Split type mounting structure for hanging ball of ceiling fan

Through the split installation structure of ceiling fan lob balls, the separation of half lob balls and lock blocks are used to connect, solving the complex and time-consuming problem of existing ceiling fans installation, achieving rapid installation and reducing production costs.

CN119267329APending Publication Date: 2025-01-07FOSHAN CARRO ELECTRICAL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411394683.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2025-01-07

AI Technical Summary

Technical Problem

The existing ceiling fans and lobs adopt an integrated design, and the installation process is complex and time-consuming, which cannot meet the needs of modern home decoration for efficiency and convenience.

Method used

The ceiling fan lob ball split mounting structure is adopted, including the separable first half lob ball and the second half lob ball connected by a locking block, and the hanging rod is arranged in the perforation of the loading of the lob ball and the lob ball curved seat to achieve rapid installation. and disassembly, reducing reliance on complex tools and skills.

Benefits of technology

It improves the installation efficiency between the ceiling fan and the lob, reduces production costs, and improves the efficiency of materials, simplifies the installation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119267329A_ABST
    Figure CN119267329A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of ceiling fan manufacturing, in particular to a ceiling fan hanging ball split type mounting structure which comprises a hanging rod, a loading hanging ball and a hanging ball curved surface seat. A first through hole is formed in the middle of the loading hanging ball; a second through hole is formed in the middle of the hanging ball curved-surface seat; the loading hanging ball comprises a first half hanging ball body and a second half hanging ball body, lock catch blocks are arranged on the two sides of the first half hanging ball body respectively, connecting grooves are formed in the two sides of the second half hanging ball body respectively, and the first half hanging ball body can be clamped into the connecting grooves of the second half hanging ball body through the lock catch blocks. According to the lifting ball, the lock catch block between the first half lifting ball and the second half lifting ball is connected with the connecting groove in an inserted mode, the operation can be rapidly completed through the inserted connection mode without complex tools or skills, mounting and dismounting are convenient, the speed of an assembly line can be increased through inserted connection, and the assembly efficiency is improved. As they usually do not need to spend additional time and effort as welding or bolted connection, the efficiency of installation between the ceiling fan and the ceiling fan loaded with the hanging ball is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of ceiling fan manufacturing, and in particular to a ceiling fan hanging ball split installation structure. Background Art

[0002] Existing ceiling fans and ceiling balls usually adopt an integrated design, and during installation, the entire ceiling ball structure needs to be installed together with other parts of the ceiling fan.

[0003] During the overall installation process, due to the integrated design, multiple connection points and fixtures need to be handled simultaneously during the installation process, which is inconvenient and time-consuming, and cannot meet the needs of modern home decoration for efficiency and convenience. Therefore, further improvements can be made. Summary of the invention

[0004] In order to improve the installation efficiency between the ceiling fan and the hanging ball, the present application provides a ceiling fan hanging ball split installation structure.

[0005] The present application provides a ceiling fan hanging ball split installation structure adopts the following technical solution: a ceiling fan hanging ball split installation structure, comprising a hanging rod, a loading hanging ball and a hanging ball curved surface seat, wherein the loading hanging ball is arranged in the hanging ball curved surface seat, and the hanging rod is passed through the loading hanging ball and the hanging ball curved surface seat; The top of the suspension rod is provided with a folded edge and two ears, the middle of the loading suspension ball is provided with a first through hole for the suspension rod to pass through, and the middle of the suspension ball curved surface seat is provided with a second through hole for the suspension rod to pass through; The loading hanging ball includes a first half hanging ball and a second half hanging ball. The first half hanging ball can be combined with the second half hanging ball to form a loading hanging ball. Locking blocks are respectively provided on both sides of one end of the first half hanging ball close to the second half hanging ball. Connecting grooves are respectively provided on both sides of one end of the second half hanging ball close to the first half hanging ball. The first half hanging ball can be clamped in the connecting groove of the second half hanging ball through the locking blocks.

