Grain logistics and emergency material storage warehouse and construction method thereof
Automatically connect the roof bracket and the support wall through the mechanical locking structure, solving the problems of low construction efficiency and insufficient structural stability in the existing technology, and achieving efficient and stable grain flow and emergency material reserve construction.
Patent Information
- Application Number
- CN202411721951.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-28
- Publication Date
- 2025-01-10
AI Technical Summary
The welding and fixing construction of the roof brackets and supporting walls of the existing food flow and emergency material reserves is inefficient, the staff is burdened with heavy burden, and there is a risk of false welding and missing welding, which affects structural stability.
The mechanical locking structure is adopted to automatically connect the roof bracket and the supporting wall through embedded bearing blocks, positioning grooves, hydraulic control components and locking rods, avoid welding and fixing, improve construction efficiency and ensure connection stability.
The construction process is simplified, the burden on staff is reduced, the problems of false welding and missing welding are avoided, and the structural stability and use stability of the reserve library are improved.
Smart Images

Figure CN119288264A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of logistics storage structures, and in particular to a grain logistics and emergency material storage depot and a construction method thereof. Background Art
[0002] Food logistics and emergency material storage warehouses are storage structures for centralized storage of materials. They are important engineering facilities for the country to centrally store strategic materials for national economy and people's livelihood. The storage warehouse in related technologies usually consists of four-side supporting walls and a roof structure. The supporting walls are usually made of reinforced concrete materials, and the roof structure usually consists of multiple roof brackets and multiple roof panels.
[0003] After the concrete pouring of the supporting wall is completed, multiple roof frames are hoisted to the top of the supporting wall, and multiple roof frames are welded and fixed to the steel bars reserved on the top of the supporting wall, and then multiple roof panels are laid and fixed on the roof frames to complete the construction of the main body of the storage warehouse. Then, the main body of the storage warehouse can be constructed by roof insulation, facade decoration, electrical engineering, heating and ventilation engineering, etc.
[0004] However, manual welding and fixing of the roof support to the steel bar frame reserved on the top of the supporting wall results in low construction efficiency and heavy burden on workers. At the same time, manual welding carries the risk of cold welds and leaking welds, which affects the structural stability of the storage warehouse and needs to be improved. Summary of the invention
[0005] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a food logistics and emergency material reserve warehouse and a construction method thereof, which can improve construction efficiency, reduce the burden on staff, and ensure the structural stability of the reserve warehouse.
[0006] In a first aspect, the present invention provides a food logistics and emergency material storage depot, comprising a supporting wall, a plurality of roof brackets and a plurality of roof panels, wherein a plurality of receiving blocks are respectively embedded at both sides of the top of the supporting wall, and the receiving blocks are arranged in a one-to-one correspondence with the roof brackets; Rectangular positioning blocks are respectively and vertically fixedly connected to the two sides of the bottom of each roof bracket, and each receiving block is respectively provided with a rectangular positioning groove, and the positioning block can be tightly inserted into the corresponding positioning groove; The four inner walls of each positioning groove are respectively provided with supporting grooves, each supporting groove is respectively connected with a locking rod for horizontal sliding, and the four side walls of each positioning block are respectively provided with locking grooves; A hydraulic control unit is respectively provided on each receiving block. When the positioning block falls into the corresponding positioning groove, the hydraulic control unit can control the corresponding four locking rods to move synchronously and make the ends of the four locking rods close to each other be inserted into the corresponding locking grooves respectively.
[0007] Optionally, each of the hydraulic control units comprises: A hydraulic chamber is arranged inside the receiving block and is located directly below the positioning groove, and the hydraulic chamber is filled with a hydraulic medium; A hydraulic piston is vertically slidably connected in the hydraulic cavity and is used to squeeze the hydraulic medium; A control rod is vertically fixed to the top of the hydraulic piston, and the top of the control rod extends to the inside of the positioning groove and is vertically slidably connected with the receiving block; There are four hydraulic channels, one end of each of which is connected to the hydraulic chamber and the other end of each of which is connected to the corresponding support groove. A one-way valve is provided in each of the hydraulic channels to limit the hydraulic medium to enter the support groove. There are four control pistons, which are respectively connected to the corresponding support grooves in a horizontal sliding manner, and the ends of the four locking rods that are away from each other are respectively connected to the corresponding control pistons.
