Tire curing bladder preassembling device and preassembling method

By designing a pre-installed device for tire vulcanization capsules, the automatic disassembly of old vulcanization capsules and the installation of new vulcanization capsules is achieved using mechanical devices and machine vision functional modules, which solves the problems of long replacement process and waste of energy in the existing technology, and improves replacement Efficiency and safety.

CN119305079AActive Publication Date: 2025-01-14NANJING YATONG RUBBER PLASTIC
View PDF 14 Cites 0 Cited by

Patent Information

Application Number
CN202411702001.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-26
Publication Date
2025-01-14
Estimated Expiration
2044-11-26

AI Technical Summary

Technical Problem

In the prior art, the replacement process of tire vulcanized capsules requires waiting for the ambient temperature to decrease, resulting in a long replacement time and waste of energy, and the traditional disassembly and assembly methods are inconvenient for automation.

Method used

Design a pre-installed device for tire vulcanization capsules, including movable frame assembly, conversion assembly and disassembly assembly, through mechanical devices, automatic disassembly of old vulcanized capsules and installation of new vulcanized capsules, and use machine vision functional modules and driving mechanisms to improve disassembly Reliability and convenience of installation.

Benefits of technology

The vulcanized capsule replacement process is shortened, the ambient temperature drop is reduced, the amount of steam required for heating is saved, and the safety and efficiency of the replacement process is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119305079A_ABST
    Figure CN119305079A_ABST
Patent Text Reader

Abstract

The invention relates to a tire curing bladder preassembling device and preassembling method, and relates to the technical field of curing bladder production, the tire curing bladder preassembling device comprises a movable frame body assembly, a conversion assembly and a dismounting assembly; a new part station for placing a new vulcanizing capsule and an old part station for placing an old vulcanizing capsule are formed on the conversion assembly, and the conversion assembly is used for exchanging the positions of the new part station and the old part station; and the dismounting assembly is used for dismounting the old vulcanizing capsule from the vulcanizing device, placing the old vulcanizing capsule on the old piece station and mounting the new vulcanizing capsule on the new piece station on the vulcanizing device. The device has the advantages that the curing bladder can be replaced without waiting for the reduction of the field environment temperature, the whole replacement process of the curing bladder is shortened, the reduction range of the tire manufacturing field environment temperature is reduced, meanwhile, when the old curing bladder is replaced, the new curing bladder is preheated in the field high-temperature environment, and the replacement efficiency is improved. The amount of steam required for increasing the temperature of a tire manufacturing site to the working temperature is reduced, and the effect of saving energy is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of vulcanization bladder production, and in particular to a tire vulcanization bladder pre-installation device and pre-installation method. Background Art

[0002] Tire curing bladder plays a vital role in the tire manufacturing process. As the inner mold of the tire mold, its main function is to form internal pressure by filling compressed air, nitrogen or superheated water during the vulcanization process, so that the tire rubber blank can be vulcanized quickly at high temperature. This method not only conducts heat quickly and efficiently, but also is easy to operate and reduces labor intensity. Due to the repeated expansion and contraction of the vulcanizing bladder and the high pressure and high temperature state, the vulcanizing bladder may crack after making 300-500 tire blanks, and needs to be replaced. The traditional way is to separate and install manually. In order to ensure the safety of the disassembly and assembly personnel, it is necessary to wait until the ambient temperature of the tire production site drops before the disassembly and assembly personnel replace the vulcanizing bladder, which prolongs the entire vulcanizing bladder replacement process and causes the ambient temperature of the tire production site to drop significantly. After the new vulcanizing bladder is replaced, more steam is needed to raise the temperature of the tire production site to the working temperature, resulting in energy waste. Summary of the invention

[0003] In order to improve the problem that manual replacement of vulcanization bladders takes a long time, causing the ambient temperature at the tire manufacturing site to drop significantly and resulting in energy waste, the present application provides a tire vulcanization bladder preinstallation device and preinstallation method.

[0004] On the one hand, the present application provides a tire curing bladder pre-installation device adopts the following technical solution: A tire curing bladder pre-installation device comprises a movable frame assembly, a conversion assembly, and a disassembly assembly; The conversion assembly is arranged on the movable frame assembly, and forms a new part station for placing a new vulcanizing bladder and an old part station for placing an old vulcanizing bladder, and is used to swap the positions of the new part station and the old part station; The disassembly assembly is arranged on the movable frame assembly, and is used for disassembling the old vulcanizing bladder from the vulcanizing device, placing the old vulcanizing bladder on the old part station, and installing the new vulcanizing bladder on the new part station on the vulcanizing device.

[0005] By adopting the above technical scheme, when replacing the old vulcanizing bladder, the new vulcanizing bladder is first placed at the new part station of the conversion assembly, and then the movable frame assembly drives the conversion assembly and the disassembly assembly to move, and the disassembly assembly is moved to above the old vulcanizing airbag on the vulcanizing device, the disassembly assembly removes the old vulcanizing bladder and places it at the old part station of the conversion assembly, the rotating assembly switches the old part station with the new part station, the disassembly assembly moves the new vulcanizing bladder to the vulcanizing device, and installs the new vulcanizing bladder, and finally the movable frame assembly withdraws from the tire manufacturing site, and the vulcanizing bladder is replaced by a mechanical device, so that the vulcanizing bladder can be replaced without waiting for the ambient temperature at the site to drop, thereby shortening the entire vulcanizing bladder replacement process and reducing the drop in ambient temperature at the tire manufacturing site. At the same time, when replacing the old vulcanizing bladder, the new vulcanizing bladder is in the on-site environment, and the high temperature environment at the site preheats the new vulcanizing bladder, reducing the amount of steam required to raise the temperature at the tire manufacturing site to the working temperature, thereby saving energy.

[0006] Preferably, the vulcanization bladder includes a bladder body and two groups of flange plate groups, the two groups of flange plate groups are arranged at the openings at both ends of the bladder body to form a connection structure between the vulcanization bladder and the vulcanization device, the bottom flange plate group is threadedly connected and fixed to the supply and discharge flow path seat in the vulcanization device, and the top flange plate group is sleeved on the central movable column in the vulcanization device, and the central movable column is provided with a support plate and a fixing nut, and the fixing nut can press the top flange plate group against and fix it on the support plate; The disassembly assembly includes a rotating disassembly component and a nut disassembly component. The nut disassembly component is used to drive the fixed nut to rotate so that the flange plate group at the top can be disassembled and assembled with the central movable column. The rotating disassembly component is used to drive the flange plate group at the bottom to rotate so that the flange plate group at the top can be disassembled and assembled with the supply and exhaust flow path seat.

[0007] By adopting the above technical solution, when disassembling the vulcanization bladder, first remove the fixing nut from the central moving column by the nut removal part, and then remove the bottom flange plate group from the supply and discharge flow path seat by rotating the disassembly part to complete the disassembly of the old vulcanization bladder; when installing the new vulcanization bladder, screw the bottom flange plate group onto the supply and discharge flow path seat, overlap the top flange plate group on the support plate, and fix the top flange plate group on the support plate by screwing the fixing nut to complete the installation of the vulcanization bladder. During the disassembly and assembly process, there is no need to screw too many bolts, thereby improving the convenience of disassembly and assembly of the vulcanization bladder.

[0008] Preferably, the nut disassembly and assembly part includes a first linear mechanism, a nut sleeve, and a rotation driving mechanism. The first linear mechanism is arranged on the movable frame assembly and is used to drive the rotation driving mechanism to move. The rotation driving mechanism is arranged on the first linear mechanism and is used to drive the nut sleeve to rotate. The nut sleeve can be sleeved on the fixed nut so as to be able to screw the fixed nut. The rotation driving mechanism drives the nut sleeve through a machine vision function module so that the nut sleeve can be sleeved on the fixed nut.

