Launch preparation equipment and launch preparation system of carrier rocket
By designing multi-configured launch vehicle launch preparation equipment, the problem of adaptation of different launch stations is solved, flexible combination and efficient launch preparation are achieved, launch costs are reduced, and resource sharing and sustainable development are promoted.
Patent Information
- Application Number
- CN202411476396.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2025-02-14
AI Technical Summary
The existing launch vehicle launch preparation equipment is difficult to adapt to launch stations in different regions, resulting in the need to develop a variety of launch solutions and equipment, which increases the launch cost and makes it difficult to share maintenance and maintenance resources, affecting sustainable development.
A multi-configured launch preparation equipment is designed, including basic configuration and simplified configuration, which can be assembled and combined according to the needs of different launch stations, adapted to the first and second launch stations to achieve flexible Launch preparations.
Through this multi-configured launch preparation equipment, the high launch cost caused by the non-universal launch preparation system can be greatly reduced, and the maintenance and maintenance resources of various structures can be shared, which promotes sustainable development.
Smart Images

Figure CN119436963A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of launch preparation of a carrier rocket. Specifically, the present application relates to a launch preparation device and a launch preparation system for a carrier rocket. Background Art
[0002] Currently, launch preparation equipment (such as a transfer launch vehicle) is usually used in the launch preparation of a carrier rocket to achieve the transfer of the rocket and the conversion between horizontal and vertical states, and docking with the launch station.
[0003] However, the launch conditions at launch sites in different regions may be different, and the launch preparation system is not universal, which makes it difficult for the same launch preparation equipment to adapt to various launch sites to complete launch preparation work.
[0004] If each launch position is equipped with its own dedicated launch preparation equipment, it will be necessary to develop different launch plans and build different launch preparation equipment, which will lead to higher launch costs and make it difficult to share related maintenance and care resources, which is not conducive to sustainable development. Summary of the invention
[0005] In view of the shortcomings of the existing methods, the present application proposes a launch preparation device and a launch preparation system for a carrier rocket to solve the technical problems in the related technology that multiple launch stations need to be equipped with their own dedicated launch preparation equipment, the degree of commonality is low or it is difficult to share related maintenance and maintenance resources.
[0006] In a first aspect, an embodiment of the present application provides a launch preparation device for a carrier rocket, comprising: a transfer platform system, a chassis assembly, an erection frame, a hydraulic system, and a movable launch platform; Launch preparation equipment, including basic and simplified configurations; When the launch preparation equipment adopts the basic configuration, it includes a transfer platform system, a chassis assembly, an erection frame and a hydraulic system, which are used to cooperate with the first launch station to form a launch preparation system; the chassis assembly is arranged on the transfer platform system, the erection frame is arranged on the chassis assembly, and the hydraulic system is connected between the chassis assembly and the erection frame; the first launch station includes a fixed launch platform, a movable launch platform is arranged on the fixed launch platform, and the movable launch platform is used to dock with the carrier rocket in the prepared state; When the launch preparation equipment adopts a simplified configuration, it includes a transfer platform system, an erection frame and a movable launch platform, which are used to cooperate with the second launch station to form a launch preparation system; the erection frame and the tail end of the carrier rocket supported by it are both docked with the movable launch platform; the second launch station includes a fixed launch platform and an erection cylinder, the movable launch platform is used to dock with the fixed launch platform, and the erection cylinder is used to connect with the erection frame.
[0007] In some possible embodiments, the erecting frame includes: a body, a plurality of supporting structures axially arranged on one side of the body, and a locking structure arranged at the tail of one side of the body; The supporting structure is used to support the launch vehicle, and the locking structure is used to lock the tail of the launch vehicle.
[0008] In some possible embodiments, the erection frame also includes: a fairing operating platform, a second-stage upper operating platform, a second-stage lower operating platform and a first-stage operating platform, which are arranged on one side of the main body along the axis close to the tail end of the main body in sequence, corresponding to the positions of the fairing, the second-stage rocket upper part, the second-stage rocket lower part and the first-stage rocket of the launch vehicle respectively.
[0009] In some possible embodiments, the erecting frame further includes: a main trunnion seat of the erecting frame disposed on the other side of the body along the rear end of the body; When the launch preparation equipment adopts the basic configuration, the main trunnion seat of the erector frame is connected to the chassis assembly.
[0010] In some possible embodiments, the transfer platform system includes: a front vehicle and a rear vehicle spaced apart in the axial direction; When the launch preparation equipment adopts the basic configuration, the front vehicle and the rear vehicle are longitudinally coaxially arranged to jointly carry the chassis assembly; The longitudinal direction is the axial direction of the vertical frame in the horizontal state.