[0008] Optionally, the locking rod is cylindrical, and is rotatably connected to the corresponding control piston via a sealed bearing, the inner side wall of each support groove is fixedly connected with a guide column, and the side wall of each locking rod is provided with a threaded guide groove, and the guide column is slidably matched with the corresponding guide groove so that the locking rod can rotate around its own axis while moving horizontally.
[0009] Optionally, a connecting thread is provided at one end of the locking rod away from the corresponding control piston, and a thread groove is provided on the inner wall of the locking groove near its bottom position, the connecting thread matches the thread groove, and the groove spacing between the thread groove and the guide groove is the same, so that the connecting thread can form a threaded connection with the thread groove.
[0010] Optionally, a stop ring is provided on the fixing sleeve of the locking rod, and an installation groove is provided on the inner wall of the support groove along its circumference, and a C-shaped elastic retaining ring is embedded in the installation groove. When the connecting thread forms a threaded connection with the thread groove, the elastic retaining ring is located between the control piston and the stop ring to limit the retreat of the locking rod.
[0011] Optionally, a guiding slope is provided on a side of the stop ring away from the control piston.
[0012] Optionally, a shear pin is horizontally fixedly connected to the bottom of the positioning groove, the side wall of the control rod is provided with a shear groove, and the shear pin is inserted into the shear groove, and when the positioning block falls into the positioning groove, the shear pin can be sheared under the joint action of the positioning block and the receiving block.
[0013] Optionally, each roof bracket is fixedly connected to both sides with a reinforcing rod, and the bottom of each reinforcing rod is vertically fixedly connected to a reinforcing column. Each receiving block is provided with a reinforcing groove, and the reinforcing column can be tightly inserted into the corresponding reinforcing groove.
[0014] Optionally, the roof support is in a triangular structure, each of the roof panels is in an inverted V shape, and the roof panels are connected to the corresponding roof support via fasteners; Half of the roof panels are provided with step portions on both sides, and the other half of the roof panels are provided with step grooves on both sides, and the step portions can be closely matched with the corresponding step grooves to achieve close overlap of the plurality of roof panels; A plurality of glue injection holes are respectively provided through each of the step portions, and the sealing foam glue can be injected into the connection position of the two roof panels through the glue injection holes to improve the sealing effect between the two adjacent roof panels.
[0015] In a second aspect, the present invention provides a method for constructing a food logistics and emergency material storage depot, comprising the following steps: S1, surveying and setting out and settlement observation; S2, foundation treatment project: according to the surrounding terrain and survey report of the site, the construction site is backfilled with soil and the ground is leveled. The ground is compacted by a rammer with a weight of 10-40T, a hammer diameter of 2.2-3.6m, a round bottom surface, and a static pressure of 25-60Kpa at the bottom of the hammer. The rammer drop distance is not less than 13.6m, and the effective reinforcement depth of a single click is not less than 6 meters. At the same time, the compaction operation adopts two times of spot tamping and two times of full tamping. The first time is spot tamping, forming a square with a side length of 5m, and the number of hits is not less than 12. The second time is spot tamping, forming a plum blossom shape with the first time of spot tamping, and the number of hits is not less than 10. The third time is full tamping, the hammer prints are tangent, and the number of hits is 3-5. The fourth time is full tamping, the hammer prints overlap 1 / 5-1 / 6, and the number of hits is 2. S3, earthwork: dig the foundation pit according to the design requirements, then backfill the earth, and perform compaction and leveling operations; S4, steel bar engineering: laying horizontal steel bars on the ground, tying and welding the steel bars to form the main structure of the ground steel bars, laying vertical steel bars on the main structure of the ground steel bars, tying and welding the steel bars to form the main structure of the wall steel bars, and at the same time, welding and fixing the receiving blocks to the main structure of the wall steel bars according to the design position requirements; S5, Formwork Engineering: Temporarily fix the casting formwork to the steel structure and the ground according to the design requirements; S6, Concrete Engineering: Pour concrete into the inner side of the casting formwork, and after the concrete solidifies, form the main frame of the storage warehouse floor and wall, and then remove the casting formwork; S7, masonry work: laying bricks according to design requirements to form supporting walls; S8, Scaffolding Engineering: Erect double-row scaffolding on the outside of the supporting wall and hang safety nets; S9, roofing project: hoist the roof support to the top of the supporting wall, connect the roof support to the receiving block, and then lay the roof board; S10, Energy-saving project: paste insulation board on the outer surface of the supporting wall, and construct a protective layer on the outer side of the insulation board; S11, building decoration and renovation project: plastering and painting the inner wall and ceiling of the supporting wall, and cement mortar powder finishing, putty filling and painting the outer wall of the supporting wall; S12, Installation Project: Install heating, ventilation and electrical facilities according to design requirements, and test the heating, ventilation and electrical facilities.
