Alternative command method and device based on analytic hierarchy process
Through the succession command method based on the hierarchical analysis method, a hierarchical structure model and evaluation system are constructed, which solves the problem of inflexible adjustment of the succession plan in the existing technology, and achieves rapid and effective selection of the succession plan in emergency situations.
Patent Information
- Application Number
- CN202411336589.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2025-02-11
AI Technical Summary
The existing succession command technology cannot adaptively adjust the succession plan according to actual conditions, lacks flexibility, and it is difficult to respond in a timely manner and find the optimal succession plan in an emergency.
Using a replacement command method based on hierarchical analysis method, by constructing a hierarchical structure model, including the goal layer, the criterion layer and the plan layer, a succession plan database and the indicator evaluation system are generated based on the task characteristics, action plan and plan evaluation indicators entered by the user, and the succession plan database and indicator evaluation system are generated, and the results are quantitatively Analyze and sort to determine the target replacement plan.
Adaptive adjustment of the successor plan is realized, the flexibility and response speed of the successor command are improved, and the optimal successor plan can be quickly found in emergencies to ensure the normal operation of the command system.
Smart Images

Figure CN119417381A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer technology, and in particular to a method and device for taking over command based on a hierarchical analysis method. Background Art
[0002] Succession command refers to the normal operation of the command system. For scenarios where the operating nodes are damaged or the operating system can no longer operate normally, the steps and processes for developing a succession plan are designed. The succession plan is formulated to respond to emergencies and complete the effective succession work in the shortest time in a timely manner to ensure the normal operation of the entire command system.
[0003] At present, there are two modes of succession command: command post backup succession, which establishes a backup machine for the replaced command post and builds a data synchronization relationship. When the replaced command post fails, the backup machine takes over and implements command authority; data center backup succession, which establishes a data backup center and the command post synchronizes data and system configuration with the data backup center. When the replaced command post fails, the successor command post downloads data from the data backup center and implements command authority; designated succession, which establishes a data backup center and each command post synchronizes data with the data backup center. When a command post fails, the chief assigns the command post to download data from the data backup center to complete the succession.
[0004] Existing succession command technologies are mostly based on pre-established succession modes. The leaders make decisions and deployments to complete the succession command in advance or before the battle. They are unable to adaptively adjust the succession plan according to various actual conditions, lack flexibility in plan decision-making, and are not convenient for the succession command post to respond in time in an emergency, and find the best succession plan in the shortest time.
[0005] In view of this, how to provide a method for taking over command so that the takeover plan can be adaptively adjusted according to actual conditions has become a technical problem that urgently needs to be solved. Summary of the invention
[0006] The embodiments of the present application provide a succession command method based on a hierarchical analysis method, a succession command device based on a hierarchical analysis method, an electronic device and a computer storage medium, which are used to solve the problem of poor adaptive adjustment of current succession schemes.
[0007] In a first aspect of an embodiment of the present application, a method for taking over command based on a hierarchical analysis method is provided, comprising:
[0008] Based on the task characteristics and action plan corresponding to the target task sent by the user terminal, a succession plan is made, and based on the succession command plan, a succession plan library is generated, wherein the succession plan library carries command post backup succession, data center backup succession and assigned succession;
[0009] Based on the scheme evaluation indicators input by the user end, an indicator evaluation system for the succession scheme is constructed, wherein the scheme evaluation indicators include response time, data synchronization time, and the scope of influence of the transfer of command relations;
[0010] Based on the succession plan library and the indicator evaluation system, a hierarchical model is constructed, wherein the hierarchical model is composed of a target layer, a criterion layer and a scheme layer. The target layer is the goal of decision-making and generates a target succession scheme; the criterion layer carries the scheme evaluation indicators that affect the succession command; the scheme layer is an alternative command succession plan;
[0011] Based on the criterion layer and the solution layer of the hierarchical structure model, the target task is analyzed to determine the target succession solution corresponding to the target layer.
