of the hoisting components and the fixing components, the workers can complete most of the splicing and installation work of the ceiling structure on the ground. After the keel frame is hoisted to the installation position, the keel frame is fixedly connected to the suspension rod; thereby reducing the workload of the workers in mid-air, thereby reducing the labor intensity of the workers and improving the installation efficiency of the ceiling structure; 2. After the keel frame is hoisted to the designated position, if the installation distance between the hanger rod and the first fixing piece in the local area deviates from the designed distance due to installation error, the staff can use a reinforcing piece to replace the second fixing piece to connect the hanger rod and the second fixing piece; 3. By setting the limit assembly to temporarily support the keel frame, the stability of the keel frame in mid-air is improved, so that the staff can fix the suspension rod and the keel frame, reduce the labor intensity of the staff, and improve the installation efficiency of the suspension rod structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the ceiling structure in Example 1.

[0027] Figure 2 yes Figure 1 Enlarged view of point A in the middle.

[0028] Figure 3 It is a schematic diagram of the ceiling structure before installation in Example 1.

[0029] Figure 4 yes Figure 3 Enlarged view of point B in the middle.

[0030] Figure 5 It is a schematic diagram showing the ceiling structure after installation in Example 1.

[0031] Figure 6 yes Figure 5 Enlarged view of point C in the middle.

[0032] Figure 7 It is a schematic diagram of the suspension rod and the keel frame before installation in Example 1.

[0033] Figure 8 It is a schematic diagram showing the installation of the suspension rod and the keel frame in Example 1.

[0034] Fig. 9 It is a schematic diagram of the ceiling structure in Example 2.

[0035] Fig.10 yes Fig. 9 Enlarged view of point D in the middle.

[0036] Fig.11 Schematic diagram of the reinforcement structure in Example 2 Explanation of reference numerals: 1. suspension rod assembly; 101. suspension rod; 102. fastening nut; 2. keel frame; 21. main keel; 211. connecting hole; 22. secondary keel; 23. main and secondary keel connecting piece; 3. panel layer; 31. panel; 4. lifting assembly; 41. lifting plate; 42. lifting bolt; 43. lifting installation hole; 6. limit assembly; 61. limit strip; 7. lifting device; 71. fixed pulley; 72. winch; 73. traction rope; 8. guide assembly; 81. universal wheel; 82. guide connecting piece; 9. fixed assembly Part; 91, first fixing part; 911, fixing plate; 9111, fixing trough; 9112, connecting ear plate; 912, first fixing bolt; 92, second fixing part; 921, first connecting plate; 9211, first fixing hole; 922, second connecting plate; 9221, second fixing hole; 923, third connecting plate; 10, reinforcement part; 1001, first reinforcement plate; 1002, second reinforcement plate; 1003, third reinforcement plate; 11, gypsum board elevator; 12, first floor slab; 13, second floor slab; 14, wall. DETAILED DESCRIPTION

[0037] The following is combined with Figure 1-11 This application is described in further detail.

[0038] Example 1 The present application embodiment discloses a building ceiling structure. Figure 1 and Figure 2 The floor slabs of the building include a first floor slab 12 and a second floor slab 13 , and the second floor slab 13 is arranged directly above the first floor slab 12 .

[0039] The suspended ceiling structure of the building is fixedly arranged at the bottom of the second floor 13 , and the suspended ceiling structure comprises a hanger assembly 1 , a keel frame 2 , a panel layer 3 , a hoisting assembly 4 , a fixing assembly 9 and a limiting assembly 6 .

[0040] Reference Figure 1 and Figure 2 The hanger assembly 1 includes a plurality of hangers 101 and a plurality of pairs of fastening nuts 102. The hangers 101 are arranged at intervals, and the number of the pairs of fastening nuts 102 is consistent with the number of the hangers 101. Both ends of the hanger 101 are provided with threaded sections. One section of the hanger 101 is fixed to the bottom of the floor slab by an expansion bolt, and the other end of the hanger 101 is threadedly connected with a pair of fastening nuts 102.

[0041] Reference Figure 1 and Figure 2 The number of the fixing components 9 is consistent with the number of the suspension rods 101, and the fixing components 9 are used to connect the keel frame 2 and the suspension rod component 1. The fixing components 9 include a first fixing member 91 and a second fixing member 92, the first fixing member 91 is fixedly connected to the suspension rod 101 by a fastening nut 102, the second fixing member 92 is fixedly connected to the keel frame 2, and the first fixing member 91 and the second fixing member 92 are fixedly connected by bolts.

