High-altitude roof aluminum-magnesium-manganese plate pressing plate transportation and installation integrated construction method

By adopting the integrated construction method of high-altitude roof aluminum-magnesium-manganese plate transportation and installation in construction, the problem of difficult to ensure the accuracy of aluminum-magnesium-manganese plate roof processing is solved, and the precise installation and efficient construction of aluminum-magnesium-manganese plates are realized, which improves the Construction efficiency and quality.

CN119434553APending Publication Date: 2025-02-14CHINA MCC22 GROUP CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411711075.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-27
Publication Date
2025-02-14

AI Technical Summary

Technical Problem

In construction, the processing accuracy of the aluminum-magnesium-manganese slab roof is difficult to ensure, resulting in dimensional deviation and quality problems during construction.

Method used

The integrated construction method of aluminum, magnesium, manganese plate pressure plate transportation and installation on high-altitude roof is adopted. By installing conveyor belts, aluminum, magnesium, manganese plate presses and aluminum, magnesium, manganese coils, the integrated process of pressure, transportation and installation of aluminum, magnesium, manganese plates is realized, and according to on-site actual measurements Process in real quantity to avoid dimensional deviation.

Benefits of technology

This construction method can accurately control the size of aluminum magnesium manganese plates, avoid dimensional deviations caused by construction errors, improve construction efficiency, save materials and costs, and has the advantages of economicality, convenience and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119434553A_ABST
    Figure CN119434553A_ABST
Patent Text Reader

Abstract

The invention relates to a high-altitude roof aluminum-magnesium-manganese plate pressing plate transportation and installation integrated construction method which comprises the following steps: 1) installing a conveyor belt with one end fixed on a roof and the other end fixed on the ground; 2) arranging baffles on two sides of the conveyor belt; (3) an aluminum-magnesium-manganese plate pressing machine is installed, and the angles of a plate inlet and a plate outlet of the aluminum-magnesium-manganese plate pressing machine are adjusted to be consistent with the gradient of the conveying belt; (4) the aluminum-magnesium-manganese coil is installed, the middle of the finished aluminum-magnesium-manganese coil is fixed through a steel pipe, and the steel pipe is arranged on the rotating shaft in a sleeving mode; the aluminum-magnesium-manganese roll is pulled out and put into an embossing machine, the height and angle of a support of the aluminum-magnesium-manganese roll are adjusted, and the aluminum-magnesium-manganese roll is kept parallel to the angle of the aluminum-magnesium-manganese plate pressing machine and the angle of the conveying belt; and (5) the conveying belt is started firstly, the aluminum-magnesium-manganese plate pressing machine is started after the conveying belt is stable, and the aluminum-magnesium-manganese plate pressing speed of the aluminum-magnesium-manganese plate pressing machine is set to be consistent with the speed of the conveying belt. According to the invention, the size deviation caused by construction is avoided, the use of materials is saved, and the method has the advantages of economical efficiency, convenience and accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and specifically relates to an integrated construction method for transporting and installing a high-altitude roof aluminum-magnesium-manganese plate pressure plate. Background Art

[0002] In the field of construction, metal roofs have the characteristics of high strength, good durability, stable performance, and recyclability. Due to its flexibility in use, metal roofs also bring many innovative designs, such as roof and wall integrated buildings, large slope roofs, variable slope roofs, arched roofs, and irregular curved roofs. Due to its characteristics, metal roofs are increasingly widely used in building envelope structures.

[0003] The most commonly used metal roof is the aluminum-magnesium-manganese plate roof. The aluminum-magnesium-manganese roof panel is also called aluminum-magnesium-manganese plate, which is an alloy panel made of a mixture of metal aluminum, magnesium and manganese. The aluminum-magnesium-manganese plate has moderate structural strength and strong plasticity. It can be made into aluminum-magnesium-manganese fan-shaped plates, curved plates and other special-shaped plates, which can meet the needs of various roofs (such as hyperbolic, recurved, spherical, arc, cone, etc.), and realize the special-shaped structure that traditional roof tiles cannot solve. Aluminum-magnesium-manganese plate is a very cost-effective roofing and exterior wall material. It has many advantages such as corrosion resistance, beautiful appearance, light weight, high strength, and easy processing and forming. It is very suitable for the processing of roof curling and rolling equipment. Different coating processes should be used in the follow-up, which can bring extraordinary visual effects to the building, and at the same time make the anti-corrosion performance of the aluminum alloy itself even better.

