Communication antenna lifting device of electric tower

By designing the communication antenna lifting device of the electric pole tower, the optimized lifting structure with single-axis double-end transmission and embedded storage design, the problem of insufficient antenna height adjustment function in the existing antenna bearing device is solved, and highly flexible adjustment and use are achieved Improved functionality.

CN119401096APending Publication Date: 2025-02-07NANJING JUNDONG ELECTROMECHANICAL EQUIP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411752527.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-02
Publication Date
2025-02-07

AI Technical Summary

Technical Problem

The existing antenna carriers lack the flexible adjustment function of antenna height, resulting in limited use functionality and reception effect of antennas, and the lifting structure is complex and operation is cumbersome, which affects the overall use performance.

Method used

A communication antenna lifting device for electric pole towers is designed, adopting an optimized lifting structure with single-axis and double-end transmission to realize multi-stage synchronous adjustment of antenna height by single-drive equipment, combining embedded storage design and sliding assistance of slot block engaging Structure improves structural stability and smooth use.

Benefits of technology

It effectively expands the adjustable height range of the antenna, simplifies the operating process, improves the overall functional and applicable range of use, and enhances support stability and load bearing strength.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119401096A_ABST
    Figure CN119401096A_ABST
Patent Text Reader

Abstract

The communication antenna lifting device of the electric tower comprises a bearing support, a loading table is fixedly installed at the upper end of the bearing support, and a lifting driving motor is fixedly installed in the middle of the bottom of the bearing support; an output shaft of the lifting driving motor penetrates through the upper end of the bearing support to be fixedly connected with a lifting adjusting screw rod, an electric control box is fixedly installed in the middle of the lower end of the outer side of the loading table, a first-stage lifting bearing column is movably installed in the loading table, and a second-stage lifting bearing column is movably installed in the first-stage lifting bearing column; and a top position rotating bearing table is fixedly mounted at the upper end of the second-stage lifting bearing column. According to the invention, the whole body is designed into a single-shaft double-end transmission optimized lifting structure, so that the whole body can realize multi-stage synchronous adjustment of the height of the antenna by single-drive equipment in normal use and work, and the adjustable height range of the antenna is effectively expanded.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of lifting devices, in particular to a communication antenna lifting device of an electric pole tower. Background Art

[0002] Antenna is a device that converts guided waves propagating on a transmission line into electromagnetic waves propagating in an open medium, or converts electromagnetic waves into guided waves. It is widely used in radio equipment to transmit or receive signals. There are various types of communication antennas, especially large and ultra-large antennas, which require stable support devices due to their size and weight. In order to ensure the signal coverage effect of communication antennas at different heights and angles, special lifting equipment is usually required to accurately adjust their position to meet various application requirements.

[0003] After searching, a Chinese invention patent with patent publication number CN101634861B discloses an antenna adjustment device, which is used in an antenna measurement system for measuring an antenna to be measured, and includes: a lifting frame having a movable device that can drive the antenna to move along the lifting frame, a fixing device installed on the movable device of the lifting frame, a transmitting antenna installed on the front of the fixing device, and a laser transmitter installed on the fixing device, wherein the laser transmitter and the transmitting antenna are located at different horizontal heights, and emits laser, and the height that the transmitting antenna needs to reach is determined by observing the position of the laser projection.

[0004] Based on the above patent, most of the antenna supporting devices currently on the market do not have the lifting function to appropriately adjust the antenna height according to usage requirements, which greatly limits the functionality of the antenna and its own receiving effect, and limits its functional upper limit. In addition, the few supporting devices with lifting function have extremely complex lifting structures and cumbersome operations, which can easily affect the comprehensive performance of the antenna itself, prolong the electromagnetic wave reception time, slow down the work progress, and thus lead to a narrow overall scope of application.

[0005] Based on this, the present invention proposes a communication antenna lifting device for an electric pole tower to solve the above problem. Summary of the invention

[0006] The purpose of this section is to summarize some aspects of the embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of the present invention to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.

[0007] In view of the above problems and / or the problems existing in the existing antenna lifting device designs, the present invention is proposed.