[0042] Reference Figures 1 to 4 , the second fixing member 92 is a groove-shaped structure, the second fixing assembly 9 includes a third connecting plate 923, and a first connecting plate 921 and a second connecting plate 922 arranged on both sides of the third connecting plate 923, the third connecting plate 923 is arranged vertically, the first connecting plate 921 and the second connecting plate 922 are arranged horizontally, and the first connecting plate 921, the second connecting plate 922 and the third connecting plate are integrally formed. In this embodiment, the first connecting plate 921 is provided with a first fixing hole 9211 for the suspension rod 101 to pass through, and the first connecting plate 921 is fixedly connected to the suspension rod 101 by nuts on both sides. The second connecting plate 922 is provided with a second fixing hole 9221 for the bolt to pass through, and the second connecting plate 922 is bolted to the first fixing member 91. In this embodiment, the first fixing hole 9211 and the second fixing hole 9221 are located on the same vertical line, which is convenient for the force of the second connecting member to improve the stability of the installation of the keel frame 2.

[0043] Reference Figures 2 to 4The keel frame 2 includes a main keel 21, a secondary keel 22 and a main-secondary keel connector 23. A plurality of main keels 21 are provided, and a plurality of main keels 21 are arranged horizontally at intervals along the X-axis direction. A plurality of secondary keels 22 are provided, and a plurality of secondary keels 22 are arranged horizontally at intervals along the Y-axis direction, that is, the secondary keel 22 is arranged perpendicular to the main keel 21, and the secondary keel 22 is fixed to the side of the main keel 21 away from the suspension rod 101. The keel frame 2 can be made of wood, aluminum alloy profiles, light steel and other materials, and this embodiment does not limit the specific material of the keel frame 2. In this embodiment, the main keel 21, the secondary keel 22 and the primary-secondary keel connecting member 23 are all made of light steel material, and the main keel 21 and the secondary keel 22 are both groove-type structures. The groove of the secondary keel 22 is bent to have a limiting groove, one end of the primary-secondary keel connecting member 23 is clamped with the limiting groove of the secondary keel 22, and the other end of the primary-secondary keel connecting member 23 is bent around the main keel 21, thereby fixing the main keel 21 and the secondary keel 22 in connection.

[0044] Reference Figure 3 and Figure 4 It is worth noting that the installation of the main keel 21 and the secondary keel 22 is completed on the first floor slab 12, so as to reduce the amount of aerial work of the staff, reduce the labor intensity of the staff, and improve the installation efficiency of the hoisting structure.

[0045] Reference Figure 3 and Figure 4 The first fixing member 91 includes a fixing plate 911, a first fixing bolt 912 and a first fixing nut. The fixing plate 911 includes a fixing slot 9111 and a connecting ear plate 9112. The fixing slot 9111 and the connecting ear plate 9112 are integrally formed. The fixing slot 9111 is used to accommodate the main keel 21. The slot side wall of the fixing slot 9111 is provided with a through hole for the first fixing bolt 912 to pass through. The first fixing bolt 912 is connected with the first fixing nut to tighten the fixing slot 9111 and the main keel 21. The connecting ear plate 9112 is horizontally arranged, and the connecting ear plate 9112 is arranged opposite to the notch of the fixing slot 9111. The connecting ear plate 9112 is provided with an ear plate through hole, and the connecting ear plate 9112 is bolted to the second fixing member 92 through the ear plate through hole. That is, through the matching relationship between the fixing groove 9111 and the first fixing bolt 912 , the first fixing member 91 is clamped tightly to the main keel 21 to ensure the connection strength between the first fixing member 91 and the main keel 21 .

[0046] Reference Figure 3 and Figure 4, there are several hoisting assemblies 4, and several hoisting assemblies 4 are detachably connected to the main keel 21 at intervals. The hoisting assemblies 4 are used to connect with the lifting device 7, and the lifting device 7 is used to lift the keel frame 2 to the suspension rod assembly 1. In this embodiment, the hoisting assembly 4 includes a hoisting plate 41, a hoisting bolt 42 and a hoisting nut. The hoisting plate 41 is bent from a light steel plate, so that the hoisting plate 41 is provided with a mounting groove for accommodating the main keel 21, the hoisting plate 41 is provided with a hoisting installation hole 43 for the hoisting bolt 42 to pass through, the main keel 21 is provided with a connecting hole 211 for the hoisting bolt 42 to pass through, and the ceiling bolt is passed through the hoisting installation hole 43 and the connecting hole 211 and then connected with the hoisting nut; thereby fixing the hoisting assembly 4 and the main keel 21 together to improve the connection strength between the hoisting assembly 4 and the main keel frame 2, and improve the stability of the keel hoisting process.

