Intelligent electric control system and method for transporting semitrailer

By designing an intelligent electronic control system for transportation semi-trailer, the temperature, pressure and liquid level in the tank are monitored and controlled in real time, the problems of unsafe and inefficient transportation in the existing technology are solved, and an efficient and safe transportation process is achieved. Improve operational flexibility through remote monitoring.

CN119396044APending Publication Date: 2025-02-07湖北省齐星汽车车身股份有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411459766.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-18
Publication Date
2025-02-07

AI Technical Summary

Technical Problem

The prior art cannot accurately control the temperature and pressure of saturated water vapor transport semi-trailer, resulting in unsafe and inefficient transportation, and the reliability of the electronic control system in harsh environments, making it impossible to detect and deal with safety issues such as leakage and overvoltage in a timely manner.

Method used

An intelligent electronic control system for transportation semi-trailer was designed, including tank body, heat exchange pipeline, steam charging pipeline, unloading pipeline, liquid level monitoring pipeline and centralized control center, and the tank body is monitored and controlled in real time. The temperature, pressure and liquid level ensure operation within a safe range and remote monitoring and operation are achieved through the network communication module.

Benefits of technology

Accurate temperature and pressure control of transport semi-trailers is achieved, transportation safety and efficiency are improved, energy waste is reduced, and operational flexibility and response speed are improved through remote monitoring, preventing unsafe situations during transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119396044A_ABST
    Figure CN119396044A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent electric control system and method for a transportation semitrailer, and relates to the technical field of transportation semitrailers, the electric control system comprises a heat exchange pipeline, a steam filling pipeline, a discharging pipeline, a liquid level monitoring pipeline and a centralized control center, and the heat exchange pipeline comprises a coil pipe, a silencer and a steam-water separator which are installed at the bottom in a tank body; one end of the steam filling pipeline is suitable for being connected with a steam source, and the other end is suitable for being connected to an air inlet of the coil; the discharging pipeline is suitable for being connected with the discharging end to convey steam. The liquid level monitoring pipeline monitors the liquid level height of cooling water in the tank body in real time; the controller is electrically connected with the steam-water separator, the steam filling pipeline, the discharging pipeline and the liquid level monitoring pipeline, and temperature, pressure and liquid level data in the tank body and control valve opening degree data are transmitted to a centralized control center through a network communication module. According to the electric control method, the temperature and pressure of the tank body are monitored and controlled in real time, the needed steam is prepared, and the safety of the transportation semitrailer is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of transport semi-trailers, and in particular to an intelligent electric control system and method for a transport semi-trailer. Background Art

[0002] The electronic control system of saturated steam transport semi-trailer is one of the key technologies to ensure its safe and efficient operation. However, due to the particularity of the operating environment of this type of vehicle, the electronic control system may face some challenges and problems.

[0003] First, the transportation of saturated water vapor requires strict temperature control to maintain the saturated state of the steam. The current electronic control system cannot accurately control heaters and other temperature regulation equipment, resulting in overheating or underheating of the saturated water vapor.

[0004] Secondly, the transportation of saturated water vapor also involves pressure control to ensure the safety of the container and the effective transportation of steam. The current electronic control system is also unable to accurately monitor and control the pressure.

[0005] Furthermore, since saturated water vapor transport trailers often operate in adverse climates and road conditions, the electrical system may be affected by factors such as moisture and vibration, resulting in reduced reliability.

[0006] Finally, the electronic control system cannot adaptively adjust the heating device and drive device according to the monitoring data, which increases unnecessary energy waste. The current electronic control system is also unable to detect and take measures in a timely manner for safety issues such as leakage and overpressure that may occur during transportation. Summary of the invention

[0007] In view of this, in view of the above-mentioned deficiencies in the prior art, the object of the present invention is to provide an intelligent electric control system and method for a transport trailer to solve the above-mentioned technical problems.

[0008] In order to solve the above problems, the first object of the present invention is to provide an intelligent electric control system for a transport semi-trailer, comprising a tank body horizontally mounted on the underframe of the semi-trailer, wherein the tank body is suitable for containing a certain amount of cooling water, and further comprising:

[0009] The heat exchange pipeline includes a coil installed at the bottom of the tank body, a muffler evenly embedded at the end of the coil, and a steam-water separator installed at the top of the tank body;

[0010] A steam filling pipeline is connected to the tank body, one end of the steam filling pipeline is suitable for connecting to a steam source, and the other end is suitable for connecting to an air inlet of the coil;

[0011] A discharge pipeline connected to the tank body and located below the steam filling pipeline, the discharge pipeline being suitable for connecting to the discharge end to deliver steam after the transport semi-trailer is transported to the designated discharge location;

[0012] A liquid level monitoring pipeline, used for real-time monitoring of the liquid level of the cooling water in the tank; and

[0013] The centralized control center includes a controller and a network communication module. The controller is electrically connected to the steam-water separator, the steam filling pipeline, the discharge pipeline and the liquid level monitoring pipeline respectively, and transmits the temperature, pressure and liquid level data in the tank body and the control valve opening data on the heat exchange pipeline, the steam filling pipeline and the discharge pipeline to the centralized control center through the network communication module.

[0014] Optionally, the steam filling pipeline includes a first electric ball valve, a first check valve and a first air inlet ball valve which are connected in sequence through a first pipe and are all located outside the tank body, one end of the first pipe is connected to a steam source, and a portion of the first pipe close to the first air inlet ball valve passes through the tank body and is connected to the air inlet of the coil to transport steam into the coil and exchange heat with cooling water in the tank body.