[0016] In summary, the present invention has the following beneficial effects: 1. The roof bracket and the receiving block adopt a mechanical locking structure, which does not need to be fixed by welding. The operation is simpler and faster, which can not only reduce the burden on the staff, but also improve the construction efficiency. At the same time, compared with welding fixation, this design will not have problems such as cold welding and leaking welding, thereby ensuring the stability of the connection and improving the stability of the use of the storage warehouse; 2. After the locking rod is inserted into the locking groove, the connecting thread on the locking rod can form a thread match with the thread groove, thereby improving the locking stability, thereby improving the connection stability between the roof bracket and the receiving block; 3. The locking rod is prevented from retreating by the cooperation of the elastic clamp and the stop ring, thereby further improving the locking effect and ensuring the stable connection between the roof bracket and the receiving block. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the embodiment; Figure 2 is a cross-sectional view of an embodiment; Figure 3 is a cross-sectional view of the positioning block and the receiving block in the embodiment, showing the state where the positioning block is not matched with the positioning groove; Figure 4 is a cross-sectional view of the positioning block and the receiving block in the embodiment, showing the state in which the positioning block and the positioning groove are matched; Figure 5 yes Figure 4 A magnified schematic diagram of the middle A area; Figure 6 is a cross-sectional view of a roof support in an embodiment; Figure 7 Schematic diagram of the structure of the roof panel in the embodiment.
[0018] 1. Support wall; 2. Roof bracket; 3. Roof board; 4. Receiver block; 5. Positioning block; 6. Positioning groove; 7. Support groove; 8. Locking rod; 9. Locking groove; 10. Hydraulic control unit; 101. Hydraulic chamber; 102. Hydraulic piston; 103. Control rod; 104. Hydraulic flow channel; 105. Check valve; 106. Control piston; 11. Guide column; 12. Guide groove; 13. Connecting thread; 14. Thread groove; 15. Check ring; 16. Mounting groove; 17. Elastic retaining ring; 18. Guide ramp; 19. Shear pin; 20. Shear groove; 21. Reinforcement rod; 22. Reinforcement column; 23. Reinforcement groove; 24. Step portion; 25. Step groove; 26. Glue injection hole. DETAILED DESCRIPTION
[0019] The present invention is further described in detail below in conjunction with the accompanying drawings.
[0020] Reference Figure 1-Figure 7 The present invention discloses a food logistics and emergency material storage warehouse, including a supporting wall 1, a plurality of roof brackets 2 and a plurality of roof panels 3. A plurality of receiving blocks 4 are respectively embedded at both sides of the top of the supporting wall 1. The receiving blocks 4 are welded and fixed to the steel bars in the supporting wall 1, and the upper surface of the receiving blocks 4 is flush with the upper surface of the supporting wall 1. At the same time, the receiving blocks 4 and the roof brackets 2 are arranged one by one.
