Module sliding installation structure for offshore suspension cable photovoltaic and use method
Through the automatic installation method of the sliding cable pillar and the sliding installation trolley structure, the problem of low installation efficiency and poor safety of offshore photovoltaic power generation is solved, and the rapid, safe and economical photovoltaic module installation is achieved, reducing the difficulty of transport ships to move The problem.
Patent Information
- Application Number
- CN202310826046.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-06
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2043-07-06
AI Technical Summary
The existing offshore photovoltaic power installation technology is inefficient, poor safety and high cost, especially the problems of manual installation methods pose safety risks and difficulty in shifting the transport ship.
The sliding cable pillars and sliding car structure are adopted to automatically install the photovoltaic module through power lifting devices and electric bolt fasteners to avoid manual operation, and the integrated sliding cables and steel beams are used to form a comprehensive sliding structure to achieve rapid and Efficient module installation.
It realizes rapid, safe and economical photovoltaic module installation, reduces installation costs, improves installation efficiency, and avoids the difficulty of transport ships shifting at sea, improving installation safety.
Smart Images

Figure CN119276207A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of offshore photovoltaic power generation, and in particular to a module sliding installation structure for offshore suspended photovoltaic power generation and a use method thereof. Background Art
[0002] As more and more coastal provinces in my country turn their attention to the ocean in the photovoltaic power generation market, offshore photovoltaic power generation, as a new field, has a broad market. How to achieve safe, economical and reliable installation of offshore photovoltaic structures has become one of the key technologies restricting the development of offshore photovoltaics.
[0003] The existing technologies close to the present invention are the manual installation technology of flexible bracket components and the construction cable hoisting installation technology of offshore cable photovoltaics. The manual installation technology of flexible bracket components is to manually transport a single photovoltaic component to the cable structure, and the installation workers use scaffolding or aerial work to rise to the installation position, and then manually install and fix the component to the cable structure. The construction cable hoisting installation technology of offshore cable photovoltaics is to set a cable crane on the construction cable, transport the module to the bottom of the installation position by ship, and the cable crane hoists the module to the installation position. The installation workers use the walking rope to reach the installation position, and then manually install and fix the module to the cable structure. The traditional installation technology has the following defects:
[0004] (1) Whether it is the manual installation technology of the flexible bracket assembly or the construction cable hoisting installation technology of the offshore cable photovoltaic, the installation workers need to arrive at the installation location and then manually install and fix the module and the cable structure. The manual installation method is inefficient, unsafe, and has high installation costs.
[0005] (2) Manual installation technology requires manpower to transport components, which is difficult, expensive, and has high safety risks when operating at sea, making it impractical. Although the construction cable hoisting installation technology can be lifted with the help of a cable crane, the transport ship needs to reach the bottom of the installation location. In this way, the transport ship needs to be constantly moved during the installation process, and the movement of the transport ship needs to be achieved by anchoring. However, there are many piles in the offshore photovoltaic field, and the piles are densely located. The movement of the transport ship is difficult and time-consuming, resulting in low installation efficiency. Summary of the invention
[0006] The first object of the present invention is to provide a module sliding installation structure that can be automatically, quickly and safely installed without manual operation when connecting the block cables. To this end, the present invention adopts the following technical solutions:
[0007] A module sliding installation structure for offshore suspended photovoltaics, comprising a sliding cable support, a sliding cable and a sliding installation trolley, wherein the sliding cable support is detachably connected to a pile head structure at the top of a pile foundation, the sliding cable support is distributed around a photovoltaic module so as to enclose and form an overall operating area, the sliding cable is connected between the sliding cable supports along the direction of the load-bearing cable; the sliding installation trolley is arranged on the sliding cable, and a power lifting device which can be connected to a photovoltaic bracket on the photovoltaic module is arranged therein, a groove is provided at the bottom of the sliding installation trolley, the opening direction of the groove corresponds to the load-bearing cable, an electric bolt fastener which can cooperate with the bolts on the photovoltaic bracket is arranged in the groove, a cavity is provided on the side wall of the groove, an upper pressure block which can be automatically removed is accommodated in the cavity, and the upper pressure block can also cooperate with the bolt connection so that the photovoltaic module is fastened to the load-bearing cable through the upper pressure block.