[0015] Optionally, the unloading pipeline includes a second pressure sensor, a second temperature sensor, a second electric ball valve, a third electric ball valve, a first outlet ball valve and a third temperature sensor which are connected in series in sequence through a second pipeline, and one end of the second pipeline close to the third temperature sensor is connected to the interior of the tank body, and one end of the second pipeline close to the second pressure sensor is suitable for connecting to the unloading end.

[0016] Optionally, the liquid level monitoring pipeline includes an upper liquid level gauge stop valve and a lower liquid level gauge stop valve installed on one side of the tank body, a first liquid level gauge, a first liquid level gauge drain valve and a second liquid level gauge. After being connected in series with the first liquid level gauge, the upper liquid level gauge stop valve is connected in parallel with the lower liquid level gauge stop valve, and then is connected in series with the first liquid level gauge drain valve and the second liquid level gauge in sequence.

[0017] Optionally, a first temperature sensor, a first thermometer, a first pressure sensor and a first pressure gauge are respectively installed on the bottom of one side of the tank body, and the first temperature sensor is used to transmit the temperature inside the tank body in real time, the first thermometer is used to measure the temperature inside the tank body in real time, the first pressure sensor is used to transmit the pressure inside the tank body in real time, and the first pressure gauge is used to measure the pressure inside the tank body in real time.

[0018] Optionally, it also includes:

[0019] A sewage discharge pipeline is connected to the bottom side of the tank body, and the sewage discharge pipeline is used to discharge impurities in the tank body;

[0020] A water supply pipeline, comprising an upper water supply branch and a lower water supply branch respectively connected to the upper and lower ends of one side of the tank body, wherein the upper water supply branch is suitable for replenishing cold water when the cooling water level inside the tank body is low, and the lower water supply branch is suitable for replenishing water from the bottom after the tank body is emptied;

[0021] The drain pipeline is connected to one side of the top of the tank body, and the drain pipeline is suitable for discharging steam and condensed water inside the tank body.

[0022] Optionally, the sewage discharge pipeline includes a first sewage discharge outlet ball valve and a first sewage discharge outlet stop valve which are connected in sequence, and the first sewage discharge outlet ball valve and the first sewage discharge outlet stop valve are both electrically connected to the controller.

[0023] Optionally, the upper water replenishment branch includes an upper water replenishment port ball valve and an upper water replenishment port stop valve which are sequentially connected from the outside to the tank body; the lower water replenishment branch includes a lower water replenishment port ball valve and a lower water replenishment port stop valve which are sequentially connected from the outside to the tank body.

[0024] Optionally, the exhaust pipeline includes a first exhaust branch and a second exhaust branch connected in parallel on one side of the tank body, the first exhaust branch and the second exhaust branch are connected in series with one end of the exhaust port stop valve at a side away from the tank body, and the other end of the exhaust port stop valve is connected between the upper water supply port ball valve and the upper water supply port stop valve;

[0025] The first exhaust branch comprises a first safety valve and a second gas outlet ball valve connected in series, and an end of the second gas outlet ball valve away from the first safety valve is connected to the tank body;

[0026] The second exhaust branch comprises a second safety valve and a first safety valve stop valve connected in series, and one end of the first safety valve stop valve away from the second safety valve is communicated with the tank body.

[0027] The second object of the present invention is to provide an intelligent electric control method for a transport trailer, which is applied to the above-mentioned intelligent electric control system for a transport trailer, and the electric control method includes a filling process and a unloading process;

[0028] The filling process comprises the following steps:

[0029] Step S1: during filling, all valves are closed, a certain amount of cooling water is filled into the tank body, and superheated steam is filled into the tank body through the steam filling pipeline;

[0030] Step S2: The superheated steam exchanges heat with the cooling water in the tank through the heat exchange pipeline, so that the cooling water is fully heated to reach saturated water at a corresponding pressure;

[0031] Step S3: The first temperature sensor, the first pressure sensor, the steam filling pipeline, the heat exchange pipeline, the liquid level monitoring pipeline, the water supply pipeline and the emptying pipeline collect temperature data, pressure data and liquid level data in the tank in real time, and transmit them to the controller for analysis and calculation through the network communication module;

[0032] Step S4: the controller controls the steam filling pipeline, the heat exchange pipeline, the water supply pipeline and the emptying pipeline to maintain the temperature and pressure in the tank within a set range;

[0033] Step S5: remotely and in real time observe the temperature, pressure and liquid level data in the tank through the centralized control center, and control the closure of the steam filling pipeline, the heat exchange pipeline, the water supply pipeline and the emptying pipeline;

[0034] The unloading process comprises the following steps:

[0035] Step S6: After the tank is filled, the transport semi-trailer transports the tank to a designated unloading location, and the unloading pipeline is connected to the unloading end to transport steam outward;

[0036] Step S7: controlling the outlet pressure and outlet flow rate of the discharge pipeline by the controller, wherein the outlet pressure ranges from 0.4 to 2.5 MPa, and the outlet flow rate ranges from 250 to 4000 kg / h;

[0037] Step S8: After the material is discharged to the specified pressure, the controller controls to close all valves.

