Upper adit concrete lining needle beam trolley
By designing the combined structure of the slider and the first roller on the needle beam trolley, and combining the self-lubricating mechanism of the oil storage box and the spring telescopic rod, the problem of limited sliding of the existing needle beam trolley is solved and a more efficient and stable construction.
Patent Information
- Application Number
- CN202411573026.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-06
- Publication Date
- 2025-01-24
AI Technical Summary
During the movement of existing needle beam trolleys, the sliding of the beam frame and the beam body is limited by rust and jam in the slide rail, resulting in a decrease in construction efficiency and quality.
A needle beam trolley for concrete lining of the upper flat hole is designed. It adopts the combined structure of the slider and the first roller to reduce the friction between the slider and the slide rail, and provides self-lubrication through the oil storage box and spring telescopic rod. Prevent rust.
Effectively reduce the wear between the slide rail and the slider, prevent rust, improve the movement efficiency and stability of the beam and the beam frame, and improve the speed and quality of construction.
Smart Images

Figure CN119352996A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel concrete construction equipment, in particular to a needle beam trolley for upper flat tunnel concrete lining. Background Art
[0002] The needle beam trolley is a special equipment used for water conservancy tunnel lining construction. It can carry out full-circle one-time forming of concrete lining construction in the tunnel. The bottom, side and top of the entire section of the tunnel lining are formed at one time, and its construction speed is significantly improved, and the lining quality is also significantly improved.
[0003] The structure of the existing needle beam trolley usually includes supporting structure, needle beam body, beam frame, guide rail, bracket, formwork and other components. The construction process includes construction preparation, trolley installation, base surface cleaning, steel bar installation, concrete construction, demolding and maintenance and other steps. During long-term use and observation, it was found that during the movement of the existing needle beam trolley, the beam frame usually slides relatively on the beam body, while the tunnel is relatively humid and impurities such as sand and gravel will enter the slide rail, causing rust and jamming in the slide rail, which affects the movement of the beam frame and the beam body.
[0004] To this end, the present invention provides an upper flat tunnel concrete lining needle beam trolley. Summary of the invention
[0005] In order to make up for the deficiencies of the prior art and solve at least one problem raised in the background technology, an upper flat tunnel concrete lining needle beam trolley is proposed.
[0006] The technical solution adopted by the present invention to solve its technical problems is as follows: the upper flat hole concrete lining needle beam trolley described in the present invention comprises a beam body; a pair of slide rails are fixedly connected to the side walls of the beam body; the pair of slide rails are symmetrical in structure; a slider is slidably connected in the slide rail; a plurality of first rollers are fixedly connected to the side walls of the slider; the first roller is in contact with the inner wall of the slide rail; a pair of side walls of the slider are commonly fixedly connected to a beam frame; an oil storage box is connected to the top of the slide rail; a spring telescopic rod is fixedly connected to the top of the inner wall of the oil storage box; a cover plate is fixedly connected to the bottom of the spring telescopic rod; a top rod is fixedly connected to the bottom of the cover plate; the bottom of the top rod is a hemispherical structure; a feed port is provided at the top of the oil storage box; an upper template is provided at the top of the beam frame; a lower template is provided at the bottom of the beam frame; the upper template and the lower template are both hydraulically The jack is fixedly connected to the beam frame; a pair of side formworks are provided on the side wall of the beam frame; the pair of side formworks are hinged to the beam frame through hydraulic jacks; a winch is fixedly connected to the side wall of the beam frame; a pulley is fixedly connected to the top of the beam body; the winch and the pulley are connected by a steel cable; a plurality of pouring ports are provided in the middle of the upper formwork, the lower formwork and the side formwork; a support assembly is provided at the bottom of the beam body; through the above structure, a slider is provided to connect the first roller, which can reduce the friction between the slider sliding in the slide rail and the inner wall thereof, so as to reduce the wear between the slide rail and the slider, and at the same time, in conjunction with the oil storage box, the spring telescopic rod, the cover plate and the top rod, the slider and the first roller can be self-lubricated when they move, so as to reduce the situation in which the water vapor in the tunnel causes the slide rail and the slider to rust, thereby affecting the movement of the beam body and the beam frame.