[0006] By adopting the above technical solution, when the ceiling fan is connected to the hanging ball, the locking block and the connecting groove between the first half hanging ball and the second half hanging ball are plugged into each other, so that the first half hanging ball and the second half hanging ball are set as a loading hanging ball, and then the hanging rod of the ceiling fan is successively penetrated through the first through hole of the loading hanging ball and the second through hole of the hanging ball curved seat. The plug-in connection method does not require complicated tools or skills, can be completed quickly, and is easy to install and disassemble. The plug-in connection can speed up the assembly line because they usually do not need to spend extra time and effort like welding or bolting, thereby improving the installation efficiency between the loading hanging ball and the ceiling fan.

[0007] Optionally, the locking block includes a vertical portion and a clamping portion, the clamping portion is arranged at one end of the vertical portion close to the connecting groove, the vertical portion is rectangular, the clamping portion is trapezoidal, a fixing portion is arranged inside the connecting groove, and the clamping portion can be clamped and fixed with the fixing portion.

[0008] By adopting the above technical solution, when the locking block is inserted into the connecting groove, the vertical part and the clamping part are both inserted into the connecting groove, and the clamping part is clamped with the fixing part, the connection between the first half hanging ball and the second half hanging ball is more firm and stable.

[0009] Optionally, a first half plug-in socket is provided at the bottom of the first half hanging ball, and a second half plug-in socket is provided at the bottom of the second half hanging ball. The first half plug-in socket can be fitted with the second half plug-in socket in the second through hole.

[0010] By adopting the above technical solution, when the first half hanging ball and the second half hanging ball are combined into a loading hanging ball, the first half plug-in socket and the second half plug-in socket fit together, so that the bottom of the loading hanging ball can be better and more tightly connected with the second through hole in the hanging ball curved seat.

[0011] Optionally, the first half hanging ball includes a first docking portion and a first fitting portion, the first docking portion is located on the inner circumference of the first half hanging ball, the first fitting portion is located on the outer circumference of the first half hanging ball, the locking block is arranged on the first docking portion, and the first fitting portion is used to fit more closely with the inner circumference of the hanging ball curved seat.

[0012] By adopting the above technical solution, the first docking portion and the first fitting portion are provided so that after the first half hanging ball is connected with the second half hanging ball, it can be placed in the hanging ball curved seat more closely and stably.

[0013] Optionally, the second half hanging ball includes a second docking portion and a second fitting portion, the second docking portion is located on the inner circumference of the second half hanging ball, the second fitting portion is located on the outer circumference of the second half hanging ball, the connecting groove is opened on the second docking portion, and the second fitting portion is used to fit more closely with the inner circumference of the hanging ball curved seat.

[0014] By adopting the above technical solution, the second docking portion and the second fitting portion are provided so that after the second half hanging ball is connected to the first half hanging ball, it can be placed in the hanging ball curved seat more closely and stably.

[0015] Optionally, a plurality of first weight-reducing grooves are provided at the top of the first half hanging ball between the first docking portion and the first fitting portion.

[0016] By adopting the above technical solution, a first weight-reducing groove is set to reduce the overall weight of the first half of the hanging ball. By reducing the weight of the first half of the hanging ball, the overall weight of the loading hanging ball is reduced. Without affecting its performance, the production cost can be reduced to a certain extent and the material utilization efficiency can be improved.

[0017] Optionally, mounting holes are provided between the plurality of first weight-reducing grooves, and the mounting holes are used to reserve space for subsequent mechanical connection with the ceiling.

[0018] By adopting the above technical solution and setting the mounting hole, a fixed connection position is provided when the first half hanging ball is connected to the ceiling.

[0019] Optionally, a plurality of second weight-reducing grooves are provided at the top of the second half-ball between the second docking portion and the second fitting portion.

[0020] By adopting the above technical solution, a second weight-reducing groove is set to reduce the overall weight of the second half of the hanging ball. By reducing the weight of the second half of the hanging ball, the overall weight of the loading hanging ball is reduced. Without affecting its performance, the production cost can be reduced to a certain extent and the material utilization efficiency can be improved.