[0021] Reference Figure 2 , Figure 3 , Figure 4 Rectangular positioning blocks 5 are vertically welded and fixedly connected to the two sides of the bottom of each roof bracket 2, and a rectangular positioning groove 6 is opened at the center position of the upper surface of each receiving block 4, and the positioning block 5 can be tightly inserted into the corresponding positioning groove 6, thereby limiting the installation position of the roof bracket 2, effectively reducing errors, and improving construction efficiency.
[0022] Reference Figure 3 , Figure 4The four inner walls of each positioning groove 6 are respectively provided with supporting grooves 7, and each supporting groove 7 is respectively connected with a locking rod 8 for horizontal sliding. At the same time, the four side walls of each positioning block 5 are respectively provided with locking grooves 9, and the locking rods 8 and the locking grooves 9 are arranged one by one.
[0023] Reference Figure 3 , Figure 4 A hydraulic control unit 10 is provided on each receiving block 4. When the positioning block 5 falls into the corresponding positioning groove 6, the hydraulic control unit 10 can control the corresponding four locking rods 8 to move synchronously, and make the ends of the four locking rods 8 close to each other be inserted into the corresponding locking grooves 9 respectively, so as to realize the locking between the positioning block 5 and the receiving block 4, and then realize the connection between the roof bracket 2 and the receiving block 4.
[0024] Since the roof bracket 2 and the receiving block 4 adopt a mechanical locking structure, there is no need to fix them by welding, and the operation is simpler and faster, which can not only reduce the burden on the staff, but also improve the construction efficiency. At the same time, compared with welding fixation, this design will not have problems such as cold welding and leaking welding, thereby ensuring the stability of the connection, thereby improving the stability of the use of the reserve warehouse. Of course, after the roof bracket 2 and the receiving block 4 are connected, the connection position of the roof bracket 2 and the receiving block 4 can also be repaired according to actual needs, so as to further improve the connection stability.
[0025] Reference Figure 3 , Figure 4 Each hydraulic control unit 10 includes a hydraulic chamber 101 disposed inside the receiving block 4. The hydraulic chamber 101 is located directly below the positioning groove 6 and is filled with a hydraulic medium. At the same time, a hydraulic piston 102 is vertically slidably connected in the hydraulic chamber 101, and the hydraulic medium is located below the hydraulic piston 102, so that the hydraulic piston 102 can squeeze the hydraulic medium.
[0026] Reference Figure 3 , Figure 4 The top of the hydraulic piston 102 is vertically fixedly connected with a control rod 103, the top of the control rod 103 extends to the inside of the positioning groove 6, and is vertically slidably connected with the receiving block 4. Four hydraulic channels 104 are arranged inside the receiving block 4, one end of the four hydraulic channels 104 is respectively connected with the hydraulic chamber 101, and the other end is respectively connected with the corresponding support groove 7, each hydraulic channel 104 is respectively provided with a one-way valve 105, and the one-way valve 105 is used to limit the hydraulic medium to enter only the support groove 7. At the same time, a control piston 106 is horizontally slidably connected in each support groove 7, and the ends of the four locking rods 8 that are away from each other are respectively connected with the corresponding control piston 106.
[0027] When the positioning block 5 falls into the positioning groove 6, the control rod 103 drives the hydraulic piston 102 to move downward under the pressure of the positioning block 5, and the hydraulic medium in the hydraulic chamber 101 enters the support groove 7 through the hydraulic channel 104, and pushes the control piston 106 to drive the corresponding locking rod 8 to move, and make the locking rod 8 abut against the side wall of the positioning block 5. As the positioning block 5 continues to fall, the pressure of the hydraulic medium gradually increases. When the locking groove 9 is aligned with the locking rod 8, the control piston 106 drives the locking rod 8 to continue to move under the pressure of the hydraulic medium. When the locking rod 8 is inserted into the locking groove 9, the connection between the positioning block 5 and the receiving block 4 can be achieved.
[0028] This design allows the roof bracket 2 to be automatically connected to the receiving block 4 during the installation process of the roof bracket 2 by the staff, effectively improving the linkage and coordination effect between the various components, improving resource utilization efficiency, while also saving time and reducing the burden on the staff.