[0007] Preferably, two groups of damping spring shock absorbers are fixedly connected to the bottom of the beam body; the two groups of damping spring shock absorbers are symmetrically distributed at the bottom of the beam body; a fixing plate is fixedly connected to the bottom of each group of damping spring shock absorbers; through the above structure, the damping spring shock absorbers are arranged to reduce vibration of the whole, so as to reduce the loosening of the overall connection structure caused by vibration, resulting in falling off or damage.
[0008] Preferably, the support assembly includes a pair of first hydraulic cylinders; the pair of first hydraulic cylinders are fixedly connected to the bottom of the fixed plate; a support block is hinged at the bottom of the first hydraulic cylinder; the bottom of the support block is an arc-shaped structure; a pair of second hydraulic cylinders are fixedly connected to the bottom of the beam body; the first hydraulic cylinders and the second hydraulic cylinders are symmetrically distributed; the bottom of the pair of second hydraulic cylinders are commonly fixedly connected to the first support plate; through the above structure, the first hydraulic cylinders and the support blocks are arranged, and the arc surface of the support blocks can be fitted with the concrete surface, so as to reduce the need to use pads between the concrete and the support blocks in the traditional way, which makes the operation process more cumbersome, and can improve the stability of the overall structural support.
[0009] Preferably, a pair of third hydraulic cylinders are fixedly connected to the side wall of the beam body; a second support plate is commonly fixedly connected to the bottom of the pair of third hydraulic cylinders; the third hydraulic cylinders and the second support plate are located near the middle section of the beam body; through the above structure, the third hydraulic cylinders and the second support plate are arranged to support the middle section of the beam body during construction, so as to reduce the situation in which the pressure on the beam body is increased and bending or even fracture occurs when the beam body is long and the middle part is suspended in the air.
[0010] Preferably, a pair of spring rods are slidably connected in the middle of the beam frame; a second roller is fixedly connected to the end of the spring rod; the spring rod and the second roller are close to the top of the beam frame and face the side formwork; through the above structure, the provision of the spring rod and the second roller can reduce the impact force generated between the winch and the beam frame when the winch is gathered, resulting in damage and bending, thereby playing a buffering role.
[0011] Preferably, the upper formwork, the lower formwork and the inner wall of the side formwork are fixedly connected with a plurality of vibration motors; the plurality of vibration motors are a uniformly distributed structure; through the above structure, the vibration motors can drive the poured concrete to vibrate, so as to reduce bubbles between the concrete, thereby making the connection between the concrete tighter and improving the solidification effect of the concrete.
[0012] Preferably, a plurality of anchor rods are fixedly connected to the bottom of the first support plate; the bottom of the anchor rods is a vertebral structure; through the above structure, anchor rods are arranged to connect the first support plate, and the anchor rods can be inserted into the soil layer of the tunnel to improve the stability of the position of the first support plate, so as to reduce the situation where the first support plate slides and causes overall displacement.
[0013] Preferably, a feed hopper is fixedly connected to the top of the oil storage box; the feed hopper is arranged corresponding to the feed port on the top of the oil storage box; a sealing plug is slidably fitted in the feed hopper; through the above structure, the feed hopper and the sealing plug are arranged, and the funnel-shaped structure of the feed hopper can facilitate the replenishment of lubricant in the oil storage box, and the sealing plug can seal the feed hopper to reduce the entry of water vapor and sand and gravel impurities from the feed hopper into the oil storage box, causing pollution and blockage.
[0014] Preferably, the side wall of the support block is provided with a plurality of square grooves; through the above structure, the provision of the square grooves can reduce the overall weight of the support block, thereby achieving a lightweight effect.
[0015] The beneficial effects of the present invention are as follows:
[0016] 1. The upper flat tunnel concrete lining needle beam trolley described in the present invention can reduce the friction between the slider sliding in the slide rail and the inner wall thereof by arranging a slider connected to the first roller, so as to reduce the wear between the slide rail and the slider. At the same time, in conjunction with the oil storage box, the spring telescopic rod, the cover plate and the top rod, the slider and the first roller can be self-lubricated when they move, so as to reduce the situation where the water vapor in the tunnel causes the slide rail and the slider to rust, thereby affecting the movement of the beam body and the beam frame.