[0008] Furthermore: the sliding installation trolley is independently arranged on each of the sliding cables, and steel beams are connected between adjacent sliding installation trolleys to form an overall sliding structure.
[0009] Furthermore: a containing body is provided at the bottom of the sliding installation trolley, and the groove is contained inside the containing body; a power wheel is provided below the sliding installation trolley, and the power wheel is staggered with the containing body, and the power wheel is connected to the sliding rope, so that the sliding installation trolley can move along the direction of the sliding rope on the sliding rope.
[0010] Furthermore: a spring is connected to the inner side wall of the cavity, the spring is located between the inner side wall of the cavity and the upper pressure block, and an electric door is provided at the exit position of the cavity.
[0011] Furthermore: a telescopic motor is arranged in the groove, and the telescopic motor is connected to the electric bolt fastener; the bolt is arranged on the photovoltaic bracket, and a connecting hole for the bolt to pass through is arranged through the upper pressure block, and the electric bolt fastener can cooperate with the bolt so that the upper pressure block can be fixed by the bolt when connected to the photovoltaic bracket.
[0012] Furthermore: the power lifting device includes a cable and a winch, the winch is installed in the sliding installation trolley, one end of the cable is connected to the winch, and the other end extends out of the sliding installation trolley and is connected to the photovoltaic bracket.
[0013] Furthermore: the pile head structure includes a hanging plate arranged on the top of the pile foundation, and a pin column, the pin column is connected to the hanging plate, the pin column extends out of the upper part of the hanging plate to set an upper pin column; the sliding rope support is sleeved on the upper pin column.
[0014] Furthermore: a support plate is provided on the outer surface of the sliding cable support, and the support plate is connected to the sliding cable.
[0015] Furthermore, the spacing between adjacent sliding cables is greater than the spacing between adjacent supporting cables, so as to facilitate the operation of the photovoltaic component module.
[0016] The second purpose of the present invention is to provide a method of use that is fast, efficient, safe, and low in installation cost. To this end, the present invention adopts the following technical solutions:
[0017] A method for using a module sliding installation structure for offshore suspension photovoltaics comprises the following steps:
[0018] S1: The required photovoltaic module is processed and manufactured in an onshore factory and transported by a transport ship to the installation sea area, close to the side of the pile foundation;
[0019] S2: Install the required sliding cable support on the pile head structure at the top of the photovoltaic pile foundation to fasten the connection, and install the sliding cable on the support hanging plate of the sliding cable support;
[0020] S3: The sliding installation trolley is installed on the sliding cable and connected through the steel beam to achieve that the relative positions of the sliding installation trolleys on both sides remain unchanged;
[0021] S4: The photovoltaic assembly module on the transport ship is connected to the sliding installation trolley through the cable, and the upper pressing block is placed in the cavity of the side wall of the groove below the sliding installation trolley, and the electric door is closed;
[0022] S5: Turn on the winch to lift the photovoltaic module to a certain height, remotely control the power wheel of the sliding installation trolley to move along the direction of the sliding rope to the installation position, and brake the power wheel;
[0023] S6: The photovoltaic module is retracted by the cable, and the bolt is aligned with the position of the electric bolt fastener, and the electric door is opened so that the upper pressure block is ejected by the spring, passes through the bolt and falls onto the photovoltaic bracket, and the block cable is automatically installed through the cooperation of the telescopic motor and the electric bolt fastener;
[0024] S7: Repeat the installation arrangement to successively install the remaining photovoltaic assembly modules to the target installation positions on the supporting cables, and remove the upper working structure after completing the installation of the photovoltaic assembly modules.