[0029] Reference Figure 3 , Figure 4 , Figure 5 The locking rod 8 is cylindrical, and the locking rod 8 is rotatably connected to the corresponding control piston 106 through a sealed bearing. The inner side wall of each support groove 7 is fixedly connected with a guide column 11, and the side wall of each locking rod 8 is provided with a threaded guide groove 12, and the guide column 11 is slidably matched with the corresponding guide groove 12. When the locking rod 8 moves horizontally, the locking rod 8 can also rotate around its own axis to improve the guiding effect, so that the locking rod 8 can be smoothly inserted into the corresponding locking groove 9.
[0030] Reference Figure 3 , Figure 4 , Figure 5 The end of the locking rod 8 away from the corresponding control piston 106 is integrally formed with a connecting thread 13, and the inner wall of the locking groove 9 near the bottom of the groove is provided with a thread groove 14, the connecting thread 13 matches the thread groove 14, and the groove spacing of the thread groove 14 and the guide groove 12 is the same. When the locking rod 8 rotates, the connecting thread 13 can form a threaded connection with the thread groove 14, which improves the connection stability between the locking rod 8 and the positioning block 5, and also improves the locking stability, thereby achieving a stable connection between the roof bracket 2 and the receiving block 4.
[0031] Reference Figure 3 , Figure 4 , Figure 5 A retaining ring 15 is fixedly sleeved on the locking rod 8, a mounting groove 16 is circumferentially provided on the inner wall of the supporting groove 7, and a C-shaped elastic retaining ring 17 is embedded in the mounting groove 16. At the same time, a guide slope 18 is provided on the side of the retaining ring 15 away from the control piston 106.
[0032] When the locking rod 8 extends out from the supporting groove 7, the elastic snap ring 17 undergoes elastic deformation under the action of the guiding slope 18. When the connecting thread 13 forms a threaded connection with the thread groove 14, the backstop ring 15 passes over the elastic snap ring 17, that is, the elastic snap ring 17 is located between the control piston 106 and the backstop ring 15. At this time, the elastic snap ring 17 is reset to limit the retreat of the locking rod 8, thereby ensuring the stable connection between the locking rod 8 and the positioning block 5.
[0033] Reference Figure 3 , Figure 4 The bottom of the positioning groove 6 is horizontally fixed with a shear pin 19, and the side wall of the control rod 103 is provided with a shear groove 20, and the shear pin 19 is inserted into the shear groove 20. When the positioning block 5 falls into the positioning groove 6, the shear pin 19 can be sheared under the joint action of the positioning block 5 and the receiving block 4, and then the control rod 103 can move downward under the pressure of the positioning block 5.
[0034] This design can achieve the limiting of the control rod 103, the hydraulic piston 102 and other components, that is, to ensure that the control rod 103, the hydraulic piston 102 and other components are in the initial position, and the control rod 103 is subjected to external force to make the hydraulic medium enter the support groove 7, thereby ensuring that the locking rod 8 and other components are in the initial state, which is convenient for the staff to perform subsequent connection operations on the roof bracket 2 and the receiving block 4.
[0035] Reference Figure 2 , Figure 6 Each roof bracket 2 is fixedly connected to both sides with reinforcing rods 21, and the bottom of each reinforcing rod 21 is vertically fixedly connected with a reinforcing column 22. Each receiving block 4 is provided with a reinforcing groove 23, and the reinforcing column 22 can be tightly inserted into the corresponding reinforcing groove 23.
[0036] When the positioning block 5 falls into the positioning groove 6, the reinforcing column 22 also falls into the reinforcing groove 23. At this time, the reinforcing rod 21 can support the roof bracket 2, thereby improving the structural strength between the roof bracket 2 and the receiving block 4, thereby improving the structural stability of the storage warehouse. Of course, the reinforcing rod 21 and the receiving block 4 can be repaired by welding as needed in the later stage, so as to further improve the connection stability.
