Power supply control method and device of battery swap station, storage medium and electronic equipment

By obtaining historical operation information in the battery swap station, estimating the power battery and reserve power in the target period, and controlling the power battery power supply, the problem of high operating costs of the battery swap station is solved and the maximum utilization of the power battery trough electricity is achieved.

CN119389047AActive Publication Date: 2025-02-07ZHEJIANG GEELY HLDG GRP CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411741773.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-29
Publication Date
2025-02-07
Estimated Expiration
2044-11-29

AI Technical Summary

Technical Problem

During normal operation of existing battery swap stations, the power consumed by the operation of load equipment such as cooling equipment and monitoring equipment mainly comes from the power grid, resulting in high operating costs, especially during peak periods of use of electric waves.

Method used

By obtaining the historical operation information of the battery swap station, we estimate the power batteries and available reserve power that can be powered by the load equipment in the target period, and control the power batteries to power the load equipment in the target period according to the power consumption needs of the load equipment, so as to reduce the power supply to the load equipment from The amount of electricity taken from the power grid.

Benefits of technology

It is achieved to maximize the use of the trough power of the power battery without changing the overall structure of the battery swap station, reduce the operating cost of the battery swap station, and reduce the amount of power withdrawn from the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119389047A_ABST
    Figure CN119389047A_ABST
Patent Text Reader

Abstract

The invention discloses a power supply control method and device of a battery swap station, a storage medium and electronic equipment, and belongs to the technical field of electric vehicle charging and swap, the method comprises the steps that historical operation information of the battery swap station is acquired, and the historical operation information comprises historical battery swap information of a power battery and historical electricity consumption of load equipment in at least one target time period; according to the historical battery replacement information, estimating a target power battery capable of supplying power to the load equipment in the next target time period and available reserve electric quantity; according to the historical electricity consumption, estimating a first required electricity consumption of the load equipment in a peak time period and a second required electricity consumption of the load equipment in an average price time period in the next target time period; and according to the available reserve electric quantity, the first required electricity consumption and the second required electricity consumption, the target power battery is controlled to supply power to the load equipment in the next target time period, so that the electric quantity taken from the power grid can be reduced, the maximum utilization of trough electricity is realized, and the flexibility and the practicability are high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of electric vehicle charging and battery replacement, and in particular, relates to a power supply control method, device, storage medium and electronic equipment of a battery replacement station. Background Art

[0002] In recent years, more and more battery swap stations for replacing electric vehicle power batteries have appeared at home and abroad, and vehicles that support battery swap functions are also emerging. When a vehicle needs to replace its power battery, the vehicle that supports battery swap functions drives into the battery swap station when it needs to replace its power battery. The corresponding battery swap mechanism in the battery swap station removes the power battery to be replaced on the vehicle and replaces it with the fully charged power battery in the battery swap station. Compared with the way that vehicles replenish energy through charging, the vehicle battery swap method has the advantages of short replenishment time, automatic replenishment, and more flexible battery charging time.

[0003] At present, during the normal operation of the battery swap station, its own related load equipment such as cooling equipment, monitoring equipment, etc. need to be running all the time. The electricity consumed in the operation is generally taken from the power grid. This power supply method will lead to higher operating costs of the power supply station, especially during peak hours when the power grid has higher electricity prices, which will significantly increase the operating costs of the entire station. Summary of the invention

[0004] The present application aims to solve at least one of the technical problems existing in the prior art. To this end, the present application proposes a power supply control method, device, storage medium and electronic equipment for a battery swap station, which can flexibly utilize the valley power of the power battery to power the battery swap station, greatly reducing the operating cost of the power supply station.

[0005] In a first aspect, the present application provides a power supply control method for a battery swap station, wherein the battery swap station includes a plurality of power batteries and a load device, and the power supply control method for the battery swap station includes:

[0006] Acquire historical operation information of the battery swap station, the historical operation information including historical battery swap information of the power battery and historical power consumption of the load device within at least one target period, the target period being the period between two adjacent trough periods and including at least one peak period and at least one parity period;

[0007] According to the historical battery replacement information, estimate the target power battery and available reserve power that can power the load device in the next target period;

[0008] According to the historical power consumption, estimating the first power consumption demand of the load device during the peak period and the second power consumption demand during the parity period in the next target period;

[0009] According to the available reserve power, the first required power consumption and the second required power consumption, the target power battery is controlled to supply power to the load device in the next target time period.

[0010] In some embodiments, the estimating, based on the historical battery replacement information, the target power battery and the available reserve power that can power the load device in the next target period includes:

[0011] Determine the power battery that has not been replaced in each of the target time periods in the past according to the historical battery replacement information as a candidate power battery, and count the number of times each of the candidate power battery has not been replaced;

[0012] According to the power level of each candidate power battery and the number of times the battery has not been replaced, the target power battery and the available reserve power that can supply power to the load device in the next target time period are estimated.

[0013] In some embodiments, the estimating the target power battery and the available reserve power that can power the load device in the next target period according to the power of each candidate power battery and the number of times the battery has not been replaced, includes:

[0014] Calculating the sum of the power levels of all the candidate power batteries in each target time period to obtain a total power level, wherein each target time period corresponds to one total power level;

[0015] Calculate the average value of all the total power and values, and use the average value as the estimated available reserve power that can power the load device in the next target period;

[0016] The candidate power batteries are sorted in descending order according to the number of times that the batteries have not been replaced, and a preset number of the candidate power batteries are selected as target power batteries that are estimated to be able to power the load device in the next target time period.

[0017] In some embodiments, estimating the first power demand of the load device during the peak period and the second power demand during the parity period in the next target period according to the historical power consumption includes:

[0018] Determine, based on the historical power consumption, a first power consumption consumed by the load device during the peak period in each target period and a second power consumption consumed during the parity period;

[0019] Calculating an average value of all the first power consumptions, and using the corresponding average value as the estimated first required power consumption of the load device during the peak period in the next target period;

[0020] An average value is calculated for all the second power consumptions, and the corresponding average value is used as the estimated second power demand of the load device in the parity period in the next target period.