[0011] In some possible embodiments, when the launch preparation equipment adopts a simplified configuration, the main trunnion seat of the erection frame is used to connect with the fixed launch platform of the second launch station.
[0012] In some possible embodiments, when the launch preparation equipment adopts a simplified configuration, the front vehicle of the transfer platform system is arranged longitudinally, and the rear vehicle of the transfer platform system is arranged transversely, and they jointly carry the erection frame; the rear vehicle carries the tail of the erection frame; The horizontal direction is perpendicular to the vertical direction in a horizontal state.
[0013] In a second aspect, an embodiment of the present application provides a launch preparation system for a carrier rocket, comprising a launch station and a launch preparation device for any carrier rocket provided in the first aspect above; When the launch station adopts the first launch station, it includes a fixed launch platform, a movable launch platform is configured on the fixed launch platform, the launch preparation equipment adopts a basic configuration, and the movable launch platform on the fixed launch platform is used to dock with the carrier rocket prepared by the launch preparation equipment; When the launch station adopts the second launch station, including a fixed launch platform and an erection cylinder, the launch preparation equipment adopts a simplified configuration. The fixed launch platform is used to dock with the movable launch platform of the launch preparation equipment, and the erection cylinder is connected to the erection frame of the launch preparation equipment.
[0014] In some possible embodiments, when the launch station adopts the first launch station, the fixed launch platform includes a simplified fixed launch platform; The overall height of the simplified fixed launch pad and the movable launch pad on the simplified fixed launch pad matches the height of the launch vehicle in a horizontal state in the launch preparation equipment using the basic configuration.
[0015] In some possible embodiments, when the launch station adopts the first launch station, the fixed launch platform is a basic fixed launch platform; A transition structure is arranged on the basic fixed launching platform, and the movable launching platform is arranged on the transition structure.
[0016] The beneficial technical effects brought about by the technical solution provided by the embodiment of the present application include: The launch preparation equipment provided in the embodiment of the present application can be assembled into a basic configuration and a simplified configuration, respectively adapted to the first launch station and the second launch station, and can be flexibly combined with the launch station according to different conditions to complete the launch preparation work, which can greatly reduce the high launch cost caused by the non-universal or low degree of universalization of the launch preparation system. Moreover, the maintenance and maintenance resources of each structure in the launch preparation equipment can be shared, which is conducive to sustainable development.
[0017] Additional aspects and advantages of the present application will be partially given in the following description, which will become apparent from the following description, or will be understood through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which: Figure 1 A schematic diagram of the structure of a launch preparation device in a launch preparation system provided in an embodiment of the present application when the launch preparation device adopts a basic configuration; Figure 2 A schematic diagram of the structure of a launch preparation device in another launch preparation system provided in an embodiment of the present application when the launch preparation device adopts a basic configuration; Figure 3 A structural schematic diagram of a launch preparation device in another launch preparation system provided in an embodiment of the present application when the launch preparation device adopts a simplified configuration; Figure 4 A schematic diagram of the structure of a vertical frame in a launch preparation device provided in an embodiment of the present application; Figure 5 A schematic structural diagram of the tail end of a vertical frame in a launch preparation device provided in an embodiment of the present application; Figure 6 A partial enlarged view of a launch preparation device provided in an embodiment of the present application, in which a vertical frame and a chassis assembly are connected through a hydraulic system; Figure 7 A partial enlarged view of the connection between a launch stand and a chassis assembly in a launch preparation device provided in an embodiment of the present application; Figure 8 for Figure 3 A partial enlarged view of the middle A; Fig. 9 for Figure 3 A partial enlarged view of point B in the middle; Fig.10 A structural schematic diagram of a launch preparation device provided in an embodiment of the present application when the basic configuration is adopted and the fixed launch platform adopts a simplified fixed launch platform; Fig.11 A structural schematic diagram of another launch preparation system provided in an embodiment of the present application when the launch preparation device adopts a basic configuration and the fixed launch platform adopts a simplified fixed launch platform; Fig.12 A schematic structural diagram of a launch preparation device in another launch preparation system provided in an embodiment of the present application when the launch preparation device adopts a simplified configuration.
