Automatic loading and delivering system for high-titanium blast furnace slag building aggregate
By designing a high-titanium blast furnace slag construction aggregate automatic loading and delivery system integrating silo fabric, vehicle identification, material discharge, weight calculation and settlement, the high-titanium blast furnace slag construction aggregate delivery process is solved. This has problems such as safety hazards, inaccurate loading and slow delivery, achieving efficient and safe automatic loading and delivery.
Patent Information
- Application Number
- CN202411828214.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-12
- Publication Date
- 2025-02-14
AI Technical Summary
There are safety hazards during the delivery process of high-titanium blast furnace slag construction aggregates, inaccurate loading, slow delivery speed, and blocked loading vehicles. The loader driver's skill requirements are high and there is a shortage of personnel.
Design a high-titanium blast furnace slag building aggregate automatic loading and delivery system, integrating aggregate silo fabric, vehicle identification, material discharge, weight counting and settlement, and realize unmanned automatic loading through the PLC control system.
It greatly improves shipment efficiency, realizes precise loading, avoids the safety risks of manual loading vehicles, and reduces the phenomenon of loading vehicles.
Smart Images

Figure CN119429738A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of high-titanium blast furnace slag building aggregate transportation, in particular to an automatic loading and delivery system for high-titanium blast furnace slag building aggregate. Background Art
[0002] Due to the large quantity and low added value of high-titanium blast furnace slag building aggregates, they are generally shipped by loaders, which are directed by people and cross-operated by people and machines, posing great safety hazards. In addition, since the loader has no metering device, it is easy to under-load or over-load when loading and weighing. If it is over-loaded, it must be unloaded, and if it is under-loaded, it must be reloaded. It takes many trips to send a truckload of goods, resulting in very slow delivery. At the same time, due to the large quantity of high-titanium blast furnace slag building aggregates and the slow delivery speed, loading trucks are often blocked in long queues. In addition, loader drivers are also special jobs that require high skills and cultural level of operators, and there is a shortage of personnel. Summary of the invention
[0003] The purpose of the present invention is to provide an automatic loading and delivery system for high-titanium blast furnace slag building aggregates, which integrates silo material distribution, vehicle identification, material discharge, weight measurement and settlement. The whole process realizes unmanned automatic loading, greatly improves the delivery efficiency, accurately loads materials, and effectively avoids the safety risks of manual loading.
[0004] According to one purpose of the present invention, the present invention provides an automatic loading and shipping system for high-titanium blast furnace slag building aggregates, comprising a silo, a discharge assembly arranged below the silo, a metering and weighing assembly located below the silo, and a PLC control system respectively connected to the discharge assembly and the metering and weighing assembly for communication; a license plate number recognition rod is provided at the head end of the metering and weighing assembly, the license plate number recognition rod is connected to the PLC control system for communication, and the basic information of the vehicle, the required loading goods and the pick-up information are determined through the vehicle license plate recognition.
[0005] Furthermore, a silo feeding and distributing belt is provided on the top of the silo.
[0006] Furthermore, a vehicle type identification component is provided below the silo, and the vehicle type identification component is communicatively connected with the PLC control system.
[0007] Furthermore, the discharge component includes a discharge port arranged below the silo and a discharge valve arranged on the discharge port, the discharge valve is communicatively connected with the PLC control system, and the vehicle type identification component identifies the length of the cargo bin to determine the number of the discharge valves.
[0008] Furthermore, the metering weighing assembly includes a weighing plate, a support group arranged below the weighing plate, and a weight sensor located below the support group, and the weight sensor is communicatively connected to the PLC control system.
[0009] Furthermore, it also includes a settlement system for billing, and the settlement system is communicatively connected with the PLC control system.
[0010] Furthermore, shooting cameras are respectively arranged at the vehicle entrance and the vehicle exit of the measuring and weighing assembly below the silo, and the shooting cameras are communicatively connected with the image recognition module of the PLC control system.
[0011] Furthermore, a positioning device is also provided above the vehicle type identification component, and the positioning device cooperates with the vehicle type identification component and is respectively communicatively connected with the PLC control system.