[0021] In some embodiments, controlling the target power battery to supply power to the load device in the next target time period according to the available reserve power, the first required power consumption, and the second required power consumption includes:

[0022] Calculating the sum of the first power demand and the second power demand to obtain a total power demand;

[0023] Generate a load power supply strategy corresponding to the next target time period according to the available reserve power, the first required power consumption, the second required power consumption, the total required power consumption, the target power battery and the power grid;

[0024] According to the load power supply strategy, the target power battery is controlled to supply power to the load device within the next target time period.

[0025] In some embodiments, generating a load power supply strategy corresponding to the next target period according to the available reserve power, the first required power consumption, the second required power consumption, the total required power consumption, the target power battery and the power grid includes:

[0026] When the available reserve power is less than the first required power consumption, a first load power supply strategy is generated, wherein the first load power supply strategy is used to indicate that in the next target period, the target power battery is used to first supply power to the load device, and when the power of the target power battery is exhausted, the power grid is used to supply power to the load device;

[0027] When the available reserve power is greater than or equal to the first required power consumption but less than the total required power consumption, a second load power supply strategy is generated, wherein the second load power supply strategy is used to indicate that in the next target period, the target power battery is used to supply power to the load device during the peak period, and the remaining power of the target power battery is used to supply power to the load device during the parity stage, and when the remaining power is insufficient, the power grid continues to supply power to the load device;

[0028] When the available reserve power is greater than or equal to the total required power consumption, a third load power supply strategy is generated, wherein the third load power supply strategy is used to indicate that the load device is powered by the target power battery during the peak period and the parity period of the next target period.

[0029] In some embodiments, the battery swap station further includes a switch module and a plurality of charge and discharge control modules, wherein the charge and discharge control modules are connected to the power batteries in a one-to-one correspondence and are used to control the corresponding power batteries to charge or discharge; one end of the switch module is connected to the power grid, and the other end is connected to the charge and discharge control module and the load device;

[0030] According to the load power supply strategy, controlling the target power battery to supply power to the load device within the next target time period includes:

[0031] In the next target time period, the switch state of the switch module and the working mode of the charge and discharge control module are controlled according to the power supply strategy, so that the target power battery and the power grid supply power to the load device through switching.

[0032] In a second aspect, the present application provides a power supply control device for a battery swap station, the battery swap station comprising a plurality of power batteries and load equipment, the power supply control device for the battery swap station comprising:

[0033] an acquisition unit, configured to acquire historical operation information of the battery swap station, wherein the historical operation information includes historical battery swap information of the power battery and historical power consumption of the load device within at least one target period, wherein the target period is a period between two adjacent trough periods and includes at least one peak period and at least one parity period;

[0034] A first estimation unit, configured to estimate, based on the historical battery replacement information, a target power battery that can supply power to the load device and available reserve power in the next target period;

[0035] A second estimating unit, configured to estimate, based on the historical power consumption, a first power consumption demand of the load device during the peak period and a second power consumption demand during the parity period in the next target period;

[0036] A power supply unit is used to control the target power battery to supply power to the load device within the next target time period according to the available reserve power, the first required power consumption and the second required power consumption.

[0037] In some embodiments, the first estimation unit is used to:

[0038] Determine the power battery that has not been replaced in each of the target time periods in the past according to the historical battery replacement information as a candidate power battery, and count the number of times each of the candidate power battery has not been replaced;

[0039] According to the power level of each candidate power battery and the number of times the battery has not been replaced, the target power battery and the available reserve power that can supply power to the load device in the next target time period are estimated.

[0040] In some embodiments, the first estimation unit is used to:

[0041] Calculating the sum of the power levels of all the candidate power batteries in each target time period to obtain a total power level, wherein each target time period corresponds to one total power level;

[0042] Calculate the average value of all the total power and values, and use the average value as the estimated available reserve power that can power the load device in the next target period;

[0043] The candidate power batteries are sorted in descending order according to the number of times that the batteries have not been replaced, and a preset number of the candidate power batteries are selected as target power batteries that are estimated to be able to power the load device in the next target time period.

[0044] In some embodiments, the second estimation unit is configured to:

[0045] Determine, based on the historical power consumption, a first power consumption consumed by the load device during the peak period in each target period and a second power consumption consumed during the parity period;

[0046] Calculating an average value of all the first power consumptions, and using the corresponding average value as the estimated first required power consumption of the load device during the peak period in the next target period;

[0047] An average value is calculated for all the second power consumptions, and the corresponding average value is used as the estimated second power demand of the load device in the parity period in the next target period.

[0048] In some embodiments, the power supply unit is used to:

[0049] Calculating the sum of the first power demand and the second power demand to obtain a total power demand;

[0050] Generate a load power supply strategy corresponding to the next target time period according to the available reserve power, the first required power consumption, the second required power consumption, the total required power consumption, the target power battery and the power grid;

[0051] According to the load power supply strategy, the target power battery is controlled to supply power to the load device within the next target time period.

[0052] In some embodiments, the power supply unit is used to:

[0053] When the available reserve power is less than the first required power consumption, a first load power supply strategy is generated, wherein the first load power supply strategy is used to indicate that in the next target period, the target power battery is used to first supply power to the load device, and when the power of the target power battery is exhausted, the power grid is used to supply power to the load device;

[0054] When the available reserve power is greater than or equal to the first required power consumption but less than the total required power consumption, a second load power supply strategy is generated, wherein the second load power supply strategy is used to indicate that in the next target period, the target power battery is used to supply power to the load device during the peak period, and the remaining power of the target power battery is used to supply power to the load device during the parity stage, and when the remaining power is insufficient, the power grid continues to supply power to the load device;

[0055] When the available reserve power is greater than or equal to the total required power consumption, a third load power supply strategy is generated, wherein the third load power supply strategy is used to indicate that the load device is powered by the target power battery during the peak period and the parity period of the next target period.