[0021] Optionally, avoidance grooves are arranged between the plurality of the second weight-reducing grooves, and a connecting hole is arranged on one side of the second docking portion close to the avoidance groove, and the connecting hole is arranged corresponding to the avoidance groove.

[0022] By adopting the above technical solution, an avoidance groove and a connecting hole are provided. When the loading ball needs to be connected to the connecting hole through a mechanical connection, the avoidance groove leaves space, so that the installation space of the loading ball is more sufficient.

[0023] Optionally, the diameters of the bottom end and the middle portion of the suspension rod are smaller than the diameter of the second through hole, and the diameter of the top end of the suspension rod is larger than the diameter of the second through hole.

[0024] By adopting the above technical solution, since the diameters of the bottom end and the middle part of the hanger are smaller than the diameter of the second through hole, and the diameter of the top end of the hanger is larger than the diameter of the second through hole, the bottom end and the middle part of the hanger can be aligned with the second through hole through which the hanging ball curved surface seat is provided, and the top end of the hanger will be stuck in the hanging ball curved surface seat, thereby limiting the installation direction of the hanger to only be installed from top to bottom.

[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. When the ceiling fan is connected to the hanging ball, the locking block and the connecting groove between the first half hanging ball and the second half hanging ball are plugged into each other, so that the first half hanging ball and the second half hanging ball are set as a loading hanging ball, and then the hanging rod of the ceiling fan is sequentially inserted into the first through hole of the loading hanging ball and the second through hole of the hanging ball curved seat. The plug-in connection method does not require complicated tools or skills, can be completed quickly, and is easy to install and disassemble. The plug-in connection can speed up the assembly line because they usually do not need to spend extra time and effort like welding or bolting, thereby improving the installation efficiency between the loading hanging ball and the ceiling fan; 2. A first weight-reducing groove is provided to reduce the overall weight of the first half of the hanging ball. By reducing the weight of the first half of the hanging ball, the overall weight of the loading hanging ball is reduced. Without affecting its performance, the production cost can be reduced to a certain extent and the use efficiency of materials can be improved; 3. Since the diameter of the bottom end and the middle part of the hanger rod is smaller than the diameter of the second through hole, and the diameter of the top end of the hanger rod is larger than the diameter of the second through hole, the bottom end and the middle part of the hanger rod can be connected with the second through hole through which the hanging ball curved surface seat is provided, and the top end of the hanger rod will be stuck in the hanging ball curved surface seat, thereby limiting the installation direction of the hanger rod to only be installed from top to bottom. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application.

[0027] Figure 2 It is an exploded diagram of the overall structure of the embodiment of the present application.

[0028] Figure 3 It is a schematic diagram of the overall separation of the first half hanging ball and the second half hanging ball in the embodiment of the present application.

[0029] Figure 4 This is the intention of the split structure of the first half hanging ball and the second half hanging ball in the embodiment of the present application from perspective one.

[0030] Figure 5 This is the intention of the second perspective view of the split structure of the first half hanging ball and the second half hanging ball in the embodiment of the present application.

[0031] Figure 6 It is a cross-sectional view of the structure of the tightening hole in the second half of the hanging ball in the embodiment of the present application.

[0032] Figure 7 This is the intention of perspective three of the split structure of the first half hanging ball and the second half hanging ball in the embodiment of the present application.

[0033] Figure 8 This is an embodiment of the present application Figure 6 A magnified view of the structure of part A.