[0019] Reference numerals: 100-launch preparation equipment; 110-transfer platform system; 111-front vehicle; 112-rear vehicle; 120- chassis assembly; 121- vertical trunnion seat of chassis assembly 120; 122- main trunnion seat of chassis assembly 120; 130-erecting frame; 131-body; 132-supporting structure; 133-locking structure; 134-fairing operating platform; 135-secondary upper operating platform; 136-secondary lower operating platform; 137-first level operating platform; 138-main trunnion seat of the erecting frame 130; 139-side trunnion seat of the erecting frame 130; 1311-bottom trunnion seat of the erecting frame 130; 140-Hydraulic system; 150-Active launch pad; 200-launching station; 210-fixed launch platform; 211-simplified fixed launch platform; 212-basic fixed launch platform; 213-trunnion mechanism of fixed launch platform 210; 214-main trunnion seat of fixed launch platform 210; 220-lifting cylinder; 230-transition structure; 300 - launch vehicle; 301 - tail of launch vehicle 300; 302 - head of launch vehicle 300. DETAILED DESCRIPTION
[0020] The embodiments of the present application are described below in conjunction with the drawings in the present application. It should be understood that the implementation methods described below in conjunction with the drawings are exemplary descriptions for explaining the technical solutions of the embodiments of the present application and do not constitute a limitation on the technical solutions of the embodiments of the present application.
[0021] Those skilled in the art will appreciate that, unless expressly stated, the "said" and "the" used herein may also include plural forms. It should be further understood that the term "including" used in the specification of the present application refers to the presence of the features, integers, elements and / or components, but does not exclude the implementation of other features, information, data, operations, elements, components and / or combinations thereof supported by the technical field. The term "and / or" used herein refers to at least one of the items defined by the term, for example, "A and / or B" may be implemented as "A", or as "B", or as "A and B".
[0022] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below in conjunction with the accompanying drawings.
[0023] First, several terms involved in this application are introduced and explained: Technical area: A special area where the rocket completes technical preparations before launch. The rocket's final assembly, testing, partial filling, etc. are usually completed in the technical area.
[0024] Launch area: A dedicated area with launch facilities and launch functions.
[0025] At present, the rocket test and launch modes mainly include the two-vertical mode of vertical assembly and vertical testing, the three-vertical mode of vertical assembly, vertical transfer, and vertical testing, and the three-horizontal mode of horizontal assembly, horizontal transfer, and horizontal testing. Among them, the two-vertical mode must be equipped with a fully functional service tower, and the rocket's testing, assembly, maintenance and other work are all carried out through the service tower; the three-vertical mode is equipped with a fully functional vertical assembly plant, and the rocket completes assembly, testing and other work in the vertical assembly plant. The launch station can be equipped with a fully functional service tower or a simplified service tower; the three-horizontal mode usually uses a transfer launch vehicle to realize the transfer of the rocket between the technical area and the launch area and the conversion between the horizontal and vertical states, and docking with the launch station in the launch area. In order to achieve high-density launches and system simplification, and at the same time to control the overall construction cost and operating cost of the launch site, commercial launch vehicles usually use the three-horizontal mode as the first choice for rocket test and launch modes.
[0026] However, the launch conditions at launch sites in different regions may be different, and the launch preparation system is not universal, which makes it difficult for the same launch preparation equipment to adapt to various launch sites to complete launch preparation work.
[0027] If each launch position is equipped with its own dedicated launch preparation equipment, it will be necessary to develop different launch plans and build different launch preparation equipment, which will lead to higher launch costs and make it difficult to share related maintenance and care resources, which is not conducive to sustainable development.
[0028] The launch preparation equipment and launch preparation system for a carrier rocket provided in this application are intended to solve the above technical problems of related technologies.
[0029] The following is a detailed description of the technical solution of the present application and how the technical solution of the present application solves the above technical problems with specific embodiments. It should be noted that the following implementations can refer to, draw on or combine with each other, and the same terms, similar features and similar implementation steps in different implementations will not be described repeatedly.
[0030] The embodiment of the present application provides a launch preparation device 100 for a carrier rocket 300 , including: a transfer platform system 110 , a chassis assembly 120 , a erection frame 130 , a hydraulic system 140 and a movable launch platform 150 .
[0031] The launch preparation device 100 includes a basic configuration and a simplified configuration.
[0032] Please refer to Figure 1 , Figure 2 , Fig.10 and Fig.11 When the launch preparation equipment 100 adopts the basic configuration, it includes a transfer platform system 110, a chassis assembly 120, a erection frame 130 and a hydraulic system 140, which are used to cooperate with the first launch station 200 to form a launch preparation system for the carrier rocket 300; the chassis assembly 120 is arranged on the transfer platform system 110, the erection frame 130 is arranged on the chassis assembly 120, and the hydraulic system 140 is connected between the chassis assembly 120 and the erection frame 130; the first launch station 200 includes a fixed launch platform 210, and a movable launch platform 150 is configured on the fixed launch platform 210, and the movable launch platform 150 is used to dock with the carrier rocket 300 in the prepared state.