[0037] Reference Figure 1 , Figure 7 The roof support 2 is a triangular structure, each roof panel 3 is in an inverted V shape, and the roof panels 3 are connected to the corresponding roof support 2 by fasteners, so that multiple roof panels 3 can form an inverted V-shaped roof to improve the diversion effect of rain and snow.
[0038] Reference Figure 1 , Figure 7Half of the roof panels 3 are provided with step portions 24 on both sides, and the other half of the roof panels 3 are provided with step grooves 25 on both sides. The roof panels 3 provided with step portions 24 and step grooves 25 are arranged at intervals, and the step portions 24 can fit tightly with the corresponding step grooves 25 to achieve a tight overlap of multiple roof panels 3, while also improving the sealing effect between two adjacent roof panels 3.
[0039] Reference Figure 1 , Figure 7 Each step portion 24 is respectively penetrated with a plurality of glue injection holes 26, and the sealing foam can be injected into the connection position of the two roof panels 3 through the glue injection holes 26, thereby further improving the sealing effect between the two adjacent roof panels 3 and reducing the risk of roof water seepage.
[0040] The present invention also discloses a construction method for a food logistics and emergency material storage depot, comprising the following steps: S1, surveying and setting out, and settlement observation, S2, foundation treatment project: according to the surrounding terrain and survey report of the site, the construction site is backfilled with soil and the ground is leveled. The ground is compacted by a rammer with a weight of 10-40 tons, a hammer diameter of 2.2-3.6m, a round bottom surface, and a static pressure of 25-60Kpa. The rammer drop distance is not less than 13.6m, and the effective reinforcement depth of a single click is not less than 6 meters; At the same time, the compaction operation adopts two times of spot tamping and two times of full tamping. The first time is spot tamping, forming a square with a side length of 5m, and the number of hits is not less than 12. The second time is spot tamping, forming a plum blossom shape with the first time of spot tamping, and the number of hits is not less than 10. The third time is full tamping, the hammer marks are tangent, and the number of hits is 3-5. The fourth time is full tamping, the hammer marks overlap 1 / 5-1 / 6, and the number of hits is 2. S3, earthwork: dig the foundation pit according to the design requirements, then backfill the earth, and perform compaction and leveling operations; S4, steel bar engineering: laying horizontal steel bars on the ground, and tying and welding the steel bars to form the main structure of the ground steel bars, laying vertical steel bars on the main structure of the ground steel bars, and tying and welding the steel bars to form the main structure of the wall steel bars, and at the same time, welding and fixing the receiving block 4 to the main structure of the wall steel bars according to the design position requirements; S5, Formwork Engineering: Temporarily fix the casting formwork to the steel structure and the ground according to the design requirements; S6, Concrete Engineering: Pour concrete into the inner side of the casting formwork, and after the concrete solidifies, form the main frame of the storage warehouse floor and wall, and then remove the casting formwork; S7, masonry engineering: laying wall bricks according to design requirements to form a supporting wall 1; S8, scaffolding engineering: set up double-row scaffolding outside the supporting wall 1 and hang a safety net; S9, roof engineering: hoist the roof bracket 2 to the top of the supporting wall 1, connect the roof bracket 2 with the receiving block 4, and then lay the roof board 3; S10, energy-saving project: affixing a heat-insulating board to the outer surface of the supporting wall 1, and constructing a protective layer on the outer side of the heat-insulating board; S11, building decoration and renovation project: plastering and painting the inner wall and ceiling of the supporting wall 1, and performing cement mortar powder finishing, putty filling and painting on the outer wall of the supporting wall 1; S12, Installation Project: Install heating, ventilation and electrical facilities according to design requirements, and test the heating, ventilation and electrical facilities.
[0041] The specific embodiments are merely explanations of the present invention and are not limitations of the present invention. After reading this specification, those skilled in the art may make modifications to the embodiments without any creative contribution as needed. However, such modifications are protected by the patent law as long as they are within the scope of the claims of the present invention.