[0009] By adopting the above technical solution, when disassembling and assembling the fixing nut, the machine vision function module first aligns the nut sleeve with the fixing nut, and then the first linear mechanism drives the nut sleeve to approach the fixing nut, and then the machine vision function module controls the rotation drive mechanism to drive the nut sleeve to rotate, so that the hexagonal hole of the nut sleeve corresponds to the fixing nut, so that the nut sleeve can be stably and reliably sleeved on the fixing nut, and then the first linear mechanism drives the nut sleeve to be sleeved on the fixing nut, and the rotation drive unit drives the nut sleeve to rotate, thereby realizing the disassembly and assembly of the fixing nut, and improving the reliability and convenience of the disassembly and assembly of the fixing nut.

[0010] Preferably, the rotating disassembly component includes a second linear mechanism, a rotating mechanism and a direct insertion mechanism. The second linear mechanism is arranged on the movable frame assembly and is used to drive the rotating mechanism to move up and down. The rotating mechanism is arranged on the second linear mechanism and is used to drive the direct insertion mechanism to rotate. A disassembly rod is provided on the direct insertion mechanism, and a slot is provided on the peripheral side wall of the flange plate group at the bottom. The direct insertion mechanism can drive the disassembly rod to be inserted into the slot, so that the rotating mechanism can drive the flange plate group at the bottom to rotate.

[0011] By adopting the above technical solution, when the flange plate group at the bottom is disassembled and assembled, the second linear mechanism drives the disassembly rod to move downward to the side of the flange plate group at the bottom, and then the straight insertion mechanism drives the disassembly rod to be inserted into the slot, and then the rotating mechanism drives the disassembly rod to rotate, thereby driving the flange plate group at the bottom to rotate, and the vulcanization bladder is disassembled from the vulcanization device, and then the second linear mechanism drives the disassembly rod to lift, and the disassembly rod can remove the old vulcanization bladder from the vulcanization device by plugging into the slot, thereby improving the automatic disassembly of the old vulcanization bladder; When installing a new vulcanization bladder, the straight insertion mechanism drives the disassembly rod to be inserted into the slot, and then the second linear mechanism drives the new vulcanization bladder to move down to the supply and discharge flow path seat, and then the rotating mechanism drives the disassembly rod to rotate, thereby driving the bottom flange plate group to be screwed onto the supply and discharge flow path seat, and then the nut sleeve is used to screw the fixing nut to complete the installation of the new vulcanization bladder.

[0012] Preferably, the disassembly and assembly rod includes a first rod body and a second rod body, the first rod body is connected to the direct insertion mechanism, the second rod body can be inserted into the slot, the first rod body is provided with a connecting sleeve, the second rod body is slidably inserted into the connecting sleeve, the first rod body and the second rod body are connected by a telescopic spring, and the telescopic spring can push the second rod body to abut against the peripheral side wall of the flange plate group at the bottom.

[0013] By adopting the above technical solution, when the disassembly rod is inserted into the slot, the straight insertion mechanism drives the second rod to move to the peripheral side wall of the bottom flange plate group through the first rod, and the telescopic spring pushes the second rod to abut against the peripheral side wall of the bottom flange plate group, and then the rotating mechanism drives the second rod to slide on the bottom flange plate group. When the second rod slides to be opposite to the slot, the telescopic spring pushes the second rod to be inserted into the slot, thereby improving the convenience of the disassembly rod and the slot.

[0014] Preferably, the movable frame assembly includes a frame and an adjustment frame, the conversion assembly and the disassembly assembly are both arranged on the adjustment frame, the adjustment frame is connected to the frame through a space adjustment mechanism to be able to adjust the position of the nut sleeve, and the machine vision function module is connected to the space adjustment mechanism to enable the nut sleeve to be aligned with the fixing nut.

[0015] By adopting the above technical solution, when adjusting the position of the nut sleeve, the machine vision function module controls the plane adjustment mechanism to drive the adjustment frame to move, and the adjustment frame drives the nut sleeve to move and align with the fixed nut. There is no need to move the entire movable frame assembly, thereby improving the convenience of adjusting the position of the nut sleeve.

[0016] Preferably, the conversion assembly includes a first placement plate, a second placement plate and two connecting rods, the new and old vulcanization capsules are placed on the first placement plate and the second placement plate respectively, the two connecting rods are respectively located on both sides of the first placement plate and the second placement plate, each of the connecting rods is rotatably connected to the first placement plate and the second placement plate through a rotating shaft, the two rotating shafts on the first placement plate or the second placement plate are arranged in parallel, and a hinge shaft is fixedly provided in the middle part of each of the connecting rods, and the hinge shaft is rotatably connected to the adjustment frame, so that the first placement plate and the second placement plate can be switched between the new part station and the old part station.

[0017] By adopting the above technical solution, when the old vulcanization bladder is placed on the second placement plate, the two hinged shafts are driven to rotate synchronously respectively. During the rotation process, the first placement plate and the second placement plate are always kept level with the ground to ensure the stability of the placement of the new and old vulcanization bladders. Then the first placement plate and the second placement plate exchange positions. During this process, since the rotation centers of the two connecting rods are located at their own center positions, there is no need to re-position the new vulcanization bladder, thereby improving the accuracy of the exchange position positioning of the new and old vulcanization bladders and the positioning accuracy.

[0018] Preferably, molding grooves are provided on the circumferential side walls of the two groups of flange plate groups, and the vulcanizing capsule is provided with support rods inserted into the two molding grooves, and the support rods are used to support the two flange plate groups. The first placement plate is provided with a clamping and unloading piece, and the clamping and unloading piece can clamp the support rods and pull the support rods out of the molding grooves.

[0019] By adopting the above technical solution, the support rod is inserted into the forming grooves on the two groups of flange plate groups, so that the stability of the positions of the two groups of flange plate groups can be ensured, which is convenient for positioning the vulcanization bladder; when the disassembly rod is inserted into the slot on the flange plate group at the bottom of the new vulcanization bladder, the clamping unloading piece clamps the support rod and pulls the support rod out of the forming groove, which effectively avoids the influence of the support rod on the expansion of the vulcanization bladder.

[0020] Preferably, a positioning block is provided on the first placement plate, and the positioning block includes a guiding portion and a positioning portion, the positioning portion can be inserted into the inner hole of the flange plate group at the bottom and matched with the inner hole of the flange plate group, and the guiding portion can guide the flange plate group at the bottom to be sleeved on the positioning portion.

[0021] By adopting the above technical solution, when a new vulcanizing bladder is placed on the first placement plate, the positioning portion guides the flange plate assembly at the bottom to be sleeved on the positioning portion, thereby improving the accuracy of the placement position of the vulcanizing bladder on the first placement plate.

[0022] On the other hand, the present application also provides a tire curing bladder pre-installation method using the following technical solution: A tire curing bladder pre-installation method, using a tire curing bladder pre-installation device, comprises the following steps: S1. Place the new curing bladder at the new part station of the conversion assembly; S2, the movable frame assembly drives the conversion assembly and the disassembly assembly to move, and moves the disassembly assembly to the top of the old vulcanizing airbag on the vulcanizing device; S3, dismantle the old vulcanizing bladder by disassembling the assembly and place it at the old part station of the conversion assembly; S4, rotating the assembly to switch the positions of the old workpiece station and the new workpiece station; S5. Disassemble the assembly, move the new vulcanizing bladder to the vulcanizing device, and install the new vulcanizing bladder; S6. The movable frame assembly is evacuated from the tire manufacturing site.