[0034] Description of reference numerals: 1. Suspension rod; 2. Loading suspension ball; 21. First half suspension ball; 211. First docking part; 212. First fitting part; 213. First weight-reducing groove; 214. Mounting hole; 215. First half plug-in socket; 22. Second half suspension ball; 221. Second docking part; 222. Second fitting part; 223. Clamping groove; 224. Second weight-reducing groove; 225. Avoidance groove; 226. Connecting hole; 227. The second half of the plug-in socket; 3. The hanging ball curved surface seat; 4. The locking block; 41. The vertical portion; 42. The clamping portion; 43. The pressing slide block; 5. The connecting groove; 51. The fixing portion; 6. The pressing hole; 7. The pressing column; 71. The pressing slide groove; 8. The elastic sheet; 81. The telescopic rod; 82. The spring; 83. The clamping block; 9. The fixing piece; 91. The fixing plate; 92. The fixing seat; 93. The fixing slide groove; 94. The fixing slide block. DETAILED DESCRIPTION

[0035] The following is combined with Figure 1-8 This application is described in further detail.

[0036] The embodiment of the present application discloses a ceiling fan hanging ball split installation structure.

[0037] Reference Figure 1 A ceiling fan hanging ball split installation structure comprises a hanging rod 1, a loading hanging ball 2 and a hanging ball curved surface seat 3, wherein the bottom of the loading hanging ball 2 is fitted on the inner bottom surface of the hanging ball curved surface seat 3, and the hanging rod 1 is sequentially inserted into the loading hanging ball 2 and the hanging ball curved surface seat 3; Specifically, the top of the suspension rod 1 is respectively provided with a folded edge and two ears, and correspondingly, the top of the loading hanging ball 2 is provided with a supporting groove, and the two ears of the suspension rod 1 are supported by the supporting groove, and a first through hole is provided in the middle of the loading hanging ball 2, and a second through hole is provided in the middle of the hanging ball curved seat 3. When the loading hanging ball 2 is fitted on the hanging ball curved seat 3, the positions of the first through hole and the second through hole coincide with each other up and down, and the diameters of the bottom end of the suspension rod 1 and the middle part of the suspension rod 1 are both smaller than the diameter of the second through hole, and the diameter of the top end of the suspension rod 1 is larger than the diameter of the second through hole.

[0038] In the actual installation process, since the diameters of the bottom end and the middle part of the suspension rod 1 are smaller than the diameter of the second through hole, and the diameter of the top end of the suspension rod 1 is larger than the diameter of the second through hole, the bottom end and the middle part of the suspension rod 1 can be connected with the second through hole through which the hanging ball curved surface seat 3 is penetrated, and the top end of the suspension rod 1 will be stuck in the hanging ball curved surface seat 3, thereby limiting the installation direction of the suspension rod 1 to only be installed from top to bottom; refer to Figure 1 , 2Specifically, in this embodiment, the loading ball 2 includes a first half ball 21 and a second half ball 22, the first half ball 21 includes a first docking portion 211 and a first fitting portion 212, the first docking portion 211 is located at the inner peripheral side of the first half ball 21, the first fitting portion 212 is located at the outer peripheral side of the first half ball 21, and a locking block 4 is provided at one end of the first docking portion 211 close to the second half ball 22; The second half ball 22 includes a second docking portion 221 and a second fitting portion 222. The second docking portion 221 is located at the inner circumference of the second half ball 22, and the second fitting portion 222 is located at the outer circumference of the second half ball 22. The second docking portion 221 is close to one end of the first half ball and is provided with a connecting groove 5. The first half hanging ball 21 can be snapped into the connecting groove 5 of the second half hanging ball 22 through the locking block 4, so that the first half hanging ball 21 and the second half hanging ball 22 can be combined with each other to form the loading hanging ball 2.

[0039] During the actual installation process, when the ceiling fan is connected to the hanging ball, the locking block 4 and the connecting groove 5 between the first half hanging ball 21 and the second half hanging ball 22 are plugged into each other, so that the first half hanging ball 21 and the second half hanging ball 22 are set as the loading hanging ball 2, and then the hanging rod 1 of the ceiling fan is successively penetrated through the first through hole of the loading hanging ball 2 and the second through hole of the hanging ball curved seat 3. Through the plug-in connection method, no complicated tools or skills are required, and it can be completed quickly, which is convenient for installation and disassembly. Plug-in connections can speed up the assembly line because they usually do not require extra time and effort like welding or bolt connections, thereby improving the installation efficiency between the loading hanging ball 2 and the ceiling fan.