[0047] Reference Figure 5 and Figure 6 , there are several lifting devices 7. In this embodiment, there are four lifting devices 7. The four lifting devices 7 are arranged at the four corner areas of the second floor 13 to lift the keel frame 2 to the designed installation position. The lifting device 7 includes a winch 72 and a fixed pulley 71. The winch 72 is fixed on the first floor 12, and the fixed pulley 71 is fixed at the bottom of the second floor 13. After the traction rope 73 of the winch 72 is wound around the fixed pulley 71, the traction rope 73 is passed through the connecting hole on the lifting plate 41, and the traction rope 73 is tied and fixed to the lifting plate 41. Thus, the keel assembly is lifted to the designed installation position through the four lifting devices 7.

[0048] Reference Figure 5 and Figure 6 In order to facilitate the installation of the keel frame 2, the ceiling structure also includes a guide assembly 8, which includes a universal wheel 81 and a guide connector 82. The universal wheel 81 is rotatably connected to the guide connector 82; the guide connector 82 is detachably connected to the keel frame 2, and the universal wheel 81 is used to abut against the wall 14. In this embodiment, the guide connector 82 is tied and fixed to the main keel 21; so that after the staff installs the keel frame 2, the guide assembly 8 can be removed from the keel frame 2 for next use. That is, by installing the guide assembly 8 on the side wall of the keel frame 2, the friction between the keel frame 2 and the wall 14 can be reduced during the installation of the keel frame 2, thereby facilitating the staff to install the keel frame 2.

[0049] Reference Figure 5 and Figure 6The limiting assembly 6 includes limiting strips 61 that are relatively arranged, and the two limiting strips 61 are located on the same horizontal plane. The limiting strips 61 are used to be fixedly connected to the wall 14. The limiting strips 61 abut against the secondary keel 22 of the keel frame 2, and the limiting strips 61 are used to support the keel frame 2. In this embodiment, the limiting strips 61 are wooden strips, and the limiting strips 61 are fixedly connected to the wall 14 by nails, so that the limiting strips 61 have a supporting effect on the keel frame 2. At the same time, the staff installs the elevator on the first floor 12, and makes the supporting surface of the elevator abut against the secondary keel 22 of the keel frame 2, so that the elevator has a supporting effect on the keel frame 2, further improving the stability of the keel frame 2.

[0050] By setting the limit assembly 6 to temporarily support the keel frame 2, on the one hand, the stability of the keel frame 2 in mid-air is improved, so that the staff can fix the suspension rod 101 and the keel frame 2, reduce the labor intensity of the staff, and improve the installation efficiency of the suspension rod 101 structure. On the other hand, the limit bar 61 of the limit assembly 6 also has a leveling effect. When the keel frame 2 abuts against the limit bar 61, the limit bar 61 has a horizontal leveling effect on the keel frame 2; thereby reducing the leveling steps of the fastening nut 102 on the suspension rod 101, thereby further reducing the workload of the staff in mid-air, reducing the work intensity of the staff, and improving the installation efficiency of the ceiling structure.

[0051] Reference Figure 7 and Figure 8 When the keel frame 2 is hoisted to the designed position, the keel frame 2 is set directly below the boom assembly 1. The staff connects the keel frame 2 to the boom assembly 1 through the fixing assembly 9. Reference Figure 7 and Figure 8 , the fastening nut 102 on the suspension rod 101 sets the second fixing member 92 above the first fixing member 91, so that there is an avoidance gap between the second fixing member 92 and the second fixing member 92. Subsequently, the staff releases the limiting effect of the fastening nut 102 on the second fixing member 92, so that the second connecting plate 922 of the second fixing member 92 abuts against the connecting ear plate 9112 of the first fixing member 91. At this time, the ear plate through hole of the connecting ear plate 9112 and the second fixing hole 9221 on the second connecting plate 922 are located on the same straight line, so that the connecting ear plate 9112 and the second connecting plate 922 can be fixed by bolts.