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] The present invention arranges a sliding cable above the load-bearing cable, and the sliding installation trolley lifts the photovoltaic module through a lifting device, so that the two are combined to form a component body, and move together along the sliding cable, so that the horizontal transportation of the photovoltaic module does not require the displacement of the transport ship, and can achieve fast and efficient transportation. In addition, the electric bolt fastener at the bottom of the sliding installation trolley corresponds to the block cable connection position, and can automatically install the photovoltaic module after the sliding installation trolley carries it to the installation position, and can achieve fast, safe and economical module installation without manual operation. At the same time, the overall structure of the present invention is not fixed, but can be reused, which can share and save installation costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is a vertical view of the sliding installation of the photovoltaic module module of the present invention;
[0028] Figure 2 It is a plan view of the sliding installation of the photovoltaic assembly module of the present invention;
[0029] Figure 3 It is a plan view of the sliding installation trolley and the module assembly of the present invention;
[0030] Figure 4 This is a front elevation view of the sliding installation trolley and the module assembly of the present invention before installation is completed;
[0031] Figure 5 This is a front elevation view of the sliding installation trolley and the module assembly of the present invention after installation;
[0032] Figure 6 It is a side elevation view of the sliding installation trolley and the module assembly of the present invention;
[0033] Figure 7 It is a plan view of the photovoltaic module module of the present invention;
[0034] Figure 8 This is a front elevation view of the photovoltaic assembly module of the present invention;
[0035] Fig. 9 It is a plan view of the pressure plate type block cable connection structure of the present invention;
[0036] Fig.10 This is an elevation view of the pressure plate type block cable connection structure of the present invention;
[0037] Fig.11 It is a detailed diagram of the block cable guide structure of the present invention;
[0038] Fig.12 This is a front elevation view of the sliding installation trolley of the present invention;
[0039] Fig.13 It is a side elevation view of the sliding installation trolley of the present invention;
[0040] Fig.14 It is a plan view of the sliding rope and the sliding rope support of the present invention;
[0041] Fig.15 It is a front elevation view of the sliding rope and the sliding rope support of the present invention;
[0042] Fig.16 This is a side elevation view of the sliding rope and the sliding rope support of the present invention:
[0043] Fig.17 It is a detailed view of the pile head structure of the present invention.
[0044] The marks in the accompanying drawings are: 2-pile foundation, 3-load-bearing cable, 4-photovoltaic component module, 41-photovoltaic panel, 42-photovoltaic bracket, 5-power lifting device, 51-cable, 52-winch, 6-power wheel, 7-sliding installation trolley, 8-spring, 9-electric bolt fastener, 91-telescopic motor, 10-pressure plate type block cable connection structure, 101-lower pressure block, 102-upper pressure block, 103-bolt, 11-electric door, 12-transport ship, 13-sliding cable, 14-steel beam, 15-nut, 16-pile head structure, 161-pile head hanging plate, 162-upper pin column, 163-lower pin column, 17-sliding cable pillar, 171-pillar hanging plate, 18-bolts and nuts. DETAILED DESCRIPTION
[0045] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.
[0046] like Figure 1-17 As shown, a module sliding installation structure for offshore suspended photovoltaics includes a sliding cable support 17, a sliding cable 13 and a sliding installation trolley 7. The sliding cable support 17 is detachably connected to the pile head structure 16 at the top of the pile foundation 2. The sliding cable support 17 is distributed around the photovoltaic component module 4 to form an overall operating area. The sliding cable 13 is connected between the sliding cable supports 17 along the direction of the load-bearing cable 3; the sliding installation trolley 7 is arranged on the sliding cable 13, and a power lifting device 5 that can be connected to the photovoltaic bracket 42 on the photovoltaic component module 4 is arranged therein. A groove is provided at the bottom of the sliding installation trolley 7, and the opening direction of the groove corresponds to the load-bearing cable 3. An electric bolt tightener 9 that can cooperate with the bolt 103 on the photovoltaic bracket 42 is provided in the groove. A cavity is provided on the side wall of the groove, and an upper pressure block 102 that can be automatically removed is accommodated in the cavity. The upper pressure block 102 can also be connected and cooperated with the bolt 103, so that the photovoltaic component module 4 is fastened to the load-bearing cable 3 through the upper pressure block 102.
[0047] like Figure 1-13As shown, specifically, the sliding installation trolley 7 is independently arranged on each sliding rope 13, so that the overall structure is equipped with two sliding installation trolleys 7, and a steel beam 14 is connected between adjacent sliding installation trolleys 7 to form an overall sliding structure. The two sliding installation trolleys 7 are connected by the steel beam 14 to achieve the unchanged relative position.
[0048] Among them, a containing body is provided at the bottom of the sliding installation trolley 7, and a groove is provided inside the containing body; a power wheel 6 is provided below the sliding installation trolley 7, and the power wheel 6 and the containing body are staggered to avoid the power wheel 6 affecting the installation control of the photovoltaic component module 4. At the same time, two sets of power wheels 6 are equipped at the bottom of each sliding installation trolley 7, and the power wheels 6 are connected to the sliding rope 13, so that the sliding installation trolley 7 can be stably moved along the direction of the sliding rope 13 through remote control.
