Novel assembly type reinforced concrete frame structure
By using structures such as connecting outer sleeves, inner sleeves and interlaced steel bars in the prefabricated reinforced concrete frame structure, the problem of unstable connection between prefabricated columns and bases is solved, and the problem of improvement of the connection between prefabricated columns and bases is improved. Seismic resistance and transportation efficiency of buildings.
Patent Information
- Application Number
- CN202411682857.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-01-10
AI Technical Summary
The existing prefabricated reinforced concrete frame structure cannot achieve stable connection when the prefabricated column is connected to the base, and it cannot guarantee the overall strength of the prefabricated column and the degree of stress at the connection.
Using a structure that includes connecting the outer sleeve, inner sleeve, through hole and barrier plate, plant cement with nanoplatelets and bamboo sheets added into the prefabricated column, and interlaced steel bars are installed in the prefabricated column, and post-pouring grooves are used. and the connecting ribs form a high-performance cement-based material to enhance earthquake and compressive properties.
It improves the connection stability and overall strength of the prefabricated columns and the base, enhances the seismic resistance and transportation efficiency of the building, and ensures a firm connection between the prefabricated columns and the base.
Smart Images

Figure CN119288067A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and specifically relates to a novel assembled reinforced concrete frame structure. Background Art
[0002] At present, the prefabricated building system is being vigorously promoted to realize the transformation and upgrading of the modernization of the construction industry. Sleeve grouting connection and post-poured concrete connection are common connection methods in prefabricated concrete structures. Sleeve grouting connection has reliable connection strength and good seismic performance, but it has strict requirements on the quality of grouting materials and construction technology.
[0003] The new prefabricated reinforced concrete frame structure is mainly composed of main structural prefabricated components such as precast concrete columns, new steel beams and precast composite floor slabs, which are connected together to form a whole and bear vertical and horizontal loads. The connection nodes include nodes where precast columns are connected by grouting sleeves and nodes formed by precast columns and steel beams through a new dry connection method.
[0004] However, the existing structure cannot connect the prefabricated columns firmly and stably to the base when connecting the prefabricated columns, and cannot ensure the overall strength of the prefabricated columns when pouring between the prefabricated columns, and cannot ensure the stress degree of the connection. Summary of the invention
[0005] In order to solve the problems raised in the above background technology, the present invention provides a novel assembled reinforced concrete frame structure.
[0006] To achieve the above-mentioned object, the present invention provides the following technical solutions: a novel assembled reinforced concrete frame structure, comprising a structural finished surface, a connection mechanism is fixed to the top of the structural finished surface, a prefabricated column is arranged inside the connection mechanism, a cantilever section is extended outward from the top of the prefabricated column, a pouring mechanism is arranged at the top of the prefabricated column, a prefabricated concrete beam is installed outside the prefabricated column, a post-pouring mechanism is arranged outside the prefabricated concrete beam, and a second cement pouring port is arranged outside the prefabricated column;
[0007] The connecting mechanism includes a connecting outer sleeve, a connecting inner sleeve and a first through hole. The connecting outer sleeve is fixed at the top of the structural finished surface. The connecting inner sleeve is arranged inside the connecting outer sleeve. The first through hole is opened inside the connecting outer sleeve. The second through hole is opened inside the connecting inner sleeve. The third through hole is opened inside the connecting inner sleeve. A blocking plate is fixed inside the connecting inner sleeve. A first steel bar is fixed inside the connecting inner sleeve. A prefabricated column is fixed at the top of the connecting inner sleeve.
[0008] Preferably, the connecting outer sleeve is provided with several groups, and the connecting outer sleeves are evenly spaced about the central axis of the finished surface of the structure, the diameter of the first through hole is equal to the diameter of the second through hole, the diameter of the first through hole is equal to the diameter of the third through hole, and the first through holes are provided with several groups and are evenly spaced about the central axis of the connecting outer sleeve, so that the reinforced concrete is more beautiful as a whole during assembly and there is more space for cement to pass through. The larger the space occupied by the plant cement during solidification, the more it can ensure the strength and seismic resistance of the connection.
[0009] Preferably, the second through holes and the third through holes are symmetrically distributed about the central axis of the baffle plate, and a plurality of groups of the second through holes and the third through holes are arranged, and the second through holes and the third through holes are symmetrically distributed about the central axis of the connecting outer sleeve, further expanding the space occupied by cement.
