Prefabricated slab distribution method for ultra-high-speed low-vacuum pipeline maglev transportation system module

By calculating the longitudinal slope of the pipe beam and the number of prefabricated modules, and automatically calculate the starting and ending mileage and coordinates of the prefabricated modules, the technical gap in the calculation of prefabricated modules in the ultra-high-speed low-vacuum pipeline maglev traffic system is solved, and the technology is realized Efficient and automated fabric design.

CN119397717APending Publication Date: 2025-02-07SHAANXI RAILWAY ENG SURVEY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411461242.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-18
Publication Date
2025-02-07

AI Technical Summary

Technical Problem

The prior art cannot meet the requirements for the layout calculation of module prefabricated plates in ultra-high-speed low-vacuum pipeline maglev transportation systems, and lacks targeted layout calculation methods.

Method used

By determining the flat and vertical curves of the line, calculating the longitudinal slope of the pipe beam and the number of module prefabricated plates, and automatically calculating the starting and end points mileage and coordinates of the module prefabricated plates to provide accurate plate design.

Benefits of technology

It realizes the calculation of prefabricated modules with rigorous theoretical and accurate results, improves the degree of automation, fills the technical gap, and meets the design requirements of the ultra-high-speed low-vacuum pipeline maglev transportation system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119397717A_ABST
    Figure CN119397717A_ABST
Patent Text Reader

Abstract

The invention relates to an ultra-high-speed low-vacuum pipeline maglev traffic system module prefabricated slab distribution method, which comprises the following steps of: calculating the longitudinal gradient of a tubular beam according to related parameters of a vertical curve, the length of the tubular beam and the width of a beam gap between adjacent tubular beams, and further calculating the starting mileage and the end mileage of the tubular beam and the number of module prefabricated slabs on the tubular beam; according to the horizontal curve related parameters, the vertical curve related parameters and the starting point mileage and the end point mileage of the tubular beam, the starting point coordinate and the end point coordinate of the tubular beam are calculated, and then the gradient of each module prefabricated slab and the starting point mileage and the end point mileage of each module prefabricated slab are calculated. According to the method, the number of the module prefabricated slabs and the starting and terminal point mileages can be automatically calculated according to the tubular beam end point mileages and the line horizontal and vertical curve information, the result is accurate, and mileage and elevation references are provided for fine adjustment of the module prefabricated slabs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of vacuum pipeline maglev transportation, and in particular to a method for arranging prefabricated panels of modules of an ultra-high-speed low-vacuum pipeline maglev transportation system. Background Art

[0002] The ultra-high-speed low-vacuum pipeline maglev transportation system is a transportation system that uses superconducting magnetic levitation technology, low-vacuum pipeline technology and superconducting synchronous linear motor technology to achieve high-speed operation of superconducting wheel-rail trains in closed pipelines. Figure 2 The system requires the laying of steel structure pipelines along the line. The bottom of the pipeline is a "U"-shaped pipe beam, the outside is a pipe shell, the inner wall of the pipe beam has a module prefabricated plate, and the bottom has a rail support platform. The pipeline is erected at a certain height from the ground, and the pipeline is in a low vacuum state. Among them, the module prefabricated plate is the bearing platform of the magnetic levitation magnetic resistance body, which is symmetrically installed on both sides of the pipe beam.

[0003] The target of the ultra-high-speed low-vacuum pipeline maglev transportation system is to achieve a maximum speed of 1000km / h near the ground, so the design requirements for steel structure pipelines are extremely high. Among them, the layout calculation of module prefabricated panels and the fine-tuning coordinate calculation are extremely important contents in the design of steel structure pipelines. Since the pipeline of the ultra-high-speed low-vacuum pipeline maglev transportation system is in a low-vacuum state, the overall structure is essentially different from the existing traffic tunnel and other structures. It is a new type of structural system. Therefore, there is no existing prefabrication layout method that can be used for reference. The existing technology cannot meet the design requirements of the ultra-high-speed low-vacuum pipeline maglev transportation system. Summary of the invention

[0004] The purpose of the present invention is to provide a method for laying out module prefabricated panels for an ultra-high-speed low-vacuum pipeline maglev transportation system, so as to solve the problem of the current lack of targeted layout calculation methods to meet the design requirements of the ultra-high-speed low-vacuum pipeline maglev transportation system.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is:

[0006] A method for arranging prefabricated panels for a module of an ultra-high-speed low-vacuum pipeline maglev transportation system, the method comprising:

[0007] Determine the horizontal and vertical curves of the line;

[0008] Determine the length of the pipe beam L 梁 , the width of the beam gap between adjacent tube beams L 梁缝 , and determine the length L of the module prefabricated board 板 , the width of the board seam between adjacent module prefabricated boards L 板缝 , module prefabricated board expansion length L 扩 And the height H from the bottom of the module prefabricated board to the rail support platform 板-台 ;

[0009] According to the relevant parameters of the vertical curve and the length of the pipe beam L 梁 The width of the beam gap between adjacent tube beams is L 梁缝 , calculate the longitudinal slope A of the pipe beam 梁i ;

[0010] According to the length of the tube beam L 梁 , the width of the beam gap between adjacent tube beams L 梁缝 and the longitudinal slope of the tube beam A 梁i , calculate the starting mileage of the pipe beam and pipe beam terminal mileage

[0011] According to the length of the tube beam L 梁 , Length of module prefabricated board L 板 , the width of the board seam between adjacent module prefabricated boards L 板缝 And the expansion length L of the module prefabricated panel 扩 , calculate the number of prefabricated panels N on the tube beam module 板 ;

[0012] According to the relevant parameters of horizontal curves, relevant parameters of vertical curves and the starting mileage of pipe beams and pipe beam terminal mileage Calculate the starting coordinates of the pipe beam (x 起i ,y 起i , z 起i ) and the end point coordinates of the pipe beam (x 终i ,y 终i , z 终i );

[0013] According to the horizontal curve related parameters, vertical curve related parameters, module prefabricated board length L 板 The width of the seam between adjacent module prefabricated panels is L 板缝 , calculate the slope A of each module prefabricated board 板i ;

[0014] According to the relevant parameters of the flat curve, the length L of the module prefabricated board 板 , the width of the board seam between adjacent module prefabricated boards L 板缝 , module prefabricated board expansion length L 扩 And the height H from the bottom of the module prefabricated board to the rail support platform 板-台 , calculate the starting mileage of each module prefabricated panel The terminal mileage of modular prefabricated panels

[0015] Furthermore, the horizontal curve of the line is determined, including:

[0016] Use the intersection method to input horizontal curve related parameters, including horizontal curve starting point mileage, horizontal curve starting point coordinates, intersection coordinates, horizontal curve radius, transition curve length, horizontal curve end point mileage, and horizontal curve end point coordinates.

[0017] Furthermore, the vertical curve of the line is determined, including:

[0018] Use the intersection method to input vertical curve related parameters, including vertical curve starting point mileage, vertical curve starting point elevation, slope change point mileage, slope change point elevation, curve radius at slope change point, vertical curve end point mileage, vertical curve end point elevation.

[0019] Furthermore, according to the vertical curve related parameters, the pipe beam length L 梁 The width of the beam gap between adjacent tube beams is L 梁缝 , calculate the longitudinal slope A of the pipe beam 梁i ,include:

[0020] First, set the slope to 0 and calculate the approximate mileage of the starting point of the pipe beam Approximate mileage to the end of the pipe beam

[0021]

[0022]

[0023] in:

[0024] M 线路起点 The mileage of the starting point of the line;

[0025] Then, based on the approximate mileage of the starting point of the pipe beam Approximate mileage to the end of the pipe beam Calculate the approximate elevation of the starting point of the pipe beam according to the vertical curve calculation method Approximate elevation of the end point of the pipe beam

[0026] Finally, the approximate elevation of the starting point of the pipe beam is Approximate elevation of the end point of the pipe beam And the length of the tube beam L 梁 , calculate the longitudinal slope A of the pipe beam 梁i ;

[0027]

[0028] Further, calculate the starting mileage of the pipe beam include:

[0029]

[0030] Further, calculate the end mileage of the pipe beam include:

[0031]

[0032] Furthermore, the number of prefabricated panels N on the tube beam is calculated. 板 ,include:

[0033] according to

[0034] (N 板 -1)×L 板缝 +N 板 ×L 板 =L 梁 +2×L 扩

[0035] have to

[0036]

[0037] Furthermore, according to the horizontal curve related parameters, vertical curve related parameters and the starting mileage of the pipe beam and pipe beam terminal mileage Calculate the starting coordinates of the pipe beam (x 起i ,y 起i , z 起i ) and the end point coordinates of the pipe beam (x 终i ,y 终i , z 终i ).