[0033] Please refer to Figure 3 and Fig.12 When the launch preparation equipment 100 adopts a simplified configuration, it includes a transfer platform system 110, an erection frame 130 and a movable launch platform 150, which are used to cooperate with the second launch station 200 to form a launch preparation system for the carrier rocket 300; the erection frame 130 and the tail end of the carrier rocket 300 supported by it are both docked with the movable launch platform 150; the second launch station 200 includes a fixed launch platform 210 and an erection cylinder 220, the movable launch platform 150 is used to dock with the fixed launch platform 210, and the erection cylinder 220 is used to connect with the erection frame 130.
[0034] In this embodiment, the launch preparation device 100 can be assembled into a basic configuration and a simplified configuration, respectively adapted to the first launch station 200 and the second launch station 200, and can be flexibly combined with the launch station 200 according to different conditions to complete the launch preparation work, which can greatly reduce the high launch cost caused by the non-universal or low degree of universalization of the launch preparation system. Moreover, the maintenance and maintenance resources of each structure in the launch preparation device 100 can be shared, which is conducive to sustainable development.
[0035] Specifically, when the launch preparation equipment 100 adopts the basic configuration, the transfer platform system 110, the chassis assembly 120, the erection frame 130 and the hydraulic system 140 are assembled into the launch preparation equipment 100 (such as a transfer launch vehicle), which is transported to the launch area after loading the rocket in the technical area, and after arriving at the launch position, the erection frame 130 is erected from the horizontal state to the preparation state through the hydraulic system 140, thereby driving the carrier rocket 300 to stand upright and dock with the movable launch platform 150 configured on the fixed launch platform 210 of the first launch station 200. It can be understood that the preparation state of the carrier rocket can include a vertical state.
[0036] When the launch preparation equipment 100 adopts a simplified configuration, the transfer platform system 110, the erection frame 130 and the movable launch platform 150 are assembled into the launch preparation equipment 100 (such as a transfer launch vehicle), which is transported to the launch area after loading the rocket in the technical area. The movable launch platform 150 is a part of the launch preparation equipment 100 and has been docked with the carrier rocket 300 in the technical area. After arriving at the launch position, the erection frame 130 is erected from a horizontal state to a preparation state through the erection cylinder 220 of the second launch station 200, thereby driving the carrier rocket 300 to be erected, and the movable launch platform 150 at the tail end of the rocket is docked with the fixed launch platform 210 of the second launch station 200.
[0037] It can be understood that the movable launch platform 150 in the first launch station 200 and the movable launch platform 150 in the simplified configuration launch preparation equipment 100 can be the same movable launch platform 150, which can be used as a separate device to form the first launch station 200 with the fixed launch platform 210, or can be used as a part of the launch preparation equipment 100, and can complete the docking with the carrier rocket 300 before transportation, reflecting the flexibility of the launch preparation system of the carrier rocket 300 provided in the embodiment of the present application.
[0038] For some possible embodiments, please refer to Figure 4 The erecting frame 130 includes: a body 131 , a plurality of supporting structures 132 axially arranged at one side of the body 131 , and a locking structure 133 arranged at the tail of one side of the body 131 .
[0039] The supporting structure 132 is used to support the launch vehicle 300 , and the locking structure 133 is used to lock the tail 301 of the launch vehicle 300 .
[0040] In this embodiment, the same erection frame 130 can be used in the two configurations of the launch preparation equipment 100. The main body 131 of the erection frame 130 plays a major bearing role. The multiple support structures 132 are connected to the body of the launch vehicle 300 at different positions to play a multi-point support role. The locking structure 133 fixes and locks the body of the launch vehicle 300 at the tail end to ensure a relatively fixed state between the body of the launch vehicle 300 and the erection frame 130.
[0041] Optionally, when the launch preparation device 100 adopts the basic configuration, the locking structure 133 is a rocket body locking structure 133, which is locked with the tail end of the rocket body to limit the tail end of the rocket body.
[0042] Optionally, when the launch preparation device 100 adopts a simplified configuration, the locking structure 133 is a locking structure 133 of a movable launch platform 150, and the movable launch platform 150 docked with the tail end of the rocket body is locked. The axial limit of the rocket body is achieved by the movable launch platform 150, and there is no need to set up a locking structure 133 to limit the tail 301 of the rocket body.
[0043] For some possible embodiments, please refer to Figure 4 The erection frame 130 also includes: a fairing operating platform 134, a second-stage upper operating platform 135, a second-stage lower operating platform 136 and a first-stage operating platform 137, which are arranged on one side of the main body 131 along the axial direction close to the tail end of the main body 131 in sequence, and correspond to the positions of the fairing, the second-stage upper part, the second-stage lower part and the first-stage rocket of the carrier rocket 300 respectively.