[0052] The panel layer 3 is composed of several panels 31, which are laid on the keel frame 2 to form the panel 31, and the panel 31 is fixedly connected to the secondary keel 22. The panel 31 can be a plate structure such as a gypsum board, a metal plate, an aluminum gusset plate, etc., and the specific structure of the panel 31 is not limited in this embodiment.

[0053] The implementation principle of a building ceiling structure and a construction method thereof in the embodiment of the present application is as follows: The staff first installs the suspension rod 101 at the bottom of the floor slab, and bolts the suspension rod 101 to the second fixing member 92 of the fixing assembly 9. Then, the staff installs the keel frame 2 on the ground, and fixes the first fixing member 91 of the fixing assembly 9 to the main keel 21; then, the staff hoists the installed keel frame 2 as a whole to the designated installation position through the hoisting assembly 4, and bolts the first fixing member 91 of the fixing assembly 9 to the second fixing member 92, thereby completing the connection between the keel frame 2 and the suspension rod 101. Finally, the staff fixes the panel layer 3 to the keel frame 2 to complete the installation of the ceiling structure.

[0054] That is, through the coordinated cooperation of the lifting assembly 4 and the fixing assembly 9, the staff can complete most of the splicing and installation work of the ceiling structure on the ground, and then lift the keel frame 2 to the installation position and fix the keel frame 2 to the suspension rod 101; thereby reducing the workload of the staff in mid-air, thereby reducing the labor intensity of the staff and improving the installation efficiency of the ceiling structure.

[0055] Example 2 Embodiment 2 of the present application discloses a construction scheme for a building ceiling structure in Embodiment 1, including the following steps: Positioning and setting out: Setting out the lines at the bottom of the floor to determine the installation position of the hanger 101; setting out the lines on the walls 14 on both sides of the floor to determine the installation position of the keel frame 2; Install the hanger assembly 1: a plurality of hangers 101 are fixed to the bottom of the floor slab by expansion bolts, and the first fixing member 91 is fixedly connected to the hanger 101 by fastening nuts 102; Installing the keel frame 2: Connecting the main keel 21 and the secondary keel 22 on the ground to form the keel frame 2, and fixing the first fixing member 91, the hoisting assembly 4 and the guide assembly 8 to the keel frame 2; Install the lifting device 7: install a winch 72 on the ground, install a fixed pulley 71 at the bottom of the floor, and wind the traction rope 73 of the winch 72 around the fixed pulley 71 and fix it to the lifting assembly 4; Lifting the keel frame 2: using the lifting device 7 to lift the keel frame 2 to the designed installation position; Install the limiting assembly 6: Install the limiting strips 61 on the walls 14 on both sides of the floor slab, so that when the keel frame 2 abuts against the limiting strips 61, the keel frame 2 is located at the designed installation position; Install the support structure: after the keel frame 2 is in contact with the limit assembly 6, install several elevators, and the support surface of the elevators is in contact with the keel frame 2, and the elevators are used to support the keel frame 2; Connecting the suspension rod assembly 1 and the keel frame 2: connecting the first fixing member 91 and the second fixing member 92 so that the keel frame 2 is fixedly connected to the suspension rod 101; Install the panel layer 3: fix the panel layer 3 to the keel frame 2.

[0056] Embodiment 3 The difference between this embodiment 3 and embodiment 1 is that: Reference Fig. 9 and Fig.10 The first connecting plate 921 and the second connecting plate 922 of the second fixing member 92 are arranged on both sides of the plane where the third connecting plate 923 is located. This makes it convenient for the staff to install the second fixing member 92 and connect the suspension rod 101 and the second fixing member 92.

[0057] Reference Fig.10 and Fig.11 At the same time, when the first fixing member 91 and the second fixing member 92 are connected, if the installation distance between the suspension rod 101 and the first fixing member 91 in the local area is different from the designed distance due to installation errors, the installation and fixation of the keel frame 2 will be affected.

[0058] Reference Fig.10 and Fig.11 Therefore, in this embodiment, the ceiling structure also includes a reinforcing member 10, so that when an error occurs between the installation distance between the local area hanger 101 and the first fixing member 91 and the design distance; the staff can use the reinforcing member 10 to replace the second fixing member 92 to connect the hanger 101 and the second fixing member 92.