[0038] Furthermore, according to the horizontal curve related parameters, vertical curve related parameters, module prefabricated board length L 板 The width of the seam between adjacent module prefabricated panels is L 板缝 , calculate the slope A of each module prefabricated board 板i ,include:

[0039] First, set the slope to 0 and calculate the approximate mileage of the starting point of the module prefabricated panel Approximate mileage to the end of the module prefabricated panel

[0040]

[0041]

[0042] Then approximate the mileage based on the starting point of the module prefabricated panel Approximate mileage to the end of the module prefabricated panel Calculate the approximate elevation of the starting point of the module prefabricated board according to the vertical curve calculation method Approximate elevation of the end point of the module precast panel

[0043] Finally, the elevation is approximated by the starting point of the module prefabricated board Approximate elevation of the end point of the module precast panel And the length of the module prefabricated board L 板 , calculate the slope A of each module prefabricated board 板i ;

[0044]

[0045] Furthermore, the starting mileage of each module prefabricated panel is calculated The terminal mileage of modular prefabricated panels include:

[0046] Starting mileage of the i-th module prefabricated panel for:

[0047]

[0048] The terminal mileage of the i-th module prefabricated panel for:

[0049]

[0050] Compared with the prior art, the present invention has the following beneficial effects:

[0051] The present invention provides a method for arranging module prefabricated panels in an ultra-high-speed low-vacuum pipeline maglev transportation system, which is used to solve the arrangement problem of module prefabricated panels in the ultra-high-speed low-vacuum pipeline maglev transportation system. The method can automatically calculate the number of module prefabricated panels and the mileage of the starting and ending points according to the mileage of the pipe beam end points and the horizontal and vertical curve information of the line. The method has rigorous theory, accurate results and a high degree of automation, and provides mileage and elevation benchmarks for fine-tuning of module prefabricated panels, thus filling the technical gap in the layout design of module prefabricated panels. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, drawings of other embodiments can be obtained based on these drawings without paying creative work.

[0053] Figure 1 It is a flow chart of the method of the present invention.

[0054] Figure 2 It is a cross-sectional view of the ultra-high-speed low-vacuum pipeline.

[0055] Figure 3 It is a longitudinal section of the ultra-high-speed low-vacuum pipeline.

[0056] Figure 4 It is a calculation diagram of the pipe and beam mileage of the ultra-high-speed low-vacuum pipeline.

[0057] Figure 5 It is a calculation diagram of the module prefabricated panel mileage of the ultra-high-speed low-vacuum pipeline.

[0058] The symbols in the figure are:

[0059] 1-tube shell, 2-tube beam, 3-module prefabricated plate, 4-rail support platform, 5-line plane. DETAILED DESCRIPTION

[0060] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. The preferred embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thoroughly understood.

[0061] It should be noted that similar reference numerals and letters represent similar items, and therefore, once an item is defined in one embodiment, it does not need to be further defined and explained in subsequent embodiments. In addition, the term "comprising" and the like and any variation thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0062] It should also be noted that although the order of steps is mentioned in the method description, in some cases, they may be performed in an order different from that shown here, and this should not be construed as a limitation on the order of the steps.

[0063] The present invention provides a method for arranging module prefabricated panels for an ultra-high-speed low-vacuum pipeline maglev transportation system, which can calculate the number of module prefabricated panels on the pipe beam and the mileage of the starting and ending points according to the pipe beam end point mileage, pipe beam design parameters and the horizontal and vertical curves of the line, and provide mileage and elevation references for the calculation of the coordinates of the module prefabricated panels. The pipe beam mentioned in the method is an important component structure of the enclosed space where the maglev superconducting wheel-rail train runs. The overall structure of the pipe beam is "U"-shaped. The module prefabricated panels are the bearing platforms of the maglev magnetic resistance bodies, which are symmetrically installed on both sides of the pipe beam. The module prefabricated panels are evenly arranged along the length of the pipe beam according to the length of the pipe beam and the preset plate seams.