[0044] In this embodiment, each operating platform such as the fairing operating platform 134, the second-stage upper operating platform 135, the second-stage lower operating platform 136 and the first-stage operating platform 137 are integrated on the erection frame 130. After the erection frame 130 drives the carrier rocket 300 to erect, the operator can provide corresponding services to the corresponding positions of the rocket body through each operating platform on the erection frame 130, including but not limited to manual plugging and unplugging of connectors, automatic plugging and unplugging of connectors, connector separation, connector storage, rocket body maintenance, repair and replacement of equipment inside the rocket, emergency rescue, etc. This embodiment can be compatible with the service tower function, reduce the construction of the service tower of the launch station 200, and can be compatible with the launch station 200 with poor infrastructure conditions, saving costs.
[0045] It should be noted that the positions of the fairing, the upper part of the second-stage rocket, the lower part of the second-stage rocket and the first-stage rocket of the launch vehicle 300 are similar to those in the related art and will not be repeated here.
[0046] Please refer to Figure 5 , Figure 5 The schematic structural diagram of the tail end of a launch preparation frame 130 in an embodiment of the present application shows that a locking structure 133 overlaps laterally with at least one supporting structure 132 .
[0047] In some possible embodiments, the erecting frame 130 further includes: a main trunnion seat 138 of the erecting frame 130 disposed on the other side of the body 131 along the rear end of the body 131 .
[0048] When the launch preparation apparatus 100 is in the base configuration, the main trunnion mount 138 of the erector frame 130 is coupled to the chassis assembly 120 .
[0049] In this embodiment, please refer to Figure 1 and Figure 7 , Figure 7 A partial enlarged view of the connection between the erection frame and the chassis assembly in a launch preparation device provided in an embodiment of the present application. When the launch preparation device 100 adopts the basic configuration, the main trunnion seat 138 of the erection frame 130 is connected to the main trunnion seat 122 of the chassis assembly 120 and fixed to the chassis assembly 120.
[0050] Optionally, refer to Figure 6 , Figure 6 A partial enlarged view of the connection between the erection frame and the chassis assembly through a hydraulic system in a launch preparation device provided in an embodiment of the present application. One end of the hydraulic system 140 is connected to the erection ear shaft seat 121 of the chassis assembly 120 on the left main beam and the right main beam of the chassis assembly 120, and the other end is connected to the side ear shaft seat 139 of the erection frame 130. The erection of the erection frame 130 can be completed through the hydraulic system 140.
[0051] In some possible embodiments, the transfer platform system 110 includes: a front vehicle 111 and a rear vehicle 112 that are spaced apart along the axial direction.
[0052] When the launch preparation device 100 adopts the basic configuration, the front vehicle 111 and the rear vehicle 112 are longitudinally coaxially arranged to jointly support the chassis assembly 120 .
[0053] The longitudinal direction is the axial direction of the vertical frame 130 in the horizontal state.
[0054] In this embodiment, the transfer platform system 110 includes a front vehicle 111 and a rear vehicle 112, wherein the front vehicle 111 is a transport vehicle close to the head of the launch vehicle 300, and the rear vehicle 112 is a transport vehicle close to the tail 301 of the launch vehicle 300. When the launch preparation device 100 adopts the basic configuration, the front vehicle 111 and the rear vehicle 112 are arranged axially at intervals, and jointly carry the chassis assembly 120, and the chassis assembly 120 carries the erection frame 130.
[0055] In this embodiment, the transfer platform system 110 has the same structure as the front vehicle 111 and the rear vehicle 112 in the two configurations, but is arranged in different ways, and can be flexibly applied to different launch preparation systems, with high versatility.
[0056] For some possible embodiments, please refer to Fig. 9 When the launch preparation device 100 adopts a simplified configuration, the main trunnion seat 138 of the erection frame 130 is used to connect with the fixed launch platform 210 of the second launch station 200 (such as the main trunnion seat 214 of the fixed launch platform 210).
[0057] In this embodiment, when the launch preparation device 100 adopts a simplified configuration, the main trunnion seat 138 of the erection frame 130 is connected to the main trunnion seat 214 of the fixed launch platform 210 and is fixed to the fixed launch platform 210 .
[0058] In some possible embodiments, when the launch preparation equipment 100 adopts a simplified configuration, the front vehicle 111 of the transfer platform system 110 is arranged longitudinally, and the rear vehicle 112 of the transfer platform system 110 is arranged transversely, and they jointly support the erection frame 130 ; the rear vehicle 112 supports the tail of the erection frame 130 .