[0010] Preferably, the first steel bars are provided in a plurality of groups, and the first steel bars are symmetrically distributed about the central axis of the connecting inner sleeve, so that the first steel bars further improve the overall strength of the cement after the cement solidifies.
[0011] Preferably, the pouring mechanism includes a first cement pouring port, a second steel bar and a third steel bar. The first cement pouring port is opened at the top of the prefabricated column, the second steel bar is fixed inside the cantilever section of the prefabricated column, and the third steel bar is fixed at the top inside the prefabricated column. Since the prefabricated column is hollow, it is lighter during transportation.
[0012] Preferably, two groups of the first cement pouring ports are provided, and the first cement pouring ports are symmetrically distributed about the central axis of the precast column; and a plurality of groups of the second steel bars are provided, and the second steel bars are evenly distributed about the central axis of the precast column.
[0013] Preferably, the third steel bars are arranged in several groups, and the third steel bars are distributed at equal intervals about the central axis of the precast column. The third steel bars and the second steel bars are in a cross shape, so that after the cement solidifies, the second steel bars and the third steel bars further improve the overall strength of the cement.
[0014] Preferably, the post-casting mechanism includes a first cement post-casting trough, a first connecting rib and a first cement post-casting port, the first cement post-casting trough is arranged outside the cantilever section of the precast column, a first connecting rib is fixed inside the first cement post-casting trough, a first cement post-casting port is arranged at the top of the cantilever section of the precast column, a second cement post-casting trough is arranged outside the precast concrete beam, a second connecting rib is fixed inside the second cement post-casting trough, a second cement post-casting port is arranged at the top of the precast concrete beam, and the two groups of precast blocks are connected by pouring high-performance cement-based materials to ensure the strength of the connection.
[0015] Preferably, the shape of the first cement post-casting groove is the same as that of the second cement post-casting groove, and a plurality of groups of the first connecting ribs are provided, and the first connecting ribs are distributed at equal intervals about the central axis of the first cement post-casting groove.
[0016] Preferably, the second connecting ribs are provided in a plurality of groups, the second connecting ribs are distributed at equal intervals about the central axis of the second cement post-casting trough, and the first connecting ribs and the second connecting ribs are staggered.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] The present invention cooperates with structures such as a connecting outer sleeve, a connecting inner sleeve, and a first through hole, and can hoist the prefabricated column as a whole on the top of the connecting outer sleeve, align the connecting inner sleeve at the bottom of the prefabricated column with the connecting outer sleeve, insert and install it, and pour cement into the interior of the prefabricated column through the second cement pouring port or the first cement pouring port, add "nano platelets" extracted from carrots and other root vegetables and bamboo chips to the cement, thereby improving the seismic resistance and compressive strength of the building, and after the plant cement is poured into the interior of the prefabricated column, it fills the interior of the prefabricated column, the connecting outer sleeve and the connecting inner sleeve. After solidification, the solidified cement connects the connecting outer sleeve, the connecting inner sleeve and the prefabricated column through its own shape, thereby achieving the purpose of facilitating the connection of the prefabricated column with the base.
[0019] The present invention arranges the coordination of the first cement pouring port, the second steel bar, the third steel bar and other structures, so that the middle section of the prefabricated block pours the plant cement into the interior of the group of prefabricated columns through the first cement pouring port, and by installing staggered second steel bars and third steel bars inside the prefabricated columns, the plant cement can have stronger earthquake resistance and compression resistance when solidified. Since the cement is poured later, the prefabricated columns are lighter and more convenient to transport, thereby achieving the purpose of facilitating the connection of the middle section of the prefabricated columns with the base and improving the transportation efficiency and overall strength of the prefabricated columns.