[0012] Furthermore, the discharge valve adopts a pneumatic jaw discharge valve and a safety valve.
[0013] Furthermore, a dust removal component is provided at the discharge port.
[0014] The technical solution of the present invention enables the loading vehicle to make an appointment according to the reservation procedure of the front end, identify the license plate number through the license plate number recognition rod, determine the name, quantity, model, etc. of the loaded product, and transmit the obtained information to the central control to guide the next step of operation. When the vehicle reaches the designated loading position, the discharge valve suitable for the model is opened according to the model recognition, and the discharge and metering are carried out simultaneously. When the metering reservation weight is accurately calculated, the discharge valve stops, and the weighing is carried out through the metering weighing component. The weighing information is transmitted to the back end of the PLC control system for settlement, and the settlement operation is carried out through the settlement system. After the settlement is completed, the system indicator light guides the vehicle to leave. The system integrates silo material distribution, vehicle identification, discharge, weighting, and settlement. The whole process realizes unmanned automatic loading, greatly improves the delivery efficiency, accurately loads, and effectively avoids the safety risks of manual loading. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 This is a schematic cross-sectional structure diagram of a single-channel and double-channel silo structure according to an embodiment of the present invention;
[0017] Figure 2This is a schematic diagram of the front structure of a dual-channel silo weighing assembly according to an embodiment of the present invention;
[0018] Figure 3 This is a top view comparing the single and double channels under the silo of the present invention.
[0019] Figure 4 This is a comparison chart of the effective loading volume of the single-channel and double-channel silos in the silo embodiment of the present invention.
[0020] Figure 5 This is a PLC control system association diagram of an embodiment of the present invention.
[0021] Figure 6 This is an automatic loading flow chart of an embodiment of the present invention.
[0022] In the figure: 1. Tilted silo feeding and distributing belt; 2. Horizontal silo feeding and distributing belt; 3. Silo; 4. Discharge port; 5. Discharging assembly; 6. Discharging valve; 7. Dust prevention device; 8. Measuring and weighing assembly; 9. Truck; 10. Confirmation rod; 11. Positioning assembly; 12. Vehicle type recognition assembly; 13. License plate number recognition rod; 14. Shooting camera; 15. Exhaust valve. DETAILED DESCRIPTION
[0023] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0025] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined. In addition, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0026] Example 1
[0027] like Figure 1 and Figure 2 As shown,
[0028] An automatic loading and delivery system for high-titanium blast furnace slag building aggregates includes a silo 3, a discharge assembly 5 arranged below the silo 3, a metering and weighing assembly 8 located on both sides below the silo 3, and a PLC control system. The PLC control system adopts a PLC central control machine or a DCS central control machine.
[0029] A confirmation rod 10 is provided in front of the vehicle entrance of the metering and weighing component 8. The driver confirms the entry and exit through the confirmation rod 10, and sends the instruction to the PLC control system. The PLC control system identifies the truck 9 that is about to enter and obtains the material order quantity of the truck 9, and controls the discharge component 5 to discharge the material in a quantitative manner.
[0030] A positioning component 11 and a vehicle type identification component 12 are also fixed below the silo 3 . The positioning component 11 and the vehicle type identification component 12 are respectively connected to the PLC control system for communication. The PLC control system combines the data of the positioning component 11 and the vehicle type identification component 12 . First, the positioning component 11 is divided into front and rear positioning. The front positioning mainly determines the position of the front and rear baffles of the car body. When the front baffle is blocked by a tarpaulin, it can effectively avoid unloading from the discharge port A. The rear detection component mainly determines whether the verification position of the vehicle rear baffle is consistent with the measurement of the vehicle model identification component 12, and at the same time determines whether the rear compartment is closed; second, the vehicle model identification component 12 divides 6 areas through 7 light sensors distributed on the channel. After the vehicle enters, the blocked part is the truck compartment, and the compartment size is obtained through the blocked part; third, combined with the video surveillance on the top of the vehicle, the simulation molding inside the computer is referenced with the landmark; fourth, through the entry of the vehicle license plate in the early stage, the number of vehicle axles is generated in the system, the vehicle length information is determined, and the vehicle information is identified. The truck size is accurately determined by the above identification and judgment method, and then the discharge amount is obtained. It is automatically matched with the discharge, and the discharge port A, B, C, D, E, F is automatically selected to carry out the subsequent discharge and loading work.
[0031] The vehicle type identification component 12 and the positioning component 11 are used to accurately identify the vehicle position, cargo box length, and loading height information. After the communication information is processed, the material discharge component 5 is used to quantitatively discharge the materials in the silo 3. The weighing component 8 is used to weigh the materials discharged into the truck 9, and the discharge is stopped when the specified weight is reached. In this process, the PLC control system automatically calibrates the time schedule of the discharge amount through the accuracy of the discharge once, and the accuracy of the discharge is controlled within 100 kilograms. Through the comparison correction algorithm in the control system, the deviation value of the last discharge is compared with the deviation value of this discharge, and the discharge accuracy value is continuously corrected by continuously initializing the discharge setting value.
[0032] A license plate number recognition rod 13 is provided in front of the weighing component 8, and the license plate number recognition rod 13 is connected to the PLC control system for communication. The license plate number recognition rod 13 is used to recognize the license plate number of the truck entering the bottom of the silo 1, and then transmit the license plate number information to the PLC control system, and the PLC control system recognizes the truck that is about to enter and obtains the material order quantity of the truck to control the discharge component 5 to discharge quantitatively.
[0033] A shooting camera 14 is also fixed on the front and rear side walls of the silo 3. The shooting camera 14 is communicatively connected to the image recognition module of the PLC control system. The loading status of the truck is photographed in real time by the shooting camera 14 and the image information is transmitted to the image recognition module of the PLC control system for recognition, and then analyzed and processed by the PLC control system.
[0034] The silo 3 is used to store high-titanium blast furnace slag building aggregates. The top of the silo is provided with an inclined silo feeding and distributing belt 1 and a horizontal silo feeding and distributing belt 2. The high-titanium blast furnace slag building aggregates can be transported into the silo 3 for storage through the inclined silo feeding and distributing belt 1 and the horizontal silo feeding and distributing belt 2. An exhaust valve 15 is provided at the top of the silo 3.
[0035] The discharge assembly 5 includes a discharge port 4 arranged below the silo 3 and a discharge valve 6 arranged on the discharge port 4, and the discharge valve 6 is connected to the PLC control system. The discharge valve 6 adopts a pneumatic jaw discharge valve, and the opening and closing of the discharge valve 6 is controlled by the PLC control system to realize quantitative discharge.
[0036] The metering weighing assembly 8 includes a weighing plate, a support group arranged below the weighing plate, and a weight sensor located below the support group. The weight sensor is connected to the PLC control system for communication. During the discharge process, the weight of the material entering the truck is sensed by the weight sensor, and the weight of the material entering the truck is obtained by subtracting the weight of the truck and the weight of the weighing plate from the total weight. After the weight sensor transmits the signal to the PLC control system, the PLC control system controls the opening of the discharge valve 6 to discharge the material from the silo 3. When the predetermined weight is reached, the PLC control system issues a stop command to the discharge valve 6 to complete the discharge operation. The PLC control system performs a precise test of this discharge. If the discharge amount does not reach the set value, the PLC control system calculates the refilling time and corrects the pre-discharge time.
[0037] In order to facilitate the settlement of fees, a settlement system for billing is also included, and the settlement system is connected to the PLC control system. The settlement system adopts the existing design, and integrates the settlement system with material discharge and weight counting, which greatly improves the overall work efficiency.
[0038] In order to prevent the dust generated during the discharge process from affecting the surrounding working environment, in the present invention, a dust prevention device 7 is provided at the discharge port 4. When the PLC control system issues a discharge instruction, the dust removal spray device is first allowed to work for 3 seconds to ensure that the loading process is environmentally friendly and controllable.
[0039] like Figure 3 As shown in the figure, in this embodiment, the top view of the 10m and 5m platforms of the silo is shown. In this embodiment, the truck channel under the silo is optimized, wherein the left part (I) adopts a double channel design, and the right part (II) adopts a single channel design. Both schemes have application cases. The double channel design is used to increase the bottom discharge area on the 10m platform, and less dead material is formed inside the aggregate silo. Figure 4 As shown, the double channel can increase the effective volume inside the aggregate bin by 34% compared with the single channel.
[0040] like Figure 5As shown, a schematic diagram of the connection relationship between each functional component and the PLC control system in this embodiment is given, and the actions of each functional component in this embodiment are controlled by the PLC control system.
[0041] like Figure 6 As shown, the automatic loading flow chart of this embodiment is given. The automatic loading and delivery system of high-titanium blast furnace slag building aggregate of the present invention has a reliable structure and good performance. Through this system, the loading vehicle makes an appointment according to the front-end appointment procedure, and the license plate number is identified by the license plate number recognition rod to determine the name, quantity, model, etc. of the loaded product, and the obtained information is transmitted to the central control to guide the next step of operation. When the vehicle reaches the designated loading position, the discharge valve suitable for the model is opened according to the model identification. The discharge and metering are carried out simultaneously. When the metering reservation weight is accurately calculated, the discharge valve stops, and the weighing is carried out through the metering weighing component. The weighing information is transmitted to the back end of the PLC control system for settlement, and the settlement operation is carried out through the settlement system. After the settlement is completed, the system indicator light guides the vehicle to leave. The system integrates silo material distribution, vehicle identification, discharge, weighting, and settlement. The whole process realizes unmanned automatic loading, greatly improves the delivery efficiency, accurately loads, and effectively avoids the safety risks of manual loading.
[0042] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. An automatic loading and delivery system for high-titanium blast furnace slag building aggregates, characterized in that: It includes a silo, a discharge assembly arranged below the silo, a metering and weighing assembly located below the silo, and a PLC control system respectively connected to the discharge assembly and the metering and weighing assembly; a license plate number recognition rod is arranged at the head end of the metering and weighing assembly, and the license plate number recognition rod is connected to the PLC control system, and vehicle information, required loading and delivery information are determined through the vehicle license plate recognition rod.
2. The automatic loading and delivery system for high-titanium blast furnace slag building aggregate according to claim 1 is characterized in that: A silo feeding and distributing belt is arranged on the top of the silo.
3. The automatic loading and delivery system for high-titanium blast furnace slag building aggregate according to claim 1 is characterized in that: A vehicle type identification component is arranged below the silo, and the vehicle type identification component is communicatively connected with the PLC control system.
4. The automatic loading and delivery system for high-titanium blast furnace slag building aggregate according to claim 3 is characterized in that: The discharge component includes a discharge port arranged below the silo and a discharge valve arranged on the discharge port, the discharge valve is communicatively connected with the PLC control system, and the vehicle type recognition component recognizes the length of the cargo bin and determines the number of the discharge valves to be opened in sequence.
5. The automatic loading and delivery system for high-titanium blast furnace slag building aggregate according to claim 1 is characterized in that: The metering weighing assembly includes a weighing plate, a support group arranged below the weighing plate, and a weight sensor located below the support group, and the weight sensor is communicatively connected with the PLC control system.
6. The automatic loading and delivery system for high-titanium blast furnace slag building aggregate according to claim 1 is characterized in that: It also includes a settlement system for billing, and the settlement system is communicatively connected with the PLC control system.
7. The automatic loading and delivery system for high-titanium blast furnace slag building aggregate according to claim 1 is characterized in that: Below the silo, shooting cameras are respectively arranged at the vehicle entrance and the vehicle exit of the measuring and weighing assembly, and the shooting cameras are communicatively connected with the image recognition module of the PLC control system.
8. The automatic loading and delivery system for high-titanium blast furnace slag building aggregate according to claim 3 is characterized in that: A positioning device is also arranged above the vehicle type identification component, and the positioning device cooperates with the vehicle type identification component and is respectively connected to the PLC control system for communication.
9. The automatic loading and delivery system for high-titanium blast furnace slag building aggregate according to claim 4 is characterized in that: The discharge valve adopts a pneumatic jaw discharge valve and a safety valve.
10. The automatic loading and delivery system for high-titanium blast furnace slag building aggregate according to claim 9, characterized in that: A dust removal component is arranged at the discharge port.