[0059] The horizontal direction is perpendicular to the vertical direction in a horizontal state.
[0060] In this embodiment, when the launch preparation equipment 100 adopts a simplified configuration, the arrangement of the front vehicle 111 and the rear vehicle 112 of the transfer platform system 110 can be adjusted according to the shape of the launch vehicle 300, and there is no need to arrange the chassis assembly 120. Specifically, if the radial dimension of the head 302 of the launch vehicle 300 is smaller than the radial dimension of the tail 301, the front vehicle 111 is arranged longitudinally and the rear vehicle 112 is arranged transversely, so as to increase the supporting area of the rear vehicle 112 for the tail 301 of the launch vehicle 300 as much as possible.
[0061] Based on the same inventive concept, an embodiment of the present application also provides a launch preparation system for a carrier rocket 300, including a launch station 200 and a launch preparation device 100 for any carrier rocket 300 provided in the aforementioned embodiments.
[0062] Please refer to Figure 1-Figure 2 , Figure 10-11 When the launch station 200 adopts the first launch station 200, it includes a fixed launch platform 210, and a movable launch platform 150 is configured on the fixed launch platform 210. The launch preparation equipment 100 adopts a basic configuration, and the movable launch platform 150 on the fixed launch platform 210 is used to dock with the carrier rocket 300 prepared by the launch preparation equipment 100.
[0063] Please refer to Figure 3 and Fig.12When the launching station 200 adopts the second launching station 200, including a fixed launching platform 210 and an erecting cylinder 220, the launching preparation equipment 100 adopts a simplified configuration, the fixed launching platform 210 is used to dock with the movable launching platform 150 of the launching preparation equipment 100, and the erecting cylinder 220 is connected to the erecting frame 130 of the launching preparation equipment 100.
[0064] The launch preparation system for the carrier rocket 300 provided in this embodiment includes the launch preparation equipment 100 for any carrier rocket 300 provided in the above embodiments, and the implementation principles are similar, which will not be repeated here.
[0065] In this embodiment, the launch station 200 and the launch preparation equipment 100 constitute a launch preparation system for a carrier rocket 300, wherein please refer to Figure 1 , Figure 2 , Fig.10 and Fig.11 When the launch station 200 adopts the first launch station 200, it includes a fixed launch platform 210 provided at the launch site, and a movable launch platform 150 is configured on the fixed launch platform 210. The launch preparation equipment 100 adopts a basic configuration, transports the carrier rocket 300 to the launch station 200 and erects it, and docks with the movable launch platform 150 on the fixed launch platform 210.
[0066] Please refer to Figure 3 , Figure 8 and Fig.12 When the launch station 200 adopts the second launch station 200, including the fixed launch platform 210 and the erection cylinder 220 provided at the launch site, the launch preparation equipment 100 adopts a simplified configuration, the launch preparation equipment 100 is equipped with a movable launch platform 150, and the erection cylinder 220 is connected to the erection frame 130 of the launch preparation equipment 100. The docking between the launch preparation equipment 100 and the movable launch platform 150 can be completed in the technical area, and there is no need to configure a movable launch platform 150 for the launch station 200.
[0067] The launch preparation device 100 provided in the embodiment of the present application can be assembled into a basic configuration and a simplified configuration, respectively adapted to the first launch station 200 and the second launch station 200, and can be flexibly combined with the launch station 200 according to different conditions to complete the launch preparation work, which can greatly reduce the high launch cost caused by the launch preparation system being non-universal or having a low degree of universalization. Moreover, the maintenance and maintenance resources of each structure in the launch preparation device 100 can be shared, which is conducive to sustainable development.
[0068] Please refer to Figure 8 , Figure 8This is a partial enlarged view of the connection between the erection frame and the erection cylinder in a launch preparation device provided in an embodiment of the present application, where the bottom ear shaft seat 1311 of the erection frame 130 of the body 131 is connected to the erection cylinder 220 .
[0069] Please refer to Fig. 9 , Fig. 9 This is a partial enlarged view of the connection between a erection frame and a fixed launch platform in a launch preparation device provided in an embodiment of the present application, where a main trunnion seat 138 of the erection frame 130 is connected to a trunnion mechanism 213 of the fixed launch platform 210 on a main trunnion seat 214 of the fixed launch platform 210 .
[0070] For some possible embodiments, please refer to Figure 1 , Fig.10 and Fig.11 , Figure 1 A launch preparation device in a launch preparation system provided in an embodiment of the present application adopts a basic configuration, and a fixed launch platform 210 includes a simplified fixed launch platform 211. When the launch station 200 adopts the first launch station 200, the fixed launch platform 210 includes a simplified fixed launch platform 211.