[0056] In some embodiments, the battery swap station further includes a switch module and a plurality of charge and discharge control modules, wherein the charge and discharge control modules are connected to the power batteries in a one-to-one correspondence and are used to control the corresponding power batteries to charge or discharge; one end of the switch module is connected to the power grid, and the other end is connected to the charge and discharge control module and the load device; the power supply unit is used to:

[0057] In the next target time period, the switch state of the switch module and the working mode of the charge and discharge control module are controlled according to the power supply strategy, so that the target power battery and the power grid supply power to the load device through switching.

[0058] In a third aspect, the present application provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the power supply control method for a battery swap station described in any one of the above items is implemented.

[0059] In a fourth aspect, the present application provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the power supply control method for the battery swap station described in any one of the above items is implemented.

[0060] In a fifth aspect, the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the power supply control method of the battery swap station described in any one of the above.

[0061] The power supply control method, device, storage medium, electronic device and computer program product of the battery swap station provided in the embodiments of the present application obtain historical operation information of the battery swap station, the historical operation information includes historical battery swap information of the power battery in at least one target time period and historical power consumption of the load equipment, the target time period is the time period between two adjacent valley time periods, and includes at least one peak time period and at least one parity time period; according to the historical battery swap information, the target power battery and the available reserve power that can power the load equipment in the next target time period are estimated; according to the historical power consumption, the first demand power consumption in the peak time period and the second demand power consumption in the parity time period of the load equipment in the next target time period are estimated; according to the available reserve power, the first demand power consumption and the second demand power consumption, the target power battery is controlled to power the load equipment in the next target time period, that is, according to the historical operation information, the battery valley power that can be provided to the battery swap station in the non-valley time period is estimated in the future, and the battery valley power is used to power the battery swap station in the non-valley time period, thereby maximizing the utilization of valley power without improving the overall structure of the battery swap station, reducing the amount of power taken from the power grid, and realizing low-cost operation of the battery swap station, with high flexibility and strong practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0063] Figure 1 It is a flowchart of a power supply control method of a battery swap station provided in an embodiment of the present application;

[0064] Figure 2 It is a schematic diagram of the architecture of a battery swap station provided in an embodiment of the present application;

[0065] Figure 3 is another flow chart of the power supply control method of the battery swap station provided in an embodiment of the present application;

[0066] Figure 4 It is a structural schematic diagram of a power supply control device of a battery swap station provided in an embodiment of the present application;

[0067] Figure 5 is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application;

[0068] Figure 6 It is a schematic diagram of the hardware structure of the electronic device provided in the embodiment of the present application.

[0069] 1. Battery pack; 2. Power grid; 3. Power battery; 4. Load device; 5. Switch module; 6. Processor; 7. Charge and discharge control module; 8. Power supply control device of battery pack; 9. Acquisition unit; 10. First estimation unit; 11. Second estimation unit; 12. Power supply unit; 13. Input unit; 14. Graphics processor; 15. Microphone; 16. Sensor; 17. Display unit; 18. Display panel; 19. User input unit; 20. Touch panel; 21. Other input devices; 22. Interface unit; 23. Memory; 24. Processor; 25. Audio output unit; 26. Input unit; 27. Graphics processor; 28. Microphone; 29. ​​Sensor; 30. Display unit; 31. Display panel; 32. User input unit; 33. Touch panel; 34. Other input devices; 35. Interface unit; 36. Memory; 37. Processor; 38. DETAILED DESCRIPTION

[0070] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.

[0071] At present, during the normal operation of the battery swap station, its own related load equipment such as cooling equipment and monitoring equipment need to be running all the time, and the electricity consumed in the operation is generally taken from the power grid. This power supply method will lead to high operating costs of the power supply station, especially during the peak period of electricity consumption, the power grid with higher electricity charges will significantly increase the operating costs of the entire station. Some existing technologies reduce the operating costs of the battery swap station by adding energy storage equipment. For example, during the valley period, electricity is taken from the grid to charge the energy storage equipment, and during the non-valley period, the valley electricity of the energy storage equipment is used to power the power battery and the battery swap station's own equipment to achieve full utilization of valley electricity. Although this method can reduce the operating costs of the battery swap station to a certain extent, adding energy storage equipment will have a large initial cost investment, the total cost of the battery swap station will be greatly increased, and the complexity of the entire station will be increased. Therefore, there is an urgent need for a more flexible valley electricity maximization solution that does not cause major changes to the overall structure of the battery swap station to achieve low-cost operation of the battery swap station.

[0072] In order to solve at least one of the above technical problems, the embodiments of the present application provide a power supply control method, device, storage medium, electronic device and computer program product for a battery swap station.

[0073] See also Figure 1 and Figure 2 , Figure 1 is a flow chart of a power supply control method for a battery swap station provided in an embodiment of the present application, Figure 2: is a schematic diagram of the architecture of the battery swap station provided in an embodiment of the present application. The power supply control method of the battery swap station is applied to electronic devices, and the power supply control method can be executed by the electronic device or a functional module or functional entity in the electronic device. The battery swap station 10 includes a plurality of power batteries 11 (for example, N power batteries) and a load device 12. The load device 12 is mainly used to maintain the normal operation of the battery swap station 10, which includes but is not limited to cooling equipment, monitoring equipment, etc. A switch module 13 is provided between the battery swap station 10 and the power grid 20. When the switch module 13 is in a closed state, the power grid 20 and the battery swap station 10 are connected, and the power grid 20 can supply power to the battery swap station 10, such as the power battery 11 and the load device 12 in the battery swap station 10. When the switch module 13 is in an open state, the power grid 20 and the battery swap station 10 are disconnected, and the power grid 20 cannot supply power to the battery swap station 10. Usually during the trough period, the power battery 11 and the load device 12 in the battery swap station 10 can be powered by the power grid 20, and the fully charged power battery 11 can subsequently provide battery swap services to the car during the peak period and the parity period.