[0004] The disadvantage of aluminum-magnesium-manganese roofing lies in its processing accuracy, especially the hyperbolic, recurved, spherical, arc, cone, etc. When the errors produced during construction do not match the processing dimensions, it will cause many quality problems.

[0005] Therefore, in order to make the processing size more consistent with the size after the error caused by on-site construction, this construction process was invented. This construction process moves the processing, transportation, and cutting to the site, and the material size can be directly processed according to the actual measurement on site, avoiding the size deviation caused by construction and saving the use of materials. It has the advantages of economy, convenience, and accuracy. Summary of the invention

[0006] In order to solve the problems in the prior art, the present invention provides a construction process in which the processing size is more consistent with the size after the error caused by on-site construction.

[0007] The present invention solves the above-mentioned problem by adopting the following technical solution: An integrated construction method for transporting and installing aluminum-magnesium-manganese plate pressure plates for high-altitude roofs is carried out in the following steps: Step 1: Install the conveyor belt, with one end fixed on the roof and the other end fixed on the ground; set a support column at the middle force-bearing position of the conveyor belt according to the length of the conveyor belt; Step 2: baffles are set on both sides of the conveyor belt, and the baffles are at least higher than the aluminum-magnesium-manganese plates; Step 3: Install the aluminum-magnesium-manganese plate press machine, and adjust the angles of the plate inlet and plate outlet of the aluminum-magnesium-manganese plate press machine to be consistent with the slope of the conveyor belt; Step 4: Install the aluminum-magnesium-manganese coil. The middle part of the finished aluminum-magnesium-manganese coil is fixed by a steel pipe, and the steel pipe is sleeved on the rotating shaft; pull out the aluminum-magnesium-manganese coil and put it into the press machine, and adjust the height and angle of the bracket of the aluminum-magnesium-manganese coil to keep it parallel with the aluminum-magnesium-manganese plate press machine and the conveyor belt angle; Step 5: Start the conveyor belt first, and then start the aluminum-magnesium-manganese plate press machine after the conveyor belt is stable. The speed of the aluminum-magnesium-manganese plate press machine for pressing the aluminum-magnesium-manganese plate is set to be consistent with the speed of the conveyor belt.

[0008] Compared with the prior art, the present invention adopting the above structure has the following beneficial effects: The construction process of the present invention moves processing, transportation and cutting to the site, and the material size can be directly processed according to the actual measurement on site, thus avoiding the size deviation caused by construction and saving the use of materials, and has the advantages of economy, convenience and accuracy.

[0009] As a preferred embodiment, a further technical solution of the above structure is: The aluminum-magnesium-manganese coil is rolled out of the unpressed aluminum-magnesium-manganese plate and enters the aluminum-magnesium-manganese plate pressing machine at a vertical angle.

[0010] The conveyor belt slope is set to be no greater than 45°. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the installation structure of the finished aluminum-magnesium-manganese coil and the plate pressing machine of the present invention; Figure 2 It is a schematic diagram of the structure of the conveyor belt of the present invention; Figure 3 It is a schematic diagram of the overall arrangement of the present invention; In the figure: 1. Aluminum-magnesium-manganese coil; 2. Aluminum-magnesium-manganese plate; 3. Aluminum-magnesium-manganese plate press; 4. Conveyor belt; 5. Baffle; 6. Support column. DETAILED DESCRIPTION

[0012] The present invention will be further described below in conjunction with embodiments, the purpose of which is only to provide a better understanding of the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.

[0013] See also Figures 1 to 3 The present invention provides An integrated construction method for transporting and installing aluminum-magnesium-manganese plate pressure plates for high-altitude roofs is carried out in the following steps: Step 1: Install the conveyor belt 4, one end of which is fixed on the roof and the other end is fixed on the ground. The slope of the conveyor belt 4 is set to be no greater than 45°; set a support column 6 at the stress-bearing position in the middle of the conveyor belt 4 according to the length of the conveyor belt 4.

[0014] Step 2: baffles 5 are set on both sides of the conveyor belt 4, and the baffles 5 are at least higher than the aluminum-magnesium-manganese plate 2, so as to prevent the embossed aluminum-magnesium-manganese plate 2 from sliding out of the conveyor belt 4.