[0040] refer to Figure 2 , 3 Specifically, in this embodiment, the locking block 4 includes a vertical portion 41 and a clamping portion 42. The clamping portion 42 is arranged at one end of the vertical portion 41 close to the connecting groove 5. The vertical portion 41 is rectangular and the clamping portion 42 is trapezoidal. A fixing portion 51 is arranged inside the connecting groove 5, and the clamping portion 42 can be clamped and fixed with the fixing portion 51.

[0041] During the actual installation process, when the locking block 4 is inserted into the connecting groove 5, the vertical portion 41 and the clamping portion 42 are both inserted into the connecting groove 5, and the clamping portion 42 is clamped with the fixing portion 51, so that the connection between the first half hanging ball 21 and the second half hanging ball 22 is more firm and stable.

[0042] refer to Figure 3-7Specifically, in this embodiment, a plurality of abutting holes 6 are provided on the second fitting portion 222 of the second half hanging ball 22, and the number of the plurality of abutting holes 6 corresponds to the number of the connecting grooves 5. The abutting holes 6 are through-set in the connecting grooves 5, and the position relationship between the abutting holes 6 and the connecting grooves 5 is perpendicular to each other. A abutting column 7 is provided in the abutting hole 6, and the abutting column 7 can be slidably set in the abutting hole 6, and the abutting column 7 can be inserted into the connecting groove 5 along the abutting hole 6 and abutted and connected with the clamping portion 42; Specifically, a clamping groove 71 is provided along the length direction of the clamping column 7 near the fixed portion 51 in the connecting groove 5. Correspondingly, a clamping slider 43 is provided near one end of the clamping column 7 at the clamping portion 42. The clamping slider 43 can be slidably set in the clamping groove 71.

[0043] During the actual installation process, when the first half ball 21 and the second half ball 22 are connected to each other, the locking block 4 and the connecting groove 5 are engaged with each other, and the engaging portion 42 in the locking block 4 and the fixing portion 51 are engaged with each other. Then, the clamping column 7 is inserted into the connecting groove 5 from the clamping hole 6. During the insertion of the clamping column 7 into the connecting groove 5, since the engaging portion 42 has been clamped and fixed with the fixing portion 51, the clamping slider 43 on the clamping portion 42 is also fixed accordingly. Then, during the sliding process of the clamping column, the clamping groove 71 on the clamping column 7 is connected with the clamping slider 43, and the locking block 4 is further tightened by the clamping column 7, so that the connection between the first half ball 21 and the second half ball 22 is more stable.

[0044] refer to Figure 6 , 8 Specifically, in the present embodiment, an elastic sheet 8 is respectively provided at one end of the abutting column 7 away from the connecting groove 5, a telescopic rod 81 with damping is provided between the two groups of elastic sheets 8, and the two ends of the telescopic rod 81 are respectively hinged to the two groups of elastic sheets 8 through hinge seats. At the same time, a spring 82 is also sleeved on the telescopic rod 81, so that the two groups of elastic sheets 8 can move within the movable range of the telescopic rod 81, and an L-shaped clamping block 83 is provided at one end of the elastic sheet 8 away from the abutting column 7. Correspondingly, the second fitting portion 222 is located at the top of the abutting hole 6. Both ends are respectively provided with clamping grooves 223, and the clamping blocks 83 can be clamped in the clamping grooves 223.