[0012] Optionally, the analyzing the target task based on the criterion layer and the solution layer of the hierarchical structure model to determine the target succession solution corresponding to the target layer includes:
[0013] Based on the evaluation index of the scheme affecting the succession of command carried by the criterion layer in the hierarchical structure and the alternative command succession plans carried by the plan layer, the importance of each factor in the criterion layer in the hierarchical structure model to each plan in the plan layer is determined in a quantitative manner, and a judgment matrix is generated based on the importance;
[0014] Based on the maximum eigenvalue of the judgment matrix, the weight corresponding to each of the scheme evaluation indicators is calculated to generate a hierarchical single ranking;
[0015] Calculating a consistency index based on the maximum eigenvalue and the order corresponding to the judgment matrix, and calculating a consistency ratio based on a random consistency index and the consistency index;
[0016] Based on the hierarchical single ranking, the consistency index and the consistency ratio, determine the relative importance weight of the elements carried by each layer in the hierarchical structure model to the upper layer, and generate a hierarchical total ranking;
[0017] Based on the total order of the levels, a target succession plan corresponding to the target layer is determined.
[0018] Optionally, the importance level includes equally important, slightly important, relatively important, strongly important, extremely important, and an intermediate value between two adjacent judgments.
[0019] The evaluation index of the scheme affecting the succession of command carried by the criterion layer in the hierarchical structure and the alternative command succession plan carried by the plan layer, and the importance of each factor of the criterion layer in the hierarchical structure model to each plan at the plan layer are determined in a quantitative manner, including:
[0020] Based on the evaluation index of the scheme affecting the succession of command carried by the criterion layer, the scale values of the two factors are calculated based on the target formula;
[0021] Based on the scale value, determine the importance of each factor at the criterion layer in the hierarchical model to each solution at the solution layer, wherein the scale value corresponds to the importance, including a first scale value, a second scale value, a third scale value, a fourth scale value, a fifth scale value and a sixth scale value.
[0022] In a second aspect of the embodiment of the present application, a succession command device based on a hierarchical analysis method is provided, comprising:
[0023] The making module is configured to make a succession plan based on the task characteristics and action plan corresponding to the target task sent by the user terminal, and generate a succession plan library based on the succession command plan, wherein the succession plan library carries command post backup succession, data center backup succession and assigned succession;
[0024] The first building module is configured to build an indicator evaluation system for the succession plan based on the plan evaluation indicators input by the user end, wherein the plan evaluation indicators carry response time, data synchronization time, and the scope of influence of the transfer of command relations;
[0025] The second construction module is configured to construct a hierarchical model based on the succession plan library and the indicator evaluation system, wherein the hierarchical model is composed of a target layer, a criterion layer and a scheme layer, the target layer is the goal of decision-making, and generates a target succession plan; the criterion layer carries the scheme evaluation index that affects the succession command; the scheme layer is an alternative command succession plan;
[0026] The determination module is configured to analyze the target task based on the criterion layer and the solution layer of the hierarchical model, and determine the target succession solution corresponding to the target layer.
[0027] According to a third aspect of an embodiment of the present application, a computing device is provided, including:
[0028] Memory and processor;
[0029] The memory is used to store computer executable instructions, and the processor is used to execute the computer executable instructions. When the computer executable instructions are executed by the processor, the steps of the above-mentioned succession command method based on the hierarchical analysis method are implemented.
[0030] According to a fourth aspect of an embodiment of the present application, a computer-readable storage medium is provided, which stores computer-executable instructions, and when the instructions are executed by a processor, the steps of the above-mentioned succession command method based on the hierarchical analysis method are implemented.
[0031] The present application provides a method for succession command based on a hierarchical analysis method, comprising: first, making a succession plan based on the task characteristics and action plan corresponding to the target task sent by the user end, and generating a succession plan library based on the succession command plan, wherein the succession plan library carries command post backup succession, data center backup succession and assigned succession; then, constructing an index evaluation system for the succession plan based on the scheme evaluation index input by the user end, wherein the scheme evaluation index carries response time, data synchronization time, and command relationship transfer influence scope; secondly, constructing a hierarchical model based on the succession plan library and the index evaluation system, wherein the hierarchical model consists of a target layer, a criterion layer and a scheme layer, wherein the target layer is the target of decision-making, and generates a target succession plan; the criterion layer carries the scheme evaluation index affecting the succession command; the scheme layer is an alternative command succession plan; finally, based on the criterion layer and the scheme layer of the hierarchical model, the target task is analyzed to determine the target succession plan corresponding to the target layer.