Claims
1. A food logistics and emergency material storage depot, comprising a supporting wall (1), a plurality of roof brackets (2) and a plurality of roof panels (3), characterized in that: A plurality of receiving blocks (4) are respectively pre-buried at two sides of the top of the supporting wall (1), and the receiving blocks (4) are arranged in a one-to-one correspondence with the roof brackets (2); Rectangular positioning blocks (5) are respectively vertically fixedly connected to the two sides of the bottom of each roof bracket (2), and each receiving block (4) is respectively provided with a rectangular positioning groove (6), and the positioning block (5) can be tightly inserted into the corresponding positioning groove (6); The four inner walls of each positioning groove (6) are respectively provided with supporting grooves (7), each supporting groove (7) is respectively connected with a locking rod (8) in a horizontal sliding manner, and the four side walls of each positioning block (5) are respectively provided with a locking groove (9); Each receiving block (4) is provided with a hydraulic control unit (10). When the positioning block (5) falls into the corresponding positioning groove (6), the hydraulic control unit (10) can control the corresponding four locking rods (8) to move synchronously, and make the ends of the four locking rods (8) close to each other be inserted into the corresponding locking grooves (9).
2. A food logistics and emergency material reserve according to claim 1, characterized in that: Each of the hydraulic control units (10) comprises: A hydraulic chamber (101) is arranged inside the receiving block (4) and is located directly below the positioning groove (6), and the hydraulic chamber (101) is filled with a hydraulic medium; A hydraulic piston (102) is vertically slidably connected in the hydraulic chamber (101) and is used to squeeze the hydraulic medium; A control rod (103) is vertically fixed to the top of the hydraulic piston (102), and the top of the control rod (103) extends to the inside of the positioning groove (6) and is vertically slidably connected to the receiving block (4); There are four hydraulic channels (104), one end of each of the four hydraulic channels (104) is connected to the hydraulic chamber (101) and the other end is connected to the corresponding support groove (7), and each hydraulic channel (104) is provided with a one-way valve (105), and the one-way valve (105) is used to restrict the hydraulic medium from entering only the support groove (7); There are four control pistons (106) which are respectively connected to the corresponding support grooves (7) in a horizontal sliding manner, and the ends of the four locking rods (8) which are away from each other are respectively connected to the corresponding control pistons (106).
3. A food logistics and emergency material reserve according to claim 2, characterized in that: The locking rod (8) is cylindrical, and the locking rod (8) is rotatably connected to the corresponding control piston (106) via a sealed bearing. The inner side wall of each support groove (7) is fixedly connected with a guide column (11), and the side wall of each locking rod (8) is provided with a threaded guide groove (12). The guide column (11) is slidably matched with the corresponding guide groove (12), so that the locking rod (8) can rotate around its own axis while moving horizontally.
4. A food logistics and emergency material reserve according to claim 3, characterized in that: A connecting thread (13) is provided at one end of the locking rod (8) away from the corresponding control piston (106), and a thread groove (14) is provided on the inner side wall of the locking groove (9) near its groove bottom position. The connecting thread (13) matches the thread groove (14), and the groove spacing between the thread groove (14) and the guide groove (12) is the same, so that the connecting thread (13) can form a threaded connection with the thread groove (14).
5. A food logistics and emergency material reserve according to claim 4, characterized in that: A retaining ring (15) is fixedly sleeved on the locking rod (8), and an installation groove (16) is provided on the inner side wall of the support groove (7) along its circumference. A C-shaped elastic retaining ring (17) is embedded in the installation groove (16). When the connecting thread (13) and the thread groove (14) form a threaded connection, the elastic retaining ring (17) is located between the control piston (106) and the retaining ring (15) to limit the retreat of the locking rod (8).
6. A food logistics and emergency material reserve according to claim 5, characterized in that: A guide slope (18) is provided on the side of the stop ring (15) away from the control piston (106).