[0008] Therefore, one of the objects of the present invention is to provide a communication antenna lifting device for an electric pole tower, which is designed as an optimized lifting structure with a single-axis double-end transmission as a whole, so that the whole can achieve multi-stage synchronous adjustment of the antenna height by a single drive device during normal use, and the adjustable height range of the antenna is effectively expanded. The overall lifting structure adopts an embedded and contained design, which will not increase the overall footprint and size of the equipment, and provides a basis for the bearing structure of super-large antennas.

[0009] To achieve the above-mentioned effect, the present invention provides the following technical solutions: a communication antenna lifting device for an electric pole tower, comprising a bearing bracket, a loading platform is fixedly installed on the upper end of the bearing bracket, a lifting drive motor is fixedly installed at the middle position of the bottom of the bearing bracket, the output shaft of the lifting drive motor passes through the upper end of the bearing bracket and is fixedly connected with a lifting adjustment screw, an electric control box is fixedly installed at the middle position of the lower end of the outer side of the loading platform, a first-level lifting bearing column is movably installed inside the loading platform, a second-level lifting bearing column is movably installed inside the first-level lifting bearing column, a top-position rotating bearing platform is fixedly installed on the upper end of the second-level lifting bearing column, an antenna assembly bearing platform is movably installed on the upper end of the top-position rotating bearing platform, and a secondary lifting screw is fixedly installed at the middle position of the bottom of the second-level lifting bearing column.

[0010] As a preferred solution of the communication antenna lifting device of the electric pole tower of the present invention, wherein: the corner positions of the bottom of the bearing bracket are supported and fixedly installed with stable supporting feet, the loading platform and the upper end of the bearing bracket are seamlessly fixedly connected to each other, and the electric control box and the lifting drive motor are electrically connected to each other;

[0011] Through the structural design of the load-bearing bracket and the stable supporting base, the overall supporting structure of the device is made more stable and solid, and has the effect of stably supporting large antenna equipment.

[0012] As a preferred solution of the communication antenna lifting device of the electric pole tower of the present invention, wherein: a sleeve rod through hole is preset at the middle position of the bottom of the loading platform, the opening position of the sleeve rod through hole at the bottom of the loading platform and the installation position of the lifting adjustment screw at the upper end of the outer side of the load-bearing bracket correspond to each other, and the inner diameter size specification of the sleeve rod through hole is larger than the outer diameter size specification of the lifting adjustment screw;

[0013] By setting the sleeve rod through hole, the transmission structure between the lifting adjustment screw rod and the lifting adjustment screw hole will not be affected by the load-bearing structure of the loading platform itself, thereby effectively enhancing the overall structural stability.

[0014] As a preferred solution of the communication antenna lifting device of the electric pole tower described in the present invention, wherein: a first-level receiving groove is opened inside the loading platform, the internal specifications of the first-level receiving groove correspond to and match the external specifications of the first-level lifting bearing column, the inner wall of the first-level receiving groove is symmetrically opened with first-level lifting auxiliary directional grooves, and the lower end position of the outside of the first-level lifting bearing column is symmetrically and evenly fixedly installed with first-level lifting auxiliary sliders, the fixed installation position of the first-level lifting auxiliary slider on the outside of the first-level lifting bearing column corresponds to the opening position of the first-level lifting auxiliary directional groove inside the first-level receiving groove, and the specifications inside the first-level lifting auxiliary directional groove correspond to and match the external specifications of the first-level lifting auxiliary slider;

[0015] As a preferred solution of the communication antenna lifting device of the electric pole tower of the present invention, wherein: a lifting adjustment screw hole is preset at the middle position of the bottom of the first-level lifting bearing column, the inner thread specification of the lifting adjustment screw hole corresponds to the outer thread specification of the lifting adjustment screw rod, and the lifting adjustment screw hole passes through the bottom of the first-level lifting bearing column and is connected with the inside thereof;