[0074] During the actual operation of the battery swap station 10, we found that many battery swap stations 10 often have the problem of low battery swap frequency, that is, the fully charged power battery 11 at the trough cannot be completely swapped to the car, and the load equipment 12 in the battery swap station 10 needs to draw power from the power grid 20 to maintain operation. In this way, on the one hand, the valley electricity in the power battery 11 in the battery swap station 10 cannot be fully utilized, and on the other hand, the cost of electricity consumed by the operation of the battery swap station 10 itself is relatively high, especially in the peak stage. In response to this phenomenon, the present application designs a power supply control method for the battery swap station 10, which can achieve low-cost operation of the battery swap station 10 by maximizing the utilization of valley electricity without changing the overall structure of the battery swap station 10.

[0075] The power supply control method of the battery swap station 10 can be executed by the processor 14 in the battery swap station 10. The processor 14 is the core control part of the entire battery swap station 10, and mainly provides analysis, coordination, control and other functions. The method specifically includes the following steps 101-104, wherein:

[0076] 101. Obtain historical operation information of the battery swap station, where the historical operation information includes historical battery swap information of the power battery and historical power consumption of the load equipment within at least one target period, where the target period is the period between two adjacent trough periods and includes at least one peak period and at least one parity period.

[0077] Among them, the peak period refers to the time period of the day when the electricity demand is the highest. During this period, the power load reaches the peak because a large number of users use electricity at the same time. The parity period refers to the time period when the electricity demand is relatively stable and the electricity price is at a normal level. During this period, the power load is relatively low and the electricity price is relatively stable. The trough period refers to the time period when the electricity demand is the lowest. During this period, the power load is reduced to the lowest because a large number of users reduce their electricity use.

[0078] The historical operation information may be the actual operation information of the battery swap station 10 for at least one day during the previous operation. The target period is a non-trough period, which is composed of a peak period and a par period, and mainly refers to a period composed of all peak periods and par periods between two adjacent trough periods. For example, if the peak period is 08:30-11:30 and 18:00-23:00, the par period is 07:00-08:30 and 11:30-18:00, and the trough period is 23:00-7:00, then the target period is 7:00-23:00.

[0079] 102. Based on the historical battery replacement information, estimate the target power battery 11 and available reserve power that can supply power to the load device 12 in the next target period.

[0080] Among them, the target power battery 11 is the power battery 11 that is unlikely to be replaced within the next target period (which can be considered as the upcoming non-valley period), and the available reserve power is the power that is likely to be used to power the battery swap station 10 within the next target period. They are all predicted based on the actual historical operation information of the battery swap station 10.

[0081] In some embodiments, see Figure 3 , Figure 3 1 is another flow chart of the power supply control method of the battery swap station 10 provided in an embodiment of the present application. The above step 102 specifically includes:

[0082] 1021. Determine the power batteries that have not been replaced in each previous target time period based on the historical battery replacement information as candidate power batteries, and count the number of times each candidate power battery has not been replaced.

[0083] 1022. According to the power level of each candidate power battery and the number of times the battery has not been replaced, estimate the target power battery and the available reserve power that can supply power to the load device in the next target period.

[0084] Furthermore, the above step 1022 specifically includes:

[0085] Calculate the sum of the power of all candidate power batteries in each target period to obtain a total power sum value, and each target period corresponds to a total power sum value;

[0086] Calculate the average of all total power and values, and use the average as the estimated available reserve power that can power the load device in the next target period;

[0087] The candidate power batteries are sorted in descending order according to the number of times they have not been replaced, and a preset number of candidate power batteries are selected as the target power batteries that are estimated to be able to power the load device in the next target period.

[0088] Among them, the power batteries 11 that have never been replaced during the non-valley period of at least one day in the past (i.e., the above-mentioned target period) are statistically analyzed, and the total power and value of these power batteries 11 counted each time are calculated. If only one day of historical data is statistically analyzed, the power batteries 11 that have not been replaced are directly used as target batteries, and the total power and value are used as available reserve power. If multiple days of historical data are statistically analyzed to improve the prediction accuracy, multiple power batteries 11 that have not been replaced the most times can be selected as target batteries, and the average of the total power and value can be used as the available reserve power.

[0089] 103. According to the historical power consumption, estimate the first power consumption demand of the load device during the peak period and the second power consumption demand during the parity period in the next target period.

[0090] In some embodiments, see Figure 3 , the above step 103 specifically includes:

[0091] 1031. Determine, based on the historical power consumption, a first power consumption consumed by the load device 12 during the peak period in each target period and a second power consumption consumed during the parity period;

[0092] 1032. Calculate the average value of all first power consumptions, and use the corresponding average value as the estimated first power demand of the load equipment during the peak period in the next target period; calculate the average value of all second power consumptions, and use the corresponding average value as the estimated second power demand of the load equipment during the parity period in the next target period.

[0093] For example, the power demand of the load device 12 in the peak period of the next one or more days can be analyzed and estimated based on the actual power consumption of the load device 12 in the peak period in the last at least one day, and the power demand of the load device 12 in the parity period in the last at least one day can be analyzed and estimated. Specifically, the average power consumption of the load device 12 in the peak period of the last at least one day and the average power consumption of the load device 12 in the parity period of the last at least one day can be calculated respectively, and the average power consumption of the load device 12 in the subsequent corresponding period can be used as the power demand of the load device 12.

[0094] 104. Control the target power battery to supply power to the load device in a next target time period according to the available reserve power, the first required power consumption, and the second required power consumption.

[0095] In some embodiments, please see Figure 3 , the above step 104 specifically includes:

[0096] 1041. Calculate the sum of the first power demand and the second power demand to obtain a total power demand.

[0097] 1042. Generate a load power supply strategy corresponding to the next target time period according to the available reserve power, the first demand power consumption, the second demand power consumption, the total demand power consumption, the target power battery and the power grid.

[0098] The load power supply strategy is mainly used to set the power supply mode of the load device 12 during the non-valley period of the next day or multiple days, such as when the power grid 20 supplies power and when the target power battery 11 supplies power. For the valley period of the next day or multiple days, the load device 12 can be powered by the power grid 20 or other power supply modes, which are not limited here.