[0023] In summary, the present application includes at least one of the following beneficial technical effects: 1. The vulcanizing bladder is replaced by mechanical devices instead of manual methods, so there is no need to wait until the ambient temperature on site drops before replacing the vulcanizing bladder, thus shortening the entire vulcanizing bladder replacement process and reducing the drop in ambient temperature on the tire manufacturing site. At the same time, when replacing the old vulcanizing bladder, the new vulcanizing bladder is in the on-site environment, and the high temperature environment on site preheats the new vulcanizing bladder, reducing the amount of steam required to raise the temperature on the tire manufacturing site to the working temperature, saving energy; 2. The two hinged shafts are driven to rotate synchronously. During the rotation process, the first placement plate and the second placement plate are always kept horizontal with the ground to ensure the stability of the placement of the new and old vulcanizing bladders. Then the first placement plate and the second placement plate are exchanged. During this process, since the rotation centers of the two connecting rods are located at their own center positions, there is no need to re-position the new vulcanizing bladder, thereby improving the accuracy of the exchange position positioning of the new and old vulcanizing bladders and the positioning accuracy; 3. By inserting the support rod into the molding grooves on the two sets of flange plates, the stability of the positions of the two sets of flange plates can be ensured, which is convenient for positioning the vulcanization bladder; when the disassembly rod is inserted into the slot on the flange plate group at the bottom of the new vulcanization bladder, the clamping unloading piece clamps the support rod and pulls the support rod out of the molding groove, effectively avoiding the influence of the support rod on the expansion of the vulcanization bladder. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a structural schematic diagram of a tire curing bladder pre-installation device according to an embodiment of the present application.

[0025] Figure 2 It is a schematic diagram used to show the structure of the vulcanization bladder.

[0026] Figure 3 is along Figure 2 Section view along line AA.

[0027] Figure 4 It is a structural diagram used to show the conversion component.

[0028] Figure 5 is along Figure 4 Cross-sectional view along line BB.

[0029] Figure 6 It is a schematic diagram used to show the structure of the connecting rod.

[0030] Figure 7 is along Figure 4 Sectional view along the CC line.

[0031] Figure 8 is along Figure 4 Sectional view along line DD.

[0032] Fig. 9 It is a structural diagram for showing the direct insertion mechanism.

[0033] Fig.10 yes Figure 7 Enlarged view of middle part E.

[0034] Fig.11 yes Figure 8 Enlarged view of part F in the middle.

[0035] Description of the accompanying drawings: 1. movable frame assembly; 11. frame; 12. adjustment frame; 13. space adjustment mechanism; 131. X-axis movable frame; 132. Z-axis movable frame; 141. replacement station; 142. standby station; 2. conversion assembly; 21. first placement plate; 22. second placement plate; 23. connecting rod; 24. rotating shaft; 25. hinge shaft; 26. first motor; 27. positioning block; 271. positioning part; 272. guide part; 273. first permanent magnet; 28. clamping unloading member; 281. straight linear cylinder; 282, connecting rod; 283, second permanent magnet; 3, disassembly assembly; 31, rotating disassembly component; 311, second linear mechanism; 3111, second cylinder; 312, rotating mechanism; 3121, rotating gear; 3122, second motor; 3123, driving gear; 3124, rotating groove; 3125, rotating part; 313, direct insertion mechanism; 3131, third motor; 3132, driving gear; 314, mounting seat; 3141, first guide rod; 3142, second guide rod; 3143, first A mounting plate; 3144, a second mounting plate; 3145, a first baffle; 3146, a first spring; 3147, a second baffle; 3148, a second spring; 315, a mounting ring; 316, a disassembly rod; 3161, a first rod body; 3162, a second rod body; 3163, a sliding support cylinder; 3164, a connecting sleeve; 3165, a telescopic spring; 32, a nut disassembly member; 321, a first linear mechanism; 3211, a first cylinder; 3212, a base plate; 322, a nut sleeve; 3221, a hexagonal sleeve hole; 3222, center hole; 3223, third permanent magnet; 323, rotation drive mechanism; 3231, rotating gear; 3232, power gear; 3233, fourth motor; 324, electromagnet; 41, new part station; 42, old part station; 5, vulcanizing capsule; 51, capsule body; 52, flange plate assembly; 53, shaping groove; 54, support rod; 55, slot; 61, supply and discharge flow path seat; 62, center moving column; 63, support plate; 64, fixing nut; 7, machine vision function module; 71, visual camera. DETAILED DESCRIPTION

[0036] The following is combined with Figure 1-11 This application is described in further detail.

[0037] The inventor of the present application has found that in the process of replacing the old vulcanizing bladder 5 on the existing vulcanizing device, in order to ensure the safety of the disassembling and assembling personnel, it is necessary to wait until the ambient temperature of the tire manufacturing site is lowered before the disassembling and assembling personnel replace the vulcanizing bladder 5, which easily leads to the prolongation of the entire vulcanizing bladder 5 replacement process, causing the ambient temperature of the tire manufacturing site to drop significantly, and more steam is required to raise the temperature of the tire manufacturing site to the working temperature, resulting in energy waste. For this reason, the present application mainly adopts mechanical equipment to replace the manual replacement of the old vulcanizing bladder 5, so that the vulcanizing bladder 5 can be replaced without waiting for the ambient temperature of the site to drop, thereby shortening the entire vulcanizing bladder 5 replacement process, reducing the drop in the ambient temperature of the tire manufacturing site, and reducing the amount of steam required to raise the temperature of the tire manufacturing site to the working temperature, thereby achieving the effect of saving energy. The following is a further detailed description of the present application.

[0038] On the one hand, an embodiment of the present application discloses a tire curing bladder pre-assembly device.

[0039] Reference Figure 1 A tire curing bladder pre-installation device includes a movable frame assembly 1, a conversion assembly 2, and a disassembly assembly 3. The conversion assembly 2 is arranged on the movable frame assembly 1, and forms a new part station 41 for placing a new curing bladder 5 and an old part station 42 for placing an old curing bladder 5, and is used to swap the positions of the new part station 41 and the old part station 42. The disassembly assembly 3 is arranged on the movable frame assembly 1, and is used to disassemble the old curing bladder 5 from the curing device, place the old curing bladder 5 at the old part station 42, and install the new curing bladder 5 on the new part station 41 on the curing device.

[0040] When replacing the old vulcanization bladder 5, first place the new vulcanization bladder 5 at the new part station 41 of the conversion component 2, then the movable frame 11 component drives the conversion component 2 and the disassembly component 3 to move, and moves the disassembly component 3 to above the old vulcanization bladder 5 on the vulcanization device, the disassembly component 3 removes the old vulcanization bladder 5 and places it at the old part station 42 of the conversion component 2, the rotating component switches the position of the old part station 42 and the new part station 41, the disassembly component 3 moves the new vulcanization bladder 5 to the vulcanization device, and installs the new vulcanization bladder 5, and finally the movable frame 11 component evacuates the tire manufacturing site, and the replacement of the old vulcanization bladder 5 is completed.

[0041] Reference Figure 2 , Figure 3The vulcanization bladder 5 in this embodiment includes a bladder body 51 and two groups of flange plate groups 52 arranged in an upper and lower manner. The two groups of flange plate groups 52 are arranged at the openings at both ends of the bladder body 51. Each group of flange plate groups 52 includes two flange plates, one flange plate is located inside the bladder body 51, and the other flange plate is located outside the bladder body 51. The body wall of the bladder body 51 is located between the two flange plates. The two flange plates are connected by bolts, and the body wall of the bladder body 51 is clamped and fixed to form a connection structure at both ends of the bladder body 51. The vulcanization device is provided with a supply and discharge flow path seat 61 and a central movable column 62. The supply and discharge flow path seat 61 is cylindrical, and the central movable column 62 is slidably arranged in the supply and discharge flow path seat 61, and the upper and lower movements of its ends are realized by an external hydraulic cylinder. The inner hole diameter of the bottom flange plate group 52 is larger than the inner hole diameter of the top flange plate group 52, and the inner hole central movable column 62 of the top flange plate group 52 is slidably sealed. The flange plate group 52 at the bottom is sleeved on the supply and exhaust flow path seat 61 and is connected by threads. A support plate 63 and a fixing nut 64 are provided on the top of the central movable column 62. The support plate 63 is coaxially fixedly connected with the central movable column 62, and the diameter of the support plate 63 is smaller than the aperture of the inner hole of the bottom flange plate group 52, so that the support plate 63 can pass through the bottom flange plate group 52. The fixing nut 64 is threadedly sleeved on the central movable column 62. During installation, the top flange plate group 52 is located between the support plate 63 and the fixing nut 64. The fixing nut 64 presses and fixes the top flange plate group 52 on the support plate 63, thereby realizing the installation of the top flange plate group 52 and the central movable column 62.