[0064] like Figure 1 , the method comprising:

[0065] S1: Determine the horizontal and vertical curves of the line according to the design documents.

[0066] A horizontal curve is a general term for a curve at a turning point in a plane line. It is a line connecting two straight lines, allowing vehicles to smoothly transition from one straight line to another.

[0067] A vertical curve is a curve set at the slope change point on the longitudinal section of the line when the algebraic difference between two adjacent slopes exceeds a certain value, for the sake of driving safety, comfort and to ensure sight distance. It is generally in the form of a circular curve.

[0068] This step is equivalent to configuring the horizontal curve file and the vertical curve file. Specifically:

[0069] ① Use the intersection method to input the horizontal curve related parameters, including the horizontal curve starting point mileage, horizontal curve starting point coordinates, intersection coordinates, horizontal curve radius, transition curve length, horizontal curve end point mileage, and horizontal curve end point coordinates.

[0070] ② Use the intersection method to input the vertical curve related parameters, including the vertical curve starting point mileage, vertical curve starting point elevation, slope change point mileage, slope change point elevation, curve radius at the slope change point, vertical curve end point mileage, vertical curve end point elevation.

[0071] S2: Determine the length of the pipe beam L 梁 , the width of the beam gap between adjacent tube beams L 梁缝 , and determine the length L of the module prefabricated board 板 , the width of the seam between adjacent module prefabricated panels L 板缝 , module prefabricated board external expansion length L 扩 (The length of the module prefabricated plate at the end of the tube beam exceeds the tube beam) and the height H from the bottom of the module prefabricated plate to the rail support platform 板-台 (The height of the module precast panel relative to the vertical curve).

[0072] The bottom of the module prefabricated panel is strictly parallel to the rail support platform, and the height of the rail support platform is consistent with the designed vertical curve of the line.

[0073] S3: According to the relevant parameters of the vertical curve and the length of the pipe beam L 梁 The width of the beam gap between adjacent tube beams is L 梁缝 , calculate the longitudinal slope A of the pipe beam 梁i . Specifically include:

[0074] S301: First, set the slope to 0 and calculate the approximate mileage of the starting point of the pipe beam Approximate mileage to the end of the pipe beam

[0075]

[0076]

[0077] in:

[0078] M 线路起点 The mileage of the starting point of the line;

[0079] S302: Then approximate the mileage based on the starting point of the pipe beam Approximate mileage to the end of the pipe beam Calculate the approximate elevation of the starting point of the pipe beam according to the vertical curve calculation method Approximate elevation of the end point of the pipe beam

[0080] S303: Finally, approximate the elevation through the starting point of the pipe beam Approximate elevation of the end point of the pipe beam And the length of the tube beam L 梁 , calculate the longitudinal slope A of the pipe beam 梁i ;

[0081]

[0082] S4: According to the length of the tube beam L 梁 , the width of the beam gap between adjacent tube beams L 梁缝 , calculate the starting mileage of the pipe beam and pipe beam terminal mileage Specifically include:

[0083] S401: Calculate the starting mileage of the i-th pipe beam include:

[0084]

[0085] S402: Calculate the mileage of the end point of the i-th pipe beam include:

[0086]

[0087] S5: According to the length of the tube beam L 梁 , Length of module prefabricated board L 板 , the width of the seam between adjacent module prefabricated panels L 板缝 And the expansion length L of the module prefabricated board 扩 , calculate the number of prefabricated panels N on the tube beam module 板 . Specifically include:

[0088] according to

[0089] (N 板 -1)×L 板缝 +N 板 ×L 板 =L 梁 +2×L 扩

[0090] have to

[0091]

[0092] S6: According to the relevant parameters of horizontal curves, vertical curves and the starting mileage of the pipe beam and pipe beam terminal mileage Calculate the starting coordinates of the pipe beam (x 起i ,y 起i , z 起i ) and the end point coordinates of the pipe beam (x 终i ,y 终i , z 终i ).