[0059] Reference Fig.10 and Fig.11 Specifically, the first reinforcing member 10 includes a third reinforcing plate 1003, and a first reinforcing plate 1001 and a second reinforcing plate 1002 arranged on both sides of the third reinforcing plate 1003; the first reinforcing plate 1001 is hingedly connected to the third reinforcing plate 1003, the first reinforcing plate 1001 is fixedly connected to the suspension rod 101, the second reinforcing plate 1002 is hingedly connected to the third reinforcing plate 1003, and the second reinforcing plate 1002 is used for fixed connection to the first fixing member 91. Since the first reinforcing plate 1001 and the third reinforcing plate 1003, as well as the second reinforcing plate 1002 and the third reinforcing plate 1003 are hingedly connected, the horizontal distance and the vertical distance between the first reinforcing plate 1001 and the second reinforcing plate 1002 are both adjustable; the reinforcing member 10 can adapt to the installation error between the suspension rod 101 and the first fixing member 91, so that the suspension rod 101 and the second fixing member 92 are connected through the reinforcing member 10, so as to further reduce the workload of the staff for reinstallation, improve the installation efficiency of the suspended ceiling, and improve the installation stability of the suspended ceiling structure.

[0060] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A building ceiling structure and a construction method thereof, characterized in that: The ceiling structure is fixedly arranged at the bottom of the floor slab; it comprises a suspension rod assembly (1), a keel frame (2), a panel layer (3), a suspension assembly (4) and a fixing assembly (9); the suspension rod assembly (1) comprises a plurality of suspension rods (101), the plurality of suspension rods (101) are arranged at intervals, and the suspension rods (101) are fixedly arranged at the bottom of the floor slab; the keel frame (2) comprises a main keel (21) and a secondary keel (22), the main keel (21) is provided in plurality, the plurality of the main keels (21) are arranged at intervals horizontally; the secondary keel (22) A plurality of secondary keels (22) are provided, and the secondary keels (22) are arranged horizontally at intervals, and the secondary keels (22) are arranged perpendicularly to the main keel (21), and the secondary keels (22) are fixed to the side of the main keel (21) away from the suspension rod (101); a plurality of lifting assemblies (4) are provided, and the plurality of lifting assemblies (4) are detachably connected to the main keel (21) at intervals, and the lifting assemblies (4) are used to be connected to a lifting device (7), and the lifting device (7) is used to lift the keel frame (2) to the suspension rod (101). The number of the fixing assemblies (9) is the same as the number of the suspension rods (101), and the fixing assemblies (9) are used to connect the keel frame (2) and the suspension rods (101); the fixing assemblies (9) include a first fixing member (91) and a second fixing member (92), and the first fixing member (91) is fixedly connected to the main keel (21); the second fixing member (92) includes a first connecting plate (921) and a second connecting plate (922) arranged horizontally, and the first connecting plate (92 1) a first fixing hole (9211) is provided for the suspension rod (101) to pass through, the first connecting plate (921) is fixedly connected to the suspension rod (101) by fastening nuts (102) on both sides, the second connecting plate (922) is provided with a second fixing hole (9221) for the bolt to pass through, and the second connecting plate (922) is bolted to the first fixing member (91); the panel layer (3) is laid on the keel frame (2), and the panel layer (3) is fixedly connected to the secondary keel (22).

2. The building ceiling structure and construction method thereof according to claim 1, characterized in that: The first fixing hole (9211) and the second fixing hole (9221) are located on the same vertical line.

3. The building ceiling structure and construction method thereof according to claim 1, characterized in that: The second fixing member (92) further comprises a third connecting plate (923), the first connecting plate (921) and the second connecting plate (922) being arranged at two ends of the third connecting plate (923), and the first connecting plate (921), the second connecting plate (922) and the third connecting plate (923) being integrally formed; the first connecting plate (921) and the second connecting plate (922) being arranged on two sides of a plane where the third connecting plate (923) is located.

4. The building ceiling structure and construction method thereof according to claim 3, characterized in that: The suspended ceiling structure also includes a reinforcing member (10), the reinforcing member (10) including, in sequence, a third reinforcing plate (1003), and a first reinforcing plate (1001) and a second reinforcing plate (1002) arranged on both sides of the third reinforcing plate (1003); the first reinforcing plate (1001) is hingedly connected to the third reinforcing plate (1003), the first reinforcing plate (1001) is fixedly connected to the suspension rod (101), the second reinforcing plate (1002) is hingedly connected to the third reinforcing plate (1003), and the second reinforcing plate (1002) is used for bolt connection to the first fixing member (91).