[0049] Among them, a spring 8 is connected to the inner side wall of the cavity, and the spring 8 is located between the inner side wall of the cavity and the upper pressure block 102, and an electric door 11 is provided at the exit position of the cavity, so that the upper pressure block 102 is stored in the cavity when the electric door 11 is closed, and after the electric door 11 is opened, the upper pressure block 102 can be popped out of the cavity under the action of the elastic force of the spring 8.
[0050] Among them, a telescopic motor 91 is arranged in the groove, and the telescopic motor 91 is connected to the electric bolt fastener 9. The electric bolt fastener 9 is pre-installed with a nut 15 that can cooperate with the bolt 103, so that the upper pressure block 102 can be fixed as a whole when connected to the photovoltaic bracket 42.
[0051] Specifically, the power lifting device 5 includes a cable 51 and a winch 52. The winch 52 is installed in the sliding installation trolley 7. One end of the cable 51 is connected to the winch 52, and the other end extends out of the sliding installation trolley 7 and is connected to the photovoltaic bracket 42, thereby freely lifting objects under the sliding installation trolley 7.
[0052] In this embodiment, the sliding cable support 17, the sliding cable 13, and the sliding installation trolley 7 are not fixed and can be reused, thereby maximizing the sharing and saving of installation costs and reducing construction costs.
[0053] like Figure 9-11As shown, in this embodiment, a pressure plate type block cable connection structure is provided so as to connect the photovoltaic assembly module 4 with the load-bearing cable 3. The pressure plate type block cable connection structure 10 comprises a lower pressure block 101 pre-fixed at the end of the photovoltaic bracket 42, and a separately arranged upper pressure block 102, and grooves that can cooperate with the load-bearing cable 3 are respectively arranged on the mating surfaces of the upper pressure block 102 and the lower pressure block 101, so that after the upper pressure block 102 and the lower pressure block 101 are mated, they can be fixed to the load-bearing cable 3, and bolts 103 are arranged on both sides of the lower pressure block 101 relative to its inner groove, and connecting holes for the bolts 103 to pass through are arranged in the upper pressure block 102, so that the upper pressure block 102 passes through the bolts 103 and fits with the lower pressure block 101 for subsequent connection.
[0054] like Figure 14-17 As shown, this embodiment takes a double-span double-row photovoltaic component module as an example as an offshore photovoltaic support structure (but not limited to this), and performs corresponding installation processing in conjunction with the module sliding installation structure.
[0055] Specifically, the pile head structure 16 includes a hanging plate 61 disposed on the top of the pile foundation 2, and a pin column, the pin column is connected to the hanging plate 61, and the upper pin column 162 is arranged on the upper part of the pin column extending from the hanging plate 61; the sliding cable support 17 is sleeved on the upper pin column 162. Among them, the load-bearing cable 3 is connected to the hanging plate 61, so that the photovoltaic assembly module 4 is installed on the load-bearing cable 3 in the working area.
[0056] Specifically, a support plate 171 is provided on the outer surface of the sliding cable support 17, and the support plate 171 is connected to the sliding cable 13. In addition, in the operation area, the spacing between adjacent sliding cables 13 is greater than the spacing between adjacent load-bearing cables 3, so as to facilitate the installation of the photovoltaic assembly module 4.
[0057] The pins are provided with lower latch pins 163 and upper latch pins 162 according to the positions of the pins in the hanging plate 61; at the top of the pile foundation 2, the lower latch pins 163 of the pile head structure 16 are inserted into the pile foundation 2 and grouted. The sliding cable support 17 is inserted into the outer side of the upper latch pins 162 of the pile head structure 16 and is fastened to the pile head structure 16 by bolts and nuts 18.