7. A food logistics and emergency material reserve according to claim 2, characterized in that: A shear pin (19) is horizontally fixedly connected to the bottom of the positioning groove (6), a shear groove (20) is provided on the side wall of the control rod (103), and the shear pin (19) is inserted into the shear groove (20), and when the positioning block (5) falls into the positioning groove (6), the shear pin (19) can be sheared under the joint action of the positioning block (5) and the receiving block (4).
8. The food logistics and emergency material reserve according to claim 1, characterized in that: Reinforcement rods (21) are fixedly connected to both sides of each roof support (2), and a reinforcement column (22) is vertically fixedly connected to the bottom of each reinforcement rod (21). A reinforcement groove (23) is provided on each receiving block (4), and the reinforcement column (22) can be tightly inserted into the corresponding reinforcement groove (23).
9. A food logistics and emergency material reserve according to claim 1, characterized in that: The roof support (2) is in a triangular structure, each of the roof panels (3) is in an inverted V shape, and the roof panels (3) are connected to the corresponding roof support (2) via fasteners; Half of the roof panels (3) are provided with step portions (24) on both sides, and the other half of the roof panels (3) are provided with step grooves (25) on both sides, and the step portions (24) can be closely matched with the corresponding step grooves (25) to achieve close overlapping of the plurality of roof panels (3); A plurality of glue injection holes (26) are respectively provided through each of the step portions (24), and the sealing foam glue can be injected into the connection position of the two roof panels (3) through the glue injection holes (26) to improve the sealing effect between the two adjacent roof panels (3).
10. A method for constructing a food logistics and emergency material storage depot according to any one of claims 1 to 9, characterized in that: The steps include: S1, surveying and setting out and settlement observation; S2, foundation treatment project: according to the surrounding terrain and survey report of the site, the construction site is backfilled with soil and the ground is leveled. The ground is compacted by a rammer with a weight of 10-40T, a hammer diameter of 2.2-3.6m, a round bottom surface, and a static pressure of 25-60Kpa at the bottom of the hammer. The rammer drop distance is not less than 13.6m, and the effective reinforcement depth of a single click is not less than 6 meters. At the same time, the compaction operation adopts two times of spot tamping and two times of full tamping. The first time is spot tamping, forming a square with a side length of 5m, and the number of hits is not less than 12. The second time is spot tamping, forming a plum blossom shape with the first time of spot tamping, and the number of hits is not less than 10. The third time is full tamping, the hammer prints are tangent, and the number of hits is 3-5. The fourth time is full tamping, the hammer prints overlap 1 / 5-1 / 6, and the number of hits is 2. S3, earthwork: dig the foundation pit according to the design requirements, then backfill the earth, and perform compaction and leveling operations; S4, reinforcement engineering: laying horizontal reinforcements on the ground, and tying and welding the reinforcements to form a main reinforcement structure of the ground, laying vertical reinforcements on the main reinforcement structure of the ground, and tying and welding the reinforcements to form a main reinforcement structure of the wall, and at the same time, welding and fixing the receiving block (4) to the main reinforcement structure of the wall according to the design position requirements; S5, Formwork Engineering: Temporarily fix the casting formwork to the steel structure and the ground according to the design requirements; S6, Concrete Engineering: Pour concrete into the inner side of the casting formwork, and after the concrete solidifies, form the main frame of the storage warehouse floor and wall, and then remove the casting formwork; S7, masonry engineering: laying bricks according to design requirements to form a supporting wall (1); S8, scaffolding engineering: erect double-row scaffolding on the outside of the supporting wall (1) and hang a safety net; S9, roofing project: hoisting the roof support (2) to the top of the supporting wall (1), connecting the roof support (2) with the receiving block (4), and then laying the roof board (3); S10, energy-saving project: affixing a heat-insulating board to the outer surface of the supporting wall (1), and constructing a protective layer on the outer side of the heat-insulating board; S11, building decoration and renovation project: plastering and painting the inner wall and ceiling of the supporting wall (1), and performing cement mortar powder finishing, putty filling and paint painting on the outer wall of the supporting wall (1); S12, Installation Project: Install heating, ventilation and electrical facilities according to design requirements, and test the heating, ventilation and electrical facilities.