[0099] Furthermore, the above step 1042 may include:

[0100] When the available reserve power is less than the first required power consumption, a first load power supply strategy is generated, wherein the first load power supply strategy is used to indicate that in the next target period, the target power battery is used to first supply power to the load device, and when the power of the target power battery is exhausted, the power grid is used to supply power to the load device;

[0101] When the available reserve power is greater than or equal to the first required power consumption but less than the total required power consumption, a second load power supply strategy is generated, the second load power supply strategy is used to indicate that in the next target period, the target power battery is used to supply power to the load device during the peak period, and the remaining power of the target power battery is used to supply power to the load device during the parity stage, and when the remaining power is insufficient, the power grid continues to supply power to the load device;

[0102] When the available reserve power is greater than or equal to the total required power consumption, a third load power supply strategy is generated, so the third load power supply strategy is used to indicate that the load device is powered by the target power battery during the peak period and the parity period of the next target period.

[0103] That is, assuming that after statistical analysis of historical operation information, the available reserve power of the non-valley period (i.e., the above-mentioned target period) is estimated to be E1, the first demand power consumption during the peak period is E2, and the second demand power consumption during the flat price period is E3. At this time, a comparative analysis is performed on the magnitudes of E1, E2, and E3. If E1 < E2, then subsequently, during the non-valley period, the power of the target power battery 11 (i.e., the estimated power battery 11 that has not been replaced) is preferentially used to supply power to the load device 12, and after its power is used up, the power grid 20 is used for power supply; if (E2 + E3) > E1 ≥ E2, then subsequently, the power consumption of the load device 12 during the peak period is entirely from the target power battery 11. If there is remaining power in the target power battery 11, it is used to supply power to the load device 12 during the flat price period. When the remaining power is insufficient, the power grid 20 urgently supplies power to the load device 12; if E1 ≥ (E2 + E3), then subsequently, the power supply of the load device 12 during the peak period and the flat price period is both from the target power battery 11, and there is no need to draw power from the power grid 20.

[0104] 1043. According to this load power supply strategy, control the target power battery to supply power to the load device within the next target period.

[0105] Among them, when implementing the load power supply strategy, it involves the switching of the power supply object of the load device 12. For example, if the power of the target power battery 11 is sufficient, the power supply object for the load device 12 can be switched from the power grid 20 to the target power battery 11. If the power of the target power battery 11 is insufficient, the power supply object for the load device 12 can be switched from the target power battery 11 to the power grid 20 to ensure that the load device 12 is not powered off at any time and to ensure the normal operation of the battery swapping station 10. This switching can be based on Figure 2 the switch module 13 and the charge and discharge control module shown in

[0106] That is, the battery swapping station 10 further includes a switch module 13 and a plurality of charge and discharge control modules 15. The charge and discharge control module 15 is connected to the corresponding power battery 11 one-to-one and is used to control the corresponding power battery 11 to charge or discharge; one end of the switch module 13 is connected to the power grid 20, and the other end is connected to the charge and discharge control module 15 and the load device 12. At this time, the above step 1043 further includes:

[0107] Within the next target period, control the switch state of the switch module and the working mode of the charge and discharge control module according to this power supply strategy, so that the target power battery and the power grid supply power to the load device in a switching manner.

[0108] Among them, the switch module 13 has two states, open and closed. It is arranged between the power grid 20 and the battery swap station 10. When it is necessary to draw power from the power grid 20, the switch module 13 needs to be in a closed state. And to prevent reverse work, when it is not necessary to draw power from the power grid 20, such as during non-valley periods, when it is only necessary to power the load device 12 through the target power battery 11, the switch module 13 can be in an open state. The charge and discharge control module 15 includes but is not limited to a bidirectional charger with charge and discharge capabilities, which includes at least two working modes: a charge control mode and a discharge control mode. The charge and discharge control module 15 cannot work in the charge control mode and the discharge control mode at the same time. In the charge control mode, the charge and discharge control module 15 can draw power from the power grid 20 to charge the corresponding power battery 11. In the discharge control mode, the charge and discharge control module 15 can draw power from the corresponding power battery 11 to output AC power to the outside.

[0109] Specifically, the process of switching to the target power battery 11 to supply power to the load device 12 is as follows: first, the charge and discharge control module 15 corresponding to the target power battery 11 is selected to make it work in the discharge control mode, and the frequency and phase are adjusted by the charge and discharge control module 15 to connect to the power grid 20. After the connection is completed, the charge and discharge control module 15 gradually transfers the power supply of the load device 12 from the power grid 20 to the target power battery 11. When the transfer is completed, the control switch module 13 is in the open state to cut off the power supply of the power grid 20, and the switching is completed. The process of switching to the power grid 20 to supply power to the load device 12 is as follows: the charge and discharge control module 15 adjusts the frequency, phase, etc. to prepare for the connection before the connection. After the connection conditions are met, the control switch module 13 is in the closed state, and the charge and discharge control module 15 gradually transfers the power supply of the load device 12 from the target power battery 11 to the power grid 20. After the transfer is completed, the charge and discharge control module 15 turns off its power output, and the switching is completed.

[0110] From the above, it can be seen that the power supply control method of the battery swap station provided in the embodiment of the present application obtains historical operation information of the battery swap station, and the historical operation information includes historical battery swap information of the power battery in at least one target time period and historical power consumption of the load equipment, the target time period is the time period between two adjacent valley periods, and includes at least one peak period and at least one parity period; according to the historical battery swap information, the target power battery and the available reserve power that can power the load equipment in the next target time period are estimated; according to the historical power consumption, the first demand power consumption of the load equipment in the peak period and the second demand power consumption in the parity period in the next target time period are estimated; according to the available reserve power, the first demand power consumption and the second demand power consumption, the target power battery is controlled to power the load equipment in the next target time period, that is, according to the historical operation information, the battery valley power that can be provided to the battery swap station in the non-valley period in the future is estimated, and the battery valley power is used to power the battery swap station in the non-valley period, thereby maximizing the utilization of valley power without improving the overall structure of the battery swap station, reducing the amount of power taken from the power grid, and realizing low-cost operation of the battery swap station with high flexibility and strong practicality.

