Large-scale test pool-reservoir-gallery circulating and dispatching system

By designing a large-scale test pool-reservoir-gazette circulation and scheduling system in the test pool, the problems of low water scheduling efficiency and poor adaptability of experimental requirements in traditional test pools are solved, and rapid and efficient water scheduling and experimental preparation are achieved, reducing the Energy consumption and operating costs, as well as foundation stability and space utilization.

CN119434427APending Publication Date: 2025-02-14TIANJIN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411911285.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-24
Publication Date
2025-02-14

AI Technical Summary

Technical Problem

Traditional test pools have problems such as low water scheduling efficiency, poor adaptability of experimental requirements, high energy consumption and operating costs, complex equipment maintenance and easy interruption of failures, low space utilization and insufficient foundation safety.

Method used

A large-scale test pool-reservoir-corridor circulation and scheduling system was designed, using a multi-channel system and a dynamic real-time control system. Through the layered design of internal and external reservoirs and upper and lower corridors, the water path and recycling are optimized to achieve rapid and efficient Water body dispatch and experimental preparation.

Benefits of technology

Improve the speed of water body scheduling and experimental preparation time, enhance experimental flexibility and adjustability, reduce energy consumption and operating costs, improve system reliability and fault adaptability, ensure foundation stability, and optimize space utilization rate and civil engineering cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119434427A_ABST
    Figure CN119434427A_ABST
Patent Text Reader

Abstract

The invention discloses a large test pool-reservoir-gallery circulating and dispatching system, and relates to the technical field of test pools. In the dispatching system, the bottom of a large-sized water tank is positioned in the center of the whole system and serves as a main storage and use area of an experimental water body; the inner reservoir and the outer reservoir are respectively positioned in inner and outer areas of the lower-layer annular backflow gallery and are connected through inner and outer reservoir channels, so that the water levels of the inner and outer reservoirs are always kept consistent; the lower-layer annular backflow gallery is arranged on the outer side of the inner reservoir and is used for storing and refluxing large-volume water; the water injection and drainage pump rooms are arranged on two sides of the water tank and are responsible for water injection and drainage; and the upper-layer gallery is arranged above the lower-layer gallery and provides a water body distribution channel. By designing the multi-channel system in which the upper and lower galleries are connected with the inner and outer reservoirs and the water pool, the water body path is optimized, the rapid and efficient scheduling of the water body is realized, different water level, water quantity and flow velocity requirements can be flexibly adapted, complex experiment conditions are met, and the experiment efficiency and precision are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of test water tanks, and in particular relates to a large test water tank-reservoir-corridor circulation and dispatching system. Background Art

[0002] In experimental research on civil engineering, hydraulic engineering and marine engineering, large test pools are important tools for simulating hydrodynamic characteristics, fluid motion laws and related phenomena. However, traditional test pools are usually single-channel pools, which have many problems in water scheduling: ① Low water scheduling efficiency: Due to the single-channel design of existing pools, the optimization of water scheduling paths is limited, resulting in complex paths, large hydraulic losses, slow speeds, and long switching time between pools and reservoirs when scheduling water flows, making it difficult to respond quickly to experimental needs; ② Poor adaptability to experimental needs: A single scheduling method lacks flexibility and cannot meet the rapid switching and diversified needs of experimental scenarios, such as the adjustment of different water levels, flow rates and water body distributions; ③ High energy consumption and operating costs: Traditional test pools usually rely on a single-direction pumping design, which results in serious energy waste and a low design. ④ Equipment failure affects the experiment: the redundant design of traditional test pool equipment is insufficient. Once the water pump or other key equipment fails, the experiment is easily interrupted; ⑤ Lack of recycling mechanism: In the existing scheme, the experimental water may be directly discharged into the external environment. The lack of recycling mechanism not only wastes water resources, but also significantly increases the cost of the experiment; ⑥ Low space utilization: The water storage and scheduling system of the pool occupies a large amount of ground or underground space, the civil engineering investment is large, and the structural layout is unreasonable; ⑦ Insufficient foundation safety: Frequent pumping and drainage operations will cause repeated changes in the foundation bearing pressure, which can easily cause uneven foundation settlement and affect the long-term stability and safety of the foundation.