[0016] As a preferred solution of the communication antenna lifting device of the electric pole tower of the present invention, wherein: the first-level lifting bearing column is slidably connected to each other through the first-level lifting auxiliary sliding block and the first-level lifting auxiliary directional groove, the first-level lifting bearing column is preset with a second-level receiving groove inside, the second-level lifting bearing column is movably installed inside the first-level lifting bearing column through the second-level receiving groove, and the internal specifications of the second-level receiving groove correspond to and match the external specifications of the second-level lifting bearing column;

[0017] By adding a first-level lifting auxiliary directional groove and a first-level lifting auxiliary slider on the basis of the embedded receiving structure, the lifting and lowering adjustment stability and smoothness of the first-level lifting bearing column in the first-level receiving groove are effectively improved, and through the adaptation structural relationship between the lifting and lowering adjustment screw hole and the lifting and lowering adjustment screw rod, continuous and stable free lifting and lowering adjustment operation can be achieved without affecting the first-level lifting bearing column's overall stable support structure on its upper part.

[0018] As a preferred solution of the communication antenna lifting device of the electric pole tower described in the present invention, wherein: the inner wall of the secondary receiving groove is symmetrically provided with secondary lifting auxiliary directional grooves at equal intervals in an annular manner, and the lower end position of the outside of the secondary lifting bearing column is symmetrically and fixedly installed with secondary lifting auxiliary sliders at equal intervals in an annular manner, the fixed installation position of the secondary lifting auxiliary slider on the outside of the secondary lifting bearing column and the opening position of the secondary lifting auxiliary directional groove in the inside of the secondary receiving groove correspond to each other, the internal specifications of the secondary lifting auxiliary directional groove and the external specifications of the secondary lifting auxiliary slider correspond to each other, and the secondary lifting bearing column is slidably connected to the secondary lifting auxiliary directional groove through the secondary lifting auxiliary slider;

[0019] By adding a counter-directional sliding connection structure of a secondary lifting auxiliary directional groove and a secondary lifting auxiliary slider on the basis of the embedded receiving structure, the lifting and lowering adjustment stability and smoothness of the secondary lifting bearing column in the secondary receiving groove are effectively improved.

[0020] As a preferred solution of the communication antenna lifting device of the electric pole tower of the present invention, wherein: a positioning associated plate is fixedly connected between the middle position of the bottom of the secondary lifting bearing column and the secondary lifting screw, and a lifting adjustment internal thread groove is preset inside the lifting adjustment screw, and the groove specifications of the lifting adjustment internal thread groove correspond to the external thread specifications of the secondary lifting screw, and the internal thread of the lifting adjustment internal thread groove and the external thread of the lifting adjustment screw are reverse threads;

[0021] By adopting the structural design of the internal and external double-thread transmission of the lifting and adjusting screw, the device can utilize the structural characteristics of the lifting and adjusting screw itself to achieve double-end synchronous lifting and adjustment work under the drive operation of the lifting drive motor, thereby effectively improving the overall height adjustment work efficiency.

[0022] As a preferred solution of the communication antenna lifting device of the electric pole tower of the present invention, wherein: a loading bracket is fixedly installed on the upper end of the top rotating bearing platform, a bearing connecting piece is movably installed inside the loading bracket, the antenna assembly bearing platform is fixedly connected to the upper end of the bearing connecting piece, and the antenna assembly bearing platform and the bearing connecting piece are integrally formed into a seamlessly connected integrated structure;

[0023] By adding an adjustable assembly structure of a loading bracket and an antenna assembly platform, not only an assembly basis is provided for the antenna, but also the angle and orientation of the antenna can be appropriately adjusted according to the specific usage requirements in actual application work, which can meet various usage requirements under different usage conditions.

[0024] As a preferred solution of the communication antenna lifting device of the electric pole tower of the present invention, a rotating adjustment motor is fixedly installed at the side position outside the loading bracket, the output shaft of the rotating adjustment motor passes through the loading bracket and is fixedly connected with the bearing connection member, and the rotating adjustment motor and the top rotating bearing platform are electrically connected to the electric control box;

[0025] By electrically connecting the rotary adjustment motor and the lifting drive motor to the electrical control box, the device can realize height adjustment operations as well as angle and azimuth adjustment operations of the carried antenna on the ground, enriching the overall functionality of use and providing a structural basis for the height adjustment of large antennas. The overall scope of application has been greatly expanded and the overall comprehensive performance has been correspondingly improved.