[0032] By applying the succession command method based on the hierarchical analysis method provided in the embodiment of the present application, on the one hand, the commander can pre-select the factors that affect the formulation of the succession plan, form a hierarchical structure, personalize the influencing factors that decision makers are concerned about, conduct quantitative analysis on the decision-making process of the succession plan formulation, and construct a judgment matrix, which provides a data basis for the selection of the succession plan; on the other hand, it is possible to perform a pairwise comparison of the importance between the considerations and the alternative plans to form a judgment matrix, normalize and sort the importance results, and obtain a solution based on the sorting results, which can increase the participation of decision makers and formulate practical and efficient succession plans as needed.
[0033] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, which can be implemented in accordance with the contents of the specification, and in order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0035] Figure 1 A flowchart of a method for taking over command based on a hierarchical analysis method provided in an embodiment of the present application;
[0036] Figure 2 A schematic diagram of the structure of a hierarchical model in a command succession method based on a hierarchical analysis method provided in an embodiment of the present application;
[0037] Figure 3 A designated flow chart of a method for taking over command based on a hierarchical analysis method provided in an embodiment of the present application;
[0038] Figure 4 A schematic diagram of the structure of a succession command device based on a hierarchical analysis method provided in an embodiment of the present application;
[0039] Figure 5 A structural block diagram of a computing device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0040] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0041] See also Figure 1 , Figure 1 The following is a flow chart of a method for taking over command based on the hierarchical analysis method provided in the embodiment of the present application. Figure 1 As shown, the specific steps include the following steps.
[0042] It should be noted that the succession command here refers to the normal operation of the command system. For the scenario where the operating node is damaged or the operating system can no longer work normally, the steps and processes for the development of the succession plan are designed. The development of the succession plan aims to complete the effective succession work in the shortest time in a timely manner in response to an emergency situation to ensure the normal operation of the entire command system.
[0043] The analytic hierarchy process (AHP) refers to a decision-making method that decomposes elements related to decision-making into levels such as goals, criteria, and plans, and conducts qualitative and quantitative analysis on this basis.
[0044] Step S102: Based on the task characteristics and action plan corresponding to the target task sent by the user terminal, a succession plan is prepared, and based on the succession command plan, a succession plan library is generated, wherein the succession plan library carries command post backup succession, data center backup succession and assigned succession.
[0045] In actual application, a succession plan library is established to integrate the technical knowledge of succession command. Currently, there are three types of succession plans. Commanders can prepare succession plans in advance according to the mission characteristics and action plans to form a succession plan library. It should be noted that the succession plans here include command post backup succession, data center backup succession, and assigned succession.
[0046] Step S104: constructing an indicator evaluation system for the succession plan based on the plan evaluation indicators input by the user, wherein the plan evaluation indicators include response time, data synchronization time, and the scope of influence of the transfer of command relations.
[0047] In actual applications, an evaluation index library is established, and commanders can manually input plan evaluation indicators (such as response time, data synchronization time, scope of impact of command relationship transfer, etc.) to build an indicator evaluation system for succession plans.
[0048] Step S106: Based on the succession plan library and the indicator evaluation system, a hierarchical model is constructed, wherein the hierarchical model consists of a target layer, a criterion layer and a scheme layer, wherein the target layer is the goal of decision-making and generates a target succession scheme; the criterion layer carries scheme evaluation indicators that affect succession command; and the scheme layer is an alternative command succession plan.
[0049] In practical applications, a hierarchical model is established to define the objects of each layer of the structure model. In the embodiment of the present application, the target layer is the goal of decision-making, that is, the optimal succession plan; the criterion layer is the factors to be considered, that is, the factors that affect the succession of command when the decision maker decides that the system fails; the response time of the system, the time for data to synchronize to the succession node, and the command node affected by the transfer of the succession command relationship; the plan layer is the alternative command succession plan. Figure 2 , Figure 2 A schematic diagram of the structure of a hierarchical model in a succession command method based on a hierarchical analysis method provided in an embodiment of the present application.
[0050] Step S108: Based on the criterion layer and the solution layer of the hierarchical structure model, the target task is analyzed to determine the target succession solution corresponding to the target layer.