[0003] Based on this, the present application proposes a large-scale test pool-reservoir-corridor circulation and scheduling system to solve the above technical problems. Summary of the invention

[0004] The present invention aims to provide a large-scale test water pool-reservoir-corridor circulation and scheduling system, which effectively solves the technical problems existing in the existing test water pools, such as low water scheduling efficiency, poor adaptability to experimental needs, high energy consumption and operating costs, complex equipment maintenance and easy interruption of experiments due to failures, low space utilization and insufficient foundation safety.

[0005] The present invention provides a large-scale test water pool-reservoir-corridor circulation and dispatching system, which adopts the following technical scheme: comprising a large-scale water pool bottom, an inner reservoir, an outer reservoir, inner and outer reservoir channels, a lower-layer annular return corridor, an injection and drainage pump house and an upper-layer corridor; The bottom of the large pool is located in the center of the entire system, the inner reservoir is arranged around the outside of the bottom of the large pool, the lower annular return corridor is arranged around the outside of the inner reservoir, and the outer reservoir is arranged around the outside of the lower annular return corridor; the inner reservoir and the outer reservoir are connected through the inner and outer reservoir channels; the injection and drainage pump house is set in the outer reservoir on both sides of the lower annular return corridor; The upper gallery is located above the lower annular return corridor and arranged along the outer side of the bottom of the large pool. The upper gallery is connected to the bottom of the large pool and the lower annular return corridor respectively to form a water distribution channel. The injection and drainage pump room includes injection equipment and drainage equipment. The injection equipment can inject water from the outer reservoir and the inner reservoir into the bottom of the large pool, and the drainage equipment can discharge water from the bottom of the large pool to the outer reservoir and the inner reservoir.

[0006] Preferably, the water injection equipment includes a water injection pump, a water injection pipe and a water injection valve, the water injection pump is connected to the water injection pipe, one end of the water injection pipe away from the water injection pump is connected to the top of the lower annular return corridor, and the water injection valve is arranged on the water injection pipe.

[0007] Preferably, the drainage equipment includes a drainage pipe and a drainage valve, one end of the drainage pipe is connected to the top of the external reservoir, and the other end is connected to the side wall of the lower annular recirculation gallery, and the drainage valve is arranged on the drainage pipe.

[0008] Preferably, a water tank level gauge is provided on the side wall of the bottom of the large water tank, a reservoir level gauge is provided on the outer side wall of the outer reservoir, and a gallery level gauge is provided on the inner side wall of the lower annular return gallery.

[0009] Preferably, the water injection pump adopts a down-suction submersible electric pump, and the water injection valve and the drainage valve both adopt electric butterfly valves and gate valves.

[0010] Preferably, the injection pumps are arranged in groups of three on both sides of the outer reservoir, and each injection pump is equipped with an injection valve; the drainage valves are arranged in groups of two on both sides of the outer reservoir.

[0011] Preferably, the scheduling system includes a water injection process and a water discharge process; The water injection process is as follows: in the initial state, the drainage valve and the water injection valve are closed, the outer reservoir is not connected to the lower annular return corridor, and the water levels of the inner reservoir and the outer reservoir are kept constant through the inner and outer reservoir channels; then the water injection operation is started, the water injection valve is opened, the water injection pump is started, and the water flows from the inner reservoir and the outer reservoir into the lower annular return corridor through the water injection pipe, and then into the bottom of the large water pool through the upper gallery; the water pool level gauge, the reservoir level gauge, and the gallery level gauge respectively monitor the water levels of the water pool, the reservoir, and the gallery in real time, and the operating parameters of the water injection pump are dynamically adjusted through the control system to ensure the water supply speed and the safety of equipment operation; finally, the water injection is completed, the water level of the large water pool reaches the set height, and the control system turns off the water injection pump and stops the water injection operation; The drainage process is as follows: in the initial state, the drainage valve and the water injection valve are closed, the outer reservoir is not connected to the lower annular reflow corridor, the upper corridor is connected to the bottom of the large water pool and the lower annular reflow corridor, and the water level in the large water pool is monitored by the water pool level gauge; then the drainage operation starts, the drainage valve is opened, and the water flows from the bottom of the large water pool through the upper corridor and the lower annular reflow corridor in turn through the action of gravity to flow back to the outer reservoir and the inner reservoir; finally, the drainage is completed, the water level of the large water pool drops to the experimental set height, and the control system closes the drainage valve.