[0017] 2. The upper flat tunnel concrete lining needle beam trolley described in the present invention can reduce the vibration of the whole by arranging a damping spring shock absorber to reduce the loosening of the overall connection structure caused by vibration, resulting in falling off or damage. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The present invention will be further described below in conjunction with the accompanying drawings.
[0019] Figure 1 is a stereogram of the present invention;
[0020] Figure 2 It is a schematic diagram of the planar structure of the present invention;
[0021] Figure 3 It is a structural schematic diagram of the beam body of the present invention;
[0022] Figure 4 It is a structural schematic diagram of the slide rail in the present invention;
[0023] Figure 5 It is a structural schematic diagram of the oil storage box in the present invention.
[0024] Legend:
[0025] 1. Beam body; 11. Beam frame; 12. Slide rail; 13. Slider; 14. Oil storage box; 15. Spring telescopic rod; 16. Cover plate; 17. Push rod; 18. Upper formwork; 19. Lower formwork; 110. Side formwork; 111. Winch; 112. Pulley; 113. Steel cable; 114. Casting port; 115. First roller; 2. Damping spring shock absorber; 21. Fixed plate; 3. First hydraulic cylinder; 31. Support block; 32. Second hydraulic cylinder; 33. First support plate; 4. Third hydraulic cylinder; 41. Second support plate; 5. Spring rod; 51. Second roller; 6. Vibration motor; 7. Anchor rod; 8. Feed hopper; 81. Sealing plug; 9. Square groove. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] Specific examples are given below.
[0028] like Figures 1 to 5As shown, the upper flat hole concrete lining needle beam trolley described in the embodiment of the present invention includes a beam body 1; a pair of slide rails 12 are fixedly connected to the side wall of the beam body 1; the pair of slide rails 12 are symmetrical in structure; a slider 13 is slidably connected in the slide rail 12; a plurality of first rollers 115 are fixedly connected to the side wall of the slider 13; the first rollers 115 are in contact with the inner wall of the slide rail 12; a beam frame 11 is fixedly connected to the side walls of the pair of sliders 13; an oil storage box 14 is connected to the top of the slide rail 12; a spring telescopic rod 15 is fixedly connected to the top of the inner wall of the oil storage box 14; a cover plate 16 is fixedly connected to the bottom of the spring telescopic rod 15; a top rod 17 is fixedly connected to the bottom of the cover plate 16; the bottom of the top rod 17 is a hemispherical structure ; A feed port is provided on the top of the oil storage box 14; an upper template 18 is provided on the top of the beam frame 11; a lower template 19 is provided on the bottom of the beam frame 11; the upper template 18 and the lower template 19 are both fixedly connected to the beam frame 11 through hydraulic jacks; a pair of side templates 110 are provided on the side wall of the beam frame 11; a pair of side templates 110 are hinged to the beam frame 11 through hydraulic jacks; a winch 111 is fixedly connected to the side wall of the beam frame 11; a pulley 112 is fixedly connected to the top of the beam body 1; the winch 111 and the pulley 112 are connected by a steel cable 113; a plurality of pouring ports 114 are provided on the upper template 18, the lower template 19 and the middle of the side template 110; a support assembly is provided at the bottom of the beam body 1;During operation, after the beam body 1 and the beam frame 11 are installed, the slider 13 and the first roller 115 are located inside the slide rail 12, and then the upper template 18, the lower template 19 and the side template 110 are connected to the beam frame 11 through a hydraulic jack. During construction, the upper template 18, the lower template 19 and the side template 110 are spread apart by a hydraulic jack so as to be close to the inner surface of the tunnel, and then concrete is pumped to the tunnel and the upper template 18, the lower template 19 and the side template 110 through the pouring port 114, etc. After the concrete solidifies, the upper formwork 18 is brought together with the lower formwork 19 and the side formwork 110 by a hydraulic jack, and then the winch 111 cooperates with the pulley 112 and the steel cable 113 to make the beam frame 11 slide on the beam body 1. At this time, the slider 13 drives