[0071] The overall height of the simplified fixed launch platform 211 and the movable launch platform 150 on the simplified fixed launch platform 211 matches the height of the launch vehicle 300 in a horizontal state in the launch preparation equipment 100 adopting the basic configuration.
[0072] In this embodiment, in the first launch station 200, the fixed launch platform 210 is a fixed launch platform provided at the launch site. Depending on the conditions at the launch site, the fixed launch platform 210 may be a simplified fixed launch platform 211 or a basic fixed launch platform 212. When the fixed launch platform 210 in the first launch station 200 is a simplified fixed launch platform 211, the overall height of the simplified fixed launch platform 211 and the movable launch platform 150 configured thereon matches the height of the launch vehicle 300 carried by the launch preparation equipment 100. After the launch vehicle 300 is erected under the action of the hydraulic system 140, it can just be placed on the movable launch platform 150 and docked with it.
[0073] Optionally, a guide structure is provided in the simplified fixed launch platform 211, which has a guide function to guide the high-temperature, high-pressure, and high-speed combustion gas flow ejected by the rocket engine.
[0074] For some possible embodiments, please refer to Figure 2 , Figure 2A structural schematic diagram of another launch preparation system provided in an embodiment of the present application is provided in which a launch preparation device adopts a basic configuration and a fixed launch platform 210 is a basic fixed launch platform 212; when a launch station 200 adopts a first launch station 200, the fixed launch platform 210 is a basic fixed launch platform 212.
[0075] A transition structure 230 is disposed on the basic fixed launching platform 212 , and the movable launching platform 150 is disposed on the transition structure 230 .
[0076] In this embodiment, in the first launch station 200, when the fixed launch platform 210 is a basic fixed launch platform 212, the basic fixed launch platform 212 is provided with a guide groove to guide the high-temperature, high-pressure, high-speed combustion gas flow ejected from the rocket engine. The overall height of the basic fixed launch platform 212, the transition structure 230 and the movable launch platform 150 configured thereon are matched with the height of the launch vehicle 300 carried by the launch preparation equipment 100. After the launch vehicle 300 is erected under the action of the hydraulic system 140, it can just be placed on the movable launch platform 150 and docked with it.
[0077] By applying the embodiments of the present application, at least the following beneficial effects can be achieved: 1. The launch preparation equipment 100 can be assembled into a basic configuration and a simplified configuration, respectively adapted to the first launch station 200 and the second launch station 200, and can be flexibly combined with the launch station 200 according to different conditions to complete the launch preparation work, which can greatly reduce the high launch cost caused by the non-universal or low degree of universalization of the launch preparation system. Moreover, the maintenance and maintenance resources of each structure in the launch preparation equipment 100 can be shared, which is conducive to sustainable development.
[0078] 2. The two configurations of the launch preparation equipment 100 can use the same erection frame 130. The main body 131 of the erection frame 130 plays a major bearing role. Multiple support structures 132 are connected to the body of the launch vehicle 300 at different positions to play a multi-point support role. The locking structure 133 fixes and locks the body of the launch vehicle 300 at the tail end to ensure a relatively fixed state between the body of the launch vehicle 300 and the erection frame 130.
[0079] 3. In the two configurations, the front vehicle 111 and the rear vehicle 112 of the transfer platform system 110 have the same structure, but are set up in different ways. They can be flexibly applied to different launch preparation systems and have strong versatility.
[0080] In the description of the present application, the directions or positional relationships indicated by words such as "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" are based on the exemplary directions or positional relationships shown in the accompanying drawings. They are for the convenience of describing or simplifying the description of the embodiments of the present application, and do not indicate or imply that the referred device or component must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be understood as limitations on the present application.
[0081] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.
[0082] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0083] In the description of this specification, specific features, structures, materials or characteristics may be combined in an appropriate manner in any one or more embodiments or examples.
[0084] The above is only a partial implementation method of the present application. It should be pointed out that for ordinary technicians in this technical field, without departing from the technical concept of the scheme of the present application, other similar implementation methods based on the technical ideas of the present application are also within the protection scope of the embodiments of the present application.