[0042] Reference Figure 4 , Figure 5 In order to improve the stability of the shape of the vulcanizing bladder 5, two shaping grooves 53 are provided on the peripheral side walls of the top and bottom flange plate groups 52, and the two shaping grooves 53 are opposite to each other along the circumference of the flange plate group 52. The two flange plate groups 52 at the top and bottom are supported by a support rod 54, which is a U-shaped rod. One end of the support rod 54 is inserted into the shaping groove 53 of the top flange plate group 52, and the other end is inserted into the shaping groove 53 of the bottom flange plate group 52. The end of the support rod 54 is overfitted with the shaping groove 53, which improves the stability of the connection between the support rod 54 and the flange plate group 52. The shaping of the vulcanizing bladder 5 by the two support rods 54 is conducive to maintaining the stability of the shape of the vulcanizing bladder 5 and ensuring the centering of the two flange plate groups 52. Two slots 55 are provided on the peripheral side wall of one flange plate in the bottom flange plate group 52, and the two slots 55 are opposite to each other along the circumference of the flange plate.

[0043] Reference Figure 1The movable frame assembly 1 in this embodiment includes a frame 11 and an adjustment frame 12. The bottom of the frame 11 is rotatably provided with four wheels, and is equipped with a vehicle drive system to drive the four wheels to move. The frame 11 is also equipped with a vehicle supporting system such as a counterweight, a battery, an electric control box, and a steering rod, so that the operator can stand on the frame 11 to drive the chassis. The adjustment frame 12 is connected to the frame 11 through a space adjustment mechanism 13. The space adjustment mechanism 13 in this embodiment includes an X-axis moving frame 131 and a Z-axis moving frame 132. The X-axis moving frame 131 is slidably arranged on the frame 11, and is driven to slide along the X-axis direction by an electric cylinder structure arranged on the frame 11. The Z-axis moving frame 132 is slidably arranged on the X-axis moving frame 131, and is driven to slide along the Z-axis direction by an electric cylinder structure arranged on the X-axis moving frame 131. The adjustment frame 12 is slidably arranged on the Z-axis moving frame 132, and is driven to slide along the Y-axis direction by an electric cylinder arranged on the Z-axis moving frame 132.

[0044] Reference Figure 1 , Figure 4 A replacement station 141 and a standby station 142 are formed at the front and rear ends of the adjustment frame 12, respectively. The conversion assembly 2 in this embodiment includes a first placement plate 21, a second placement plate 22 and two connecting rods 23. The first placement plate 21 and the second placement plate 22 are arranged in parallel or in the same plane. Initially, the first placement plate 21 is located at the standby station 142 and is used as a new part station 41. The second placement plate 22 is located at the replacement station 141 and is used as an old part station 42. At this time, the first placement plate 21 and the second placement plate 22 are in the same plane. The new vulcanization bladder 5 is placed on the first placement plate 21, and the old vulcanization bladder 5 can be placed on the second placement plate 22. When the adjustment frame 12 is moved to the tire manufacturing site, during the replacement of the old vulcanization bladder 5, the high temperature at the tire manufacturing site preheats the new vulcanization bladder 5 on the first placement plate 21, thereby reducing the amount of steam used when the new vulcanization bladder 5 is heated to the working temperature, thereby achieving an energy-saving effect.

[0045] Reference Figure 4 , Figure 6 The two connecting rods 23 are respectively located on both sides of the first placement plate 21 and the second placement plate 22. Both ends of the two connecting rods 23 are fixed with rotating shafts 24. The rotating shafts 24 are vertically arranged with the connecting rods 23 and are rotatably inserted in the first placement plate 21 or the second placement plate 22 along the horizontal direction. The two rotating shafts 24 in the first placement plate 21 and the second placement plate 22 are arranged at intervals. A hinge shaft 25 is fixed at the middle position of the two connecting rods 23. The axes of the two hinge shafts 25 are coplanar. The two hinge shafts 25 are rotatably inserted on the adjusting frame 12. A first motor 26 is fixed on the adjusting frame 12. The first motor 26 corresponds to the hinge shaft 25 one by one. The output shaft of the first motor 26 is coaxially fixedly connected with the hinge shaft 25.

[0046] When the disassembly assembly 3 disassembles the old vulcanization bladder 5 and places it on the second placement plate 22 on the replacement station 141, the two first motors 26 synchronously drive the two connecting rods 23 to rotate. When the two connecting rods 23 rotate, the four hinge points formed with the first placement plate 21 and the second placement plate 22 are projected into the vertical plane to form a parallelogram structure, thereby ensuring that the first placement plate 21 and the second placement plate 22 are kept horizontal during use. When the connecting rod 23 rotates 180°, the first placement plate 21 rotates to the replacement station 141 together with the new vulcanization bladder 5, and the second placement plate 22 rotates to the standby station 142 together with the old vulcanization bladder 5, so that the positions of the new and old vulcanization bladders 5 are reversed, and there is no need to adjust the position of the new vulcanization bladder 5, thereby improving the accuracy of the position reversal of the new and old vulcanization bladders 5.

[0047] Reference Figure 4 , Figure 5 In order to improve the stability and position accuracy of the new vulcanization bladder 5 on the first placement plate 21, a positioning block 27 is fixed on the first placement plate 21. The positioning block 27 includes a positioning portion 271 and a guiding portion 272. The positioning portion 271 is cylindrical and matches the inner hole of the bottom flange plate group 52. When the vulcanization bladder 5 is placed on the first placement plate 21, the positioning portion 271 is plugged into the bottom flange plate group 52 to improve the position accuracy of the vulcanization bladder 5 on the first placement plate 21. The guiding portion 272 is located above the positioning portion 271 and is conical, which can guide the positioning portion 271 to be plugged into the inner hole of the bottom flange plate group 52, so that the positioning portion 271 is inserted into the bottom flange plate group 52. The first placement plate 21 is embedded with a first permanent magnet 273 to adsorb the bottom flange plate group 52, thereby improving the stability of the new vulcanization bladder 5 placed on the first placement plate 21.

[0048] Reference Figure 4 , Figure 5 A clamping and unloading member 28 is provided on the first placement plate 21. The clamping and unloading member 28 in this embodiment includes two linear cylinders 281. The two linear cylinders 281 are fixedly installed at the bottom of the first placement plate 21 and are arranged in opposite directions. A connecting rod 282 is fixedly provided on the piston rod of each linear cylinder 281. The connecting rod 282 extends from the edge of the first placement plate 21 to the top of the first placement plate 21, and a second permanent magnet 283 is fixedly provided at the end. The two second permanent magnets 283 respectively adsorb and fix the two support rods 54 on the new vulcanization capsule 5, and then the linear cylinder 281 drives the two connecting rods 282 to move away from each other, so as to pull the support rod 54 out of the molding groove 53.