[0026] The beneficial effects of the present invention are as follows: the present invention designs the overall structure as an optimized lifting structure with single-axis double-end transmission, so that the overall structure can realize multi-stage synchronous adjustment of the antenna height by a single-drive device during normal use, and the adjustable height range of the antenna is effectively expanded. The overall lifting structure adopts an embedded and contained design, which will not increase the overall footprint and size of the equipment, and provides a foundation for the bearing structure of super-large antennas. In addition, by adopting a sliding auxiliary structure with slot block engagement, it effectively improves the overall lifting adjustment smoothness while ensuring that the overall bearing stability will not be affected by the corresponding factors, thereby enhancing the overall support stability and bearing strength. At the same time, on the basis of the lifting adjustment structure, a loading structure that can support the adjustment of the antenna angle and azimuth is also provided, which effectively enriches the overall functionality of use, can meet a variety of usage requirements, and greatly expands the overall scope of application. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:

[0028] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0029] Figure 2 It is a structural schematic diagram of the angle adjustment assembly of the present invention;

[0030] Figure 3 It is a structural schematic diagram of the first swinging part of the present invention;

[0031] Figure 4 It is a schematic diagram of the position of the first swing frame of the present invention;

[0032] Figure 5 It is a structural schematic diagram of the first swing frame of the present invention;

[0033] Figure 6 is a schematic structural diagram of the second swinging portion of the present invention;

[0034] Figure 7 It is a schematic diagram of the positions of the third swing axis and the fourth swing axis of the present invention;

[0035] Figure 8 It is a schematic diagram of the structure of the electric cylinder and the bump of the present invention;

[0036] Fig. 9 It is a front view of the robot of the present invention when moving forward.

[0037] Numbers in the figure: 1. load-bearing bracket; 2. stable supporting foot; 3. loading platform; 4. lifting drive motor; 5. lifting adjustment screw; 6. electric control box; 7. sleeve rod through hole; 8. primary receiving slot; 9. primary lifting load-bearing column; 10. primary lifting auxiliary directional slot; 11. primary lifting auxiliary slider; 12. lifting adjustment screw hole; 13. secondary receiving slot; 14. secondary lifting load-bearing column; 15. secondary lifting auxiliary directional slot; 16. secondary lifting auxiliary slider; 17. secondary lifting screw; 18. top position rotating load-bearing platform; 19. positioning association disk; 20. lifting adjustment internal thread groove; 21. loading bracket; 22. load-bearing connector; 23. rotation adjustment motor; 24. antenna assembly load-bearing platform. DETAILED DESCRIPTION

[0038] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0039] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0040] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0041] Example 1