5. The building ceiling structure and construction method thereof according to claim 1, characterized in that: The ceiling structure also includes a limiting component (6), the limiting component (6) at least including limiting strips (61) arranged opposite to each other, the two limiting strips (61) being located on the same horizontal plane, the limiting strips (61) being used for being fixedly connected to the wall (14); the limiting strips (61) being in contact with the keel frame (2), the limiting strips (61) being used for supporting the keel frame (2).

6. The building ceiling structure and construction method thereof according to claim 1, characterized in that: The suspended ceiling structure also includes a guide assembly (8), the guide assembly (8) including a universal wheel (81) and a guide connecting piece (82), the universal wheel (81) being rotatably connected to the guide connecting piece (82); the guide connecting piece (82) being detachably connected to the keel frame (2), and the universal wheel (81) being used to abut against the wall (14).

7. The building ceiling structure and construction method thereof according to claim 1, characterized in that: The hanging assembly (4) comprises a hanging plate (41), a hanging bolt (42) and a hanging nut; the hanging plate (41) is bent to form a mounting groove for accommodating the main keel (21); the hanging plate (41) is provided with a hanging mounting hole (43) for the hanging bolt (42) to pass through; the main keel (21) is provided with a connecting hole (211) for the hanging bolt (42) to pass through; the ceiling bolt is passed through the hanging mounting hole (43) and the connecting hole (211) and then connected to the hanging nut.

8. The building ceiling structure and construction method thereof according to claim 1, characterized in that: The first fixing member (91) comprises a fixing plate (911), a first fixing bolt (912) and a first fixing nut; the fixing plate (911) comprises a fixing groove body (9111) and a connecting ear plate (9112); the fixing groove body (9111) and the connecting ear plate (9112) are integrally formed; the fixing groove body (9111) is used to accommodate the main keel (21); a through hole for the first fixing bolt (912) to pass through is provided on a groove side wall of the fixing groove body (9111); the first fixing bolt (912) is connected to the first fixing nut to tighten the fixing groove body (9111) and the main keel (21); the connecting ear plate (9112) is arranged horizontally, and the connecting ear plate (9112) and the notch of the fixing groove body (9111) are arranged opposite to each other; the connecting ear plate (9112) and the second fixing member (92) are bolted together.

9. A construction method for a building ceiling structure according to any one of claims 1 to 8, characterized in that: The following steps are involved: Positioning and setting out: setting out lines at the bottom of the floor slab to determine the installation position of the hanger (101); setting out lines on the walls (14) on both sides of the floor slab to determine the installation position of the keel frame (2); Installing the hanger rod assembly (1): a plurality of hangers (101) are fixed to the bottom of the floor slab by means of expansion bolts, and the first fixing member (91) and the hanger rod (101) are fixedly connected by means of a fastening nut (102); Installing the keel frame (2): connecting the main keel (21) and the secondary keel (22) on the ground to form the keel frame (2), and fixing the first fixing member (91), the hanging assembly (4) and the guide assembly (8) to the keel frame (2); Installing the lifting device (7): installing a winch (72) on the ground, installing a fixed pulley (71) at the bottom of the floor, and winding a traction rope (73) of the winch (72) around the fixed pulley (71) and fixedly connecting it to the lifting assembly (4); Lifting the keel frame (2): using the lifting device (7) to lift the keel frame (2) to the designed installation position; Installing the limiting assembly (6): installing limiting strips (61) on the walls (14) on both sides of the floor slab, so that when the keel frame (2) abuts against the limiting strips (61), the keel frame (2) is located at the designed installation position; Connecting the suspension rod assembly (1) and the keel frame (2): connecting the first fixing member (91) and the second fixing member (92) so that the keel frame (2) is fixedly connected to the suspension rod (101); Install the panel layer (3): fix the panel layer (3) to the keel frame (2).

10. The construction method of the building ceiling structure according to claim 9, characterized in that: The following steps are also included: Installing the supporting structure: After the keel frame (2) is in contact with the limiting assembly (6), a plurality of gypsum board elevators (11) are installed, and the supporting surfaces of the gypsum board elevators (11) are in contact with the keel frame (2). The gypsum board elevators (11) are used to support the keel frame (2).