[0049] Reference Figure 4 , Figure 7The disassembly assembly 3 in this embodiment includes a rotating disassembly component 31 and a nut disassembly component 32. The rotating disassembly component 31 in this embodiment includes a second linear mechanism 311, a rotating mechanism 312 and a straight insertion mechanism 313. The adjustment frame 12 is provided with a mounting seat 314 on the replacement station 141. A first guide rod 3141 and two second guide rods 3142 are slidably penetrated on the mounting seat 314. The first guide rod 3141 is located between the two second guide rods 3142. The first guide rod 3141 and the two second guide rods 3142 are both arranged in the vertical direction. A first mounting plate 3143 is fixedly provided at the bottom of the first guide rod 3141. A second mounting plate 3144 is commonly fixedly provided on the two second guide rods 3142. A first baffle plate 3145 is fixedly provided on the top of the first guide rod 3141. Two first springs 3146 are sleeved on the first guide rod 3141, and the two first springs 3146 are respectively located on the upper and lower sides of the mounting seat 314, and the two ends of one first spring 3146 are respectively abutted against the mounting seat 314 and the first baffle plate 3145, while the two ends of the other first spring 3146 are respectively abutted against the mounting seat 314 and the first mounting plate 3143.

[0050] Reference Figure 4 , Figure 7 A second baffle 3147 is fixedly provided on the top of each second guide rod 3142, and two second springs 3148 are sleeved on each second guide rod 3142. The two second springs 3148 on the same second guide rod 3142 are respectively located on both sides of the mounting seat 314, and the two ends of one second guide rod 3142 are respectively abutted against the first baffle 3145 and the mounting seat 314, and the two ends of the other second guide rod 3142 are respectively abutted against the mounting seat 314 and the second support plate.

[0051] Reference Figure 4 , Figure 7 The second linear mechanism 311 in this embodiment includes a second cylinder 3111, and in other embodiments it may also be a hydraulic cylinder, a linear screw, etc. There are two second cylinders 3111, and the cylinder bodies of the two second cylinders 3111 are fixedly mounted on the second mounting plate 3144, and the output shafts of the second cylinders 3111 are set downward, and a mounting ring 315 is fixedly provided on the output shafts of the two second cylinders 3111, and the axis of the mounting ring 315 is collinear with the central axis of the new vulcanizing bladder 5 located at the replacement station 141.

[0052] Reference Figure 7 , Figure 8The rotating mechanism 312 in this embodiment includes a rotating gear 3121, a second motor 3122, and a driving gear 3123. The rotating gear 3121 is coaxially rotatably arranged on the bottom surface of the mounting ring 315, and a through hole communicating with the inner hole of the mounting ring 315 is opened at the center position. A rotating groove 3124 is opened on the bottom wall of the mounting ring 315, and the opening of the rotating groove 3124 faces the center of the mounting ring 315. The rotating gear 3121 is provided with a rotating portion 3125 that cooperates with the rotating groove 3124. The rotating portion 3125 is inserted into the rotating groove 3124, so that the rotating gear 3121 is rotatably connected to the mounting ring 315. The second motor 3122 is fixedly arranged on the side wall of the mounting ring 315. The driving gear 3123 is coaxially fixedly arranged on the output shaft of the second motor 3122 and meshes with the rotating gear 3121, so that the second motor 3122 drives the rotating gear 3121 to rotate.

[0053] Reference Figure 7 , Fig. 9 The number of the direct insertion mechanism 313 is two groups, and the two groups of direct insertion mechanisms 313 are both arranged on the bottom wall of the rotating gear 3121 and are opposite to each other along the circumference of the rotating gear 3121. The direct insertion mechanism 313 in this embodiment includes a third motor 3131 and a driving gear 3132. Two disassembly rods 316 are slidably provided on the bottom wall of the rotating gear 3121. The two disassembly rods 316 are opposite to each other along the axial direction of the rotating gear 3121. Each disassembly rod 316 includes a first rod body 3161 and a second rod body 3162. The first rod body 3161 is a U-shaped rod. The two first rod bodies 3161 are arranged opposite to each other. The bottom wall of the rotating gear 3121 Two sliding support cylinders 3163 are fixedly provided on the top, and the sliding support cylinders 3163 correspond to the first rod bodies 3161 one by one. The first rod body 3161 is slidably inserted in the sliding support cylinder 3163, so that the first rod body 3161 is slidably connected with the rotating gear 3121. The first rod body 3161 is provided with a rack segment arranged along its own length direction. The third motor 3131 is fixedly arranged on the bottom wall of the rotating gear 3121. The driving gear 3132 is coaxially fixedly arranged on the output shaft of the third motor 3131 and meshes with the rack segment on the first rod body 3161, thereby driving the two first rod bodies 3161 to move closer to or away from each other.

[0054] Reference Figure 7 , Fig.10The end of the first rod 3161 is fixedly sleeved with a connecting sleeve 3164, the second rod 3162 is slidably inserted in the connecting sleeve 3164, a telescopic spring 3165 is arranged in the connecting sleeve 3164, one end of the telescopic spring 3165 is fixedly connected to the first rod 3161, and the other end is fixedly connected to the second rod 3162, and the end of the second rod 3162 can be inserted into the slot 55. The rotating gear 3121 is provided with an electromagnet 324, when the second rod 3162 is inserted into the slot 55, the electromagnet 324 adsorbs the flange plate group 52 at the top, so as to keep the shape of the vulcanizing bladder 5 stable.

[0055] When the flange plate group 52 at the bottom and the supply and exhaust flow path seat 61 are disassembled, the second cylinder 3111 drives the mounting ring 315 to descend to the old vulcanizing bladder 5, and makes the second rod 3162 descend to the height of the slot 55, and then the third motor 3131 drives the driving gear 3132 to rotate, and the driving gear 3132 drives the two first rods 3161 to approach each other, and the first rod 3161 drives the second rod 3162 to abut against the peripheral side wall of the flange plate group 52 at the bottom, and then the second motor 3122 drives the rotating gear 3121 to rotate, and the rotating gear 3121 drives the first rod 3161 to rotate, and the first rod 3161 drives the second rod body 3162 to rotate on the peripheral side wall of the bottom flange plate group 52. When the second rod body 3162 rotates to be opposite to the slot 55, the telescopic spring 3165 pushes the second rod body 3162 to be inserted into the slot 55, thereby improving the convenience of the disassembly and assembly rod 316 and the slot 55. Then the gear 3121 is rotated to continue to drive the second rod body 3162 to rotate, and the second rod body 3162 drives the bottom flange plate group 52 to rotate. The second spring 3148 is telescoped to adapt to the rotation of the bottom flange plate group 52 and drive the second cylinder 3111 to be lifted, thereby realizing the disassembly of the bottom flange plate group 52.

[0056] Reference Figure 7 , Figure 8The nut disassembly and assembly part 32 in this embodiment includes a first linear mechanism 321, a nut sleeve 322, and a rotation drive mechanism 323. The first linear mechanism 321 in this embodiment is a first cylinder 3211, and in other embodiments it can also be a hydraulic cylinder, an electric cylinder or the like. The cylinder body of the first cylinder 3211 is fixedly arranged on the first mounting plate 3143 and is arranged downwardly. A base plate 3212 is fixedly arranged on the piston rod of the first cylinder 3211. The rotation drive mechanism 323 in this embodiment includes a rotating gear 3231, a power gear 3232 and a fourth motor 3233. The rotating gear 3231 is rotatably connected to the bottom wall of the base plate 3212 through a gear shaft and is coaxially arranged with the rotating gear 3121. The fourth motor 3233 is fixedly arranged on the side wall of the base plate 3212. The power gear 3232 is coaxially fixedly arranged on the output shaft of the fourth motor 3233 and meshes with the rotating gear 3231. The nut sleeve 322 is coaxially fixedly arranged on the rotating gear 3231 and has an opening facing downward.

[0057] Reference Figure 8 , Fig.11 The nut sleeve 322 is provided with a hexagonal sleeve hole 3221 cooperating with the fixing nut 64 and a center hole 3222 cooperating with the center movable column 62 from bottom to top, and a third permanent magnet 3223 is provided at the step between the hexagonal sleeve hole 3221 and the center hole 3222. The third permanent magnet 3223 is used to adsorb the removed fixing nut 64 to ensure the stability of the fixing nut 64.

[0058] When the first cylinder 3211 and the second cylinder 3111 drive the nut sleeve 322 and the disassembly rod 316 to change their positions, the distance sensor is used to control the moving distance of the nut sleeve 322 and the disassembly rod 316. The motors used above all have a self-locking function to improve the stability of the replacement process.

[0059] Reference Figure 4 A machine vision function module 7 is provided on the adjustment frame 12, and the machine vision function module 7 includes a visual camera 71. The visual camera 71 controls the servo motor in the electric cylinder in the space adjustment mechanism 13 and the fourth motor 3233 to position the nut sleeve 322 and the fixing nut 64.

[0060] The first is center positioning: First, the camera needs to be calibrated to obtain the camera's intrinsic parameters (focal length, principal point coordinates, etc.) and extrinsic parameters (position vector and rotation matrix, etc.), which are used to convert the image coordinate system into a three-dimensional space coordinate system; detect feature points (such as corner points, edges, etc.) in the image, and find the corresponding points of these feature points in different images or models through matching algorithms; use the feature point matching results, combined with the camera's intrinsic and extrinsic parameters, and solve the camera's attitude (rotation and translation vectors) relative to the world coordinate system through geometric principles (such as the PnP problem, i.e., the Perspective-n-Point problem); in plane positioning, some markers with known positions (such as ArUco markers) are usually placed on the plane, and the camera determines its position on the plane by detecting these markers. Through the 2D image coordinates of the detected markers and their 3D coordinates in the world coordinate system, combined with the camera's intrinsic parameters, the camera's attitude (rotation vector and translation vector) can be solved using functions such as cv2.solvePnP(); for targets on the plane, the coordinates of the target can be determined by calculating the intersection of the ray from the camera to the target point and the known plane (such as the ground). This usually involves converting the target point in the camera coordinate system to the world coordinate system and calculating the intersection with the plane; once the position of the camera and the target in the world coordinate system is determined, this information can be used to control the corresponding servo motor to drive the mobile frame to move to the specified position. This usually involves path planning and obstacle avoidance algorithms to ensure that the mobile structure can reach the target position safely and efficiently; during the movement of the mobile structure, the visual camera 71 can continuously provide feedback and adjust the moving path by comparing the actual position and the target position to ensure that it reaches the destination accurately.

[0061] The second is the morphological positioning of the nut sleeve 322 and the fixed nut 64: first, the template posture image of the nut is obtained through calibration, and the nut is identified using an algorithm based on the improved Faster-RCNN. The rotation angle of the nut and the ratio relative to the template nut image are solved by an algorithm based on Fourier and logarithmic polar coordinate transformation, and then the rotation angle of the sleeve is obtained. The motion control law is established using the visual feedback error, which is converted into a Cartesian space error through the image Jacobian matrix. The fourth motor 3233 is controlled by a PI controller to drive the nut sleeve 322 to rotate, and the rotational freedom of the sleeve is adjusted to achieve posture alignment. Then the first cylinder 3211 drives the nut sleeve 322 to descend, so that the nut sleeve 322 is sleeved on the fixed nut 64.

[0062] The implementation principle of a tire curing bladder pre-installation device according to an embodiment of the present application is as follows: two support rods 54 are respectively inserted into the shaping grooves 53 of a new curing bladder 5 to shape the new curing bladder 5, and then the new curing bladder 5 is placed on the first placement plate 21, and the positioning portion 271 is inserted into the inner hole of the flange plate group 52 at the bottom, and the new curing bladder 5 is rotated so that the two support rods 54 are aligned with the two second permanent magnets 283.

[0063] The operator drives the carriage 11 to move to the work site, and then the visual camera 71 controls the electric cylinder to drive the X-axis moving frame 131 to rise along the Z-axis moving frame 132, and the Z-axis moving frame 132 slides along the carriage 11, and the adjustment frame 12 slides along the X-axis moving frame 131, so that the nut sleeve 322 is aligned with the fixed nut 64 on the central moving column 62, and the first cylinder 3211 drives the nut sleeve 322 to descend to the fixed nut 64, and then the visual camera 71 controls the fourth motor 3233 to drive The nut sleeve 322 rotates so that the posture of the nut sleeve 322 is opposite to the fixed nut 64, and then the first cylinder 3211 drives the nut sleeve 322 to descend and sleeve on the fixed nut 64. At this time, the fixed nut 64 is inserted into the hexagonal sleeve hole 3221, and the center movable column 62 is inserted into the center hole 3222. Then the fourth motor 3233 drives the nut sleeve 322 to rotate, and the fixed nut 64 is screwed and disassembled, and the third permanent magnet 3223 adsorbs the removed fixed nut 64.

[0064] The second cylinder 3111 drives the mounting ring 315 to descend to the old vulcanizing bladder 5, and makes the second rod body 3162 descend to the height of the slot 55, and then the third motor 3131 drives the driving gear 3132 to rotate, and the driving gear 3132 drives the two first rod bodies 3161 to approach each other, and the first rod body 3161 drives the second rod body 3162 to abut against the peripheral side wall of the flange plate group 52 at the bottom, and then the second motor 3122 drives the rotating gear 3121 to rotate, and the rotating gear 3121 drives the first rod body 3161 to rotate, and the first rod body 3161 drives the second rod body 3162 to rotate on the peripheral side wall of the flange plate group 52 at the bottom, and when the second rod body 3162 rotates to be opposite to the slot 55, the telescopic spring 3165 pushes the second rod body 3162 to be inserted into the slot 55, and then The rear rotating gear 3121 continues to drive the second rod body 3162 to rotate, and the second rod body 3162 drives the bottom flange plate group 52 to rotate. The second spring 3148 is extended and retracted to adapt to the rotation of the bottom flange plate group 52 and drive the second cylinder 3111 to lift, thereby realizing the disassembly of the bottom flange plate group 52, and then the first cylinder 3211 and the second cylinder 3111 are both contracted, and the second cylinder 3111 lifts the old vulcanization capsule 5 to a certain height, and then the first motor 26 drives the connecting rod 23 to rotate, and the connecting rod 23 drives the second placement plate 22 to rotate to the replacement station 141, and then the third motor 3131 drives the two disassembly and assembly rods 316 to move away from each other, and the old vulcanization capsule 5 is placed on the second placement plate 22, and then the second cylinder 3111 drives the disassembly and assembly rod 316 to continue to lift.

[0065] The first motor 26 drives the connecting rod 23 to rotate, and switches the positions of the first placement plate 21 and the second placement plate 22, so that the first placement plate 21 rotates to the replacement station 141, and the second placement plate 22 rotates to the standby station 142. At this time, the new vulcanization bladder 5 on the first placement plate 21 is aligned with the nut sleeve 322.

[0066] The first cylinder 3211 drives the disassembly rod 316 to descend to the height of the slot 55 on the new vulcanization capsule 5 on the first placement plate 21, and then the fourth motor 3233 drives the two disassembly rods 316 to approach each other, and the second rod body 3162 rotates on the peripheral side wall of the flange plate group 52 at the bottom. When the second rod body 3162 rotates to be opposite to the slot 55, the telescopic spring 3165 pushes the second rod body 3162 to insert into the slot 55, and at the same time, the electromagnet 324 adsorbs and fixes the top flange plate group 52, and then the linear cylinder 281 drives the second permanent magnet 283 to pull the two support rods 54 out of the molding groove 53 and separate from the new vulcanization capsule 5, and then the first cylinder 3211 drives the new vulcanization capsule 5 to lift.

[0067] The first motor 26 drives the connecting rod 23 to rotate to vertical, and the first placement plate 21 is removed from the replacement station 141. Then the second cylinder 3111 drives the new vulcanizing bladder 5 to fall onto the vulcanizing device, and the bottom flange plate group 52 is sleeved on the supply and discharge flow path seat 61, and the top flange plate group 52 is sleeved on the central moving column 62. At this time, the second spring 3148 pushes the thread of the inner hole of the bottom flange plate group 52 to engage with the thread on the supply and discharge flow path seat 61, and then the second motor 3122 drives the disassembly rod 316 to reverse, and the bottom flange plate group 52 is installed on the supply and discharge flow path seat 61.

[0068] The first cylinder 3211 drives the nut sleeve 322 to be sleeved on the central movable column 62, and the first spring 3146 pushes the fixed nut 64 to engage with the thread on the central movable column 62, and then the fourth motor 3233 drives the nut sleeve 322 to rotate, and the nut sleeve 322 drives the fixed nut 64 to be screwed onto the central movable column 62, and the top flange plate group 52 is pressed and fixed on the support plate 63, completing the installation and fixation of the top flange plate group 52 and the central movable column 62, thereby completing the installation of the new vulcanization bladder 5.

[0069] The third motor 3131 drives the two disassembly rods 316 to be pulled out of the slots 55, the first cylinder 3211 and the second cylinder 3111 contract, the nut sleeve 322 and the disassembly rod 316 are both lifted, and then the operator drives the frame 11 to evacuate the tire manufacturing site.

[0070] The present application mainly adopts mechanical equipment to replace the manual replacement of the old vulcanization bladder 5, so that the vulcanization bladder 5 can be replaced without waiting for the ambient temperature on site to drop, thereby shortening the entire vulcanization bladder 5 replacement process, reducing the drop in ambient temperature on the tire manufacturing site, and reducing the amount of steam required to raise the temperature on the tire manufacturing site to the working temperature, thereby achieving the effect of saving energy.

[0071] In addition, an embodiment of the present application also discloses a tire curing bladder pre-installation method.

[0072] A tire curing bladder pre-installation method, using the above-mentioned tire curing bladder pre-installation device, comprises the following steps: S1. Insert the two support rods 54 into the shaping grooves 53 of the new vulcanization bladder 5 respectively to shape the new vulcanization bladder 5, and then place the new vulcanization bladder 5 on the first placement plate 21, and insert the positioning portion 271 into the inner hole of the flange plate group 52 at the bottom, and rotate the new vulcanization bladder 5 so that the two support rods 54 are aligned with the two second permanent magnets 283.

[0073] S2. The operator drives the carriage 11 to the work site, and then the visual camera 71 controls the electric cylinder to drive the X-axis moving frame 131 to rise along the Z-axis moving frame 132, and the Z-axis moving frame 132 slides along the carriage 11, and the adjustment frame 12 slides along the X-axis moving frame 131, so that the nut sleeve 322 is aligned with the fixed nut 64 on the central moving column 62, and the first cylinder 3211 drives the nut sleeve 322 to descend to the fixed nut 64, and then the visual camera 71 controls the fourth motor 3233 The nut sleeve 322 is driven to rotate so that the posture of the nut sleeve 322 is opposite to the fixed nut 64, and then the first cylinder 3211 drives the nut sleeve 322 to descend and sleeve on the fixed nut 64. At this time, the fixed nut 64 is inserted into the hexagonal sleeve hole 3221, and the center movable column 62 is inserted into the center hole 3222. Then the fourth motor 3233 drives the nut sleeve 322 to rotate, and the fixed nut 64 is screwed and disassembled. The third permanent magnet 3223 adsorbs the removed fixed nut 64.

[0074] S3, the second cylinder 3111 drives the mounting ring 315 to descend to the old vulcanizing bladder 5, and makes the second rod 3162 descend to the height of the slot 55, and then the third motor 3131 drives the driving gear 3132 to rotate, and the driving gear 3132 drives the two first rods 3161 to approach each other, and the first rod 3161 drives the second rod 3162 to abut against the peripheral side wall of the flange plate group 52 at the bottom, and then the second motor 3122 drives the rotating gear 3121 to rotate, and the rotating gear 3121 drives the first rod 3161 to rotate, and the first rod 3161 drives the second rod 3162 to rotate on the peripheral side wall of the flange plate group 52 at the bottom, and when the second rod 3162 rotates to be opposite to the slot 55, the telescopic spring 3165 pushes the second rod 3162 to insert into the slot 55, Then the rotating gear 3121 continues to drive the second rod body 3162 to rotate, and the second rod body 3162 drives the bottom flange plate group 52 to rotate, and the second spring 3148 is extended and retracted to adapt to the rotation of the bottom flange plate group 52 and drive the second cylinder 3111 to lift, thereby realizing the disassembly of the bottom flange plate group 52, and then the first cylinder 3211 and the second cylinder 3111 are both contracted, and the second cylinder 3111 lifts the old vulcanization capsule 5 to a certain height, and then the first motor 26 drives the connecting rod 23 to rotate, and the connecting rod 23 drives the second placement plate 22 to rotate to the replacement station 141, and then the third motor 3131 drives the two disassembly and assembly rods 316 to move away from each other, and the old vulcanization capsule 5 is placed on the second placement plate 22, and then the second cylinder 3111 drives the disassembly and assembly rod 316 to continue to lift.

[0075] S4, the first motor 26 drives the connecting rod 23 to rotate, and switches the positions of the first placement plate 21 and the second placement plate 22, so that the first placement plate 21 rotates to the replacement station 141, and the second placement plate 22 rotates to the standby station 142. At this time, the new vulcanization bladder 5 on the first placement plate 21 is aligned with the nut sleeve 322.

[0076] S5. The first cylinder 3211 drives the disassembly and assembly rod 316 to descend to the height of the slot 55 on the new vulcanization capsule 5 on the first placement plate 21, and then the fourth motor 3233 drives the two disassembly and assembly rods 316 to approach each other, and the second rod body 3162 rotates on the peripheral side wall of the flange plate group 52 at the bottom. When the second rod body 3162 rotates to be opposite to the slot 55, the telescopic spring 3165 pushes the second rod body 3162 to insert into the slot 55, and at the same time, the electromagnet 324 adsorbs and fixes the flange plate group 52 on the top, and then the linear cylinder 281 drives the second permanent magnet 283 to pull the two support rods 54 out of the molding groove 53 and separate from the new vulcanization capsule 5, and then the first cylinder 3211 drives the new vulcanization capsule 5 to lift.

[0077] The first motor 26 drives the connecting rod 23 to rotate to vertical, and the first placement plate 21 is removed from the replacement station 141. Then the second cylinder 3111 drives the new vulcanizing bladder 5 to fall onto the vulcanizing device, and the bottom flange plate group 52 is sleeved on the supply and discharge flow path seat 61, and the top flange plate group 52 is sleeved on the central moving column 62. At this time, the second spring 3148 pushes the thread of the inner hole of the bottom flange plate group 52 to engage with the thread on the supply and discharge flow path seat 61, and then the second motor 3122 drives the disassembly rod 316 to reverse, and the bottom flange plate group 52 is installed on the supply and discharge flow path seat 61.

[0078] The first cylinder 3211 drives the nut sleeve 322 to be sleeved on the central movable column 62, and the first spring 3146 pushes the fixed nut 64 to engage with the thread on the central movable column 62, and then the fourth motor 3233 drives the nut sleeve 322 to rotate, and the nut sleeve 322 drives the fixed nut 64 to be screwed onto the central movable column 62, and the top flange plate group 52 is pressed and fixed on the support plate 63, completing the installation and fixation of the top flange plate group 52 and the central movable column 62, thereby completing the installation of the new vulcanization bladder 5.

[0079] S6. The third motor 3131 drives the two disassembly rods 316 to be pulled out of the slots 55. The first cylinder 3211 and the second cylinder 3111 contract. The nut sleeve 322 and the disassembly rod 316 are both lifted. Then the operator drives the frame 11 to evacuate the tire manufacturing site.

[0080] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A tire curing bladder pre-installation device, characterized in that: It comprises a movable frame component (1), a conversion component (2), and a disassembly component (3); The conversion component (2) is arranged on the movable frame component (1) and forms a new component station (41) for placing a new vulcanizing bladder (5) and an old component station (42) for placing an old vulcanizing bladder (5), and is used to swap the positions of the new component station (41) and the old component station (42); The disassembly component (3) is arranged on the movable frame component (1) and is used to disassemble the old vulcanization bladder (5) from the vulcanization device, place the old vulcanization bladder (5) on the old part station (42), and install the new vulcanization bladder (5) on the new part station (41) on the vulcanization device.

2. The tire curing bladder pre-installation device according to claim 1, characterized in that: The vulcanization bladder (5) comprises a bladder body (51) and two groups of flange plate groups (52). The two groups of flange plate groups (52) are respectively arranged at the openings at both ends of the bladder body (51) to form a connection structure between the vulcanization bladder (5) and the vulcanization device. The bottom flange plate group (52) is threadedly connected and fixed to a supply and discharge flow path seat (61) in the vulcanization device. The top flange plate group (52) is sleeved on a central movable column (62) in the vulcanization device. The central movable column (62) is provided with a support plate (63) and a fixing nut (64). The fixing nut (64) can press and fix the top flange plate group (52) on the support plate (63). The disassembly assembly (3) comprises a rotating disassembly component (31) and a nut disassembly component (32). The nut disassembly component (32) is used to drive the fixed nut (64) to rotate so as to enable the top flange plate group (52) and the central movable column (62) to be disassembled. The rotating disassembly component (31) is used to drive the bottom flange plate group (52) to rotate so as to enable the top flange plate group (52) and the supply and discharge flow path seat (61) to be disassembled.

3. The tire curing bladder pre-installation device according to claim 2, characterized in that: The nut disassembly component (32) comprises a first linear mechanism (321), a nut sleeve (322), and a rotation drive mechanism (323); the first linear mechanism (321) is arranged on the movable frame assembly (1) and is used to drive the rotation drive mechanism (323) to move; the rotation drive mechanism (323) is arranged on the first linear mechanism (321) and is used to drive the nut sleeve (322) to rotate; the nut sleeve (322) can be sleeved on the fixed nut (64) so ​​as to be able to screw the fixed nut (64); the rotation drive mechanism (323) drives the nut sleeve (322) through a machine vision function module (7) so that the nut sleeve (322) can be sleeved on the fixed nut (64).

4. The tire curing bladder pre-installation device according to claim 2, characterized in that: The rotating disassembly component (31) comprises a second linear mechanism (311), a rotating mechanism (312) and a direct insertion mechanism (313); the second linear mechanism (311) is arranged on the movable frame component (1) and is used to drive the rotating mechanism (312) to move up and down; the rotating mechanism (312) is arranged on the second linear mechanism (311) and is used to drive the direct insertion mechanism (313) to rotate; a disassembly rod (316) is provided on the direct insertion mechanism (313); a slot (55) is provided on the peripheral side wall of the flange plate group (52) at the bottom; the direct insertion mechanism (313) can drive the disassembly rod (316) to be inserted into the slot (55), so that the rotating mechanism (312) can drive the flange plate group (52) at the bottom to rotate.

5. The tire curing bladder pre-installation device according to claim 4, characterized in that: The disassembly and assembly rod (316) comprises a first rod body (3161) and a second rod body (3162); the first rod body (3161) is connected to the direct insertion mechanism (313); the second rod body (3162) can be inserted into the slot (55); a connecting sleeve (3164) is provided on the first rod body (3161); the second rod body (3162) is slidably inserted into the connecting sleeve (3164); the first rod body (3161) and the second rod body (3162) are connected via a telescopic spring (3165); the telescopic spring (3165) can push the second rod body (3162) to abut against the peripheral side wall of the flange plate group (52) at the bottom.

6. The tire curing bladder pre-installation device according to claim 3, characterized in that: The movable frame assembly (1) comprises a vehicle frame (11) and an adjustment frame (12); the conversion assembly (2) and the disassembly assembly (3) are both arranged on the adjustment frame (12); the adjustment frame (12) and the vehicle frame (11) are connected via a space adjustment mechanism (13) so as to be able to adjust the position of the nut sleeve (322); the machine vision function module (7) and the space adjustment mechanism (13) are connected so as to enable the nut sleeve (322) to be aligned with the fixing nut (64).

7. The tire curing bladder pre-installation device according to claim 6, characterized in that: The conversion assembly (2) comprises a first placement plate (21), a second placement plate (22) and two connecting rods (23). The new and old vulcanizing bladders (5) are placed on the first placement plate (21) and the second placement plate (22) respectively. The two connecting rods (23) are respectively located on both sides of the first placement plate (21) and the second placement plate (22). Each of the connecting rods (23) is rotatably connected to the first placement plate (21) and the second placement plate (22) through a rotating shaft (24). The two rotating shafts (24) on the first placement plate (21) or the second placement plate (22) are arranged in parallel. A hinge shaft (25) is fixedly provided at the middle part of each of the connecting rods (23). The hinge shaft (25) is rotatably connected to the adjustment frame (12) so that the first placement plate (21) and the second placement plate (22) can be switched between the new part station (41) and the old part station (42).

8. The tire curing bladder pre-installation device according to claim 7, characterized in that: The peripheral side walls of the two groups of flange plate groups (52) are both provided with shaping grooves (53), the vulcanizing bladder (5) is provided with a support rod (54) inserted into the two shaping grooves (53), the support rod (54) is used to support the two flange plate groups (52), the first placement plate (21) is provided with a clamping and unloading member (28), the clamping and unloading member (28) can clamp the support rod (54) and pull the support rod (54) out of the shaping groove (53).

9. The tire curing bladder pre-installation device according to claim 8, characterized in that: A positioning block (27) is provided on the first placement plate (21), and the positioning block (27) includes a guiding portion (272) and a positioning portion (271). The positioning portion (271) can be inserted into the inner hole of the flange plate group (52) at the bottom and matched with the inner hole of the flange plate group (52). The guiding portion (272) can guide the flange plate group (52) at the bottom to be sleeved on the positioning portion (271).

10. A tire curing bladder pre-installation method, using a tire curing bladder pre-installation device as claimed in claim 1, characterized in that: The steps include: S1, placing a new curing bladder (5) at a new component station (41) of a conversion assembly (2); S2, the movable frame (11) assembly drives the conversion assembly (2) and the disassembly assembly (3) to move, and moves the disassembly assembly (3) to the top of the old vulcanizing airbag on the vulcanizing device; S3, the disassembly component (3) removes the old vulcanizing bladder (5) and places it at the old part station (42) of the conversion component (2); S4, the rotating assembly switches the positions of the old part station (42) and the new part station (41); S5, disassembling the assembly (3), moving the new vulcanizing bladder (5) to the vulcanizing device, and installing the new vulcanizing bladder (5); S6, the movable frame (11) assembly is evacuated from the tire manufacturing site.

Citation Information

Patent Citations

  • Center mechanism of tire vulcanizer

    CN102528978A

  • Tire production method and device

    CN102802902A

  • Structure for rapid mounting of tire vulcanization bladder

    CN111590938A

  • Quick change device of capsule chuck applied to vulcanizing machine

    CN203973872U

  • Vulcanizing capsule demolding device

    CN217073455U