[0038] Compared with the prior art, the present invention has the following beneficial effects:

[0039] The intelligent electric control system for transport trailers in this application provides a complete set of control and monitoring mechanisms for transport trailers to ensure safety and efficiency during transportation. The steam filling pipeline is connected to the steam source, and the steam is filled into the tank body through the steam filling pipeline, and heat exchange is performed through the coil to heat the cooling water; the coil in the heat exchange pipeline exchanges heat with the cooling water in the tank body to generate steam, the muffler is used to reduce the noise generated by the steam flow, and the steam-water separator is used to separate the steam and the unevaporated cooling water to ensure that only steam enters the unloading pipeline; the liquid level monitoring pipeline is used to monitor the cooling water level in the tank body in real time to ensure that the amount of cooling water is within a safe range; the centralized control center monitors the temperature and pressure in the tank body through the controller to ensure that it is within a safe range, and the controller also adjusts the heat exchange pipeline, steam filling pipeline, and unloading pipeline according to the monitored data. The control valve opening on the road is used to control the generation and delivery of steam; during the transportation of the semi-trailer, the centralized control center continuously monitors and controls the status of the tank to ensure transportation safety. When the semi-trailer arrives at the designated unloading location, the unloading pipeline is connected to the unloading end and steam is started to be delivered. By controlling the control valve on the unloading pipeline, the steam delivery volume and speed can be adjusted to complete the unloading process; the centralized control center transmits the monitored temperature, pressure, liquid level data and control valve opening data to the monitoring center or operator through the network communication module for remote monitoring and operation; after the unloading is completed, the steam filling pipeline is closed, the steam supply is stopped, and then the system is shut down to wait for the next filling and transportation. The design of the entire system ensures safety and efficiency during transportation. Through real-time monitoring and control, the status of the tank can be effectively managed to prevent unsafe situations such as overheating and overpressure. At the same time, the addition of the network communication module enables the system to be remotely monitored and operated, which improves the flexibility and response speed of operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a structural schematic diagram of an intelligent electric control system for a transport trailer in an embodiment of the present invention;

[0041] Figure 2 Schematic diagram of an intelligent electric control system for a transport trailer in an embodiment of the present invention;

[0042] Figure 3 It is a schematic diagram of the flow of the intelligent electric control method for a transport trailer in an embodiment of the present invention.

[0043] Description of reference numerals:

[0044] 100-tank;

[0045] 110 - first temperature sensor; 120 - first thermometer; 130 - first pressure sensor; 140 - first pressure gauge;

[0046] 200-steam filling pipeline;

[0047] 210 - first electric ball valve; 220 - first check valve; 230 - first air inlet ball valve;

[0048] 300-heat exchange pipeline;

[0049] 310-steam separator; 320-muffler; 330-coil;

[0050] 400-discharging pipeline;

[0051] 410 - second pressure sensor; 420 - second temperature sensor; 430 - second electric ball valve; 440 - third electric ball valve; 450 - first air outlet ball valve; 460 - third temperature sensor;

[0052] 500-sewage pipeline;

[0053] 510-ball valve of the first sewage outlet; 520-stop valve of the first sewage outlet;

[0054] 600-Liquid level monitoring pipeline;

[0055] 610-upper liquid level gauge stop valve; 620-lower liquid level gauge stop valve; 630-first liquid level gauge; 640-first liquid level gauge drain valve; 650-second liquid level gauge;

[0056] 700-water supply pipeline;

[0057] 710-upper water supply branch; 711-upper water supply inlet ball valve; 712-upper water supply inlet stop valve;

[0058] 720-lower water supply branch; 721-lower water supply port ball valve; 722-lower water supply port stop valve;

[0059] 800-Drain the pipeline;

[0060] 810-first safety valve; 820-second air outlet ball valve; 830-second safety valve; 840-first safety valve stop valve; 850-drain stop valve;

[0061] 900-centralized control center; 910-network communication module; 920-controller. DETAILED DESCRIPTION

[0062] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0063] In the description of the present invention, it should be noted that the terms "first", "second", "third", "fourth", etc. are used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0064] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, it can also be the internal connection of two components, it can be a wireless connection, or it can be a wired connection. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0065] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0066] See also Figure 1 , 2 As shown, an embodiment of the present invention provides an intelligent electric control system for a transport semitrailer, the intelligent electric control system comprising a tank body 100, a heat exchange pipeline 300, a steam filling pipeline 200, a discharge pipeline 400, a liquid level monitoring pipeline 600 and a centralized control center 900, wherein:

[0067] The tank body 100 is horizontally installed on the underframe of the semi-trailer, and the tank body 100 is suitable for containing a certain amount of cooling water; the heat exchange pipeline 300 includes a coil 330 installed at the bottom of the tank body 100, a muffler 320 evenly embedded at the end of the coil 330, and a steam-water separator 310 installed at the top of the tank body 100; the steam filling pipeline 200 is connected to the tank body 100, one end of the steam filling pipeline 200 is suitable for connecting to the steam source, and the other end is suitable for connecting to the air inlet of the coil 330; the unloading pipeline 400 is connected to the tank body 100 and is located below the steam filling pipeline 200, and the unloading pipeline 400 is suitable for transporting the semi-trailer. After the vehicle is transported to the designated unloading location, it is connected to the unloading end to deliver steam; the liquid level monitoring pipeline 600 is used to monitor the liquid level of the cooling water in the tank body 100 in real time; the control center 900 includes a controller 920 and a network communication module 910, and the controller 920 is electrically connected to the steam-water separator 310, the steam filling pipeline 200, the unloading pipeline 400 and the liquid level monitoring pipeline 600, respectively, and transmits the temperature, pressure, liquid level data in the tank body 100 and the control valve opening data on the heat exchange pipeline 300, the steam filling pipeline 200 and the unloading pipeline 400 to the control center 900 through the network communication module 910.

[0068] Specifically in this implementation example, the intelligent electronic control system provides a complete set of control and monitoring mechanisms for the transport trailer to ensure the safety and efficiency during transportation. The following is an introduction to the specific working process:

[0069] The steam filling pipeline 200 is connected to the steam source, and the steam is filled into the tank body 100 through the steam filling pipeline 200, and heat is exchanged through the coil 330 to heat the cooling water; the coil 330 in the heat exchange pipeline 300 exchanges heat with the cooling water in the tank body 100 to generate steam, the muffler 320 is used to reduce the noise generated by the steam flow, and the steam-water separator 310 is used to separate the steam and the unevaporated cooling water to ensure that only the steam enters the discharge pipeline 400; the liquid level monitoring pipeline 600 is used to monitor the cooling water level in the tank body 100 in real time to ensure that the amount of cooling water is within a safe range. The centralized control center 900 monitors the temperature and pressure in the tank body 100 through the controller 920 to ensure that it is within a safe range. The controller 920 adjusts the heat exchange pipeline 300 according to the monitored data. , the opening of the control valves on the steam filling pipeline 200 and the unloading pipeline 400 to control the generation and transportation of steam. During the transportation of the semi-trailer, the control center 900 continuously monitors and controls the status inside the tank 100 to ensure transportation safety. When the semi-trailer arrives at the designated unloading location, the unloading pipeline 400 is connected to the unloading end and starts to transport steam. By controlling the control valve on the unloading pipeline 400, the steam delivery volume and speed can be adjusted to complete the unloading process; the control center 900 transmits the monitored temperature, pressure, liquid level data and control valve opening data to the monitoring center or operator through the network communication module 910 for remote monitoring and operation; after unloading is completed, the steam filling pipeline 200 is closed, the steam supply is stopped, and then the system is shut down to wait for the next filling and transportation.

[0070] The entire system is designed to ensure safety and efficiency during transportation. Through real-time monitoring and control, the state inside the tank 100 can be effectively managed to prevent unsafe conditions such as overheating and overpressure. At the same time, the addition of the network communication module 910 allows the system to be remotely monitored and operated, improving operational flexibility and response speed.

[0071] It can be understood that the network communication module 910 can adopt any one of the GPRS module, 5G module, Wi-Fi module, ZigBee module and satellite communication module. For example, the GPRS module can realize remote data transmission through the cellular network; the 5G module is suitable for systems with extremely high real-time requirements; the Wi-Fi module is suitable for wireless network connections within a local area, usually for short-distance, high-speed data transmission; the ZigBee module is suitable for systems requiring low power consumption and low cost; the satellite communication module can provide global data transmission services.

[0072] For further information, see Figure 1 , 2 As shown, the steam filling pipeline 200 includes a first electric ball valve 210, a first check valve 220 and a first air inlet ball valve 230 which are connected in sequence through a first pipe and are all located outside the tank body 100. One end of the first pipe is connected to the steam source, and a portion of the first pipe close to the first air inlet ball valve 230 passes through the tank body 100 and is connected to the air inlet of the coil 330 to transport the steam into the coil 330 and exchange heat with the cooling water in the tank body 100.

[0073] Specifically in this embodiment, one end of the first pipeline is connected to the steam source to ensure that steam can enter the pipeline system. The first electric ball valve 210 is the first control point for steam to enter the system. The first electric ball valve 210 can be remotely controlled by an electric actuator to open or close the flow of steam. The opening and closing states of the first electric ball valve 210 can be adjusted by the controller 920 of the centralized control center 900 as needed to control the steam filling process; the function of the first check valve 220 is to prevent steam from flowing in the reverse direction in the system, ensuring that steam can only flow in one direction, from the steam source to the coil 330. When the first electric ball valve 210 is closed, the first check valve 220 can prevent the pressure in the coil 330 from affecting the first electric ball valve. Valve 210 creates reverse pressure; the first air inlet ball valve 230 serves as the last control point before the steam enters the tank body 100. The first air inlet ball valve 230 can be controlled manually or by an actuator to accurately control the amount of steam flowing into the coil 330. The first air inlet ball valve 230 is located close to the tank body 100 and can quickly respond to the instructions of the control center 900 to adjust the steam flow rate; the steam exchanges heat with the cooling water in the tank body 100 through the coil 330, heats the cooling water, and generates steam or hot water; when the steam passes through the coil 330, the heat is transferred to the cooling water in contact with it through the surface of the coil 330, heating the water, and the steam condenses into water in the coil 330, releasing heat, and then is discharged or refluxed through the pipeline.

[0074] For further information, see Figure 1 , 2 As shown, the unloading pipeline 400 includes a second pressure sensor 410, a second temperature sensor 420, a second electric ball valve 430, a third electric ball valve 440, a first outlet ball valve 450 and a third temperature sensor 460 which are connected in series in sequence through a second pipeline. One end of the second pipeline close to the third temperature sensor 460 is connected to the interior of the tank body 100, and one end of the second pipeline close to the second pressure sensor 410 is suitable for connection with the unloading end.

[0075] Specifically in this embodiment, the unloading pipeline 400 is used to safely and effectively transport the steam in the tank body 100 to the unloading end. The safety and controllability of the unloading process are ensured through the precise control of a series of sensors and electric ball valves.

[0076] The second pressure sensor 410 and the second temperature sensor 420 are used to monitor the pressure and temperature at the end of the discharge pipeline 400, respectively, to ensure that the discharge process is carried out within the safety parameter range; the second electric ball valve 430 and the third electric ball valve 440 are used to control the flow of steam, and these ball valves can be remotely controlled by the controller 920 of the centralized control center 900 to ensure accurate flow control; the first outlet ball valve 450 is located on the side of the discharge pipeline close to the tank body 100, and directly controls the outlet of the steam flowing to the discharge end, which can also be remotely controlled by the controller 920; the third temperature sensor 460 is located at the head end of the discharge pipeline 400, and is used to monitor the temperature of the steam about to enter the discharge pipeline 400. It helps to ensure that the temperature of the steam meets the process requirements during discharge.

[0077] For further information, see Figure 1 , 2 As shown, the liquid level monitoring pipeline 600 includes an upper liquid level gauge stop valve 610 and a lower liquid level gauge stop valve 620, a first liquid level gauge 630, a first liquid level gauge drain valve 640 and a second liquid level gauge 650 installed on one side of the tank body 100. The upper liquid level gauge stop valve 610 is connected in series with the first liquid level gauge 630 and then connected in parallel with the lower liquid level gauge stop valve 620, and then connected in series with the first liquid level gauge drain valve 640 and the second liquid level gauge 650 in sequence.

[0078] Specifically in this embodiment, the liquid level monitoring pipeline 600 is designed to accurately monitor the liquid level changes of the cooling water in the tank body 100 to ensure the safety and effectiveness during transportation. Accurate monitoring of the liquid level is achieved by installing an upper liquid level gauge stop valve 610, a lower liquid level gauge stop valve 620, a first liquid level gauge 630, a first liquid level gauge drain valve 640 and a second liquid level gauge 650 on one side of the tank body 100. The upper liquid level gauge stop valve 610 and the lower liquid level gauge stop valve 620 are used to control the water inlet and outlet of the liquid level gauge so that the connection between the liquid level gauge and the tank body 100 can be cut off when necessary for maintenance or cleaning. These stop valves can operate the liquid level gauge without affecting the cooling water in the tank body 100, thereby improving the safety of the system and the convenience of maintenance. The upper liquid level gauge stop valve 610 is connected in series with the first liquid level gauge 630, which means that the water flow can pass through the upper liquid level gauge stop valve 610 and then flow into the first liquid level gauge. 630; the lower level gauge stop valve 620 is connected in parallel with the upper level gauge stop valve 610 and the first level gauge 630, so that the first level gauge 630 can be bypassed when necessary and directly connected to the tank body 100; the first level gauge drain valve 640 is used to discharge impurities or air that may accumulate in the first level gauge 630 to ensure the accuracy and reliability of the level gauge. Through regular discharge, the level gauge can be prevented from malfunctioning or inaccurate readings due to impurity accumulation; the second level gauge 650 provides an additional level monitoring point, which together with the first level gauge 630 can provide more comprehensive level data. This dual monitoring can improve the redundancy of the system and ensure that when one of the level gauges fails, the other level gauge can still provide accurate level data.

[0079] For further information, see Figure 1 , 2 As shown, a first temperature sensor 110, a first thermometer 120, a first pressure sensor 130 and a first pressure gauge 140 are respectively installed on the bottom of one side of the tank body 100, and the first temperature sensor 110 is used to transmit the temperature inside the tank body 100 in real time, the first thermometer 120 is used to measure the temperature inside the tank body 100 in real time, the first pressure sensor 130 is used to transmit the pressure inside the tank body 100 in real time, and the first pressure gauge 140 is used to measure the pressure inside the tank body 100 in real time.

[0080] Specifically in this embodiment, the temperature and pressure monitoring equipment installed at the bottom of one side of the tank body 100 is crucial to ensure transportation safety and efficiency. These devices include a first temperature sensor 110, a first thermometer 120, a first pressure sensor 130 and a first pressure gauge 140, wherein the first temperature sensor 110 is used to transmit the temperature data inside the tank body 100 in real time. This sensor is usually based on the thermoelectric effect or the principle of resistance change, and can convert temperature changes into electrical signals. The first temperature sensor 110 may include a thermocouple or a thermistor, which are connected to the controller 920 of the control center 900 to realize real-time data collection and transmission; the first thermometer 120 is used to measure the temperature inside the tank body 100 in real time. It may use a glass tube liquid thermometer or a digital display thermometer. The first thermometer 120 can provide instant temperature readings, which is convenient for operators to directly observe the temperature conditions inside the tank body on site; it is used to transmit the pressure data inside the tank body 100 in real time. The first pressure sensor 130 is usually based on piezoelectric or piezoresistive effect to convert pressure changes into electrical signals. These sensors can detect pressure changes in the tank body and convert them into digital signals, and perform real-time data collection and transmission through the controller 920 of the control center 900; the first pressure gauge 140 is used to measure the pressure inside the tank body 100 in real time. The pressure gauge can be mechanical (such as spring tube type) or electronic. The first pressure gauge 140 provides an intuitive pressure reading, so that the operator can quickly understand the pressure status inside the tank body 100 on site.

[0081] For further information, see Figure 1 , 2 As shown, the intelligent electronic control system for the transport semi-trailer also includes a sewage pipeline 500, a water supply pipeline 700 and an emptying pipeline 800, wherein:

[0082] The sewage pipe 500 is connected to the bottom side of the tank body 100, and the sewage pipe 500 is used to discharge impurities inside the tank body 100;

[0083] The water replenishment pipeline 700 includes an upper water replenishment branch 710 and a lower water replenishment branch 720 respectively connected to the upper and lower ends of one side of the tank body 100. The upper water replenishment branch 710 is suitable for replenishing cold water when the cooling water level inside the tank body 100 is low, and the lower water replenishment branch 720 is suitable for replenishing water from the bottom after the tank body 100 is emptied;

[0084] The exhaust pipe 800 is connected to one side of the top of the tank body 100 , and the exhaust pipe 800 is suitable for exhausting the steam and condensed water inside the tank body 100 .

[0085] Specifically in this embodiment, the sewage pipeline 500, the water supply pipeline 700 and the emptying pipeline 800 are important components to ensure the clean environment, appropriate water volume and gas discharge of the tank body 100. The sewage pipeline 500 is installed on the bottom side of the tank body 100, and its main function is to remove impurities and sewage accumulated inside the tank body 100. When the water in the tank body is heated, sediment may be generated or impurities may be collected during transportation. The sewage pipeline 500 discharges these impurities through the sewage valve at the bottom, and the sewage discharge process can also be remotely controlled by the controller 920 of the centralized control center 900.

[0086] The water replenishment pipeline 700 includes an upper water replenishment branch 710 and a lower water replenishment branch 720, which are respectively connected to the upper and lower ends of the tank body 100. The upper water replenishment branch 710 is used to replenish cold water from the top when the cooling water level inside the tank body 100 is low, so as to ensure that the water volume in the tank body 100 is maintained at an appropriate level; the lower water replenishment branch 720 replenishes water from the bottom after the tank body 100 is emptied, so as to ensure that the tank body has sufficient water before or during transportation; the water replenishment process can also be automatically controlled by the controller 920 of the control center 900 according to the liquid level monitoring data, or it can be manually operated.

[0087] The drain pipe 800 is installed on one side of the top of the tank body 100 to discharge the steam and condensed water inside the tank body 100. Before transportation or after unloading, the steam and condensed water inside the tank body 100 may need to be discharged. The drain pipe 800 achieves this function through the drain valve on the top. The draining process can also be remotely controlled by the controller 920 of the centralized control center 900 to ensure that the pressure and humidity inside the tank body are controlled within a safe range.

[0088] For further information, see Figure 1 , 2 As shown, the sewage discharge pipeline 500 includes a first sewage discharge outlet ball valve 510 and a first sewage discharge outlet stop valve 520 which are connected in sequence, and the first sewage discharge outlet ball valve 510 and the first sewage discharge outlet stop valve 520 are both electrically connected to the controller 920 .

[0089] Specifically in this embodiment, the sewage pipeline 500 is to ensure the cleanliness of the inside of the tank body 100 and prevent the accumulation of impurities and possible blockage problems. The first sewage outlet ball valve 510 is usually used to control the flow of fluids and can quickly open or close the pipeline. The first sewage outlet ball valve 510 is the main control point of the sewage outlet pipeline, allowing the operator to remotely control the opening and closing of the valve. When sewage discharge operation is required, the controller 920 will send a signal to the first sewage outlet ball valve 510 to open it, thereby allowing the impurities inside the tank body 100 to be discharged through the sewage outlet pipeline 500; the first sewage outlet stop valve 520 is mainly used to accurately control the flow of fluids and is suitable for occasions where the flow rate needs to be carefully adjusted. The first sewage outlet stop valve 520 is another control point of the sewage outlet pipeline, which can provide additional control after the first sewage outlet ball valve 510. In some cases, it may be necessary to slowly discharge impurities to prevent environmental pollution or avoid sudden ejection of impurities. At this time, the first sewage outlet stop valve 520 can adjust the opening to accurately control the sewage discharge speed.

[0090] For further information, see Figure 1 , 2 As shown, the upper water replenishment branch 710 includes an upper water replenishment port ball valve 711 and an upper water replenishment port stop valve 712 which are sequentially connected from the outside to the tank body 100; the lower water replenishment branch 720 includes a lower water replenishment port ball valve 721 and a lower water replenishment port stop valve 722 which are sequentially connected from the outside to the tank body 100.

[0091] Specifically in this embodiment, the upper water replenishment inlet ball valve 711 is used to control the opening and closing of the water replenishment. When the cooling water level inside the tank body 100 is low, cold water needs to be added. At this time, the upper water replenishment inlet ball valve 711 is opened to allow water to enter the tank body 100. The upper water replenishment inlet ball valve 711 switches quickly and has good sealing performance, which is suitable for occasions that require frequent operation; the upper water replenishment inlet stop valve 712 is installed downstream of the upper water replenishment inlet ball valve 711, and is used to accurately control the water replenishment flow and cut off the water flow in an emergency. The upper water replenishment inlet stop valve 712 has high adjustment accuracy and is suitable for occasions that require fine flow adjustment.

[0092] The function of the lower water replenishment port ball valve 721 is similar to that of the upper water replenishment port ball valve 711, but it is installed on the bottom side of the tank body 100, and is used to replenish water from the bottom after the tank body 100 is emptied. When the tank body 100 needs to be completely emptied and refilled with water, the lower water replenishment port ball valve 721 opens to allow water to enter the tank body; the lower water replenishment port stop valve 722 has a similar function to the upper water replenishment port stop valve 712, but it is located on the lower water replenishment branch 720, and is used to control and cut off the water flow of the lower water replenishment port ball valve 721. When it is necessary to accurately control the water replenishment amount or to cut off the water source in an emergency, the lower water replenishment port stop valve 722 comes into play.

[0093] For further information, see Figure 1 , 2As shown, the emptying pipeline 800 includes a first exhaust branch and a second exhaust branch connected in parallel on one side of the tank body 100, the first exhaust branch and the second exhaust branch are connected in series with one end of the emptying port stop valve 850 at a side away from the tank body 100, and the other end of the emptying port stop valve 850 is connected between the upper water supply port ball valve 711 and the upper water supply port stop valve 712;

[0094] The first exhaust branch includes a first safety valve 810 and a second gas outlet ball valve 820 connected in series, and an end of the second gas outlet ball valve 820 away from the first safety valve 810 is connected to the tank body 100;

[0095] The second exhaust branch includes a second safety valve 830 and a first safety valve stop valve 840 connected in series, and one end of the first safety valve stop valve 840 away from the second safety valve 830 is connected to the tank body 100 .

[0096] Specifically in this embodiment, the emptying pipeline 800 is provided to discharge the steam and condensed water in the tank body 100 when necessary. The emptying pipeline 800 includes a first exhaust branch and a second exhaust branch, which are connected in parallel on one side of the tank body 100 and are connected in series with one end of the emptying port stop valve 850 on the side away from the tank body 100. The other end of the emptying port stop valve 850 is connected between the upper water replenishment port ball valve 711 and the upper water replenishment port stop valve 712. The function of the first safety valve 810 is to automatically open when the internal pressure of the tank body 100 exceeds the set value, release excessive pressure, so as to protect the tank body and transportation safety. The second outlet ball valve 820 is used to control the steam flow discharged from the tank body 100, which can be remotely or manually controlled to adjust the discharge speed.

[0097] The drain stop valve 850 is located downstream of the first exhaust branch and the second exhaust branch. It controls the discharge of steam and condensed water to the external environment. The drain stop valve 850 can accurately control the discharge process, ensure the smooth reduction of the internal pressure of the tank body 100, and avoid the risks caused by a sudden drop in pressure.

[0098] See also Figure 3 As shown, another embodiment of the present invention further provides an intelligent electric control method for a transport trailer, which is applied to the above-mentioned intelligent electric control system for a transport trailer, and the electric control method includes a filling process and a unloading process;

[0099] The filling process comprises the following steps:

[0100] Step S1: When filling, all valves are closed, a certain amount of cooling water is filled into the tank body 100, and superheated steam is filled into the tank body 100 through the steam filling pipeline 200;

[0101] Step S2: The superheated steam exchanges heat with the cooling water in the tank 100 through the heat exchange pipeline 200, so that the cooling water is fully heated to reach saturated water at a corresponding pressure;

[0102] Step S3: The first temperature sensor 110, the first pressure sensor 130, the steam filling pipeline 200, the heat exchange pipeline 300, the liquid level monitoring pipeline 600, the water supply pipeline 700 and the emptying pipeline 800 collect temperature data, pressure data and liquid level data in the tank body 100 in real time, and transmit the data to the controller 920 for analysis and calculation through the network communication module 910;

[0103] Step S4: the controller 920 controls the steam filling pipeline, the heat exchange pipeline, the water supply pipeline and the emptying pipeline to maintain the temperature and pressure in the tank within a set range;

[0104] Step S5: remotely observe the temperature, pressure and liquid level data in the tank 100 in real time through the centralized control center 900, and control the closure of the steam filling pipeline 200, the heat exchange pipeline 300, the water supply pipeline 700 and the emptying pipeline 800;

[0105] The unloading process comprises the following steps:

[0106] Step S6: After the tank body 100 is filled, the transport semi-trailer transports the tank body 100 to the designated unloading location, and the unloading pipeline 400 is connected to the unloading end to transport steam to the outside;

[0107] Step S7: controlling the outlet pressure and outlet flow rate of the discharge pipeline 400 through the controller 920, wherein the outlet pressure ranges from 0.4 to 2.5 MPa, and the outlet flow rate ranges from 250 to 4000 kg / h;

[0108] Step S8: After the material is discharged to the specified pressure, the controller 920 controls all valves to close.

[0109] Therefore, through intelligent electronic control methods, the pressure, temperature and liquid level inside the tank can be monitored in real time to ensure that filling and unloading are carried out within a safe range and prevent accidents caused by overpressure, overheating or abnormal liquid level; intelligent control methods can automate the filling and unloading processes, reduce manual operations, improve work efficiency, and shorten loading and unloading time; precise control of electric ball valves, safety valves and stop valves can ensure accurate filling and unloading of liquids, avoid waste of resources and environmental pollution; through the remote monitoring module, operators can monitor and operate the semi-trailer in a safe location, improving the flexibility and convenience of operation.

[0110] Although the present invention is disclosed as above, the protection scope of the present invention is not limited thereto. Those skilled in the art may make various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications will fall within the protection scope of the present invention.

Claims

1. An intelligent electric control system for a transport semi-trailer, comprising a tank body horizontally mounted on a semi-trailer chassis, wherein the tank body is suitable for containing a certain amount of cooling water, characterized in that: Also includes: The heat exchange pipeline includes a coil installed at the bottom of the tank body, a muffler evenly embedded at the end of the coil, and a steam-water separator installed at the top of the tank body; A steam filling pipeline is connected to the tank body, and one end of the steam filling pipeline is suitable for connecting to a steam source, and the other end is suitable for connecting to an air inlet of the coil; a discharge pipeline connected to the tank body and located below the steam filling pipeline, the discharge pipeline being suitable for being connected to the discharge end to deliver steam after the transport semi-trailer is transported to the designated discharge location; A liquid level monitoring pipeline, used for real-time monitoring of the liquid level of the cooling water in the tank; and The centralized control center includes a controller and a network communication module. The controller is electrically connected to the steam-water separator, the steam filling pipeline, the discharge pipeline and the liquid level monitoring pipeline respectively, and transmits the temperature, pressure and liquid level data in the tank body and the control valve opening data on the heat exchange pipeline, the steam filling pipeline and the discharge pipeline to the centralized control center through the network communication module.

2. The intelligent electric control system for a transport trailer according to claim 1 is characterized in that: The steam filling pipeline includes a first electric ball valve, a first check valve and a first air inlet ball valve which are connected in sequence through a first pipe and are all located outside the tank body. One end of the first pipe is connected to a steam source, and a portion of the first pipe close to the first air inlet ball valve passes through the tank body and is connected to the air inlet of the coil to transport steam into the coil and exchange heat with cooling water in the tank body.

3. The intelligent electric control system for a transport trailer according to claim 1, characterized in that: The unloading pipeline includes a second pressure sensor, a second temperature sensor, a second electric ball valve, a third electric ball valve, a first outlet ball valve and a third temperature sensor which are connected in series in sequence through a second pipeline. One end of the second pipeline close to the third temperature sensor is connected to the interior of the tank body, and one end of the second pipeline close to the second pressure sensor is suitable for being connected to the unloading end.

4. The intelligent electric control system for a transport trailer according to any one of claims 1 to 3, characterized in that: The liquid level monitoring pipeline includes an upper liquid level gauge stop valve and a lower liquid level gauge stop valve installed on one side of the tank body, a first liquid level gauge, a first liquid level gauge drain valve and a second liquid level gauge. The upper liquid level gauge stop valve is connected in series with the first liquid level gauge and then connected in parallel with the lower liquid level gauge stop valve, and then connected in series with the first liquid level gauge drain valve and the second liquid level gauge in sequence.

5. The intelligent electric control system for a transport trailer according to claim 4 is characterized in that: A first temperature sensor, a first thermometer, a first pressure sensor and a first pressure gauge are also installed on the bottom of one side of the tank body, respectively. The first temperature sensor is used to transmit the temperature inside the tank body in real time, the first thermometer is used to measure the temperature inside the tank body in real time, the first pressure sensor is used to transmit the pressure inside the tank body in real time, and the first pressure gauge is used to measure the pressure inside the tank body in real time.

6. The intelligent electric control system for a transport trailer according to claim 1, characterized in that: Also includes: A sewage discharge pipeline is connected to the bottom side of the tank body, and the sewage discharge pipeline is used to discharge impurities in the tank body; A water supply pipeline, comprising an upper water supply branch and a lower water supply branch respectively connected to the upper and lower ends of one side of the tank body, wherein the upper water supply branch is suitable for replenishing cold water when the cooling water level inside the tank body is low, and the lower water supply branch is suitable for replenishing water from the bottom after the tank body is emptied; The drain pipeline is connected to one side of the top of the tank body, and the drain pipeline is suitable for discharging steam and condensed water inside the tank body.

7. The intelligent electric control system for a transport semitrailer according to claim 6 is characterized in that: The sewage discharge pipeline includes a first sewage discharge outlet ball valve and a first sewage discharge outlet stop valve which are connected in sequence, and the first sewage discharge outlet ball valve and the first sewage discharge outlet stop valve are both electrically connected to the controller.

8. The intelligent electric control system for a transport trailer according to claim 6, characterized in that: The upper water replenishment branch includes an upper water replenishment port ball valve and an upper water replenishment port stop valve which are sequentially connected from the outside to the tank body; the lower water replenishment branch includes a lower water replenishment port ball valve and a lower water replenishment port stop valve which are sequentially connected from the outside to the tank body.

9. The intelligent electric control system for a transport trailer according to claim 6, characterized in that: The exhaust pipeline includes a first exhaust branch and a second exhaust branch connected in parallel on one side of the tank body, the first exhaust branch and the second exhaust branch are connected in series with one end of the exhaust port stop valve at a side away from the tank body, and the other end of the exhaust port stop valve is connected between the upper water supply port ball valve and the upper water supply port stop valve; The first exhaust branch comprises a first safety valve and a second gas outlet ball valve connected in series, and an end of the second gas outlet ball valve away from the first safety valve is connected to the tank body; The second exhaust branch comprises a second safety valve and a first safety valve stop valve connected in series, and one end of the first safety valve stop valve away from the second safety valve is communicated with the tank body.

10. An intelligent electric control method for a transport trailer, applied to the intelligent electric control system for a transport trailer as claimed in claim 5, characterized in that: The electric control method includes a filling process and a discharging process; The filling process comprises the steps of: Step S1: during filling, all valves are closed, a certain amount of cooling water is filled into the tank body, and superheated steam is filled into the tank body through the steam filling pipeline; Step S2: The superheated steam exchanges heat with the cooling water in the tank through the heat exchange pipeline, so that the cooling water is fully heated to reach saturated water at a corresponding pressure; Step S3: The first temperature sensor, the first pressure sensor, the steam filling pipeline, the heat exchange pipeline, the liquid level monitoring pipeline, the water supply pipeline and the emptying pipeline collect temperature data, pressure data and liquid level data in the tank in real time, and transmit them to the controller for analysis and calculation through the network communication module; Step S4: the controller controls the steam filling pipeline, the heat exchange pipeline, the water supply pipeline and the emptying pipeline to maintain the temperature and pressure in the tank within a set range; Step S5: remotely and in real time observe the temperature, pressure and liquid level data in the tank through the centralized control center, and control the closure of the steam filling pipeline, the heat exchange pipeline, the water supply pipeline and the emptying pipeline; The unloading process comprises the following steps: Step S6: After the tank is filled, the transport semi-trailer transports the tank to a designated unloading location, and the unloading pipeline is connected to the unloading end to transport steam outward; Step S7: controlling the outlet pressure and outlet flow rate of the discharge pipeline by the controller, wherein the outlet pressure ranges from 0.4 to 2.5 MPa, and the outlet flow rate ranges from 250 to 4000 kg / h; Step S8: After the material is discharged to the specified pressure, the controller controls to close all valves.