[0020] The present invention arranges the first cement post-casting groove, the first connecting rib, the first cement post-casting mouth and other structures to cooperate, so that the device can assemble the precast column cantilever section with the precast concrete beam, the first cement post-casting mouth and the second cement post-casting mouth are connected to form a cement inlet, the first cement post-casting groove and the second cement post-casting groove form a cavity, and high-performance cement-based material is poured into the cement inlet. After solidification, since the first connecting rib and the first cement post-casting mouth are staggered, the solidified cement connects the first connecting rib and the second connecting rib together, and then connects the precast column cantilever section and the precast concrete beam, so as to achieve the purpose of facilitating the connection between precast blocks. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1It is a schematic diagram of the overall structure of the present invention;
[0022] Figure 2 It is a schematic diagram of the overall front view structure of the present invention;
[0023] Figure 3 For the present invention Figure 2 A partial cross-section at the center is an enlarged structural diagram;
[0024] Figure 4 It is a structural schematic diagram of the connection state of the precast column and the precast concrete beam of the present invention;
[0025] Figure 5 For the present invention Figure 4 A schematic diagram of the enlarged structure of the local section at B in the middle;
[0026] Figure 6 For the present invention Figure 4 The enlarged structural diagram of the local section at C in the middle;
[0027] Figure 7 It is a schematic diagram of the connection mechanism structure of the present invention;
[0028] Figure 8 It is a schematic diagram of the concrete solidification state of the present invention.
[0029] In the figure: 1. Structural completion surface; 2. Connecting mechanism; 201. Connecting outer sleeve; 202. Connecting inner sleeve; 203. First through hole; 204. Second through hole; 205. Third through hole; 206. Blocking plate; 207. First steel bar; 3. Precast column; 4. Pouring mechanism; 401. First cement pouring port; 402. Second steel bar; 403. Third steel bar; 5. Precast concrete beam; 6. Post-pouring mechanism; 601. First cement post-pouring trough; 602. First connecting rib; 603. First cement post-pouring port; 604. Second cement post-pouring trough; 605. Second connecting rib; 606. Second cement post-pouring port; 7. Second cement pouring port. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] In the description of the present invention, it should be understood that descriptions involving orientations, such as up, down, front, back, left, right, etc., and orientations or positional relationships indicated are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0032] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.
[0033] In addition, in the description of the present specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0034] References to "one embodiment" or "some embodiments" etc. described in the present specification mean that one or more embodiments of the present invention include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0035] like Figures 1 to 8 As shown, the present invention provides a novel assembled reinforced concrete frame structure, including a structural finished surface 1, a connecting mechanism 2 is fixed to the top of the structural finished surface 1, a precast column 3 is arranged inside the connecting mechanism 2, a cantilever section is extended outward from the top of the precast column 3, a pouring mechanism 4 is arranged at the top of the precast column 3, a precast concrete beam 5 is installed outside the precast column 3, a post-pouring mechanism 6 is arranged outside the precast concrete beam 5, and a second cement pouring port 7 is arranged outside the precast column 3.
[0036] In some embodiments, Figure 3As shown, the pouring mechanism 4 includes a first cement pouring port 401, a second steel bar 402 and a third steel bar 403. The first cement pouring port 401 is opened at the top of the precast column 3, the second steel bar 402 is fixed inside the cantilever section of the precast column 3, two groups of the first cement pouring port 401 are opened, and the first cement pouring port 401 is symmetrically distributed about the central axis of the precast column 3, several groups of the second steel bars 402 are arranged, and the second steel bars 402 are evenly distributed about the central axis of the precast column 3, the third steel bar 403 is fixed at the top inside the precast column 3, several groups of the third steel bars 403 are arranged, and the third steel bars 403 are evenly distributed about the central axis of the precast column 3, and the third steel bars 403 and the second steel bars 402 are crossed.
[0037] The plant cement is poured into the interior of the middle precast column 3 through the first cement pouring port 401, and by installing staggered second steel bars 402 and third steel bars 403 inside the precast column 3, the plant cement can have stronger seismic resistance and compressive resistance when solidified. Since the cement is poured later, the precast column 3 is lighter during transportation and is more convenient to transport.
[0038] In some embodiments, Figure 7 As shown, the connecting mechanism 2 includes a connecting outer sleeve 201, a connecting inner sleeve 202 and a first through hole 203. The connecting outer sleeve 201 is fixed at the top of the structural finished surface 1. The connecting inner sleeve 202 is arranged inside the connecting outer sleeve 201. The first through hole 203 is opened inside the connecting outer sleeve 201, the second through hole 204 is opened inside the connecting inner sleeve 202, and the third through hole 205 is opened inside the connecting inner sleeve 202. The connecting outer sleeve 201 is provided with a plurality of groups. The connecting outer sleeve 201 is evenly spaced about the central axis of the structural finished surface 1. The diameter of the first through hole 203 is equal to the diameter of the second through hole 204, and the diameter of the first through hole 203 is equal to the diameter of the third through hole 205. The first through hole 203 is provided with a plurality of groups. The connecting outer sleeve 201 is evenly spaced about the central axis of the connecting outer sleeve 201.