[0111] According to the method described in the above embodiment, the present application embodiment also provides a power supply control device for a battery swap station, which is used to execute the steps in the power supply control method for the battery swap station. Figure 4 , Figure 4 200 is a schematic diagram of the structure of the power supply control device of the battery swap station provided in an embodiment of the present application. The power supply control device 200 of the battery swap station is applied to an electronic device, and the power supply control method can be executed by the electronic device or a functional module or functional entity in the electronic device. Specifically, the power supply control device 200 of the battery swap station includes an acquisition unit 201, a first estimation unit 202, a second estimation unit 203 and a power supply unit 204, wherein:

[0112] An acquisition unit 201 is used to acquire historical operation information of the battery swap station, where the historical operation information includes historical battery swap information of the power battery and historical power consumption of the load device within at least one target period, where the target period is a period between two adjacent trough periods and includes at least one peak period and at least one parity period;

[0113] The first estimation unit 202 is used to estimate the target power battery and available reserve power that can supply power to the load device in the next target period according to the historical battery replacement information;

[0114] The second estimation unit 203 is used to estimate the first demand power consumption of the load device in the peak period and the second demand power consumption in the parity period in the next target period according to the historical power consumption;

[0115] The power supply unit 204 is used to control the target power battery to supply power to the load device in the next target time period according to the available reserve power, the first required power consumption and the second required power consumption.

[0116] In some embodiments, the first estimation unit 202 is used to:

[0117] Determine the power battery that has not been replaced in each of the target time periods in the past according to the historical battery replacement information as a candidate power battery, and count the number of times each of the candidate power battery has not been replaced;

[0118] According to the power level of each candidate power battery and the number of times the battery has not been replaced, the target power battery and the available reserve power that can supply power to the load device in the next target time period are estimated.

[0119] In some embodiments, the first estimation unit 202 is used to:

[0120] Calculate the sum of the power of all the candidate power batteries in each target time period to obtain a total power sum value, and each target time period corresponds to one total power sum value;

[0121] Calculate the average value of all the total power and values, and use the average value as the estimated available reserve power that can power the load device in the next target period;

[0122] The candidate power batteries are sorted in descending order according to the number of times that the batteries have not been replaced, and a preset number of the candidate power batteries are selected as the target power batteries that are estimated to be able to power the load device in the next target time period.

[0123] In some embodiments, the second estimation unit 203 is used to:

[0124] Determine, based on the historical power consumption, a first power consumption consumed by the load device during the peak period in each target period and a second power consumption consumed during the parity period;

[0125] Calculate an average value of all the first power consumptions, and use the corresponding average value as the estimated first required power consumption of the load device during the peak period in the next target period;

[0126] An average value is calculated for all the second power consumptions, and the corresponding average value is used as the estimated second power demand of the load device in the parity period in the next target period.

[0127] In some embodiments, the power supply unit 204 is used to:

[0128] Calculate the sum of the first power demand and the second power demand to obtain a total power demand;

[0129] Generate a load power supply strategy corresponding to the next target time period according to the available reserve power, the first required power consumption, the second required power consumption, the total required power consumption, the target power battery and the power grid;

[0130] According to the load power supply strategy, the target power battery is controlled to supply power to the load device within the next target time period.

[0131] In some embodiments, the power supply unit 204 is used to:

[0132] When the available reserve power is less than the first required power consumption, a first load power supply strategy is generated, wherein the first load power supply strategy is used to indicate that in the next target period, the target power battery is used to first supply power to the load device, and when the power of the target power battery is exhausted, the power grid is used to supply power to the load device;

[0133] When the available reserve power is greater than or equal to the first required power consumption but less than the total required power consumption, a second load power supply strategy is generated, the second load power supply strategy is used to indicate that in the next target period, the target power battery is used to supply power to the load device during the peak period, and the remaining power of the target power battery is used to supply power to the load device during the parity stage, and when the remaining power is insufficient, the power grid continues to supply power to the load device;

[0134] When the available reserve power is greater than or equal to the total required power consumption, a third load power supply strategy is generated, and the third load power supply strategy is used to indicate that the load device is powered by the target power battery during the peak period and the parity period of the next target period.

[0135] In some embodiments, the battery swap station further includes a switch module and a plurality of charge and discharge control modules, the charge and discharge control modules are connected to the power batteries in a one-to-one correspondence, and are used to control the corresponding power batteries to charge or discharge; one end of the switch module is connected to the power grid, and the other end is connected to the charge and discharge control module and the load device; the power supply unit 204 is used to:

[0136] In the next target time period, the switch state of the switch module and the working mode of the charge and discharge control module are controlled according to the power supply strategy, so that the target power battery and the power grid supply power to the load device through switching.

[0137] It should be noted that the specific details of each module unit in the power supply control device 200 of the above-mentioned battery swap station have been described in detail in the embodiment of the power supply control method of the above-mentioned battery swap station, and will not be repeated here.

[0138] As can be seen from the above, the power supply control device 200 of the battery swap station provided in the embodiment of the present application obtains the historical operation information of the battery swap station through the acquisition unit 201, and the historical operation information includes the historical battery swap information of the power battery in at least one target time period and the historical power consumption of the load equipment. The target time period is the time period between two adjacent trough time periods, and includes at least one peak time period and at least one parity time period; the first estimation unit 202 estimates the target power battery and the available reserve power that can power the load equipment in the next target time period based on the historical battery swap information; the second estimation unit 203 estimates the load equipment in the next target time period based on the historical power consumption. The first demand electricity consumption during the peak period and the second demand electricity consumption during the parity period in the target time period; the power supply unit 204 controls the target power battery to supply power to the load equipment in the next target time period according to the available reserve electricity, the first demand electricity consumption and the second demand electricity consumption, that is, it estimates the battery valley electricity that can be provided to the battery swap station in the non-valley period in the future according to the historical operation information, and uses the battery valley electricity to power the battery swap station in the non-valley period, thereby maximizing the utilization of valley electricity without improving the overall structure of the battery swap station, reducing the amount of electricity drawn from the power grid, and realizing low-cost operation of the battery swap station with high flexibility and strong practicality.