Claims
1. A launch preparation device for a carrier rocket, characterized in that: include: Transfer platform system, chassis assembly, erection frame, hydraulic system and movable launching platform; The launch preparation equipment includes a basic configuration and a simplified configuration; When the launch preparation equipment adopts the basic configuration, it includes the transfer platform system, the chassis assembly, the erection frame and the hydraulic system, which are used to cooperate with the first launch station to form a launch preparation system; the chassis assembly is arranged on the transfer platform system, the erection frame is arranged on the chassis assembly, and the hydraulic system is connected between the chassis assembly and the erection frame; the first launch station includes a fixed launch platform, and the movable launch platform is arranged on the fixed launch platform, which is used to dock with the carrier rocket in the preparation state; When the launch preparation equipment adopts the simplified configuration, it includes the transfer platform system, the erection frame and the movable launch platform, which are used to cooperate with the second launch station to form a launch preparation system; the erection frame and the tail end of the carrier rocket supported by it are both connected to the movable launch platform; the second launch station includes a fixed launch platform and an erection cylinder, the movable launch platform is used to dock with the fixed launch platform, and the erection cylinder is used to connect with the erection frame.
2. The launch preparation equipment for a carrier rocket according to claim 1, characterized in that: The erecting frame comprises: a body, a plurality of supporting structures axially arranged on one side of the body, and a locking structure arranged at the tail of one side of the body; The supporting structure is used to support the launch vehicle, and the locking structure is used to lock the tail of the launch vehicle.
3. The launch preparation equipment for a carrier rocket according to claim 2, characterized in that: The erection frame also includes: a fairing operating platform, a second-stage upper operating platform, a second-stage lower operating platform and a first-stage operating platform, which are arranged on one side of the main body along the axial direction close to the tail end of the main body in sequence, and correspond to the positions of the fairing, the second-stage rocket upper part, the second-stage rocket lower part and the first-stage rocket of the carrier rocket respectively.
4. The launch preparation equipment for a carrier rocket according to claim 2, characterized in that: The erecting frame further comprises: a main trunnion seat of the erecting frame disposed on the other side of the body along the rear end of the body; When the launch preparation device adopts the basic configuration, the main trunnion seat of the erection frame is connected to the chassis assembly.
5. The launch preparation equipment for a carrier rocket according to claim 4, characterized in that: The transfer platform system comprises: a front vehicle and a rear vehicle spaced apart in the axial direction; When the launch preparation device adopts the basic configuration, the front vehicle and the rear vehicle are longitudinally coaxially arranged to jointly carry the chassis assembly; The longitudinal direction is the axial direction of the erecting frame in a horizontal state.
6. The launch preparation equipment for a carrier rocket according to claim 2, characterized in that: When the launch preparation equipment adopts the simplified configuration, the main ear shaft seat of the erection frame is used to connect with the fixed launch platform of the second launch station.
7. The launch preparation equipment for a carrier rocket according to claim 6, characterized in that: When the launch preparation equipment adopts the simplified configuration, the front vehicle of the transfer platform system is arranged longitudinally, and the rear vehicle of the transfer platform system is arranged transversely, and they jointly carry the erection frame; the rear vehicle carries the tail of the erection frame; The transverse direction is perpendicular to the longitudinal direction in a horizontal state.
8. A launch preparation system for a carrier rocket, characterized in that: A launch preparation device comprising a launch station and a launch vehicle as claimed in any one of claims 1 to 7; When the launch station adopts the first launch station, it includes a fixed launch platform, a movable launch platform is configured on the fixed launch platform, the launch preparation equipment adopts a basic configuration, and the movable launch platform on the fixed launch platform is used to dock with the carrier rocket prepared by the launch preparation equipment; When the launch station adopts the second launch station, including a fixed launch platform and an erection cylinder, the launch preparation equipment adopts a simplified configuration, the fixed launch platform is used to dock with the movable launch platform of the launch preparation equipment, and the erection cylinder is connected to the erection frame of the launch preparation equipment.
9. The launch preparation system for a carrier rocket according to claim 8, characterized in that: When the launch station adopts the first launch station, the fixed launch platform includes a simplified fixed launch platform; The overall height of the simplified fixed launch platform and the movable launch platform on the simplified fixed launch platform matches the height of the carrier rocket in a horizontal state in the launch preparation equipment adopting the basic configuration.
10. The launch preparation system for a carrier rocket according to claim 8, characterized in that: When the launching station adopts the first type of launching station, the fixed launching platform is a basic fixed launching platform; The basic fixed launching platform is provided with a transition structure, and the movable launching platform is provided on the transition structure.
Citation Information
Patent Citations
Rocket transfer and erection system
CN111023899A
Launching pad with erecting support and rocket erecting launching device
CN111268172A
Splicing type maneuvering carrier rocket launching platform
CN112229270A
Rocket transport vehicle and carrier rocket launching system and method
CN113739633A
Launching vehicle with locking mechanism and auxiliary erecting device
CN113959259A
Cited By
Aircraft launching pad and integrated transferring, erecting and launching system
CN120991657A