[0051] In an embodiment of the present application, the target task is analyzed based on the criterion layer and the solution layer of the hierarchical model to determine the target succession plan corresponding to the target layer, including: based on the plan evaluation index affecting the succession command carried by the criterion layer in the hierarchical structure, and the alternative command succession plan carried by the solution layer, the importance of each factor in the criterion layer in the hierarchical model to each plan in the solution layer is determined in a quantitative manner, and a judgment matrix is generated based on the importance; based on the maximum eigenvalue of the judgment matrix, the weight corresponding to each of the plan evaluation indicators is calculated to generate a hierarchical single ranking; based on the maximum eigenvalue and order corresponding to the judgment matrix, a consistency index is calculated, and based on the random consistency index and the consistency index, a consistency ratio is calculated; based on the hierarchical single ranking, the consistency index and the consistency ratio, the relative importance weight of the elements carried by each layer in the hierarchical model to the upper layer is determined to generate a hierarchical total ranking; based on the hierarchical total ranking, the target succession plan corresponding to the target layer is determined.
[0052] It should be noted that the degree of importance here includes equal importance, slightly important, relatively important, strongly important, extremely important, and the middle value between two adjacent judgments.
[0053] Among them, based on the evaluation index of the plan affecting the succession of command carried by the criterion layer in the hierarchical structure, and the alternative command succession plans carried by the plan layer, the importance of each factor in the criterion layer in the hierarchical structure model to each plan in the plan layer is determined in a quantitative manner, including: based on the evaluation index of the plan affecting the succession of command carried by the criterion layer, based on the target formula, calculating the scale value of each factor in the criterion layer in the hierarchical structure model based on the scale value to each plan in the plan layer, wherein the scale value corresponds to the importance, including a first scale value, a second scale value, a third scale value, a fourth scale value, a fifth scale value and a sixth scale value.
[0054] In practical applications, a judgment matrix is constructed to determine the weights between factors. The evaluation method of the present invention compares the factors in pairs in a quantitative manner, such as comparing the lower-layer schemes of a certain factor in the middle layer in pairs, and assessing the level according to their importance to form a judgment matrix.
[0055] Specifically, the importance of each factor is calculated using the following formula.
[0056]
[0057] Among them, α ij is the comparison result of the importance of factor i and factor j, and the judgment matrix element α ij The scaling method is as follows:
[0058] Table 11-9 degree scale table
[0059]
[0060] In the present application embodiment, Figure 2 For example, for each solution at the solution level, the evaluation indicators at the criterion level are compared pairwise to form a judgment matrix A (.) =(α ij ) 3*3 .
[0061] According to the judgment matrix, the weight of each indicator is calculated. max The corresponding eigenvector W is obtained and normalized to form the weight of each evaluation index, forming a hierarchical single ranking.
[0062] The weight of the feature vector W is expressed as: W = W = [w1, w2, ..., w n ] T .
[0063] The consistency index CI is calculated as follows:
[0064] Among them, λ max is the matrix (a ij ) n*n The maximum eigenvalue of , n is the order of the judgment matrix, and the RI value is determined by querying the average random consistency index according to the order.
[0065] Table 2 Reference table of average random consistency index RΙ standard value
[0066]
[0067] The consistency ratio is calculated as follows:
[0068] Among them, CI (Consistency Index) is the consistency index, RI (Random Index) is the random consistency index, and CR (Consistency Ratio) is the consistency ratio. If CR<0.1, the index ranking is reasonable. If CR≥0.1, the matrix needs to be readjusted.
[0069] From the highest level to the lowest level, the weights of all factors in each level with respect to the relative importance of the previous level are calculated to form a total hierarchical ranking.
[0070] Based on the hierarchical total ranking results, the optimal succession plan based on the commander's wishes is screened out.
[0071] Figure 3A designated flow chart of a succession command method based on a hierarchical analysis method is provided in an embodiment of the present application.
[0072] like Figure 3 As shown in the figure, firstly, a succession plan library is constructed; then, an evaluation index library is constructed. When the command node is unavailable, the AHP algorithm is used to analyze and select the succession plan.
[0073] The specific implementation method of the AHP algorithm here is: first establish a hierarchical model; then construct a judgment matrix; secondly generate a hierarchical single ranking and its consistency test; thirdly generate a hierarchical total ranking and its consistency test; finally, select a successor plan based on the total ranking.