[0045] In addition, the second fitting portion 222 is located at both ends of the clamping groove 223 away from the elastic member, and fixing members 9 are respectively provided with fixing members 9, and the fixing members 9 include an L-shaped fixing plate 91 and fixing seats 92 located on both sides of the fixing member, and a fixing groove 93 is provided on the side of the fixing seat 92 close to the fixing plate 91 along its length direction. Correspondingly, the fixing plate 91 is respectively provided with a damped fixing slide block 94 at both ends along its length direction, so that the fixing plate 91 can slide along the fixed groove 93, and the position height of the bottom of the fixing plate 91 is higher than the top of the clamping block 83, so that the fixing plate 91 can slide to the top of the clamping block 83 through the fixed groove 93 to press the clamping block 83. Since there is damping between the fixing slide block 94 and the fixed groove 93, it is a prior art and will not be described in detail here.

[0046] During the actual installation process, the clamping column 7 is inserted into the clamping hole 6, and the elastic sheet 8 on the clamping column 7 is also inserted into the clamping hole 6 along with the clamping column 7. At the same time, the two groups of elastic sheets 8 are separated from each other until the clamping block 83 on the elastic sheet 8 is clamped in the clamping groove 223, thereby further fixing the clamping column 7.

[0047] refer to Figure 1 , 3 Specifically, in the present embodiment, a plurality of first weight-reducing grooves 213 are provided at the top of the first half hanging ball 21 between the first docking portion 211 and the first fitting portion 212, and mounting holes 214 are provided between the plurality of first weight-reducing grooves 213, and the mounting holes 214 are used to leave space for subsequent mechanical connection with the ceiling; a plurality of second weight-reducing grooves 224 are provided at the top of the second half hanging ball 22 between the second docking portion 221 and the second fitting portion 222, and avoidance grooves 225 are provided between the plurality of second weight-reducing grooves 224, and a connecting hole 226 is provided on the side of the second docking portion 221 close to the avoidance groove 225, and the connecting hole 226 is provided corresponding to the avoidance groove 225.

[0048] During the actual installation process, the first weight-reducing groove 213 and the second weight-reducing groove 224 are provided to reduce the overall weight of the first half hanging ball 21 and the second half hanging ball 22. By reducing the weight of the first half hanging ball 21 and the second half hanging ball 22, the overall weight of the loading hanging ball 2 is reduced. Without affecting its performance, the production cost can be reduced to a certain extent and the utilization efficiency of the materials can be improved.

[0049] refer to Figure 2 , 3Specifically, in the present embodiment, in order to better fit the loading ball 2 in the ball curved seat 3, a semicircular first half plug-in seat 215 is provided at the bottom of the first half ball 21, and a semicircular second half plug-in seat 227 is also provided at the bottom of the second half ball 22. The first half plug-in seat 215 can be fit with the second half plug-in seat 227 to form a ball shape, and the diameters of the first half plug-in seat 215 and the second half plug-in seat 227 are smaller than the diameter of the second through hole, thereby preventing the bottom of the loading ball 2 from falling out of the ball curved seat 3.

[0050] During the actual installation process, when the first half hanging ball 21 and the second half hanging ball 22 are combined into the loading hanging ball 2, the first half plug-in socket 215 and the second half plug-in socket 227 fit together, so that the bottom of the loading hanging ball 2 can be better and more tightly connected with the second through hole in the hanging ball curved seat 3.

[0051] The implementation principle of a split-type installation structure of a ceiling fan hanging ball in an embodiment of the present application is as follows: when the ceiling fan is connected to the hanging ball, the locking block 4 and the connecting groove 5 between the first half hanging ball 21 and the second half hanging ball 22 are plugged into each other, so that the first half hanging ball 21 and the second half hanging ball 22 are set as the loading hanging ball 2, and then the hanging rod 1 of the ceiling fan is successively penetrated through the first through hole of the loading hanging ball 2 and the second through hole of the hanging ball curved seat 3, so as to quickly complete the installation between the ceiling fan and the hanging ball.