[0039] In some embodiments, Figure 7 As shown, a blocking plate 206 is fixed inside the connecting inner sleeve 202, a first steel bar 207 is fixed inside the connecting inner sleeve 202, a prefabricated column 3 is fixed to the top of the connecting inner sleeve 202, the second through holes 204 and the third through holes 205 are symmetrically distributed about the central axis of the blocking plate 206, the second through holes 204 and the third through holes 205 are arranged in several groups, the second through holes 204 and the third through holes 205 are symmetrically distributed about the central axis of the connecting outer sleeve 201, the first steel bars 207 are arranged in several groups, and the first steel bars 207 are symmetrically distributed about the central axis of the connecting inner sleeve 202.
[0040] After the prefabricated column 3 is hoisted as a whole at the top of the connecting outer sleeve 201, the connecting inner sleeve 202 at the bottom of the prefabricated column 3 is aligned with the connecting outer sleeve 201 and inserted and installed, and cement-based materials are poured into the interior of the prefabricated column 3 through the second cement pouring port 7 or the first cement pouring port 401, and "nanoplatelets" extracted from carrots and other root vegetables and bamboo chips are added to the cement, so as to improve the seismic resistance and compressive strength of the building. After the plant cement is poured into the interior of the prefabricated column 3, it fills the interior of the prefabricated column 3, the connecting outer sleeve 201 and the connecting inner sleeve 202. After solidification, the solidified cement connects the connecting outer sleeve 201, the connecting inner sleeve 202 and the prefabricated column 3 through its own shape.
[0041] like Figure 5 As shown, the post-casting mechanism 6 includes a first cement post-casting groove 601, a first connecting rib 602 and a first cement post-casting port 603. The first cement post-casting groove 601 is arranged outside the cantilever section of the precast column 3, the first connecting rib 602 is fixed inside the first cement post-casting groove 601, the top of the cantilever section of the precast column 3 is provided with a first cement post-casting port 603, and the second cement post-casting groove 604 is arranged outside the precast concrete beam 5. The shape of the first cement post-casting groove 601 is the same as that of the second cement post-casting groove 604. Several groups of first connecting ribs 602 are arranged, and the first connecting ribs 602 are evenly spaced about the central axis of the first cement post-casting groove 601.
[0042] like Figure 5 As shown, a second connecting rib 605 is fixed inside the second cement post-casting trough 604, a second cement post-casting port 606 is opened at the top of the precast concrete beam 5, and a plurality of groups of second connecting ribs 605 are arranged. The second connecting ribs 605 are evenly spaced about the central axis of the second cement post-casting trough 604, and the first connecting ribs 602 and the second connecting ribs 605 are staggered.
[0043] After the cantilever section of the precast column 3 is assembled with the precast concrete beam 5, the first cement post-casting port 603 and the second cement post-casting port 606 are connected to form a cement inlet, and the first cement post-casting groove 601 and the second cement post-casting groove 604 form a cavity. By pouring high-performance cement-based material into the cement inlet, after solidification, since the first connecting rib 602 and the first cement post-casting port 603 are staggered, the solidified cement connects the first connecting rib 602 and the second connecting rib 605 together, thereby connecting the cantilever section of the precast column 3 and the precast concrete beam 5.
[0044] It can be understood that after the prefabricated column 3 is hoisted as a whole on the top of the connecting outer sleeve 201, the connecting inner sleeve 202 at the bottom of the prefabricated column 3 is aligned with the connecting outer sleeve 201 and inserted and installed, and cement is poured into the interior of the prefabricated column 3 through the second cement pouring port 7 or the first cement pouring port 401, and "nanoplatelets" extracted from carrots and other root vegetables and bamboo chips are added to the cement, thereby improving the seismic resistance and compressive strength of the building. After the plant cement is poured into the interior of the prefabricated column 3, it fills the interior of the prefabricated column 3, the connecting outer sleeve 201 and the connecting inner sleeve 202. After solidification, the solidified cement connects the connecting outer sleeve 201, the connecting inner sleeve 202 and the prefabricated column 3 through its own shape. , the plant cement is poured into the interior of the middle precast column 3 through the first cement pouring port 401, and the staggered second steel bars 402 and the third steel bars 403 are installed inside the precast column 3. After the precast column 3 is assembled with the precast concrete beam 5, the first cement post-casting port 603 and the second cement post-casting port 606 are connected to form a cement inlet, and the first cement post-casting groove 601 and the second cement post-casting groove 604 form a cavity. High-performance cement-based material is poured into the cement inlet. After solidification, since the first connecting rib 602 and the first cement post-casting port 603 are staggered, the solidified cement connects the first connecting rib 602 and the second connecting rib 605 together, thereby connecting the cantilever section of the precast column 3 and the precast concrete beam 5.