[0074] The embodiment of the present application uses a hierarchical analysis method to perform a hierarchical analysis on three succession plans (i.e., customization of succession command influencing factors, succession command hierarchical analysis model, and succession command plan adaptive adjustment mechanism), disassembles system problems, and based on the factors that decision makers need to consider, when the command node is damaged, quickly analyzes an efficient succession plan based on pre-established rules, thereby realizing the process of intelligent selection of succession plans and achieving seamless succession. At the same time, decision makers can independently set the elements of each layer in the hierarchical structure and integrate the decision makers' ideas into the formulation of succession plans. The present invention solves the problem that the current command system can only pre-specify succession plans and cannot automatically match succession plans according to on-site emergency situations.
[0075] By applying the method proposed in the embodiment of the present application, on the one hand, commanders can pre-select factors that affect the formulation of succession plans, form a hierarchical structure, personalize the influencing factors that decision makers are concerned about, conduct quantitative analysis on the decision-making process of succession plan formulation, and construct a judgment matrix, thereby providing a data basis for the selection of succession plans. On the other hand, they can perform pairwise comparisons of importance between considerations and alternative plans to form a judgment matrix, normalize and rank the importance results, and obtain a solution based on the ranking results, thereby increasing the participation of decision makers and formulating practical and efficient succession plans as needed.
[0076] Corresponding to the above method embodiment, this specification also provides an embodiment of a command succession device based on a hierarchical analysis method. Figure 4 The following is a schematic diagram of a structure of a command succession device based on a hierarchical analysis method provided in an embodiment of the present application. Figure 4 As shown, the device comprises:
[0077] The making module 402 is configured to make a succession plan based on the task characteristics and action plan corresponding to the target task sent by the user terminal, and generate a succession plan library based on the succession command plan, wherein the succession plan library carries command post backup succession, data center backup succession and assigned succession;
[0078] The first construction module 404 is configured to construct an indicator evaluation system for the succession plan based on the plan evaluation indicators input by the user end, wherein the plan evaluation indicators include response time, data synchronization time, and the scope of influence of the transfer of command relations;
[0079] The second construction module 406 is configured to construct a hierarchical model based on the succession plan library and the indicator evaluation system, wherein the hierarchical model is composed of a target layer, a criterion layer and a scheme layer, wherein the target layer is a decision-making target and generates a target succession scheme; the criterion layer carries a scheme evaluation index that affects the succession command; and the scheme layer is an alternative command succession plan;
[0080] The determination module 408 is configured to analyze the target task based on the criterion layer and the solution layer of the hierarchical structure model, and determine the target succession solution corresponding to the target layer.
[0081] In an optional embodiment, the determining module 408 is further configured to:
[0082] Based on the evaluation index of the scheme affecting the succession of command carried by the criterion layer in the hierarchical structure and the alternative command succession plans carried by the plan layer, the importance of each factor in the criterion layer in the hierarchical structure model to each plan in the plan layer is determined in a quantitative manner, and a judgment matrix is generated based on the importance;
[0083] Based on the maximum eigenvalue of the judgment matrix, the weight corresponding to each of the scheme evaluation indicators is calculated to generate a hierarchical single ranking;
[0084] Calculating a consistency index based on the maximum eigenvalue and the order corresponding to the judgment matrix, and calculating a consistency ratio based on a random consistency index and the consistency index;
[0085] Based on the hierarchical single ranking, the consistency index and the consistency ratio, determine the relative importance weight of the elements carried by each layer in the hierarchical structure model to the upper layer, and generate a hierarchical total ranking;
[0086] Based on the total order of the levels, a target succession plan corresponding to the target layer is determined.
[0087] In an optional embodiment, the determining module 408 is further configured to:
[0088] Based on the evaluation index of the scheme affecting the succession of command carried by the criterion layer, the scale values of the two factors are calculated based on the target formula;
[0089] Based on the scale value, determine the importance of each factor at the criterion layer in the hierarchical model to each solution at the solution layer, wherein the scale value corresponds to the importance, including a first scale value, a second scale value, a third scale value, a fourth scale value, a fifth scale value and a sixth scale value.