[0015] Step three: Install the aluminum-magnesium-manganese plate press machine 3. The function of the press machine is to emboss the aluminum-magnesium-manganese plate 2. Embossing can improve the aesthetics, improve the anti-slip property and increase the strength. Adjust the inlet and outlet angles of the aluminum-magnesium-manganese plate press machine 3 to make them consistent with the slope of the conveyor belt 4 to prevent the aluminum-magnesium-manganese plate 2 from bending and deforming due to angle mismatch.

[0016] Step 4: Install the aluminum-magnesium-manganese coil 1. The middle part of the finished aluminum-magnesium-manganese coil 1 is fixed by a steel pipe. The steel pipe is mounted on the rotating shaft. Pull out the aluminum-magnesium-manganese coil 1 and put it into the press machine. Adjust the bracket height and angle of the aluminum-magnesium-manganese coil 1 to keep it parallel to the aluminum-magnesium-manganese plate press machine 3 and the conveyor belt 4 to prevent the aluminum-magnesium-manganese plate 2 from bending and deforming due to angle mismatch.

[0017] Step 5: Start the conveyor belt 4 first, and then start the aluminum-magnesium-manganese plate pressing machine 3 after the conveyor belt 4 is stable. The speed of the aluminum-magnesium-manganese plate pressing machine 3 for pressing the aluminum-magnesium-manganese plate 2 is set to be consistent with the speed of the conveyor belt 4.

[0018] Through the above steps, the aluminum-magnesium-manganese plate 2 can realize an integrated process of pressing, transportation and installation.

[0019] The present invention has the following outstanding substantive features and significant improvements: 1. The device of the present invention can realize the integrated process of aluminum-magnesium-manganese plate pressing, high-altitude transportation, and construction, which greatly improves the construction efficiency. 2. The present invention can be used to adjust the size of the aluminum-magnesium-manganese plate on site during the construction process, and then produce aluminum-magnesium-manganese plates of the same size. The size of the aluminum-magnesium-manganese plate can be more accurately controlled during the construction process to avoid dimensional deviations caused by construction errors. 3. The present invention saves the time, manpower, machinery and other costs of transporting the aluminum-magnesium-manganese plate during the construction process.

[0020] The above description is only a preferred feasible embodiment of the present invention, and does not limit the scope of rights of the present invention. All equivalent changes made using the contents of the present specification and its drawings are included in the scope of rights of the present invention.

Claims

1. A method for transporting and installing an integrated construction method for a high-altitude roof aluminum-magnesium-manganese plate press plate, comprising a conveyor belt (4), a press plate machine and a bracket for an aluminum-magnesium-manganese coil (1), characterized in that: Step 1: Install a conveyor belt (4), one end of which is fixed to the roof and the other end is fixed to the ground; and set a support column (6) at a stress-bearing position in the middle of the conveyor belt (4) according to the length of the conveyor belt (4); Step 2: baffles (5) are arranged on both sides of the conveyor belt (4), and the baffles (5) are at least higher than the aluminum-magnesium-manganese plate (2); Step 3: Install the aluminum-magnesium-manganese plate press machine (3), and adjust the angles of the plate inlet and plate outlet of the aluminum-magnesium-manganese plate press machine (3) to be consistent with the slope of the conveyor belt (4); Step 4: Install the aluminum-magnesium-manganese coil (1), the middle part of the finished aluminum-magnesium-manganese coil (1) is fixed by a steel pipe, and the steel pipe is sleeved on the rotating shaft; pull out the aluminum-magnesium-manganese coil (1) and put it into the press machine, and adjust the height and angle of the bracket of the aluminum-magnesium-manganese coil (1) to keep it parallel with the aluminum-magnesium-manganese plate press machine (3) and the conveyor belt (4); Step 5: Start the conveyor belt (4) first, and then start the aluminum-magnesium-manganese plate pressing machine (3) after the conveyor belt (4) is stable. The speed of the aluminum-magnesium-manganese plate pressing machine (3) for pressing the aluminum-magnesium-manganese plate (2) is set to be consistent with the speed of the conveyor belt (4).

2. The integrated construction method for transporting and installing aluminum-magnesium-manganese plate pressure plates for high-altitude roofs according to claim 1 is characterized in that: The aluminum-magnesium-manganese coil (1) is rolled out of the unpressed aluminum-magnesium-manganese plate (2) and enters the aluminum-magnesium-manganese plate pressing machine (3) at a vertical angle.

3. The integrated construction method for transporting and installing aluminum-magnesium-manganese plate pressure plates for high-altitude roofs according to claim 1 is characterized in that: The slope of the conveyor belt (4) is set to be no greater than 45°.