[0139] In some embodiments, the power supply control device of the battery swap station in the embodiment of the present application can be an electronic device, or a component in the electronic device, such as an integrated circuit or a chip. The electronic device can be a terminal device. Exemplarily, the electronic device can be a mobile phone, a tablet computer, a laptop computer, a PDA, a vehicle-mounted electronic device, a mobile Internet device (Mobile Internet Device, MID), an augmented reality (augmented reality, AR) / virtual reality (virtual reality, VR) device, a robot, a wearable device, an ultra-mobile personal computer (ultra-mobile personal computer, UMPC), a netbook or a personal digital assistant (personal digital assistant, PDA), etc. It can also be a server, a network attached storage (Network Attached Storage, NAS), a personal computer (personal computer, PC), a television (television, TV), a teller machine or a self-service machine, etc., and the embodiment of the present application is not specifically limited.

[0140] In some embodiments, Figure 5As shown, an embodiment of the present application also provides an electronic device 300, including a processor 301, a memory 302, and a computer program stored in the memory 302 and executable on the processor 301. When the program is executed by the processor 301, each process of the power supply control method embodiment of the above-mentioned battery swap station is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.

[0141] It should be noted that the electronic devices in the embodiments of the present application include the mobile electronic devices and non-mobile electronic devices mentioned above.

[0142] Figure 6 A schematic diagram of the hardware structure of an electronic device to implement an embodiment of the present application.

[0143] The electronic device 400 includes but is not limited to: a radio frequency unit 401, a network module 402, an audio output unit 403, an input unit 404, a sensor 405, a display unit 406, a user input unit 407, an interface unit 408, a memory 409, a processor 410 and other components.

[0144] Those skilled in the art will appreciate that the electronic device 400 may also include a power source (such as a battery) for supplying power to each component, and the power source may be logically connected to the processor 410 through a power management system, thereby implementing functions such as managing charging, discharging, and power consumption management through the power management system. Figure 6 The electronic device structure shown in the figure does not constitute a limitation on the electronic device. The electronic device may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently, which will not be described in detail here.

[0145] It should be understood that in the embodiment of the present application, the input unit 404 may include a graphics processor (Graphics Processing Unit, GPU) 4041 and a microphone 4042, and the graphics processor 4041 processes the image data of the static picture or video obtained by the image capture device (such as a camera) in the video capture mode or the image capture mode. The display unit 406 may include a display panel 4061, and the display panel 4061 may be configured in the form of a liquid crystal display, an organic light emitting diode, etc. The user input unit 407 includes a touch panel 4071 and at least one of other input devices 4072. The touch panel 4071 is also called a touch screen. The touch panel 4071 may include two parts: a touch detection device and a touch controller. Other input devices 4072 may include, but are not limited to, a physical keyboard, function keys (such as volume control keys, switch keys, etc.), a trackball, a mouse, and a joystick, which will not be repeated here.

[0146] The memory 409 can be used to store software programs and various data. The memory 409 may mainly include a first storage area for storing programs or instructions and a second storage area for storing data, wherein the first storage area may store an operating system, an application program or instructions required for at least one function (such as a sound playback function, an image playback function, etc.), etc. In addition, the memory 409 may include a volatile memory or a non-volatile memory, or the memory 409 may include both volatile and non-volatile memories. Among them, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be a random access memory (RAM), a static random access memory (SRAM), a dynamic random access memory (DRAM), a synchronous dynamic random access memory (SDRAM), a double data rate synchronous dynamic random access memory (DDRSDRAM), an enhanced synchronous dynamic random access memory (ESDRAM), a synchronous link dynamic random access memory (SLDRAM) and a direct memory bus random access memory (DRRAM). The memory 409 in the embodiment of the present application includes but is not limited to these and any other suitable types of memory.

[0147] The processor 410 may include one or more processing units; the processor 410 integrates an application processor and a modem processor, wherein the application processor mainly processes operations related to an operating system, a user interface, and application programs, and the modem processor mainly processes wireless communication signals, such as a baseband processor. It is understandable that the modem processor may not be integrated into the processor 410.

[0148] An embodiment of the present application also provides a non-transitory computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the various processes of the power supply control method embodiment of the above-mentioned battery swap station are implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.

[0149] The processor is the processor in the electronic device described in the above embodiment. The readable storage medium includes a computer readable storage medium, such as a computer read-only memory ROM, a random access memory RAM, a magnetic disk or an optical disk.

[0150] An embodiment of the present application also provides a computer program product, including a computer program, which implements the power supply control method of the above-mentioned battery swap station when executed by a processor.

[0151] The processor is the processor in the electronic device described in the above embodiment. The readable storage medium includes a computer readable storage medium, such as a computer read-only memory ROM, a random access memory RAM, a magnetic disk or an optical disk.

[0152] It should be noted that, in this article, the terms "comprise", "include" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise one..." do not exclude the presence of other identical elements in the process, method, article or device including the element. In addition, it should be pointed out that the scope of the methods and devices in the embodiments of the present application is not limited to performing functions in the order shown or discussed, and may also include performing functions in a substantially simultaneous manner or in reverse order according to the functions involved, for example, the described method may be performed in an order different from that described, and various steps may also be added, omitted, or combined. In addition, the features described with reference to certain examples may be combined in other examples.

[0153] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a computer software product, which is stored in a storage medium (such as ROM / RAM, a disk, or an optical disk), and includes a number of instructions for a terminal (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present application.

[0154] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.

[0155] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.

[0156] In the description of the present application, “plurality” means two or more.

[0157] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0158] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.