the first roller 115 to slide in the slide rail 12. When the first roller 115 passes the oil storage box 14 at the top of the slide rail 12, it will push the push rod 17 and the cover plate 16 upward. At this time, the lubricant stored in the oil storage box 14 will be discharged from the oil outlet below the oil storage box 14. , flows to the first roller 115 and the slider 13 for lubrication. After the first roller 115 passes through the oil storage box 14, the spring telescopic rod 15 will rebound to reset the top rod 17 and the cover plate 16, so that the cover plate 16 covers the oil outlet below the oil storage box 14. When the beam body 1 needs to be moved, the upper template 18, the lower template 19 and the side template 110 are supported in a state of being spread apart, and then the supporting assembly on the beam body 1 is retracted, and then the winch 111, the pulley 112 and the steel cable 113 drive the beam body 1 to move. Through the above structure, the slider 13 is connected to the first roller 115, which can reduce the friction between the slider 13 and the inner wall of the slide rail 12, so as to reduce the wear between the slide rail 12 and the slider 13. At the same time, the oil storage box 14, the spring telescopic rod 15, the cover plate 16 and the top rod 17 can be used to self-lubricate the slider 13 and the first roller 115 when they move, so as to reduce the corrosion of the slide rail 12 and the slider 13 caused by the water vapor in the tunnel, which affects the movement of the beam body 1 and the beam frame 11.
[0029] like Figures 1 to 3 As shown, two groups of damping spring shock absorbers 2 are fixedly connected to the bottom of the beam body 1; the two groups of damping spring shock absorbers 2 are symmetrically distributed at the bottom of the beam body 1; a fixing plate 21 is fixedly connected to the bottom of each group of damping spring shock absorbers 2; when working, more vibrations will be generated during the construction process such as moving the beam body 1 and the beam frame 11 and pouring concrete. When the vibration is transmitted to the damping spring shock absorber 2 under the beam body 1, the damping spring shock absorber 2 will perform buffering and vibration reduction through its own contraction and rebound. Through the above structure, the damping spring shock absorber 2 can be set to reduce the vibration of the whole structure, so as to reduce the loosening of the overall connection structure caused by vibration, resulting in falling off or damage.
[0030] like Figure 1As shown, the support assembly includes a pair of first hydraulic cylinders 3; the pair of first hydraulic cylinders 3 are fixedly connected to the bottom of the fixed plate 21; the first hydraulic cylinder 3 is hinged with a support block 31 at the bottom; the bottom of the support block 31 is an arc-shaped structure; a pair of second hydraulic cylinders 32 are fixedly connected to the bottom of the beam body 1; the first hydraulic cylinders 3 and the second hydraulic cylinders 32 are symmetrically distributed; the bottom of the pair of second hydraulic cylinders 32 is commonly fixedly connected to a first support plate 33; when working, when installing the first hydraulic cylinder 3 and the support block 31, the first hydraulic cylinder 3 and the support block 31 are installed at the end where the tunnel concrete is laid, and the second hydraulic cylinder 32 and the first support plate 33 are installed at the end to be laid, and then Starting the first hydraulic cylinder 3 to drive the support block 31 to move will make the support block 31 contact with the concrete surface paved in the tunnel. At this time, the arc surface of the support block 31 will contact the arc surface of the concrete. The second hydraulic cylinder 32 is stretched to drive the first support plate 33 to contact the surface to be paved in the tunnel. At this time, the beam body 1 and the beam frame 11 can be supported, and then subsequent pouring and other work can be carried out. Through the above structure, the first hydraulic cylinder 3 and the support block 31 are set, and the arc surface of the support block 31 can be fitted with the concrete surface, so as to reduce the need to use a pad between the concrete and the support block 31 in the traditional way, resulting in a more cumbersome operation process, and can improve the stability of the overall structural support.