[0012] Beneficial effects of the present invention: (1) Fast water body scheduling and short experimental preparation time: The present invention optimizes the water body path and realizes fast and efficient water body scheduling by designing a multi-channel system with upper and lower corridors connected to internal and external reservoirs and pools. Through layered design and multi-channel collaborative work, the scheduling speed is greatly improved, the experimental preparation time is significantly shortened, and it can quickly adapt to complex experimental needs.

[0013] (2) High experimental flexibility and ability to quickly adapt to complex experimental requirements: The present invention adopts a dynamic real-time control system, which monitors water level changes through a liquid level gauge and can flexibly adjust the operating parameters of the water pump to meet the water level, water volume and requirements of different experiments. It has strong adaptability and greatly improves the flexibility and adjustability of the experiment.

[0014] (3) Energy conservation and environmental protection, low operating cost: The present invention realizes the recycling of water through the multi-channel design of internal and external reservoirs and upper and lower corridors and pools. The water circulates within the system, reducing water resource consumption. At the same time, the gravity drainage design is adopted to effectively reduce the operating cost.

[0015] (4) Improved reliability and fault adaptability of the dispatching system: The pump room dispatching system of the present invention has a redundant design. Each water pump is equipped with an independent electric butterfly valve and gate valve to support the coordinated operation of multiple pumps. Even if a certain device fails, it can still guarantee the normal operation of other pumps, thereby ensuring the stability and continuity of the experimental process.

[0016] (5) Ensure foundation stability and reduce the risk of settlement: The design of the present invention ensures a constant ballast above the foundation, ensuring that the bearing pressure of the foundation is stable during water regulation, avoiding the risk of uneven foundation settlement caused by water pumping, and ensuring the long-term stability of the foundation.

[0017] (6) Optimized space utilization and reduced civil engineering costs: The present invention adopts a layered design of inner and outer reservoirs and upper and lower corridors, and optimizes the spatial layout to reduce the floor space, greatly improve space utilization, achieve large-volume water storage within a limited range, and reduce construction costs.

[0018] (7) Simplified water supply system and reduced maintenance costs: The present invention adopts a concrete corridor design to replace the traditional pipeline system. The structure is strong and durable, and corrosion and maintenance requirements are reduced. At the same time, the construction process is simplified and the maintenance complexity of the equipment is reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] For ease of explanation, the present invention is described in detail with reference to the following specific implementations and the accompanying drawings.

[0020] Figure 1 This is an overview diagram of the scheduling system of this embodiment; Figure 2 This is a schematic diagram of the lower layer structure of the scheduling system in this embodiment; Figure 3 This is a detailed diagram of the injection and drainage pump room of this embodiment; Figure 4 This is a water injection flow chart of the dispatching system in this embodiment; Figure 5 For this embodiment Figure 4 Sectional view at AA; Figure 6 This is a flow chart of water injection in the water injection and drainage pump room of this embodiment; Figure 7 This is the drainage flow chart of the drainage pump room in this embodiment; Figure 8 This is the full-field water injection flow chart of the dispatching system in this embodiment; Fig. 9 This is the whole-field drainage flow chart of the dispatching system in this embodiment.

[0021] In the figure: 1-bottom of large water pool, 2-inner reservoir, 3-outer reservoir, 4-inner and outer reservoir passages, 5-lower circular return corridor, 6-injection and drainage pump room, 7-upper corridor, 8-pool level gauge, 9-reservoir level gauge, 10-corridor level gauge, 11-injection pipe, 12-drainage pipe, 13-injection valve, 14-drainage valve. DETAILED DESCRIPTION

[0022] The following are specific embodiments of the present invention and the accompanying drawings to further describe the technical solutions of the present invention, but the present invention is not limited to these embodiments; in the following description, specific details such as specific configurations and components are provided only to help fully understand the embodiments of the present invention. Therefore, it should be clear to those skilled in the art that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of the present invention. In addition, for the sake of clarity and brevity, the description of known functions and structures is omitted.

[0023] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.

[0024] like Figure 1-Figure 9 As shown, a large-scale experimental water pool-reservoir-corridor circulation and dispatching system provided by this embodiment includes: a large-scale water pool bottom 1, an inner reservoir 2, an outer reservoir 3, an inner and outer reservoir channel 4, a lower annular return corridor 5, an injection and drainage pump room 6 and an upper corridor 7; wherein, the large-scale water pool bottom 1 is located in the center of the entire system, and the entire water pool serves as the main storage and use area of ​​the experimental water body; the inner reservoir 2 is arranged around the outside of the large-scale water pool bottom 1, and the lower annular return corridor 5 is arranged around the outside of the inner reservoir 2 for storing and returning a large volume of water; the outer reservoir 3 is arranged around the outside of the lower annular return corridor 5; the inner reservoir 2 and the outer reservoir 3 are arranged around the outside of the lower annular return corridor 5; The inner and outer reservoirs are connected by an inner and outer reservoir channel 4, so that the water levels of the inner and outer reservoirs are always consistent; the injection and drainage pump room 6 is arranged in the outer reservoir 3 on both sides of the lower annular return corridor 5 for injection and drainage; the upper gallery 7 is located above the lower annular return corridor 5 and arranged along the outer side of the large pool bottom 1, and the upper gallery 7 is connected with the large pool bottom 1 and the lower annular return corridor 5 respectively to form a water distribution channel; the injection and drainage pump room 6 includes injection equipment and drainage equipment. The injection equipment can inject water from the outer water reservoir 3 and the inner water reservoir 2 into the large pool bottom 1, and the drainage equipment can discharge the water from the large pool bottom 1 to the outer reservoir 3 and the inner reservoir 2.

[0025] It can be seen that the dispatching system of this embodiment forms a lower structure through the inner reservoir 2, the outer reservoir 3 and the lower annular return corridor 5, and the upper corridor 7 connects the bottom 1 of the large pool to form an upper structure. With such a layered design and the annular return corridor layout, a highly coordinated water body dispatching network is formed, which realizes the storage of large volumes of water within a limited range and optimizes the circulation path of the water flow; and the lower annular return corridor 5 releases the lower space of the pool for installing the equipment required for the experiment, while the upper corridor 7 is arranged along the pool wall, which occupies less space and improves the overall space utilization. In addition, the dispatching system of this embodiment ensures that the pressure above the foundation is constant, maintains the stability of the foundation load, avoids uneven settlement of the foundation due to water injection and drainage operations, and ensures the long-term safety of the foundation.

[0026] In this embodiment, the lower annular return corridor 5 and the upper corridor 7 can be made of concrete, replacing the traditional pipeline system, which significantly reduces the material cost and maintenance requirements, while improving durability. At the same time, it simplifies the construction process and reduces the complexity of equipment maintenance.

[0027] In this embodiment, the water injection equipment includes a water injection pump, a water injection pipe 11 and a water injection valve 13. The water injection pump is connected to the water injection pipe 11. One end of the water injection pipe 11 away from the water injection pump is connected to the top of the lower annular return corridor 5. The water injection valve 13 is arranged on the water injection pipe 11. The drainage equipment includes a drainage pipe 12 and a drainage valve 14. One end of the drainage pipe 12 is connected to the top of the outer reservoir 3, and the other end is connected to the side wall of the lower annular return corridor 5. The drainage valve 14 is arranged on the drainage pipe 12. Specifically, the water supply equipment uses 6 down-suction submersible electric pumps for water supply. Each group of 3 pumps is arranged on both sides of the outer reservoir. Each water pump is equipped with an electric butterfly valve, a total of 6 pumps, to control the water supply flow. Each water injection pump is equipped with a set of gate valves, a total of 6 pumps, to provide conditions for the maintenance of the water pump and the electric butterfly valve; the drainage equipment uses electric butterfly valves for drainage. Each group of 2 pumps is arranged on both sides of the outer reservoir, a total of 4 pumps, and each electric butterfly valve is equipped with a set of gate valves, a total of 4 pumps.

[0028] In this embodiment, a water tank level gauge 8 is provided on the side wall of the large water tank bottom 1, a reservoir level gauge 9 is provided on the outer wall of the outer reservoir 3, and a gallery level gauge 10 is provided on the inner wall of the lower annular return gallery 5 for real-time monitoring of water level changes.

[0029] The dispatching system of this embodiment includes a water injection process and a drainage process; the water injection process is: in the initial state, the drainage valve 14 and the water injection valve 13 are closed, the outer reservoir 3 is not connected to the lower annular return corridor 5, and the water levels of the inner reservoir 2 and the outer reservoir 3 are kept constant through the inner and outer reservoir channels 4; then the water injection operation is started, the water injection valve 13 is opened, the water injection pump is started, and the water flows from the inner reservoir 2 and the outer reservoir 3 into the lower annular return corridor 5 through the water injection pipe 11, and then enters the bottom 1 of the large water pool through the upper gallery 7; the water pool level meter 8, the reservoir level meter 9, and the gallery level meter 10 respectively monitor the water levels of the water pool, reservoir and gallery in real time, and dynamically adjust the operating parameters of the water injection pump through the control system to ensure the water supply speed and the safety of equipment operation; finally, the water injection is completed, the water level of the large water pool reaches the set height, the control system turns off the water injection pump, and stops the water injection operation; The drainage process is as follows: in the initial state, the drainage valve 14 and the water injection valve 13 are closed, the outer reservoir 3 is not connected to the lower annular return corridor 5, the upper corridor 7 is connected to the bottom 1 of the large water pool and the lower annular return corridor 5, and the water level in the large water pool is monitored by the water pool level meter 8; then the drainage operation starts, the drainage valve 14 is opened, and the water flows from the bottom 1 of the large water pool through the upper corridor 7 and the lower annular return corridor 5 in turn through the action of gravity to flow back to the outer reservoir 3 and the inner reservoir 2; finally, the drainage is completed, the water level of the large water pool drops to the experimental set height, and the control system closes the drainage valve 14.

[0030] The injection and drainage pump room 6 of this embodiment has a redundant design. Each injection pump is equipped with an independent electric butterfly valve and gate valve to support the coordinated operation of multiple pumps. Even if a certain device fails, it can still guarantee the normal operation of other pumps, ensuring the stability and continuity of the experimental process. In addition, the scheduling process uses the control system to independently adjust the operating parameters of each injection pump based on the data collected in real time by the liquid level meter, so that in different experimental scenarios, each injection pump can flexibly and accurately adjust the operating state to meet the water level and water volume requirements of different experiments, greatly improving the flexibility and adjustability of the experiment to achieve the best scheduling effect. In addition, the drainage process uses gravity self-flow to return the water from the pool to the inner reservoir and the outer reservoir without additional energy consumption, avoiding the high energy consumption operation of the pump, thereby significantly reducing energy consumption and operating costs, while maintaining efficient operation while optimizing the energy use of the overall system.

[0031] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0032] In the description of the present application, it should be understood that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0033] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

Claims

1. A large-scale test pool-reservoir-corridor circulation and dispatching system, characterized in that: include: Large pool bottom (1), inner reservoir (2), outer reservoir (3), inner and outer reservoir passages (4), lower circular return corridor (5), injection and drainage pump house (6) and upper corridor (7); The large pool bottom (1) is located in the center of the entire system; the inner reservoir (2) is arranged around the outside of the large pool bottom (1); the lower annular return corridor (5) is arranged around the outside of the inner reservoir (2); and the outer reservoir (3) is arranged around the outside of the lower annular return corridor (5); the inner reservoir (2) and the outer reservoir (3) are connected via an inner and outer reservoir channel (4); the injection and drainage pump room (6) is arranged in the outer reservoir on both sides of the lower annular return corridor (5); The upper gallery (7) is located above the lower annular recirculation gallery (5) and is arranged along the outer side of the large pool bottom (1). The upper gallery (7) is respectively connected to the large pool bottom (1) and the lower annular recirculation gallery (5) to form a water distribution channel; The injection and drainage pump room (6) comprises injection equipment and drainage equipment, wherein the injection equipment is capable of injecting water from the outer water reservoir (3) and the inner water reservoir (2) into the bottom (1) of the large water pool, and the drainage equipment is capable of discharging water from the bottom (1) of the large water pool into the outer water reservoir (3) and the inner water reservoir (2).