[0093] S7: According to the horizontal curve related parameters, vertical curve related parameters, module prefabricated board length L 板 The width of the seam between adjacent module prefabricated panels is L 板缝 , calculate the slope A of each module prefabricated board 板i . Specifically include:

[0094] S701: First, set the slope to 0 and calculate the approximate mileage of the starting point of the module prefabricated board Approximate mileage to the end of the module prefabricated panel

[0095]

[0096]

[0097] S702: Then approximate the mileage based on the starting point of the module prefabricated panel Approximate mileage to the end of the module prefabricated panel Calculate the approximate elevation of the starting point of the module prefabricated board according to the vertical curve calculation method Approximate elevation of the end point of the module precast panel

[0098] S703: Finally, the elevation is approximated by the starting point of the module prefabricated panel Approximate elevation of the end point of the module precast panel And the length of the module prefabricated board L 板 , calculate the slope A of each module prefabricated board 板i ;

[0099]

[0100] S8: According to the relevant parameters of the flat curve and the length L of the module prefabricated board 板 , the width of the seam between adjacent module prefabricated panels L 板缝、 Module prefabricated board expansion length L 扩 And the height H from the bottom of the module prefabricated board to the rail support 板-台 , calculate the starting mileage of each module prefabricated panel The terminal mileage of modular prefabricated panels Specifically include:

[0101] Starting mileage of the i-th module prefabricated panel for:

[0102]

[0103] The terminal mileage of the i-th module prefabricated panel for:

[0104]

[0105] The method of the present invention has the following technical advantages:

[0106] (1) Rigorous theory and accurate results

[0107] The present invention needs to utilize the pipe beam mileage, pipe beam design parameters and line horizontal and vertical curves. The slope influence at the module prefabricated plate is taken into account in the mileage calculation. The mileage is calculated through a rigorous theoretical algorithm. The calculation method is reasonable, the result is accurate and reliable, and the connectivity between the module prefabricated plates is guaranteed.

[0108] (2) High degree of automation

[0109] By simply configuring the horizontal and vertical curves through the software and determining the parameters of the tubular beams and precast panels according to the design documents, the number of module precast panels and the starting and ending mileages can be automatically calculated, and the calculation process is fully automated.

[0110] (3) Filling the technological gap at home and abroad

[0111] This patent uses a rigorous mathematical model to realize the layout calculation of ultra-high-speed low-vacuum pipeline module prefabricated panels, filling the gap in the layout calculation of module prefabricated panels in low-vacuum pipelines at home and abroad, and achieving a qualitative leap from "nothing to something".

[0112] In addition, the present invention also provides a prefabricated panel layout system for an ultra-high-speed low-vacuum pipeline maglev transportation system module, which is used to implement the above method, including:

[0113] A horizontal and vertical curve determination module is used to determine the horizontal curve and vertical curve of the line, corresponding to S1 of the above method;

[0114] Design parameter determination module, used to determine the length L of the tube beam 梁 , the width of the beam gap between adjacent tube beams L 梁缝 , and determine the length L of the module prefabricated board 板 , the width of the board seam between adjacent module prefabricated boards L 板缝 , module prefabricated board expansion length L 扩 And the height H from the bottom of the module prefabricated board to the rail support platform 板-台 , corresponding to S2 of the above method;

[0115] The longitudinal slope calculation module of the pipe beam is used to calculate the longitudinal slope of the pipe beam according to the relevant parameters of the vertical curve and the length of the pipe beam L. 梁 The width of the beam gap between adjacent tube beams is L梁缝 , calculate the longitudinal slope A of the pipe beam 梁i , corresponding to S3 of the above method;

[0116] The pipe beam end point mileage calculation module is used to calculate the pipe beam length L 梁 , the width of the beam gap between adjacent tube beams L 梁缝 and the longitudinal slope of the tube beam A 梁i , calculate the starting mileage of the pipe beam and pipe beam terminal mileage Corresponding to S4 of the above method;

[0117] The module for calculating the number of prefabricated panels is used to calculate the number of prefabricated panels according to the length of the pipe beam L. 梁 , Length of module prefabricated board L 板 , the width of the seam between adjacent module prefabricated panels L 板缝 And the expansion length L of the module prefabricated board 扩 , calculate the number of prefabricated panels N on the tube beam module 板 , corresponding to S5 of the above method;

[0118] The pipe beam endpoint coordinate calculation module is used to calculate the pipe beam endpoint coordinates based on the horizontal curve related parameters, vertical curve related parameters and pipe beam starting point mileage. and pipe beam terminal mileage Calculate the starting coordinates of the pipe beam (x 起i ,y 起i , z 起i ) and the end point coordinates of the pipe beam (x 终i ,y 终i , z 终i ), corresponding to s6 of the above method;