[0031] like Figure 3 As shown, a pair of third hydraulic cylinders 4 are fixedly connected to the side wall of the beam body 1; a second support plate 41 is commonly fixedly connected to the bottom of the pair of third hydraulic cylinders 4; the third hydraulic cylinders 4 and the second support plate 41 are close to the middle section of the beam body 1; when working, after the beam body 1 moves to the construction position, the third hydraulic cylinder 4 is started to drive the second support plate 41 to move toward the bottom surface of the tunnel, and when the second support plate 41 contacts the bottom surface of the tunnel, it will support the middle section of the beam body 1. Through the above structure, the third hydraulic cylinder 4 and the second support plate 41 can be provided to support the middle section of the beam body 1 during construction, so as to reduce the situation where the beam body 1 is long and the middle part is suspended, resulting in increased pressure to cause bending or even fracture.
[0032] like Figures 1 to 3 As shown, a pair of spring rods 5 are slidably connected to the middle of the beam frame 11; the end of the spring rod 5 is fixedly connected to the second roller 51; the spring rod 5 and the second roller 51 are close to the top of the beam frame 11 and face the side template 110; during operation, when the hydraulic jack retracts the side template 110, the inner wall of the side template 110 will contact the second roller 51, and at this time the side template 110 will squeeze the spring rod 5 to produce stretching, thereby generating a buffering force, and when the winch 111 moves, the second roller 51 will rotate on the surface of the winch 111. Through the above structure, the arrangement of the spring rod 5 and the second roller 51 can reduce the impact force generated between the winch 111 and the beam frame 11 when the winch 111 is gathered, resulting in damage and bending, thereby playing a buffering role.
[0033] like Figure 1 to Figure 2 As shown, the inner walls of the upper formwork 18, the lower formwork 19 and the side formwork 110 are fixedly connected with a plurality of vibration motors 6; the plurality of vibration motors 6 are evenly distributed structures; when working, when pouring concrete into the tunnel from the pouring port 114, the plurality of vibration motors 6 are started to generate vibration, and at this time, the vibration is transmitted to the interior of the concrete through the upper formwork 18, the lower formwork 19 and the side formwork 110, and at this time, the concrete can be vibrated, thereby vibrating away some bubbles between the concrete. Through the above structure, the vibration motor 6 can be set to drive the poured concrete to vibrate, so as to reduce the bubbles between the concrete, thereby making the connection between the concrete tighter, so as to improve the solidification effect of the concrete.
[0034] like Figure 1 As shown, a plurality of anchor rods 7 are fixedly connected to the bottom of the first support plate 33; the bottom of the anchor rods 7 is a vertebral structure; when working, after the second hydraulic cylinder 32 drives the first support plate 33 to contact the bottom surface of the tunnel, the anchor rods 7 at the bottom of the first support plate 33 will be inserted into the soil layer of the tunnel. Through the above structure, the anchor rods 7 are arranged to connect the first support plate 33, and the anchor rods 7 can be inserted into the soil layer of the tunnel to improve the stability of the position of the first support plate 33, so as to reduce the situation where the first support plate 33 slides and causes overall displacement.
[0035] like Figure 5 As shown, a feed hopper 8 is fixedly connected to the top of the oil storage box 14; the feed hopper 8 is arranged corresponding to the feed port at the top of the oil storage box 14; a sealing plug 81 is slidably fitted in the feed hopper 8; during operation, when it is necessary to add lubricant to the oil storage box 14, the sealing plug 81 can be taken out from the feed hopper 8, and then the lubricant is added to the feed hopper 8, and then enters the oil storage box 14 along the feed port at the top of the oil storage box 14, and then the sealing plug 81 is reset to the feed hopper 8. Through the above structure, the feed hopper 8 and the sealing plug 81 are set, and the funnel-shaped structure of the feed hopper 8 can facilitate the addition of lubricant to the oil storage box 14, and at the same time, the sealing plug 81 can block the feed hopper 8 to reduce the entry of water vapor and sand and gravel impurities from the feed hopper 8 into the oil storage box 14, resulting in pollution and blockage.
[0036] like Figure 1 and Figure 2 As shown, the side wall of the support block 31 is provided with a plurality of square grooves 9; through the above structure, the provision of the square grooves 9 can reduce the overall weight of the support block 31, thereby achieving a lightweight effect.