[0042] Reference Figures 1 to 9, which is the first embodiment of the present invention, and provides a communication antenna lifting device for an electric pole tower, including a bearing bracket 1, a stable supporting foot 2, a loading platform 3, a lifting drive motor 4, a lifting adjustment screw 5, an electric control box 6, a sleeve rod through hole 7, a primary receiving groove 8, a primary lifting bearing column 9, a primary lifting auxiliary directional groove 10, a primary lifting auxiliary slider 11, a lifting adjustment screw hole 12, a secondary receiving groove 13, a secondary lifting bearing column 14, a secondary lifting auxiliary directional groove 15, a secondary lifting auxiliary slider 16, a secondary lifting screw 17, a top position rotating bearing platform 18, a positioning association plate 19, a lifting adjustment internal thread groove 20, a loading bracket 21, a bearing connector 22, a rotating adjustment motor 23 and an antenna assembly bearing platform 24, the bearing bracket 1 A loading platform 3 is fixedly installed on the upper end, a lifting drive motor 4 is fixedly installed in the middle position of the bottom of the load-bearing bracket 1, the output shaft of the lifting drive motor 4 passes through the upper end of the load-bearing bracket 1 and is fixedly connected with a lifting adjustment screw 5, an electric control box 6 is fixedly installed in the middle position of the lower end of the outer side of the loading platform 3, a first-level lifting bearing column 9 is movably installed inside the loading platform 3, a second-level lifting bearing column 14 is movably installed inside the first-level lifting bearing column 9, a top-position rotating bearing platform 18 is fixedly installed on the upper end of the second-level lifting bearing column 14, an antenna assembly bearing platform 24 is movably installed on the upper end of the top-position rotating bearing platform 18, a secondary lifting screw 17 is fixedly installed in the middle position of the bottom of the second-level lifting bearing column 14, and a stable supporting bottom is fixedly supported at the corner position of the bottom of the load-bearing bracket 1 The foot 2, the loading platform 3 and the upper end of the load-bearing bracket 1 are seamlessly fixedly connected to each other, the electric control box 6 and the lifting drive motor 4 are electrically connected to each other, and a sleeve rod through hole 7 is preset in the middle position of the bottom of the loading platform 3. The opening position of the sleeve rod through hole 7 at the bottom of the loading platform 3 and the installation position of the lifting adjustment screw 5 at the upper end of the outer side of the load-bearing bracket 1 correspond to each other, and the inner diameter size specification of the sleeve rod through hole 7 is larger than the outer diameter size specification of the lifting adjustment screw 5. A first-level receiving groove 8 is opened inside the loading platform 3, and the internal specifications of the first-level receiving groove 8 correspond to the external specifications of the first-level lifting bearing column 9. The inner wall of the first-level receiving groove 8 is symmetrically provided with a first-level lifting auxiliary directional groove 10, and the lower end position of the outer side of the first-level lifting bearing column 9 is symmetrically and evenly fixedly installed with a first-level lifting The auxiliary slider 11 for lowering the first-level lifting auxiliary slider 11, the fixed installation position of the first-level lifting auxiliary slider 11 outside the first-level lifting bearing column 9 and the opening position of the first-level lifting auxiliary directional groove 10 inside the first-level receiving groove 8 correspond to each other, and the groove specifications of the first-level lifting auxiliary directional groove 10 correspond to the external specifications of the first-level lifting auxiliary slider 11. A lifting adjustment screw hole 12 is preset at the middle position of the bottom of the first-level lifting bearing column 9. The thread specifications in the hole of the lifting adjustment screw hole 12 correspond to the external thread specifications of the lifting adjustment screw 5, and the lifting adjustment screw hole 12 passes through the bottom of the first-level lifting bearing column 9 and is connected with the inside thereof. The first-level lifting bearing column 9 is slidably connected with the first-level lifting auxiliary directional groove 10 through the first-level lifting auxiliary slider 11.A secondary receiving groove 13 is preset inside the primary lifting bearing column 9, and the secondary lifting bearing column 14 is movably installed inside the primary lifting bearing column 9 through the secondary receiving groove 13. The internal specifications of the secondary receiving groove 13 correspond to the external specifications of the secondary lifting bearing column 14. The inner wall of the secondary receiving groove 13 is symmetrically provided with secondary lifting auxiliary directional grooves 15 at equal intervals in an annular manner. A secondary lifting auxiliary slider 16 is symmetrically fixedly installed at the lower end position of the outside of the secondary lifting bearing column 14 at equal intervals in an annular manner. The fixed installation position of the secondary lifting auxiliary slider 16 on the outside of the secondary lifting bearing column 14 corresponds to the opening position of the secondary lifting auxiliary directional groove 15 inside the secondary receiving groove 13. The internal specifications of the secondary lifting auxiliary directional groove 15 correspond to the external specifications of the secondary lifting auxiliary slider 16. The secondary lifting bearing column 14 is slidably connected to the secondary lifting auxiliary directional groove 15 through the secondary lifting auxiliary slider 16. The middle position at the bottom of the secondary lifting bearing column 14 A positioning associated disk 19 is fixedly connected between the position and the secondary lifting screw 17, and a lifting adjustment internal thread groove 20 is preset inside the lifting adjustment screw 5. The internal specifications of the lifting adjustment internal thread groove 20 correspond to the external thread specifications of the secondary lifting screw 17, and the internal thread of the lifting adjustment internal thread groove 20 and the external thread of the lifting adjustment screw 5 are reverse threads. A loading bracket 21 is fixedly installed on the upper end of the top rotating bearing platform 18, and a bearing connection piece 22 is movably installed inside the loading bracket 21. The antenna assembly bearing platform 24 is fixedly connected to the upper end of the bearing connection piece 22. The antenna assembly bearing platform 24 and the bearing connection piece 22 are an integrated structure seamlessly connected to each other. A rotation adjustment motor 23 is fixedly installed on the side position of the outside of the loading bracket 21. The output shaft of the rotation adjustment motor 23 passes through the loading bracket 21 and is fixedly connected to the bearing connection piece 22. The rotation adjustment motor 23 and the top rotating bearing platform 18 are electrically connected to each other between the electric control box 6.