2. A large-scale test pool-reservoir-corridor circulation and dispatching system according to claim 1, characterized in that: The water injection equipment comprises a water injection pump, a water injection pipeline (11) and a water injection valve (13); the water injection pump is connected to the water injection pipeline (11); one end of the water injection pipeline (11) away from the water injection pump is connected to the top of the lower annular return corridor (5); and the water injection valve (13) is arranged on the water injection pipeline (11).

3. A large-scale test pool-reservoir-corridor circulation and dispatching system according to claim 2, characterized in that: The drainage equipment comprises a drainage pipe (12) and a drainage valve (14); one end of the drainage pipe (12) is connected to the top of the external reservoir (3), and the other end is connected to the side wall of the lower annular return corridor (5); and the drainage valve (14) is arranged on the drainage pipe (12).

4. A large-scale test pool-reservoir-corridor circulation and dispatching system according to claim 3, characterized in that: A water tank level gauge (8) is provided on the side wall of the large water tank bottom (1), a water reservoir level gauge (9) is provided on the outer side wall of the outer water reservoir (3), and a gallery level gauge (10) is provided on the inner side wall of the lower annular recirculation gallery (5).

5. A large-scale test pool-reservoir-corridor circulation and dispatching system according to claim 3, characterized in that: The water injection pump is a down-suction submersible electric pump, and the water injection valve (13) and the drainage valve (14) are both electric butterfly valves and gate valves.

6. A large-scale test pool-reservoir-corridor circulation and dispatching system according to claim 3, characterized in that: The injection pumps are arranged in groups of three on both sides of the outer reservoir (3), and each injection pump is equipped with an injection valve (13); the drainage valves (14) are arranged in groups of two on both sides of the outer reservoir (3).

7. A large-scale test pool-reservoir-corridor circulation and dispatching system according to claim 3, characterized in that: The scheduling system includes a water injection process and a drainage process; The water injection process is as follows: in the initial state, the drainage valve (14) and the water injection valve (13) are closed, the outer reservoir (3) is not connected to the lower annular return corridor (5), and the water levels of the inner reservoir (2) and the outer reservoir (3) are kept constant through the inner and outer reservoir channels (4); then the water injection operation is started, the water injection valve (13) is opened, the water injection pump is started, and the water flows from the inner reservoir (2) and the outer reservoir (3) into the lower annular return corridor (5) through the water injection pipe (11), and then into the bottom of the large pool (1) through the upper gallery (7); the pool level meter (8), the reservoir level meter (9), and the gallery level meter (10) respectively monitor the water levels of the pool, the reservoir, and the gallery in real time, and dynamically adjust the operating parameters of the water injection pump through the control system to ensure the water supply speed and the safety of equipment operation; finally, the water injection is completed, the water level of the large pool reaches the set height, and the control system turns off the water injection pump and stops the water injection operation; The drainage process is as follows: in the initial state, the drainage valve (14) and the water injection valve (13) are closed, the outer reservoir (3) is not connected to the lower annular return corridor (5), the upper corridor (7) is connected to the bottom of the large pool (1) and the lower annular return corridor (5), and the water level in the large pool is monitored by the pool level meter (8); then the drainage operation starts, the drainage valve (14) is opened, and the water flows from the bottom of the large pool (1) through the upper corridor (7), the lower annular return corridor (5) and back to the outer reservoir (3) and the inner reservoir (2) by gravity; finally, the drainage is completed, the water level of the large pool drops to the experimental set height, and the control system closes the drainage valve (14).