[0090] By using the device proposed in the embodiment of the present application, on the one hand, the commander can pre-select factors that affect the formulation of succession plans, form a hierarchical structure, personalize the influencing factors that decision makers are concerned about, conduct quantitative analysis on the decision-making process of succession plan formulation, and construct a judgment matrix, thereby providing a data basis for the selection of succession plans. On the other hand, it is possible to perform a pairwise comparison of the importance of the considerations and alternative plans to form a judgment matrix, normalize and sort the importance results, and obtain a solution based on the sorting results, thereby increasing the participation of decision makers and formulating practical and efficient succession plans as needed.
[0091] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the succession command device based on the hierarchical analysis method, since it is basically similar to the succession command method embodiment based on the hierarchical analysis method, the description is relatively simple, and the relevant parts can be referred to the partial description of the succession command method embodiment based on the hierarchical analysis method.
[0092] Figure 5 This is a block diagram of a computing device provided in an embodiment of the present application. The components of the computing device 500 include but are not limited to a memory 510 and a processor 520. The processor 520 is connected to the memory 510 via a bus 530, and the database 550 is used to store data.
[0093] The computing device 500 also includes an access device 540, which enables the computing device 500 to communicate via one or more networks 560. Examples of these networks include a public switched telephone network (PSTN), a local area network (LAN), a wide area network (WAN), a personal area network (PAN), or a combination of communication networks such as the Internet. The access device 540 may include one or more of any type of network interface (e.g., a network interface card (NIC)) of wired or wireless, such as an IEEE 802.11 wireless local area network (WLAN) wireless interface, a world-wide interoperability for microwave access (Wi-MAX) interface, an Ethernet interface, a universal serial bus (USB) interface, a cellular network interface, a Bluetooth interface, and a near field communication (NFC).
[0094] In one embodiment of the present specification, the above components of the computing device 500 and Figure 5 Other components not shown in the figure may also be connected to each other, for example, via a bus. It should be understood that Figure 5 The computing device structure block diagram shown is only for the purpose of illustration, and is not intended to limit the scope of this specification. Those skilled in the art can add or replace other components as needed.
[0095] The computing device 500 may be any type of stationary or mobile computing device, including a mobile computer or mobile computing device (e.g., a tablet computer, a personal digital assistant, a laptop computer, a notebook computer, a netbook, etc.), a mobile phone (e.g., a smart phone), a wearable computing device (e.g., a smart watch, smart glasses, etc.), or other types of mobile devices, or a stationary computing device such as a desktop computer or a personal computer (PC). The computing device 500 may also be a mobile or stationary server.
[0096] The processor 520 is used to execute the following computer executable instructions, which, when executed by the processor, implement the steps of the above-mentioned succession command method based on the hierarchical analysis method.
[0097] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the computing device embodiment, since it is basically similar to the embodiment of the succession command method based on the hierarchical analysis method, the description is relatively simple, and the relevant parts can be referred to the partial description of the embodiment of the succession command method based on the hierarchical analysis method.
[0098] An embodiment of the present specification also provides a computer-readable storage medium storing computer-executable instructions, which, when executed by a processor, implement the steps of the above-mentioned command succession method based on the hierarchical analysis method.
[0099] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the computer-readable storage medium embodiment, since it is basically similar to the embodiment of the succession command method based on the hierarchical analysis method, the description is relatively simple, and the relevant parts can be referred to the partial description of the embodiment of the succession command method based on the hierarchical analysis method.
[0100] An embodiment of the present specification also provides a computer program, wherein when the computer program is executed in a computer, the computer is caused to execute the steps of the above-mentioned succession command method based on the hierarchical analysis method.
[0101] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the computer program embodiment, since it is basically similar to the embodiment of the succession command method based on the hierarchical analysis method, the description is relatively simple, and the relevant parts can be referred to the partial description of the embodiment of the succession command method based on the hierarchical analysis method.
[0102] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0103] The computer instructions include computer program codes, which may be in source code form, object code form, executable files or some intermediate forms, etc. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium, etc. It should be noted that the content contained in the computer-readable medium may be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.
[0104] It should be noted that the above is a description of a specific embodiment of the present specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the embodiments of the present specification.
[0105] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0106] The preferred embodiments of this specification disclosed above are only used to help explain this specification. The optional embodiments do not describe all the details in detail, nor do they limit the invention to only the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of the embodiments of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the embodiments of this specification, so that technicians in the relevant technical field can well understand and use this specification. This specification is only limited by the claims and their full scope and equivalents.