[0043] Example 2

[0044] Reference Figures 1 to 9 , which is the second embodiment of the present invention, and this embodiment is located above the previous embodiment.

[0045] Through the structural design of the load-bearing bracket 1 and the stable supporting foot 2, the overall supporting structure of the device is made more stable and strong, and has the effect of stably supporting large antenna equipment. Through the setting of the sleeve rod through hole 7, the transmission structure between the lifting and adjusting screw rod 5 and the lifting and adjusting screw hole 12 will not be affected by the load-bearing structure of the loading platform 3 itself, which effectively enhances the overall structural stability. By adding a first-level lifting auxiliary directional groove 10 and a first-level lifting auxiliary slider 11 on the basis of the embedded receiving structure, the lifting and adjusting stability and smoothness of the first-level lifting bearing column 9 in the first-level receiving groove 8 are effectively improved. Through the adaptation structural relationship between the lifting and adjusting screw hole 12 and the lifting and adjusting screw 5, it is possible to achieve continuous and stable free lifting and adjusting operation without affecting the first-level lifting bearing column 9 on its upper overall stable supporting structure. By adding a second-level lifting auxiliary directional groove 15 and a second-level lifting auxiliary slider 16 on the basis of the embedded receiving structure, the second-level lifting bearing column 14 is effectively improved in the The stability and smoothness of the lifting adjustment in the secondary receiving groove 13 are improved by adopting the structural design of the inner and outer double-threaded transmission of the lifting adjustment screw 5, so that the device can utilize the structural characteristics of the lifting adjustment screw 5 itself, and realize the double-end synchronous lifting adjustment work under the driving operation of the lifting drive motor 4, effectively improving the overall height adjustment work efficiency. By adding an adjustable assembly structure of a loading bracket 21 and an antenna assembly carrier 24, not only an assembly basis is provided for the antenna, but also the angle and azimuth of the antenna carried can be properly adjusted according to the specific use requirements in the actual application work, which can meet various use requirements under different use conditions. By electrically connecting the rotary adjustment motor 23 and the lifting drive motor 4 to the electric control box 6, the device can realize the height adjustment operation and the angle and azimuth adjustment operation of the antenna carried on the ground, enriching the overall use functionality, and providing a structural basis for the height adjustment work of large antennas. The overall scope of application has been greatly expanded, and the overall comprehensive use performance has been correspondingly improved.

[0046] Example 3

[0047] Reference Figures 1 to 9 , which is the third embodiment of the present invention, and this embodiment is located above the previous embodiment.