[0052] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A ceiling fan hanging ball split installation structure, characterized in that: It comprises a suspension rod (1), a loading suspension ball (2) and a suspension ball curved surface seat (3), wherein the loading suspension ball (2) is arranged in the suspension ball curved surface seat (3), and the suspension rod (1) passes through the loading suspension ball (2) and the suspension ball curved surface seat (3); The top of the suspension rod (1) is provided with a folded edge and two ears, the middle of the loading suspension ball (2) is provided with a first through hole for the suspension rod (1) to pass through, and the middle of the suspension ball curved surface seat (3) is provided with a second through hole for the suspension rod (1) to pass through; The loading ball (2) comprises a first half ball (21) and a second half ball (22); the first half ball (21) and the second half ball (22) can be combined with each other to form the loading ball (2); locking blocks (4) are respectively arranged on both sides of one end of the first half ball (21) close to the second half ball (22); connecting grooves (5) are respectively opened on both sides of one end of the second half ball (22) close to the first half ball (21); the first half ball (21) can be snap-connected to the connecting groove (5) of the second half ball (22) through the locking blocks (4).

2. A ceiling fan hanging ball split installation structure according to claim 1, characterized in that: The locking block (4) comprises a vertical portion (41) and a clamping portion (42), wherein the clamping portion (42) is arranged at one end of the vertical portion (41) close to the connecting groove (5), the vertical portion (41) is rectangular, and the clamping portion (42) is trapezoidal. A fixing portion (51) is arranged inside the connecting groove (5), and the clamping portion (42) can be clamped and fixed with the fixing portion (51).

3. The ceiling fan ball split installation structure according to claim 1, characterized in that: A first half plug-in seat (215) is disposed at the bottom of the first half hanging ball (21), and a second half plug-in seat (227) is disposed at the bottom of the second half hanging ball (22). The first half plug-in seat (215) can be fitted with the second half plug-in seat (227) in the second through hole.

4. The ceiling fan ball split installation structure according to claim 1, characterized in that: The first half hanging ball (21) comprises a first docking portion (211) and a first fitting portion (212), wherein the first docking portion (211) is located on the inner circumference of the first half hanging ball (21), and the first fitting portion (212) is located on the outer circumference of the first half hanging ball (21), and the locking block (4) is arranged on the first docking portion (211), and the first fitting portion (212) is used to fit more tightly with the inner circumference of the hanging ball curved seat (3).

5. A ceiling fan hanging ball split installation structure according to claim 4, characterized in that: The second half hanging ball (22) comprises a second docking portion (221) and a second fitting portion (222), wherein the second docking portion (221) is located on the inner circumference of the second half hanging ball (22), and the second fitting portion (222) is located on the outer circumference of the second half hanging ball (22), the connecting groove (5) is provided on the second docking portion (221), and the second fitting portion (222) is used for fitting more tightly with the inner circumference of the hanging ball curved surface seat (3).

6. A ceiling fan hanging ball split installation structure according to claim 5, characterized in that: A plurality of first weight-reducing grooves (213) are provided at the top of the first half hanging ball (21) between the first docking portion (211) and the first fitting portion (212).

7. A ceiling fan hanging ball split installation structure according to claim 6, characterized in that: Mounting holes (214) are provided between the plurality of first weight-reducing grooves (213), and the mounting holes (214) are used to reserve space for subsequent mechanical connection with the ceiling.

8. The ceiling fan ball split installation structure according to claim 5, characterized in that: A plurality of second weight-reducing grooves (224) are provided at the top of the second half hanging ball (22) between the second docking portion (221) and the second fitting portion (222).

9. The ceiling fan ball split installation structure according to claim 8, characterized in that: Avoidance grooves (225) are arranged between the plurality of second weight-reducing grooves (224), and a connection hole (226) is arranged on one side of the second docking portion (221) close to the avoidance groove (225), and the connection hole (226) is arranged corresponding to the avoidance groove (225).

10. The ceiling fan ball split installation structure according to claim 1, characterized in that: The diameters of the bottom end of the suspension rod (1) and the middle part of the suspension rod (1) are smaller than the diameter of the second through hole, and the diameter of the top end of the suspension rod (1) is larger than the diameter of the second through hole.