Claims
1. A succession command method based on hierarchical analysis method, characterized in that: include: Based on the task characteristics and action plan corresponding to the target task sent by the user terminal, a succession plan is made, and based on the succession command plan, a succession plan library is generated, wherein the succession plan library carries command post backup succession, data center backup succession and assigned succession; Based on the scheme evaluation indicators input by the user end, an indicator evaluation system for the succession scheme is constructed, wherein the scheme evaluation indicators include response time, data synchronization time, and the scope of influence of the transfer of command relations; Based on the succession plan library and the indicator evaluation system, a hierarchical model is constructed, wherein the hierarchical model is composed of a target layer, a criterion layer and a scheme layer. The target layer is the goal of decision-making and generates a target succession scheme; the criterion layer carries the scheme evaluation indicators that affect the succession command; the scheme layer is an alternative command succession plan; Based on the criterion layer and the solution layer of the hierarchical structure model, the target task is analyzed to determine the target succession solution corresponding to the target layer.
2. The method according to claim 1, characterized in that The step of analyzing the target task based on the criterion layer and the solution layer of the hierarchical structure model to determine the target succession solution corresponding to the target layer includes: Based on the evaluation index of the scheme affecting the succession of command carried by the criterion layer in the hierarchical structure and the alternative command succession plans carried by the plan layer, the importance of each factor in the criterion layer in the hierarchical structure model to each plan in the plan layer is determined in a quantitative manner, and a judgment matrix is generated based on the importance; Based on the maximum eigenvalue of the judgment matrix, the weight corresponding to each of the scheme evaluation indicators is calculated to generate a hierarchical single ranking; Calculating a consistency index based on the maximum eigenvalue and the order corresponding to the judgment matrix, and calculating a consistency ratio based on a random consistency index and the consistency index; Based on the hierarchical single ranking, the consistency index and the consistency ratio, determine the relative importance weight of the elements carried by each layer in the hierarchical structure model to the upper layer, and generate a hierarchical total ranking; Based on the total order of the levels, a target succession plan corresponding to the target layer is determined.
3. The method according to claim 2, characterized in that The importance levels include equally important, slightly important, relatively important, strongly important, extremely important, and the middle value between two adjacent judgments. The evaluation index of the scheme affecting the succession of command carried by the criterion layer in the hierarchical structure and the alternative command succession plan carried by the plan layer, and the importance of each factor of the criterion layer in the hierarchical structure model to each plan at the plan layer are determined in a quantitative manner, including: Based on the evaluation index of the scheme affecting the succession of command carried by the criterion layer, the scale values of the two factors are calculated based on the target formula; Based on the scale value, determine the importance of each factor at the criterion layer in the hierarchical model to each solution at the solution layer, wherein the scale value corresponds to the importance, including a first scale value, a second scale value, a third scale value, a fourth scale value, a fifth scale value and a sixth scale value.
4. A succession command device based on hierarchical analysis method, characterized in that: include: The making module is configured to make a succession plan based on the task characteristics and action plan corresponding to the target task sent by the user terminal, and generate a succession plan library based on the succession command plan, wherein the succession plan library carries command post backup succession, data center backup succession and assigned succession; The first building module is configured to build an indicator evaluation system for the succession plan based on the plan evaluation indicators input by the user end, wherein the plan evaluation indicators carry response time, data synchronization time, and the scope of influence of the transfer of command relations; The second construction module is configured to construct a hierarchical model based on the succession plan library and the indicator evaluation system, wherein the hierarchical model is composed of a target layer, a criterion layer and a scheme layer, the target layer is the goal of decision-making, and generates a target succession plan; the criterion layer carries the scheme evaluation index that affects the succession command; the scheme layer is an alternative command succession plan; The determination module is configured to analyze the target task based on the criterion layer and the solution layer of the hierarchical model, and determine the target succession solution corresponding to the target layer.
5. A computer device, characterized in that: The computer device comprises: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program implements the steps of the method according to any one of claims 1 to 3 when executed by the processor.
6. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores an implementation program for information transmission, and when the program is executed by a processor, the steps of the method according to any one of claims 1 to 3 are implemented.