[0048] The stable support foot 2 combined with the high stable support structure of the load-bearing bracket 1 can ensure that the lifting device can achieve a stable support effect for the carried antenna in any environment. The target antenna equipment can be stably assembled and supported on the upper end of the antenna assembly bearing platform 24. When the target antenna needs to be adjusted in height, the lifting drive motor 4 can be controlled and started through the electric control box 6, so that its output shaft drives the lifting adjustment screw 5 to rotate. The lifting adjustment screw 5 passes through the threaded adaptation connection structure between the sleeve rod through hole 7 and the lifting adjustment screw hole 12, so that the first-level lifting bearing column 9 embedded in the first-level receiving groove 8 can receive the jacking force generated by the threaded adaptation rotation, so as to achieve the upward lifting antenna height adjustment effect. The adaptation sliding connection structure between the first-level lifting auxiliary directional groove 10 and the first-level lifting auxiliary slider 11 guarantees the structural stability of the first-level lifting bearing column 9 during the lifting process to the greatest extent, and correspondingly improves the overall lifting operation smoothness. Under the rotation action of the lifting adjustment screw 5, the adaptation threaded connection structure between itself and the lifting adjustment internal thread groove 20, as well as the reverse thread structure clamping, can be used to adjust the first-level lifting bearing column 9 from the first-level receiving groove 8. While the groove 8 is lifting upward to adjust the height, the secondary lifting bearing column 14 is released from the secondary receiving groove 13 to adjust the lifting height upward. The adaptive sliding connection structure between the secondary lifting auxiliary slider 16 and the secondary lifting auxiliary directional groove 15 guarantees the structural stability of the secondary lifting bearing column 14 during the lifting process to the greatest extent, and correspondingly improves the overall lifting operation smoothness. The lifting drive motor 4 is controlled by the electric control box 6 to reverse its output shaft, so that the synchronous lowering adjustment operation of the secondary lifting bearing column 14 and the primary lifting bearing column 9 can be achieved, and the top position rotating bearing platform 18 can be controlled to rotate according to specific use requirements during long-term use, so as to achieve the effect of adjusting the orientation of the antenna carried on the upper end of the antenna assembly bearing platform 24. Similarly, controlling and starting the rotating adjustment motor 23 can drive the bearing connector 22 and the antenna assembly bearing platform 24 as a whole, so that the carried antenna can perform appropriate angle adjustment operations, effectively enriching the overall use functionality, and providing a relatively stable mechanism foundation for the lifting and bearing of large antennas and super-large antennas. It is relatively comprehensive in bearing stability and use functionality, and has extremely broad application prospects.

[0049] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A communication antenna lifting device for an electric pole tower, comprising a bearing bracket (1), characterized in that: A loading platform (3) is fixedly mounted on the upper end of the supporting bracket (1); a lifting drive motor (4) is fixedly mounted at the middle position of the bottom of the supporting bracket (1); the output shaft of the lifting drive motor (4) passes through the upper end of the supporting bracket (1) and is fixedly connected to a lifting adjustment screw (5); an electric control box (6) is fixedly mounted at the middle position of the lower end of the outer side of the loading platform (3); a first-level lifting bearing column (9) is movably mounted inside the loading platform (3); a second-level lifting bearing column (14) is movably mounted inside the first-level lifting bearing column (9); a top-position rotating bearing platform (18) is fixedly mounted on the upper end of the second-level lifting bearing column (14); an antenna assembly bearing platform (24) is movably mounted on the upper end of the top-position rotating bearing platform (18); and a secondary lifting screw (17) is fixedly mounted at the middle position of the bottom of the second-level lifting bearing column (14).

2. The communication antenna lifting device of the electric pole tower according to claim 1, characterized in that: The corners of the bottom of the support bracket (1) are supported and fixedly mounted with stable support feet (2); the loading platform (3) and the upper end of the support bracket (1) are seamlessly fixedly connected to each other; and the electric control box (6) and the lifting drive motor (4) are electrically connected to each other.

3. The communication antenna lifting device of the electric pole tower according to claim 2, characterized in that: A sleeve rod through hole (7) is preset in the middle position of the bottom of the loading platform (3); the opening position of the sleeve rod through hole (7) at the bottom of the loading platform (3) and the installation position of the lifting and adjusting screw rod (5) at the upper end of the outer side of the supporting bracket (1) correspond to each other; the inner diameter size specification of the sleeve rod through hole (7) is larger than the outer diameter size specification of the lifting and adjusting screw rod (5).

4. The communication antenna lifting device of the electric pole tower according to claim 3, characterized in that: A first-level receiving groove (8) is provided inside the loading platform (3), and the internal specifications of the first-level receiving groove (8) correspond to the external specifications of the first-level lifting bearing column (9), and the inner wall of the first-level receiving groove (8) is symmetrically provided with a first-level lifting auxiliary orientation groove (10), and a first-level lifting auxiliary slider (11) is symmetrically and evenly fixedly installed at the lower end position outside the first-level lifting bearing column (9), and the fixed installation position of the first-level lifting auxiliary slider (11) outside the first-level lifting bearing column (9) corresponds to the opening position of the first-level lifting auxiliary orientation groove (10) inside the first-level receiving groove (8), and the internal specifications of the first-level lifting auxiliary orientation groove (10) correspond to the external specifications of the first-level lifting auxiliary slider (11).

5. The communication antenna lifting device of the electric pole tower according to claim 4, characterized in that: A lifting adjustment screw hole (12) is preset in the middle position of the bottom of the first-level lifting support column (9), the internal thread specifications of the lifting adjustment screw hole (12) correspond to the external thread specifications of the lifting adjustment screw rod (5), and the lifting adjustment screw hole (12) passes through the bottom of the first-level lifting support column (9) and is connected with its interior.

6. The communication antenna lifting device of the electric pole tower according to claim 5, characterized in that: The first-level lifting support column (9) is slidably connected to the first-level lifting auxiliary sliding block (11) and the first-level lifting auxiliary directional groove (10); a second-level receiving groove (13) is preset inside the first-level lifting support column (9); the second-level lifting support column (14) is movably installed inside the first-level lifting support column (9) through the second-level receiving groove (13); the internal specifications of the second-level receiving groove (13) and the external specifications of the second-level lifting support column (14) correspond to each other.

7. The communication antenna lifting device of the electric pole tower according to claim 6, characterized in that: The inner wall of the secondary receiving groove (13) is provided with secondary lifting auxiliary orientation grooves (15) symmetrically and annularly at equal intervals, and the lower end position of the outside of the secondary lifting support column (14) is fixedly and annularly at equal intervals, and the fixed installation position of the secondary lifting auxiliary slide block (16) outside the secondary lifting support column (14) and the opening position of the secondary lifting auxiliary orientation groove (15) inside the secondary receiving groove (13) correspond to each other, and the groove specifications of the secondary lifting auxiliary orientation groove (15) and the external specifications of the secondary lifting auxiliary slide block (16) correspond to each other, and the secondary lifting support column (14) is slidably connected with the secondary lifting auxiliary orientation groove (15) through the secondary lifting auxiliary slide block (16).

8. The communication antenna lifting device for an electric pole tower as claimed in claim 7, characterized in that: A positioning associated plate (19) is fixedly connected between the middle position of the bottom of the secondary lifting support column (14) and the secondary lifting screw (17); a lifting adjustment internal thread groove (20) is preset inside the lifting adjustment screw (5); the internal specifications of the lifting adjustment internal thread groove (20) correspond to the external thread specifications of the secondary lifting screw (17), and the internal thread of the lifting adjustment internal thread groove (20) and the external thread of the lifting adjustment screw (5) are reverse threads.

9. The communication antenna lifting device of the electric pole tower according to claim 8, characterized in that: A loading bracket (21) is fixedly mounted on the upper end of the top rotating bearing platform (18); a bearing connector (22) is movably mounted inside the loading bracket (21); the antenna assembly bearing platform (24) is fixedly connected to the upper end of the bearing connector (22); the antenna assembly bearing platform (24) and the bearing connector (22) are integrally formed into a seamlessly connected integrated structure.

10. The communication antenna lifting device of the electric pole tower according to claim 9, characterized in that: A rotation adjustment motor (23) is fixedly installed at a side position outside the loading bracket (21), and an output shaft of the rotation adjustment motor (23) passes through the loading bracket (21) and is fixedly connected to the bearing connection member (22). The rotation adjustment motor (23) and the top position rotation bearing platform (18) are both electrically connected to the electric control box (6).

Citation Information

Patent Citations

  • Antenna regulating equipment

    CN101634861B