[0037] Working principle: After the beam body 1 and the beam frame 11 are installed, the slider 13 and the first roller 115 are located inside the slide rail 12, and then the upper template 18, the lower template 19 and the side template 110 are connected to the beam frame 11 through the hydraulic jack. During construction, the upper template 18, the lower template 19 and the side template 110 are spread apart by the hydraulic jack so as to be close to the inner surface of the tunnel, and then the concrete is pumped to the tunnel and the upper template 18, the lower template 19 and the side template 110 through the pouring port 114. After the concrete solidifies, the upper template 18, the lower template 19 and the side template 110 are gathered together by the hydraulic jack, and then the winch 111 cooperates with the pulley 112 and the steel cable 113 to make the beam frame 11 slide on the beam body 1. At this time, the slider 13 drives the first roller The wheel 115 slides in the slide rail 12. When the first roller 115 passes the oil storage box 14 at the top of the slide rail 12, the push rod 17 and the cover plate 16 will be pushed upward. At this time, the lubricant stored in the oil storage box 14 will flow from the oil outlet below the oil storage box 14 to the first roller 115 and the slider 13 for lubrication. After the first roller 115 passes the oil storage box 14, the spring telescopic rod 15 will rebound to reset the push rod 17 and the cover plate 16, so that the cover plate 16 covers the oil outlet below the oil storage box 14. When it is necessary to move the beam 1, the upper template 18, the lower template 19 and the side template 110 are supported in a state of being spread apart, and then the supporting assembly on the beam 1 is retracted, and then the winch 111, the pulley 112 and the steel cable 113 drive the beam 1 to move. During the construction process such as the movement of the beam frame 11 and the pouring of concrete, more vibrations will be generated. When the vibration is transmitted to the damping spring shock absorber 2 under the beam body 1, the damping spring shock absorber 2 will perform buffering and vibration reduction through its own contraction and rebound. When installing the first hydraulic cylinder 3 and the support block 31, the first hydraulic cylinder 3 and the support block 31 are installed at the end where the tunnel concrete is laid, and the second hydraulic cylinder 32 and the first support plate 33 are installed at the end to be laid. Then, the first hydraulic cylinder 3 is started to drive the support block 31 to move, which will make the support block 31 contact with the concrete surface laid in the tunnel. At this time, the arc surface of the support block 31 will contact with the arc surface of the concrete, and the second hydraulic cylinder 32 will stretch and drive the first support plate 33 to contact with the surface to be laid in the tunnel. At this time, the beam body can be 1 is supported by the beam frame 11, and then subsequent pouring and other work are carried out. After the beam body 1 moves to the construction position, the third hydraulic cylinder 4 is started to drive the second support plate 41 to move toward the bottom surface of the tunnel. When the second support plate 41 contacts the bottom surface of the tunnel, it will support from the middle section of the beam body 1. When the hydraulic jack retracts the side template 110, the inner wall of the side template 110 will contact the second roller 51. At this time, the side template 110 will squeeze the spring rod 5 to generate tension, thereby generating a buffering force. When the winch 111 moves, the second roller 51 will rotate on the surface of the winch 111. When pouring concrete into the tunnel from the pouring port 114, multiple vibration motors 6 are started to generate vibration. At this time, the vibration passes through the upper template 18, the lower template 19 and the side template 110.The conduction to the inside of the concrete can generate vibrations on the concrete, thereby vibrating away some of the bubbles between the concrete. After the second hydraulic cylinder 32 drives the first support plate 33 to contact the bottom surface of the tunnel, the anchor rod 7 at the bottom of the first support plate 33 will be inserted into the soil layer of the tunnel. When it is necessary to add lubricant to the oil storage box 14, the sealing plug 81 can be taken out of the feed hopper 8, and then the lubricant is added to the feed hopper 8, and then enters the oil storage box 14 along the feed port at the top of the oil storage box 14, and then the sealing plug 81 is reset to the feed hopper 8.
[0038] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A needle beam trolley for concrete lining of an upper flat tunnel, comprising a beam body (1); characterized in that: A pair of slide rails (12) are fixedly connected to the side walls of the beam body (1); the pair of slide rails (12) are of symmetrical structure; a slider (13) is slidably connected inside the slide rail (12); a plurality of first rollers (115) are fixedly connected to the side walls of the slider (13); the first rollers (115) are in contact with the inner wall of the slide rail (12); the side walls of the pair of sliders (13) are commonly fixedly connected to a beam frame (11); the top of the slide rail (12) is connected to an oil storage box (14); a spring telescopic rod (15) is fixedly connected to the top of the inner wall of the oil storage box (14); a cover plate (16) is fixedly connected to the bottom of the spring telescopic rod (15); a top rod (17) is fixedly connected to the bottom of the cover plate (16); the bottom of the top rod (17) is of a hemispherical structure; a feed port is provided at the top of the oil storage box (14); An upper template (18) is provided at the top of the beam frame (11); a lower template (19) is provided at the bottom of the beam frame (11); the upper template (18) and the lower template (19) are both fixedly connected to the beam frame (11) through hydraulic jacks; a pair of side templates (110) are provided on the side wall of the beam frame (11); the pair of side templates (110) are hinged to the beam frame (11) through hydraulic jacks; a winch (111) is fixedly connected to the side wall of the beam frame (11); a pulley (112) is fixedly connected to the top of the beam body (1); the winch (111) and the pulley (112) are connected through a steel cable (113); a plurality of pouring openings (114) are provided in the middle of the upper template (18), the lower template (19) and the side template (110); and a support assembly is provided at the bottom of the beam body (1).
2. The upper flat tunnel concrete lining needle beam trolley according to claim 1 is characterized in that: Two groups of damping spring shock absorbers (2) are fixedly connected to the bottom of the beam body (1); the two groups of damping spring shock absorbers (2) are symmetrically distributed at the bottom of the beam body (1); and a fixing plate (21) is fixedly connected to the bottom of each group of damping spring shock absorbers (2).
3. The upper flat tunnel concrete lining needle beam trolley according to claim 1 is characterized in that: The support assembly comprises a pair of first hydraulic cylinders (3); the pair of first hydraulic cylinders (3) are fixedly connected to the bottom of a fixed plate (21); a support block (31) is hingedly connected to the bottom of the first hydraulic cylinder (3); the bottom of the support block (31) is in an arc-shaped structure; a pair of second hydraulic cylinders (32) are fixedly connected to the bottom of the beam body (1); the first hydraulic cylinders (3) and the second hydraulic cylinders (32) are symmetrically distributed; and a first support plate (33) is fixedly connected to the bottom of the pair of second hydraulic cylinders (32).
4. The upper flat tunnel concrete lining needle beam trolley according to claim 1 is characterized in that: A pair of third hydraulic cylinders (4) are fixedly connected to the side walls of the beam body (1); a second support plate (41) is fixedly connected to the bottoms of the pair of third hydraulic cylinders (4); and the third hydraulic cylinders (4) and the second support plate (41) are located close to the middle section of the beam body (1).
5. The upper flat tunnel concrete lining needle beam trolley according to claim 1 is characterized in that: A pair of spring rods (5) are slidably connected to the middle of the beam frame (11); the ends of the spring rods (5) are fixedly connected to second rollers (51); the spring rods (5) and the second rollers (51) are close to the top of the beam frame (11) and face one side of the side template (110).
6. The upper flat tunnel concrete lining needle beam trolley according to claim 1 is characterized in that: The upper template (18), the lower template (19) and the inner side wall of the side template (110) are all fixedly connected with a plurality of vibration motors (6); the plurality of vibration motors (6) are in a uniformly distributed structure.
7. The upper flat tunnel concrete lining needle beam trolley according to claim 3 is characterized by: A plurality of anchor rods (7) are fixedly connected to the bottom of the first support plate (33); the bottom of the anchor rods (7) is a vertebral structure.
8. The upper flat tunnel concrete lining needle beam trolley according to claim 1 is characterized in that: A feed hopper (8) is fixedly connected to the top of the oil storage box (14); the feed hopper (8) is arranged corresponding to the feed opening at the top of the oil storage box (14); and a sealing plug (81) is slidably fitted inside the feed hopper (8).
9. The upper flat tunnel concrete lining needle beam trolley according to claim 3 is characterized by: The side wall of the support block (31) is provided with a plurality of square grooves (9).