[0058] See also Figure 1-17 When the module sliding installation structure is installed offshore, the specific installation and use steps are as follows:
[0059] S1: The required photovoltaic module 4 is processed and manufactured in a land factory and transported by a transport ship 12 to the installation sea area, close to the side of the pile foundation 2;
[0060] S2: the required photovoltaic pile foundation 2 has completed the piling operation, the pile head structure 16 has been installed, and the load-bearing cable 3 has been installed on the pile head hanging plate 161 of the pile head structure 16;
[0061] S3: insert the sliding cable support 17 into the outer side of the upper pin 162 of the pile head structure 16, and fasten it to the pile head structure 16 by bolts and nuts 18;
[0062] S4: Install the sliding cable 13 onto the support plate 171 of the sliding cable support 17;
[0063] S5: Two sliding installation trolleys 7 are installed on the sliding rope 13, and the two sliding installation trolleys 7 are connected by a steel beam 14 to achieve unchanged relative position;
[0064] S6: The photovoltaic assembly module 4 on the transport ship 12 is connected to the sliding installation trolley 7 through the cable 51 in the power lifting device 5, the upper pressing block 102 is placed in the cavity of the side wall of the groove below the sliding installation trolley 7, and the electric door 11 is closed;
[0065] S7: Start the winch 52 to lift the photovoltaic module 4 and the photovoltaic panel 41 carried thereon to a certain height, remotely control the power wheel 6 of the sliding installation trolley 7 to move along the sliding cable 13 to the installation position along the cable direction, brake the power wheel 6 of the sliding installation trolley 7, realize the sliding transportation of the photovoltaic module 4, and avoid the movement of the transport ship 12 between the pile foundations 2;
[0066] S8: The power lifting device 5 lifts the photovoltaic module 4 by recovering the cable 51, aligning the position of the lower pressing block 101 with the electric bolt tightener 9; the electric door 11 is opened, the upper pressing block 102 is ejected by the spring 8, passes through the bolt 103 and falls on the upper part of the lower pressing block 101, and the bolt 103 is tightened to the set torque value through the cooperation of the telescopic motor 91 and the electric bolt tightener 9. After tightening, the power lifting device 5 is released, and the photovoltaic module 4 is separated from the sliding installation trolley 7, so as to realize the automatic installation of the block cable;
[0067] S9: Repeat the steps S6-S8 to successively install the remaining photovoltaic assembly modules 4 to the installation positions of the load-bearing cables 3 to complete the installation of the offshore suspension photovoltaic modules;
[0068] S10: The sliding cable support 17, the sliding cable 13 and the sliding installation trolley 7 are removed, and the transport ship 12 withdraws from the operation. The removed structure can be recycled and further utilized.
[0069] The above embodiment is only a preferred technical solution of the present invention. Those skilled in the art should understand that the technical solutions or parameters in the embodiments can be modified or replaced without departing from the principle and essence of the present invention, and all should be covered within the protection scope of the present invention.
Claims
1. A module sliding installation structure for offshore cable photovoltaic, characterized in that: It comprises a sliding cable support (17), a sliding cable (13) and a sliding installation trolley (7), wherein the sliding cable support (17) is detachably connected to a pile head structure (16) at the top of a pile foundation (2), the sliding cable support (17) is distributed around a photovoltaic component module (4) to form an overall operating area, and the sliding cable (13) is connected between the sliding cable supports (17) along the direction of the load-bearing cable (3); The sliding installation trolley (7) is arranged on the sliding rope (13), and a power lifting device (5) is arranged therein, which can be connected to the photovoltaic bracket (42) on the photovoltaic component module (4). A groove is provided at the bottom of the sliding installation trolley (7), and the opening direction of the groove corresponds to the load-bearing rope (3). An electric bolt fastener (9) is arranged in the groove and can cooperate with the bolt (103) on the photovoltaic bracket (42). A cavity is provided on the side wall of the groove, and an upper pressure block (102) that can be automatically removed is accommodated in the cavity. The upper pressure block (102) can also be connected and cooperated with the bolt (103) so that the photovoltaic component module (4) is fastened to the load-bearing rope (3) through the upper pressure block (102).
2. A module sliding installation structure for offshore cable photovoltaic according to claim 1, characterized in that: The sliding installation trolley (7) is independently arranged on each of the sliding cables (13), and steel beams (14) are connected between adjacent sliding installation trolleys (7) to form an integral sliding structure.
3. The module sliding installation structure for offshore cable photovoltaic according to claim 1, characterized in that: A containing body is provided at the bottom of the sliding installation trolley (7), and the groove is contained inside the containing body; a power wheel (6) is provided below the sliding installation trolley (7), and the power wheel (6) and the containing body are staggered, and the power wheel (6) is connected to the sliding rope (13) so that the sliding installation trolley (7) can move along the direction of the sliding rope (13) on the sliding rope (13).
4. The module sliding installation structure for offshore cable photovoltaic according to claim 1, characterized in that: A spring (8) is connected to the inner side wall of the cavity, the spring (8) is located between the inner side wall of the cavity and the upper pressure block (102), and an electric door (11) is provided at the exit of the cavity.
5. The module sliding installation structure for offshore cable photovoltaic according to claim 4, characterized in that: A telescopic motor (91) is arranged in the groove, and the telescopic motor (91) is connected to the electric bolt tightener (9); at the same time, a connecting hole for the bolt (103) to pass through is arranged through the upper pressing block (102).
6. The module sliding installation structure for offshore cable photovoltaic according to claim 1, characterized in that: The power lifting device (5) comprises a cable (51) and a winch (52), wherein the winch (52) is installed in the sliding installation trolley (7), one end of the cable (51) is connected to the winch (52), and the other end extends out of the sliding installation trolley (7) and is connected to the photovoltaic bracket (42).
7. The module sliding installation structure for offshore cable photovoltaic according to claim 1, characterized in that: The pile head structure (16) comprises a hanging plate (61) arranged on the top of the pile foundation (2), and a pin column, wherein the pin column is connected to the hanging plate (61), and an upper pin column (162) is arranged on the upper part of the pin column extending from the hanging plate (61); the sliding rope support (17) is sleeved on the upper pin column (162).
8. A module sliding installation structure for offshore cable photovoltaic according to claim 1 or 7, characterized in that: A support plate (171) is provided on the outer surface of the sliding cable support (17), and the support plate (171) is connected to the sliding cable (13).
9. The module sliding installation structure for offshore cable photovoltaic according to claim 1, characterized in that: The spacing between adjacent sliding cables (13) is greater than the spacing between adjacent supporting cables (3), so as to facilitate the operation of the photovoltaic assembly module (4).
10. A method for using a module sliding installation structure for offshore suspension photovoltaics, characterized in that: The module sliding installation structure for offshore cable photovoltaic is installed and used according to any one of claims 1 to 9, and the specific steps are as follows: S1: The required photovoltaic assembly modules (4) are processed and manufactured in a land factory and transported by a transport ship (12) to the installation sea area, close to one side of the pile foundation (2); S2: installing the required sliding cable support (17) on the pile head structure (16) at the top of the photovoltaic pile foundation (2) to achieve a fastening connection, and installing the sliding cable (13) on the support hanging plate (171) of the sliding cable support (17); S3: The sliding installation trolley (7) is installed on the sliding rope (13) and connected via the steel beam (14), so that the relative positions of the sliding installation trolleys (7) on both sides remain unchanged; S4: The photovoltaic assembly module (4) located on the transport ship (12) is connected to the sliding installation trolley (7) via the cable (51), and the upper pressing block (102) is placed in the cavity of the side wall of the groove below the sliding installation trolley (7), and the electric door (11) is closed; S5: starting the hoist (52) to lift the photovoltaic assembly module (4) to a certain height, remotely controlling the power wheel (6) of the sliding installation trolley (6) to move along the direction of the sliding rope (13) to the installation position, and braking the power wheel (6); S6: The photovoltaic assembly module (4) is retracted by the cable (51), and the bolt (103) is aligned with the position of the electric bolt fastener (9), and the electric door (11) is opened so that the upper pressing block (102) is ejected by the spring (8), passes through the bolt (103) and falls onto the photovoltaic bracket (42), and the block cable is automatically installed through the coordinated work of the telescopic motor (91) and the electric bolt fastener (9); S7: Repeat the installation arrangement to successively install the remaining photovoltaic component modules (4) to the target installation positions on the supporting cables (3), and remove the upper working structure after completing the installation of the photovoltaic component modules (4).
Citation Information
Patent Citations
Photovoltaic module
CN105610392A
Floating-type storable thin-film photovoltaic power station
CN109911133A
Offshore photovoltaic panel support with steering function
CN216625661U
Rail mechanism for photovoltaic cell panel sweeping device, trolley operation mechanism and sweeping device
WO2016180376A1