Claims

1. A power supply control method for a battery swap station, characterized in that: The battery swap station includes a plurality of power batteries and load equipment, and the power supply control method of the battery swap station includes: Acquire historical operation information of the battery swap station, the historical operation information including historical battery swap information of the power battery and historical power consumption of the load device within at least one target period, the target period being the period between two adjacent trough periods and including at least one peak period and at least one parity period; According to the historical battery replacement information, estimate the target power battery and available reserve power that can power the load device in the next target period; According to the historical power consumption, estimating the first power consumption demand of the load device during the peak period and the second power consumption demand during the parity period in the next target period; According to the available reserve power, the first required power consumption and the second required power consumption, the target power battery is controlled to supply power to the load device in the next target time period.

2. The power supply control method of a battery swap station according to claim 1, characterized in that: The target power battery and available reserve power that can be used to power the load device in the next target period are estimated based on the historical power replacement information, including: Determine the power battery that has not been replaced in each of the target time periods in the past according to the historical battery replacement information as a candidate power battery, and count the number of times each of the candidate power battery has not been replaced; According to the power level of each candidate power battery and the number of times the battery has not been replaced, the target power battery and the available reserve power that can supply power to the load device in the next target time period are estimated.

3. The power supply control method of the battery swap station according to claim 2, characterized in that: The estimating, based on the power of each candidate power battery and the number of times the battery has not been replaced, the target power battery that can supply power to the load device in the next target period and the available reserve power, includes: Calculating the sum of the power levels of all the candidate power batteries in each target time period to obtain a total power level, wherein each target time period corresponds to one total power level; Calculate the average value of all the total power and values, and use the average value as the estimated available reserve power that can power the load device in the next target period; The candidate power batteries are sorted in descending order according to the number of times that the batteries have not been replaced, and a preset number of the candidate power batteries are selected as target power batteries that are estimated to be able to power the load device in the next target time period.

4. The power supply control method of a battery swap station according to claim 1, characterized in that: The estimating, based on the historical power consumption, the first power consumption demand of the load device during the peak period and the second power consumption demand during the parity period in the next target period includes: Determine, based on the historical power consumption, a first power consumption consumed by the load device during the peak period in each target period and a second power consumption consumed during the parity period; Calculating an average value of all the first power consumptions, and using the corresponding average value as the estimated first required power consumption of the load device during the peak period in the next target period; An average value is calculated for all the second power consumptions, and the corresponding average value is used as the estimated second power demand of the load device in the parity period in the next target period.

5. The power supply control method of a battery swap station according to claim 1, characterized in that: The controlling the target power battery to supply power to the load device in the next target time period according to the available reserve power, the first required power consumption, and the second required power consumption includes: Calculating the sum of the first power demand and the second power demand to obtain a total power demand; Generate a load power supply strategy corresponding to the next target time period according to the available reserve power, the first required power consumption, the second required power consumption, the total required power consumption, the target power battery and the power grid; According to the load power supply strategy, the target power battery is controlled to supply power to the load device within the next target time period.

6. The power supply control method of the battery swap station according to claim 5, characterized in that: The step of generating a load power supply strategy corresponding to the next target time period according to the available reserve power, the first required power consumption, the second required power consumption, the total required power consumption, the target power battery and the power grid includes: When the available reserve power is less than the first required power consumption, a first load power supply strategy is generated, wherein the first load power supply strategy is used to indicate that in the next target period, the target power battery is used to first supply power to the load device, and when the power of the target power battery is exhausted, the power grid is used to supply power to the load device; When the available reserve power is greater than or equal to the first required power consumption but less than the total required power consumption, a second load power supply strategy is generated, wherein the second load power supply strategy is used to indicate that in the next target period, the target power battery is used to supply power to the load device during the peak period, and the remaining power of the target power battery is used to supply power to the load device during the parity stage, and when the remaining power is insufficient, the power grid continues to supply power to the load device; When the available reserve power is greater than or equal to the total required power consumption, a third load power supply strategy is generated, wherein the third load power supply strategy is used to indicate that the load device is powered by the target power battery during the peak period and the parity period of the next target period.

7. The power supply control method of a battery swap station according to claim 5, characterized in that: The battery swap station further includes a switch module and a plurality of charge and discharge control modules, wherein the charge and discharge control modules are connected to the power batteries in a one-to-one correspondence and are used to control the corresponding power batteries to charge or discharge; one end of the switch module is connected to the power grid, and the other end is connected to the charge and discharge control module and the load device; According to the load power supply strategy, controlling the target power battery to supply power to the load device within the next target time period includes: In the next target time period, the switch state of the switch module and the working mode of the charge and discharge control module are controlled according to the power supply strategy, so that the target power battery and the power grid supply power to the load device through switching.

8. A power supply control device for a battery swap station, characterized in that: The battery swap station includes a plurality of power batteries and load equipment, and the power supply control device of the battery swap station includes: an acquisition unit, configured to acquire historical operation information of the battery swap station, wherein the historical operation information includes historical battery swap information of the power battery and historical power consumption of the load device within at least one target period, wherein the target period is a period between two adjacent trough periods and includes at least one peak period and at least one parity period; A first estimation unit, configured to estimate, based on the historical battery replacement information, a target power battery that can supply power to the load device and available reserve power in the next target period; A second estimating unit, configured to estimate, based on the historical power consumption, a first power consumption demand of the load device during the peak period and a second power consumption demand during the parity period in the next target period; A power supply unit is used to control the target power battery to supply power to the load device within the next target time period according to the available reserve power, the first required power consumption and the second required power consumption.

9. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the power supply control method for the battery swap station as described in any one of claims 1 to 7 is implemented.

10. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the power supply control method for the battery swap station as described in any one of claims 1-7 is implemented.

Citation Information

Patent Citations

  • SFLA-based electric vehicle and power grid energy exchange optimization method

    CN110581555A

  • Distributed discharging method, distributed charging method, electronic equipment and storage medium

    CN113479096A

  • Electric vehicle charging method and system considering space-time double-layer optimization and application

    CN115860352A

  • Charging method and device for battery swap station and electronic equipment

    CN116674415A

  • Composition for skin whitening containing gypenoside compound

    KR1020250053490A