[0045] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0046] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A novel assembled reinforced concrete frame structure, including a structural finished surface, characterized in that: A connection mechanism is fixed at the top of the finished surface of the structure, a precast column is arranged inside the connection mechanism, a cantilever section is extended outward from the top of the precast column, a pouring mechanism is arranged at the top of the precast column, a precast concrete beam is installed outside the precast column, a post-pouring mechanism is arranged outside the precast concrete beam, and a second cement pouring port is arranged outside the precast column; The connecting mechanism comprises a connecting outer sleeve, a connecting inner sleeve and a first through hole, the connecting outer sleeve is fixed at the top of the finished surface of the structure, the connecting inner sleeve is provided inside the connecting outer sleeve, the connecting outer sleeve has a first through hole inside, the connecting inner sleeve has a second through hole inside, and the connecting inner sleeve also has a third through hole inside; A blocking plate is fixed inside the connecting inner sleeve, a first steel bar is fixed inside the connecting inner sleeve, and a prefabricated column is fixed at the top end of the connecting inner sleeve.
2. The novel assembled reinforced concrete frame structure according to claim 1 is characterized in that: The connecting outer sleeve is provided in a plurality of groups, the diameter of the first through hole is equal to the diameter of the second through hole, and the diameter of the first through hole is equal to the diameter of the third through hole.
3. The novel assembled reinforced concrete frame structure according to claim 2 is characterized in that: The second through holes and the third through holes are symmetrically distributed about the central axis of the blocking plate, and the second through holes and the third through holes are arranged in a plurality of groups, and the second through holes and the third through holes are symmetrically distributed about the central axis of the connecting outer sleeve.
4. The novel assembled reinforced concrete frame structure according to claim 1 is characterized in that: The first steel bars are provided in a plurality of groups, and the first steel bars are symmetrically distributed about the central axis of the connecting inner sleeve.
5. The novel assembled reinforced concrete frame structure according to claim 1 is characterized in that: The pouring mechanism includes a first cement pouring port, a second steel bar and a third steel bar. The first cement pouring port is opened at the top of the precast column, the second steel bar is fixed inside the cantilever section of the precast column, and the third steel bar is fixed at the top inside the precast column.
6. The novel assembled reinforced concrete frame structure according to claim 5 is characterized in that: Two groups of the first cement pouring ports are provided, and the first cement pouring ports are symmetrically distributed about the central axis of the precast column. Several groups of the second steel bars are provided, and the second steel bars are evenly distributed about the central axis of the precast column.
7. The novel assembled reinforced concrete frame structure according to claim 5 is characterized in that: The third steel bars are arranged in a plurality of groups, and the third steel bars are distributed at equal intervals about the central axis of the prefabricated column, and the third steel bars and the second steel bars are in a cross shape.
8. The novel assembled reinforced concrete frame structure according to claim 1 is characterized in that: The post-casting mechanism includes a first cement post-casting groove, a first connecting rib and a first cement post-casting port, wherein the first cement post-casting groove is arranged outside the cantilever section of the precast column, a first connecting rib is fixed inside the first cement post-casting groove, a first cement post-casting port is arranged at the top end of the cantilever section of the precast column, a second cement post-casting groove is arranged outside the precast concrete beam, a second connecting rib is fixed inside the second cement post-casting groove, and a second cement post-casting port is arranged at the top end of the precast concrete beam.
9. The novel assembled reinforced concrete frame structure according to claim 8 is characterized in that: The shape of the first cement post-casting groove is the same as that of the second cement post-casting groove. The first connecting ribs are provided in a plurality of groups, and the first connecting ribs are distributed at equal intervals about the central axis of the first cement post-casting groove.
10. The novel assembled reinforced concrete frame structure according to claim 8 is characterized in that: The second connecting ribs are provided in a plurality of groups, the second connecting ribs are distributed at equal intervals about the central axis of the second cement post-casting trough, and the first connecting ribs and the second connecting ribs are staggered.