[0119] The module prefabricated board slope calculation module is used to calculate the slope of the module prefabricated board according to the horizontal curve related parameters, vertical curve related parameters, and the length L of the module prefabricated board. 板 The width of the seam between adjacent module prefabricated panels is L 板缝 , calculate the slope A of each module prefabricated board 板i , corresponding to S7 of the above method;

[0120] The module prefabricated board endpoint mileage calculation module is based on the relevant parameters of the flat curve and the length L of the module prefabricated board. 板 , the width of the seam between adjacent module prefabricated panels L 板缝 , module prefabricated board external expansion length L 扩 And the height H from the bottom of the module prefabricated board to the rail support 板-台 , calculate the starting mileage of each module prefabricated panel The terminal mileage of modular prefabricated panels Corresponding to S8 of the above method.

[0121] Those skilled in the art will appreciate that all or part of the functions of the embodiments of the present invention may be implemented by hardware or by computer programs. When all or part of the functions in the above-mentioned embodiments are implemented by computer programs, the program may be stored in a computer-readable storage medium, and the storage medium may include: a read-only memory, a random access memory, a disk, an optical disk, a hard disk, etc., and the program is executed by a computer to implement the above-mentioned functions. For example, the program is stored in the memory of the device, and when the program in the memory is executed by the processor, all or part of the above-mentioned functions can be implemented. In addition, when all or part of the functions in the above-mentioned embodiments are implemented by computer programs, the program may also be stored in a storage medium such as a server, another computer, a disk, an optical disk, a flash disk or a mobile hard disk, and is downloaded or copied and saved in the memory of the local device, or the system of the local device is updated, and when the program in the memory is executed by the processor, all or part of the functions in the above-mentioned embodiments can be implemented.

[0122] The above specific examples are used to illustrate the present invention, which is only used to help understand the present invention and is not intended to limit the present invention. For those skilled in the art, according to the concept of the present invention, some simple deductions, modifications or substitutions can be made.

Claims

1. A method for arranging prefabricated panels for a super-high-speed low-vacuum pipeline maglev transportation system module, characterized in that: The method comprises: Determine the horizontal and vertical curves of the line; Determine the length of the pipe beam L 梁 , the width of the beam gap between adjacent tube beams L 梁缝 , and determine the length L of the module prefabricated board 板 , the width of the board seam between adjacent module prefabricated boards L 板缝 , module prefabricated board expansion length L 扩 And the height H from the bottom of the module prefabricated board to the rail support platform 板-台 ; According to the relevant parameters of the vertical curve and the length of the pipe beam L 梁 The width of the beam gap between adjacent tube beams is L 梁缝 , calculate the longitudinal slope A of the pipe beam 梁i ; According to the length of the tube beam L 梁 , the width of the beam gap between adjacent tube beams L 梁缝 and the longitudinal slope of the tube beam A 梁i , calculate the starting mileage of the pipe beam and pipe beam terminal mileage According to the length of the tube beam L 梁 , Length of module prefabricated board L 板 , the width of the board seam between adjacent module prefabricated boards L 板缝 And the expansion length L of the module prefabricated panel 扩 , calculate the number of prefabricated panels N on the tube beam module 板 ; According to the relevant parameters of horizontal curves, relevant parameters of vertical curves and the starting mileage of pipe beams and pipe beam terminal mileage Calculate the starting coordinates of the pipe beam (x 起i ,y 起i ,z 起i ) and the end point coordinates of the pipe beam (x 终i ,y 终i ,z 终i ); According to the horizontal curve related parameters, vertical curve related parameters, module prefabricated board length L 板 The width of the seam between adjacent module prefabricated panels is L 板缝 , calculate the slope A of each module prefabricated board 板i ; According to the relevant parameters of the flat curve, the length L of the module prefabricated board 板 , the width of the board seam between adjacent module prefabricated boards L 板缝 , module prefabricated board expansion length L 扩 And the height H from the bottom of the module prefabricated board to the rail support platform 板-台 , calculate the starting mileage of each module prefabricated panel The terminal mileage of modular prefabricated panels 2. The method for arranging prefabricated panels for ultra-high-speed low-vacuum pipeline maglev transportation system modules according to claim 1 is characterized in that: Determine the horizontal curve of the line, including: Use the intersection method to input horizontal curve related parameters, including horizontal curve starting point mileage, horizontal curve starting point coordinates, intersection coordinates, horizontal curve radius, transition curve length, horizontal curve end point mileage, and horizontal curve end point coordinates.

3. The method for arranging prefabricated panels for ultra-high-speed low-vacuum pipeline maglev transportation system modules according to claim 2 is characterized in that: Determine the vertical curve of the line, including: Use the intersection method to input vertical curve related parameters, including vertical curve starting point mileage, vertical curve starting point elevation, slope change point mileage, slope change point elevation, curve radius at slope change point, vertical curve end point mileage, vertical curve end point elevation.

4. The method for arranging prefabricated panels for ultra-high-speed low-vacuum pipeline maglev transportation system modules according to claim 3 is characterized in that: According to the relevant parameters of the vertical curve and the length of the pipe beam L 梁 The width of the beam gap between adjacent tube beams is L 梁缝 , calculate the longitudinal slope A of the pipe beam 梁i ,include: First, set the slope to 0 and calculate the approximate mileage of the starting point of the pipe beam Approximate mileage to the end of the pipe beam in: M 线路起点 The mileage of the starting point of the line; Then, based on the approximate mileage of the starting point of the pipe beam Approximate mileage to the end of the pipe beam Calculate the approximate elevation of the starting point of the pipe beam according to the vertical curve calculation method Approximate elevation of the end point of the pipe beam Finally, the approximate elevation of the starting point of the pipe beam is Approximate elevation of the end point of the pipe beam And the length of the tube beam L 梁 , calculate the longitudinal slope A of the pipe beam 梁i ; 5. The method for arranging prefabricated panels for ultra-high-speed low-vacuum pipeline maglev transportation system modules according to claim 4 is characterized in that: Calculate the starting mileage of the pipe beam include:

6. The method for arranging prefabricated panels for ultra-high-speed low-vacuum pipeline maglev transportation system modules according to claim 5, characterized in that: Calculate the end distance of the pipe beam include:

7. The method for arranging prefabricated panels for ultra-high-speed low-vacuum pipeline maglev transportation system modules according to claim 6, characterized in that: Calculate the number of prefabricated panels N on the tube beam module 板 ,include: according to (N 板 -1)×L 板缝 +N 板 ×L 板 =L 梁 +2×L 扩 have to 8. The method for arranging prefabricated panels for ultra-high-speed low-vacuum pipeline maglev transportation system modules according to claim 7, characterized in that: According to the relevant parameters of horizontal curves, relevant parameters of vertical curves and the starting mileage of pipe beams and pipe beam terminal mileage Calculate the starting coordinates of the pipe beam (x 起i ,y 起i ,z 起i ) and the end point coordinates of the pipe beam (x 终i ,y 终i ,z 终i ).

9. The method for arranging prefabricated panels for ultra-high-speed low-vacuum pipeline maglev transportation system modules according to claim 8, characterized in that: According to the horizontal curve related parameters, vertical curve related parameters, module prefabricated board length L 板 The width of the seam between adjacent module prefabricated panels is L 板缝 , calculate the slope A of each module prefabricated board 板i ,include: First, set the slope to 0 and calculate the approximate mileage of the starting point of the module prefabricated panel Approximate mileage to the end of the module prefabricated panel Then approximate the mileage based on the starting point of the module prefabricated panel Approximate mileage to the end of the module prefabricated panel Calculate the approximate elevation of the starting point of the module prefabricated board according to the vertical curve calculation method Approximate elevation of the end point of the module precast panel Finally, the elevation is approximated by the starting point of the module prefabricated board Approximate elevation of the end point of the module precast panel And the length of the module prefabricated board L 板 , calculate the slope A of each module prefabricated board 板i ; 10. The method for arranging prefabricated panels for ultra-high-speed low-vacuum pipeline maglev transportation system modules according to claim 9, characterized in that: Calculate the starting mileage of each module prefabricated panel The terminal mileage of modular prefabricated panels include: Starting mileage of the i-th module prefabricated panel for: The terminal mileage of the i-th module prefabricated panel for: